This is a Questions and Answers document for NASA procurement SATPC0043099 concerning Anderson Greenwood Type 81 relief valves (OEM P/N 81S W8A16A-6, CAGE code 01343). The document clarifies specifications and requirements for relief valve procurement destined for Kennedy Space Center, FL 32899-0001.
Key requirements include: the exact OEM part is mandated and cannot be substituted per engineering drawing approval; initial cleaning must comply with KSC-C-123J Level 300A by an approved vendor, with subsequent cleaning to be performed at KSC on a flow-through basis; delivery to Kennedy Space Center is acceptable beyond the 11/25/2026 need date, though vendors should obtain the earliest possible estimated delivery date; the 120 psig set pressure must be set and certified at ambient conditions per Engineering; test evidence must include hydrostatic testing at 1.5 times MAWP or pneumatic testing at 1.25 times MAWP per QC07 requirements; and valves should be naturally cleaned during manufacturing to eliminate burrs and metal pieces, then bagged or have open ports capped for shipment. NASA will not maintain an approved vendor list for initial cleaning but will perform cleaning upon receipt at KSC. Manufacturer Certificates of Compliance must accompany valve receipt, with Anderson Greenwood familiar with providing necessary documentation for NASA requirements.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SATPC0043099: Relief valves we have received the following questions:
Can you confirm the manufacturer of OEM P/N 81S W8A16A-6? We read it as an Anderson Greenwood (Emerson) Type 81 relief valve.
o Yes, the manufacturer is Anderson Greenwood, CAGE code 01343.
Will an equivalent relief valve meeting the listed size, materials, set pressure and ASME requirements be considered, or is the exact OEM part required?
o Exact OEM Part required and cannot be substituted because it is the only approved part per engineering drawing.
Is a cleaning level or cleanliness certificate required for the LH2 service (for example a KSC or ASTM G93 cleaning specification)?
o Cleaning requirements are as follows: INITIAL CLEANING PER KSC-C-
123J, LEVEL 300A, BY APPROVED VENDOR, SUBSEQUENT CLEANING TO
BE ACCOMPLISHED AT KSC. FLOW THRU ONLY.
If manufacturer lead time runs past the 11/25/2026 need date, will a quote with a later delivery date still be considered technically acceptable?
o Yes, later dates can be accepted, this is just a need date based on schedule/work to be performed. Please try to obtain the earliest possible
EDD.
Please confirm the delivery address and receiving point at KSC.
o City: KENNEDY SPACE CENTER o State/Province: FL o Zip/Postal Code: 32899-0001 o Country: USA
. Cleaning vendor: Does NASA maintain a list of approved vendors for the initial KSC-C-123J Level 300A cleaning, or will cleaning by the OEM's authorized facility, with a cleanliness certificate, be accepted? Not at this point. We will clean them upon receipt at KSC, which is what we have recorded in the Item Master as well as it should have been on the Req.
Test evidence (QC07): Is the manufacturer's standard set-pressure and seat-tightness test report suƯicient, or is cold-diƯerential or cryogenic testing required for the LH2 service? We have had this done before when we procured these valves. It is per our PVS requirements; QC07: The Seller shall provide results of inspections and tests (e.g., nominal operating load or pressure, maximum proof load or pressure the hardware was subjected to, electrical resistance, continuity & nondestructive testing/reports) performed by the Seller in accordance with the Order and specification requirements. Requires hydrostatic or pneumatic leak test (1.5 x MAWP hydrostatic test or 1.25 x MAWP pneumatic test.)
Set pressure: Should the 120 psig set pressure be set and certified at ambient conditions? Yes, per Engineering.
Packaging: After Level 300A cleaning, what packaging and sealing is required for shipment (for example, double-bagged, capped, nitrogen-purged)? We can’t have them clean to level 300A as they are not certified. We will clean them here. But, the valve should naturally be cleaned as they go eliminating any burrs or metal pieces from the manufacturing process. I would have the valve bagged or the open ports capped.
Certificate of Compliance (QC03): When the valves are supplied through an authorized distributor, will a manufacturer's CoC together with the distributor's traceability documentation satisfy the requirement? The manufacturer C of C needs to be included with the receipt of the valves. Again, Anderson Greenwood is familiar with providing us what we need.