SMAS II Industry Day Charts_Final.pdf
PDF 13 MB Posted
- Attached to
- Safety and Mission Assurance Services (SMAS) II
- Solicitation number
- 80MSFC24R0002
About this file
This document contains information about the Safety and Mission Assurance Services (SMAS) II contract, a pre-solicitation notice for a future Request for Proposals (RFP) #80MSFC24R0002 issued by the National Aeronautics and Space Administration (NASA) Marshall Space Flight Center (MSFC).
The SMAS II contract will be a small business set-aside, single-award indefinite-delivery, indefinite-quantity (IDIQ) contract with cost-plus-award-fee (CPAF) task orders. The contract will have the option to transition from CPAF to cost-plus-fixed-fee (CPFF) task orders. The draft solicitation specifies an eight-year period of performance. The NAICS code for this acquisition is 541715 with a 1,300 employee size standard. The principal purpose is to provide a broad range of safety and mission assurance services including system safety, reliability, software assurance, quality engineering, and independent assessment to support MSFC, KSC, MAF, and SSC requirements. NASA plans to release the final RFP on or about November 22, 2024, with proposals due on or about January 6, 2025. Interested parties are invited to review the draft RFP and submit comments by October 4, 2024.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SMAS II Industry Day Presentation Attendee List.pdf | ||
| Attachment L-1 Excel Pricing Model (EPM)-revied 09122024.xlsx | XLSX spreadsheet | |
| J-10-A_Installation Accountable Government Property.pdf | ||
| 80MSFC24R0002_SMAS II Draft Request for Proposal.docx | DOCX document | |
| Attachment L-1 Excel Pricing Model (EPM).xlsx | XLSX spreadsheet | |
| E-Library.zip | ZIP file |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
September 25, 2024
Safety and Mission Assurance Services (SMAS) II
Draft Request for Proposal (DRFP)
80MSFC24R0002
Virtual Industry Day Briefing Before the briefing begins –
Please enter your company's name and POC information in the Teams’ meeting chat
Services (SMAS) II
Draft Request for Proposal (DRFP)
80MSFC24R0002
Virtual Industry Day Briefing
Meeting Logistics
Judith Roberts Chairperson
3September 25, 2024 SMAS IISMAS II
Please ensure that your company’s name and POC information have been entered in the Teams chat.
No oral or Teams chat questions related to this acquisition will be addressed. Submit all questions in writing to the designated procurement point of contact.
Ensure microphones are muted and remain muted.
No video or audio recording is permitted.
The solicitation will take precedence over any remarks or explanations provided in this industry briefing.
The industry briefing charts and a list of firms attending the industry briefing will be posted to SAM.gov.
September 25, 2024 4
Meeting Logistics
SMAS II
Welcome Judith Roberts
Opening Remarks Bill Hill
Ground Rules, Comments, & Questions Judith Roberts
Purpose & Requirements Overview Judith Roberts
Procurement Overview Maranda McCord
Proposal Submission Guidelines Maranda McCord
Price Templates Overview Dion Woodson
Virtual Site Tour Judith Roberts
Concluding Remarks Judith Roberts
September 25, 2024 5
Agenda and Presenters
Opening Remarks
Bill Hill Director, MSFC Safety and Mission Assurance
6September 25, 2024 SMAS IISMAS II
Comments and Questions
September 25, 2024 SMAS II 7
No oral or Teams chat questions related to this acquisition will be addressed. Submit all questions in writing to the designated procurement point of contact.
An assessment of all comments and questions will be made by the Government.
Incorporation of industry comments and questions in the Final RFP is at the discretion of the Government. Changes will be identified in the Final RFP change log.
All questions/comments shall be submitted electronically no later than October 4, 2024, 4:00 p.m., Central Time as specified in MSFC 52.205-90, Designated Point of Contact.
September 25, 2024 8
Comments & Questions
Purpose and Requirements Overview
September 25, 2024 SMAS II 9
The SMAS II contract will provide services to support the Marshall Space Flight Center (MSFC) Safety and Mission Assurance Directorate.
NASA and MSFC are strongly committed to- Safety, teamwork, integrity and mission success Preventing human injury and ensuring the safety of all operations and products leading to mission success
September 25, 2024 10
Program Overview
The following SMAS II Work Breakdown Structure (WBS) can be found in Attachment J-3.
