This is a Questions and Answers (Q&A) document clarifying requirements for a Request for Quotation (RFQ) for Building 2204 at SSC involving the design and installation of a modular building with structural components, HVAC systems, and flooring.
The solicitation requires offerors to submit design sketches for Government acceptance. The ideal delivery schedule is October 31, 2026, with installation completion by December 31, 2026. Pre-quotation site visits are not mandatory but are at the awardee's discretion. For HVAC systems, mini-split units adequate for a 30-by-30-foot space are required, with tie-in to existing house power; no detailed load calculations or design conditions are specified in the RFQ. Flooring should be standard with carpet preferred. The Government will accept a prime contractor utilizing specialized subcontractors for the modular building, structural mezzanine/professional engineering, stairs/guardrails, electrical, HVAC, and flooring components, provided the prime contractor remains responsible for overall performance. Subcontractor use is permissible within budget constraints. Technical drawings beyond the required design sketch, sealed calculations, manufacturer authorizations, and past performance documentation are not explicitly mandated for quote submission.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SATPC0042320 Tab 10 RFQ Open Market Template APR 2026.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. request for drawings as well as the questions below:
2. Please provide or identify the required delivery and installation schedule. The attached RFQ identifies Building 2204 at SSC but does not state a required delivery/completion date.
Ideally - Delivery 31 Oct 2026 / Install completion 31 Dec 2026
3. Is a pre-quotation site visit mandatory? If so, please provide the date, registration procedure, access requirements, point of contact and whether subcontractors/teaming partners may attend. Not required, up to the awardee.
4. Please clarify the required HVAC system capacity/configuration. The SOW says “adequate HVAC wall units and mini-split systems” but does not provide load calculations, design conditions, equipment schedule, electrical requirements or responsibility for final design. Mini splits adequate for 30/30 space. Will tie into house power.
5. Please clarify the flooring/carpeting quantity, product standard and installation requirements. Standard flooring, Carpet preferred
6. Please confirm whether the Government will accept a prime contractor using specialized subcontractors for the modular building, structural mezzanine/PE engineering, stairs/guardrails, electrical, HVAC and flooring, with the prime remaining responsible for overall performance. Prime is preferred, subs within budget.
7. Please confirm whether the offeror must submit any specific technical drawings, sealed calculations, manufacturer authorization, past performance or subcontractor information with the quote. Sketch (design) must be provided and accepted.