SATPC0042318 Tab 04 Specification Rev.pdf

PDF 42 KB Posted

Attached to
R507 Refrigerant Resupply for IRT
Solicitation number
80NSSC26941217Q
Issued by

About this file

This document is a specification for R507 refrigerant procurement for NASA Glenn Research Center's Icing Research Tunnel Refrigeration Plant.

The requirement is for 2,000 pounds of R507 refrigerant delivered in cylinders with specific packaging specifications: the bulk quantity must be in 1,000-lb cylinders (containing approximately 800 lbs of usable R507 per cylinder), with the remaining balance in cylinders no smaller than 100 lbs. The need-by date is October 15th, 2026 or sooner. Delivery must be made to NASA Glenn Research Center, Building 170: Icing Research Tunnel Refrigeration Plant, located at 21000 Brookpark Road, Cleveland, Ohio 44135. The procurement is intended to enhance the efficiency of the refrigeration plant and improve overall system performance.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Specifications for R507 for the Icing Research Tunnel’s Refrigeration Plant

The Icing Research Tunnel is in need of additional R507 to enhance the e iciency of the refrigeration plant and improve the system performance.

1) 2000 lbs of R507 refrigerant in cylinders.

2) The bulk of the R507 needs to be in 1000-lb cylinders (typically equates to 800 lbs of R507 per cylinder) and the remaining balance in no smaller than 100-lb cylinders

Need by date of Oct. 15th, 2026 or sooner.

Delivery of the product will be to:

NASA Glenn Research Center Building 170: Icing Research Tunnel Refrigeration Plant 21000 Brookpark Rd Cleveland, OH 44135

File details come from the government source that posted it. Updated .