This is a Procurement Request for spare parts to support Kennedy Space Center Propellants & Life Support Services (KPLSS) equipment used in the Artemis systems program. The procurement is for non-CCF (Contractor-Managed Configuration) spare parts necessary to maintain inventory for Exploration Ground Systems (EGS) and minimize equipment outages. The systems provide high-pressure helium, low- and high-pressure nitrogen, breathing air, and oxygen to support Artemis III missions.
The document specifies procurement of Air Lock brand Oxygen QUICK-DISCONNECT ASSEMBLY components (Part Number 10038-01, National Stock Number 482000PL26144) with a quantity of two units. Each component must be cleaned to 100A specification per ASTM G93 standards through a full disassembly and reassembly process. Vendors are required to provide estimated Annual Recurring Orders (AROs) and any additional lead time from the manufacturer with their quotes. A certificate of conformance must accompany delivery to NASA/Kennedy Space Center BOSS Warehouse (M6-0744, Kennedy Space Center, FL 32899). Points of contact are KPLSS Terrie Hydorn and NASA Steven Shelley. The procurement references KSC-C-123 cleaning specifications, which align with industry standard ASTM G93.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Procurement of EGS Spare Parts, non-CCF
1.0 Background
Procurement of these components is necessary to ensure spare parts are available for Kennedy Space Center Propellants & Life Support Services (KPLSS) equipment to support Artemis systems, including commodity lines, rechargers, and panels. These systems provide high-pressure helium, low- and high-pressure nitrogen, breathing air, and oxygen. Spare parts are required to be purchased to have on-hand in the event of component failure, to minimize outages and provide continued support to Exploration Ground Systems (EGS). This purchase is for spare parts to support this effort. Each system has certain cleaning requirements, per KSC-C-123.
Cleaning specifications are noted for components using this standard, which is similar to industry standard ASTM G93.
2.0 Requirements
The following are the components needed to ensure EGS has the minimum number of spares needed for Artemis III. Quotes must have estimated AROs and any additional lead time from the manufacturer. Specified cleaning is requested to be completed by the vendor per ASTM G93 specifications through a full disassembly and reassembly process, unless otherwise noted to be flow-through, prior to shipment to Kennedy Space Center. A certificate of conformance shall be included with the delivery of the component.
Brand Name – Air Lock
Item No.
National Stock Number Part Number Description Quantity
1 482000PL26144 10038-01
Oxygen QUICK-DISCONNECT
ASSEMBLY, SST, 1/4",
Attaches to outlet of a filter on BAir cylinder, Cleaned to 100A
NASA / Kennedy Space Center
BOSS Warehouse - M6-0744
Kennedy Space Center, FL 32899
ATTN: KPLSS Terrie Hydorn / NASA Steven Shelley