This is a Statement of Work (SOW) template for a NASA Goddard Space Flight Center requirement to procure 120 acrylic floating frames with hardware. The frames must be 34 x 44 inches in size with rounded edges on all four corners.
The frames will be used to update display walls in multiple Goddard buildings (B11, B305, B7/29, B23, and B28) to showcase work being done on-site, provide informational signage for tours and VIP visitors, and highlight employee contributions to NASA's mission through the Engineering and Technology Directorate (ETD). The vendor must order materials, fabricate the frames, and deliver them to NASA Goddard's B11 loading dock where an ETD contractor will inspect them. This one-time acquisition is intended to create a stock of frames that will allow for in-house poster updates without incurring external framing costs, projected to save the government thousands of dollars over time.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Questions and Answers.pdf | ||
| Questions and Answers.pdf | ||
| RFQ.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Page 1 09/2018
STATEMENT OF WORK (SOW) TEMPLATE
Statement of Work (SOW)
Project: 120 acrylic frame order for ETD
GENERAL INFORMATION
1.0 Scope of Work: We need to have a quantity of 120 acrylic floating frames with hardware fabricated to each be the size of 34 x 44 inches.
2.0 Background: These frames will be utilized to update various display walls that are in multiple Goddard buildings such as B11, B305, B7/29, B23, and B28. These frames will allow for ease of replacement of posters that become outdated by allowing in-house posters to be designed and printed for replacement without incurring extra costs for having them reframed at an outside vendor. This is a one-and-done acquisition which will save the government thousands of dollars over the years by having this stock of frames ready for use.
3.0 Objective: Our objective is to showcase the work being done on-site at Goddard, provide informational signage for tours and VIP visitors as well as showcase the employees’ contributions to the overall NASA mission through the work they have done as part of the Engineering and Technology Directorate (ETD). These frames will provide a cohesive look and feel within our facilities promoting morale and providing stunning imagery highlighting the important work that Goddard is known for.
CONTRACTOR REQUIREMENTS
4.0 Technical Requirements or Description of the Work: This section defines and explains the work to be performed. The work effort should be segregated into major tasks with a detailed description of what is to be achieved as opposed to the manner by which the work is to be performed. This section should be developed in an orderly progression and in sufficient detail to ensure the Government gets what it needs. Items to consider:
Vendor will order acrylic material and hardware. Acrylic panels will be cut down to the requested size with rounded edges on all 4 corners.
Vendor will deliver frames to NASA Goddard’s B11 loading dock and on-site ETD contractor will oversee delivery and inspect fabricated materials.
5.0 Government Furnished Information: N/A