September 25, 2024 11
Work Breakdown Structure
SMAS II
Level 1
WBS
Level 2 WBS Description J-1 PWS
Section Notes
N/A 2.1 Program Management 2.0, 2.1 Overhead
<UPN> 2.2 Cross-cutting Support 2.0, 2.2 IDIQ
<UPN> 3.1 System Safety Engineering 3.0, 3.1 IDIQ
<UPN> 3.2 Reliability and Maintainability Engineering 3.0, 3.2 IDIQ
<UPN> 3.3 Software Assurance 3.0, 3.3 IDIQ
<UPN> 3.4 Quality Engineering 3.0, 3.4 IDIQ
<UPN> 3.5 Quality Assurance 3.0, 3.5 IDIQ
<UPN> 3.6 Independent Assessment Tasks 3.0, 3.6 IDIQ
<UPN> 4.1 Industrial Safety Program 4.0, 4.1 IDIQ
<UPN> 4.2 Pressure Systems and Systems (PVS) and Non-destructive Examination (NDE) Services
4.0, 4.2 IDIQ
<UPN> 5.0 Phase-in and Phase-out 5.0 IDIQ
This contract will augment the NASA workforce through indefinite-delivery, indefinite-quantity (IDIQ) task orders, and provide services associated with the planning, implementation, and assessment of Program, Project, and Activities discipline support, for the Government.
The contract involves:
Surveillance and analysis of assigned in-house and contracted design, development, manufacturing, and testing activities for both hardware and software.
Provision of Government contract quality assurance functions at various locations nationwide.
Ensuring that management assessment information is provided to the Government in a timely manner to support the decision-making process regarding open problems, hazards, and risks pertaining to accomplishing MSFC's mission.
Operation of SMA management information processes.
Section 1.0 Contract Scope
September 25, 2024 SMAS II
Section 2.0 Contract Integration Requirements
2.1 Program Management: administrative and technical program
management for effective direction and control of this contract.
2.2 Cross-Cutting Support: technically managed activities that cross over multiple SMA disciplines which include, but are not limited to, the following:
2.2.1 Technical Management
2.2.2 MSFC Personnel Certification Administration
2.2.3 NASA Engineering and Safety Center (NESC), NASA Safety
Center (NSC), and Technical Authority Support
2.2.4 Information Exchange and Requirements Revision Support
2.2.5 Documentation and Report Support
2.2.6 Support to MSFC Quality Management System
2.2.7 SMA Management Information Services
2.2.8 MSFC Vendor and Supplier Audit Support Services
Provide technical services, in accordance with task orders, to any supported program and project in the following SMA disciplines:
3.1 System Safety Engineering
3.2 Reliability and Maintainability Engineering
3.3 Software Assurance
3.4 Quality Engineering
3.5 Quality Assurance
3.6 Independent Assessment Tasks
Section 3.0 Program and Project Discipline Support
Provide technical services, in accordance with task orders, in the following institutional disciples:
4.1 Industrial Safety Program
4.2 Pressure Vessels and Systems (PVS) and Non-destructive
Examination (NDE) Services
Section 4.0 Institutional Discipline Support
Procurement Overview
Maranda McCord Contracting Officer
September 25, 2024 SMAS II 16
Contract Type: A single-award IDIQ contract with the capability to issue cost-plus-award-fee (CPAF) task orders (TOs) which includes an option to transition to cost-plus-fixed-fee (CPFF) TOs.
NAICS Code: 541715, Research and Development in the Physical, Engineering, and Life Sciences (except Nanotechnology and Biotechnology).
Size Standard: 1,300 Employees
September 25, 2024 17
Contracting Approach
September 25, 2024 18
Fee Type and Structure
SMAS II
The CPAF structure will be comprised of subjective performance evaluation factors and weights (as shown in the table below).
Contract Period Fee Evaluation Methodology Fee Distribution Methodology
Base Period and all Option Ordering
Periods
CPAF
Technical Performance Factor 50% Management Performance Factor 25% Cost Control Factor 25% Potential Award Fee 100%
The award fee evaluation will be held semi-annually during the first year. The evaluation period will have the ability to be conducted on an annual basis depending on Contractor performance.
Any unearned potential award fee will be removed as a reduction to contract value as part of the award fee modification and will not roll over into any subsequent periods.
Contract will include a 31-day phase-in period, a four-year base period, and two 2-year options.
