This is a Statement of Work (SOW) for a 12-month service contract supporting the SPTS HRM deep etching system at NASA Goddard Space Flight Center's Detector Development Lab. The STS DRIE HRM system is critical infrastructure for fabricating micro-optical devices for high-profile projects including PRIMA and HWO/NGMSA. Since the original manufacturer no longer supports the equipment, the contractor must provide comprehensive maintenance and technical expertise to ensure continued operational capability.

The contractor is required to deliver two primary components: (1) a 12-month preventive maintenance kit containing all necessary parts including chamber and load lock o-rings, valve rebuild kits, viewport assemblies, and replacement bearings, and (2) one week of on-site field service support scheduled by mutual agreement. The on-site support must include comprehensive system troubleshooting, operational assistance, diagnostics, maintenance support, process verification, and technical evaluation. The preventive maintenance kit must be delivered to NASA GSFC prior to or concurrent with the on-site service visit. The period of performance consists of one week on-site, to be coordinated between the vendor and NASA GSFC's Integrated Detector and Electronic Systems Branch.

View the file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

Vacuum Chamber Acquisition

Background The SPTS HRM deep etching system is one of the most critical tools for fabricating micro-optical devices for several high-profile projects, such as PRIMA and HWO/NGMSA. Since the HRM is no longer supported by the original manufacturer, we rely on the experience and expertise of the contractor to maintain it and ensure it operates smoothly to meet project needs. This Statement of Work (SOW) establishes the requirements for a 12-month service contract and one week of on-site field service support for the STS DRIE HRM system in the Detector Development Lab located at NASA Goddard Space Flight Center.

Requirements

1. Provide a 12-month service contract for preventive maintenance and field service support for the STS DRIE HRM system, including comprehensive system troubleshooting, operational assistance, diagnostics, maintenance support, process verification, and technical evaluation of the system.

2. Provide a 12-month preventive maintenance kit including all required chamber and load lock o-rings, valve rebuild kits, viewport assemblies, and replacement bearings necessary to complete scheduled preventive maintenance service, and one week of on-site field service support.

Deliverables or Delivery Schedule

1. On-site Field Service Support: One week of on-site support to be scheduled by mutual agreement between the contractor and NASA GSFC

2. 12-Month Preventive Maintenance Kit: To be delivered to NASA GSFC on or prior to the onsite service

Period of Performance The period of performance is one week on-site, scheduled by mutual agreement between the vendor and NASA GSFC's Integrated Detector and Electronic Systems Branch.