The IDIQ maximum ordering value is $488,000,000.
September 25, 2024 19
Period of Performance
SMAS II
*Unused IDIQ contract value may be rolled forward to any subsequent period, without change to the Maximum Potential NTE Value.
*The minimum value for the Base Ordering Period through FAR 52.217-8, Option to Extend Services Period, is $250,000.
CONTRACT PERIOD PERIOD OF PERFORMANCE MINIMUM VALUE
MAXIMUM
VALUE*
Phase-in 10/01/2025 – 10/31/2025 $1 $150,000
Base Ordering Period 11/01/2025 – 09/30/2029
$250,000
$218,850,000
Option 1 Ordering Period 10/01/2029 – 09/30/2031 $116,000,000
Option 2 Ordering Period 10/01/2031 – 09/30/2033 $122,000,000
Option to Extend Services 10/01/2033 – 03/31/2034 $31,000,000
Maximum Potential NTE Value $488,000,000
The Contractor shall perform the work under this contract via IDIQ TOs at the following locations:
– Marshall Space Flight Center (MSFC)
– Michoud Assembly Facility (MAF)
– Stennis Space Center (SSC)
– MSFC efforts at Kennedy Space Center (KSC)
– MSFC Resident Management Offices (e.g., at prime contractor facilities in California (CA) and Utah (UT))
– Offsite at the SMAS II Contractor’s facilities, and
– At other locations approved in writing by the contracting officer. In the event services are required at other NASA operating locations or alternate work locations, the Government and the Contractor shall negotiate the Fully Burdened Rates (FBR) for the location.
(Reference MSFC 52.237-91, Place of Performance)
September 25, 2024 20
Place of Performance
SMAS II 20
MSFC 52.209-91, Associate Contractor Agreements (ACA) Applicable when any portion of the contract requires cooperation and coordination with another NASA contractor to achieve successful contract performance.
Required for each of the relevant NASA contracts:
September 25, 2024 21
Special Clauses
SMAS II
Contract Description
80MSFC18C0011 - Engineering Services and Science Capability (ESSCA)
Engineering and Science Services
80MSFC23CA004 - Marshall Engineering Technicians and Trades Support (METTS) III
Engineering Technicians and Trade Services
80MSFC24DA002 - Center Operations Building (COBA) Automation
Operation and Maintenance Support of all MSFC Facilities
80MSFC17C0007 - Facilities and Operations Maintenance Support Services (FOMSS)
MSFC Facilities Support Services
NNS15AA01C - Synergy-Achieving Consolidated Operations and Maintenance
(SACOM)
Operations and Maintenances support of facilities at MAF and SSC
MSFC 52.216-91, Supplies And/Or Services To Be Provided And Type Of Contract Contractor shall provide resources necessary to perform and/or deliver the services in accordance with Attachment J-1, Performance Work Statement (PWS).
The contract will have the option to transition from CPAF to CPFF TOs and the option to transition back to CPAF TOs, if appropriate.
Labor categories and associated hourly rates to be used in TOs are included in Attachment J-4, Description of Labor Categories, and Attachment J-6, Schedule of Rates, and in performing IDIQ services.
All ODCs (e.g., travel, material, training, software) required to support this contract shall be authorized and accounted for within IDIQ TOs.
The Contractor is not authorized to drive or use Government-owned or leased vehicles in performance of this contract.
September 25, 2024 22
Special Clauses (Continued)
FAR 52.215-1, Instructions to Offerors- Competitive Acquisitions
The Government intends to evaluate proposals and award a contract without discussions with offerors (except clarifications as described in FAR 15.306(a)). Therefore, the offeror's initial proposal should contain the offeror's best terms from a cost or price and technical standpoint.
The Government reserves the right to conduct discussions if the contracting officer later determines them to be necessary.
If the contracting officer determines that the number of proposals that would otherwise be in the competitive range exceeds the number at which an efficient competition can be conducted, the contracting officer may limit the number of proposals in the competitive range to the greatest number that will permit an efficient competition among the most highly rated proposals.
September 25, 2024 23
Special Provisions
The SMAS II acquisition has been designated as a total small business set-aside.
If the Offeror is a Joint Venture, the Offeror shall provide a complete copy of the JV agreement signed by all parties.
Mentor-Protégé Program (MPP) is currently on hold.
September 25, 2024 24
Small Business Objectives
NFS 1852.209-71, Limitation Of Future Contracting
If the Contractor, under the terms of this contract, or through the performance of tasks pursuant to this contract, is required to develop specifications or statements or work that are to be incorporated into a solicitation, the Contractor shall be ineligible to perform the work described in that solicitation as a prime of first-tier subcontractor under an ensuing NASA contract.
The Contractor shall prepare, implement, and maintain an Organizational Conflict of Interest (OCI) Plan. The Contractor’s OCI Plan will be incorporated into the contract as Attachment J-12, Organizational Conflict of Interest (OCI) Plan. The plan shall be submitted with the initial proposal.
September 25, 2024 25
Organizational Conflict of Interest
MSFC 52.223-97, Mandatory and Required Training, requires that all onsite personnel complete training courses (or approved equivalent) as well as any future training requirements mandated by MSFC. The clause provides a link to the required training courses.
Training for employees and subcontractors shall be the responsibility of the Contractor.
MSFC is not obligated to provide training to Contractor personnel.
September 25, 2024 26
Required On-Site Training
Phase-In will be no longer than 31 days, concurrent with the incumbent contract, with full assumption on November 1, 2025.
Phase-in activities will be via a firm-fixed-price (FFP) contract line item number (CLIN) 001, which will be limited to no more than $150,000.
The Contractor shall accomplish all tasks required to complete phase-in activities, to include, but not limited to, managing an orderly transition, hiring personnel, obtaining personnel badges and clearances, training personnel, and scheduling performance of work necessary to ensure the effective transfer of effort from the predecessor contractor.
September 25, 2024 27
Contract Phase-in
Ensure completion of all Offeror Fill-Ins for the contract volume as specified in Section L provision Volume IV – Contract Instructions.
Check that SAM.gov registration is current at the time of proposal submission.
Review proposal submission guidelines thoroughly to ensure the proposal is complete.
September 25, 2024 28
Things to Consider
Proposal Submission Guidelines
Maranda McCord Contracting Officer
September 25, 2024 SMAS II 29
September 25, 2024 30
Schedule
SMAS II
Milestones Dates Draft RFP Released September 11, 2024
Industry Briefing September 25, 2024
Release Final RFP November 22, 2024
Proposals Due January 6, 2025
Competitive Range Determination (if applicable) TBD
Source Selection/Contract Award September 17, 2025
Phase-In Start October 1, 2025
Contract Effective Date November 1, 2025
Note: All dates are subject to change and are to be used for planning purposes only.
Please note time deadlines for submission of proposals as noted in Section L provision MSFC 52.215-91, Due Date for Receipt of Proposals or Quotations.
Submittal tentatively scheduled for January 6, 2025, 2:00 p.m., Central Time, per MSFC 52.215-91, Due Date for Receipt of Proposals or Quotations
Proposal Volumes:
Volume I: Mission Suitability Volume II: Cost Volume III: Past Performance Volume IV: Contract
Proposal Submittal:
Proposals for this solicitation are required to be submitted through NASA’s
Enterprise File Sharing and Sync Box (EFSS Box), a FedRAMP Moderate certified platform.
The Final RFP will include an EFSS Box System Link to allow for “drag and drop” submission of proposals.
Offerors are encouraged to submit proposals at least 24 hours prior to the due date specified in the solicitation to allow for resolution of any submission issues experienced by the offeror or applicable subcontractors.
September 25, 2024 31
Proposal Submission Guidelines
32September 25, 2024 32
Enterprise File Sharing and Sync Box (EFSS)
SMAS II
Click “Select Files” bottom to upload document from a folder
Drag and Drop proposal files into box to submit proposal documents here.
NFS 1852.215-81, Proposal Page Limitations
*NOTE: Requested in accordance with MSFC 52-215-91, Due Date for Receipt of Proposals or Quotations, prior to related due date and time for proposals; however, delivery is not required until the proposal due date and time.
Each volume should be submitted separately.
Consult the RFP regarding any exclusions from the page limitations.
Information that can be construed as belonging in a page-limited volume but is submitted in an unlimited page limit volume will be counted against the page-limited volume.
Pay close attention to page limitations and other instructions as failure to comply may impact proposal acceptability and evaluation.
September 25, 2024 33
Proposal Submission Guidelines (Continued)
SMAS II
Proposal Section Page Limit Proposal Subsection
Volume I: Mission Suitability
92 pages Subfactor 1 Management Approach and Subfactor 2 Technical Approach Sample Tasks 1 through 3 are a subset of this 92-page total. The sample task responses are expected to be approximately 10-12 pages which are distributed among the 3 tasks within the 92-page limitation.
Volume II: Cost No page limit For volume contents, see Section L, Volume II - Cost Factor Instructions and Volume I - Mission Suitability Factor Instructions, paragraph (d), Subfactor 1: Management Approach, MA3: Retention, Staffing, Recruitment, and Total Compensation, Subparagraph (c)
Volume III: Past Performance (requested two weeks early)*
37 pages Offerors shall include all information and tables required by the provision entitled Volume III - Past Performance Factor Instructions.
Each Attachment L-3, Past Performance Questionnaire, submitted separately and directly to the Government, does not count against this volume’s page limitation.
Volume IV: Contract No page limit For volume contents, see Section L, Volume IV - Contract Instructions.
The acquisition will be conducted utilizing a best value tradeoff between the factors of Mission Suitability, Cost, and Past Performance in accordance with FAR Part 15/NFS 1815.
In accordance with FAR Subpart 15.304(e), the relative importance of these factors is:
Mission Suitability and Past Performance are considered to be essentially equal to each other, both of which are more important than Cost.
Mission Suitability and Past Performance when combined are significantly more important than Cost.
Basis For Award—General
SMAS IISeptember 25, 2024
September 25, 2024 35
Mission Suitability
SMAS II
Subfactor 1: Management Approach (MA)
MA1: Teaming and Organization Structure
MA2: Management Systems
MA3: Retention, Staffing, Recruitment, and Total Compensation
MA4: Risk Identification and Mitigation
Subfactor 2: Technical Approach (TA)
TA1: Technical Approach to Meeting the Requirements of the Performance Work Statement (PWS)
TA2: Sample Tasks (3)
Subfactor Points
Management Approach 550
Technical Approach 450
Total 1,000
September 25, 2024 36
Total Compensation Plan Overview
SMAS II
Offeror and subcontractor total compensation plans shall include:
Methodology for establishing total compensation
Describe the methodology and rationale used to establish all proposed compensation rates for Professional Exempt employees
(A) Direct labor/salary rates Offerors and subcontractors proposing to utilize the incumbent workforce should review the benchmark (i.e., blend of incumbent and Economic Research Institute [ERI] rates) average unburdened hourly direct labor rates provided in Section L for those labor categories for which rates are provided, in order to better understand the anticipated compensation levels for the identified labor categories.
(B) Fringe Benefits Attachment L-5, “Total
Compensation Rate Build-up Form,” provides a build-up of the elements of the proposed fringe benefit categories.
Offerors and applicable subcontractors shall complete Attachment L-5 (for each year).
Offerors shall describe the proposed fringe benefits to include:
− Types of insurance and plans offered − Paid time off policies − Retirement or savings plans offered to include the company’s contribution
− Information regarding vesting of company contributions
September 25, 2024 37
Total Compensation Plan Overview (Continued)
SMAS II
(iii) Impact of any uncompensated overtime.
The offeror and applicable subcontractors shall identify any proposed uncompensated overtime (by labor category) and the impact of any proposed uncompensated overtime on the proposed direct labor rate(s) consistent with FAR 52.237-10, Identification of Uncompensated Overtime
Shall be consistent with any Cost volume instructions related to uncompensated overtime in this solicitation, if applicable
(iv) Total Compensation Plan (TCP) Rate Build-up Form (completed yearly).
Attachment L-5, “Total Compensation Rate Build-up Form,” quantifies the firm’s personnel policies, labor rates, and fringe benefits by location (if different), by year
Steps to prepare the total hourly compensation rates (i.e., direct labor rates plus fringe benefit rates):
‒ Input the data used (i.e., paid leave, supplemental pay, insurance, retirement and savings, and legally required benefits)
‒ Consider the traceability of the values to the fringe pool ‒ Calculate the total hourly compensation rate values, including the employer share, by dollar value, of any fringe benefit elements
September 25, 2024 38
Total Compensation Plan Overview (Continued)
Excerpt from Attachment L-5, “Total Compensation Rate Build-up Form”
September 25, 2024 39
Past Performance Evaluation
SMAS II
IAW FAR 15.305(a)(2) and NFS 1815.305(a)(2), the offeror's past performance, including relevant federal, state, and local government and private contracts, and the past performance of any proposed subcontractors and individual joint venture partners, if applicable, will be evaluated.
A confidence level in the offeror's past performance will be assessed using the adjectival ratings at NFS 1815.305(a)(3)(A).
Review DRFP Section M provision Factor III - Past Performance Evaluation, for more details about past performance references for specific scenarios.
Past Performance References Offeror's references limited to five contracts/subcontracts, including those of any proposed subcontractors.
Two past performance references should be for the offeror.
Each referenced contract shall have a minimum of one year of performance within the five-year recency period.
Section M provision Factor III - Past Performance Evaluation, paragraph (b), provides guidance for joint ventures, whether newly formed or current, and when proposed subcontractor relevancy thresholds apply to references (see 13 C.F.R. § 125.8(e), 13 C.F.R. § 126.616(f) and 13 C.F.R. § 124.513(f), respectively).
Offerors are required to submit a Safety and Health Plan with their proposal as an eligibility requirement for Volume IV, Contract.
The Safety and Health plan submitted in accordance with NFS 1852.223- 73, Safety and Health Plan, will be required during the phase-in period.
The Contractor will be required to comply with all Federal, State, local, and Agency environmental and safety laws/regulations (e.g., OSHA).
September 25, 2024 40
Safety and Health
Cost Volume Overview
Jenerral “Dion” Woodson
Enterprise Pricing Office (EPO) Pricing Team Representative
September 25, 2024 SMAS II 41
Cost Forms Overview
All Offerors shall submit a Cost volume. Additionally, in accordance with FAR 15.404-3(c)(2), all proposed subcontractors, to include interdivisional and/or intra-company effort, as defined in Section L, Factor I – Mission Suitability Volume Instructions, MA3: Retention, Staffing, Recruitment, and Total Compensation, paragraph (b), shall submit a complete Cost volume electronically in accordance with the provision entitled Electronic Submission of Proposals - Proposal Marking and Delivery Through NASA's EFSS Box. However, in addition to any joint venture Offeror Cost volume, all members of a joint venture shall submit a complete Cost volume.
The Government has provided uniform rates of change for Calendar Years 2025 through 2033 in Table L-2, “Escalation Rates” (Solicitation indicates that the escalation rates provided shall be used for the exempt labor categories).
Should an Offeror determine the need for a different annual escalation rate, an explanation and justification shall be provided.
September 25, 2024 SMAS II 42
Cost Forms Overview (continued)
The Offeror and all applicable subcontractors shall provide a copy of the latest approved forward pricing rate package (if applicable).
The Offeror and all applicable subcontractors shall provide a pricing narrative BOE that explains in detail all pricing and estimating techniques.
The information provided will be used to assess the reasonableness of the Offeror's cost.
September 25, 2024 SMAS II 43
All formulas used in the workbook must be clearly visible in the individual cells and verifiable. Whereas linking among the attachments' worksheets is anticipated, the use of external links (to source data not provided in the workbook) is prohibited.
The completed attachments must contain no macros or hidden cells.
The attachments, nor any supporting cost information provided, shall not be locked/protected, or secured by passwords in part or in whole.
September 25, 2024 SMAS II 44
The Offeror and applicable subcontractors shall provide a description of proposed fee structure. For the Offeror, if a profit-sharing pool arrangement is proposed, include a discussion of the arrangement and the distribution of fee earned.
Note - Award Fee and Fixed Fee shall be entered into the EPM Tab A by contract period.
September 25, 2024 SMAS II 45
Consistency between the Mission Suitability factor and the Cost factor volumes will be considered in determining if the Offeror’s proposed costs are reasonable and realistic. Additionally, failure by an Offeror to provide all required Excel Pricing Model data (e.g., IDIQ labor rates for all labor categories for all years of performance, for all Centers, if multiple) could adversely impact the Offeror’s Mission Suitability score or result in a determination that the proposal is unacceptable (see NFS 1815.305-70(a)(3)).
Offeror's Cost, Fee, and Phase-in Price
The Offeror’s proposed cost, to include the Offeror’s fully burdened IDIQ labor rates will be assessed to determine reasonableness and realism in accordance with FAR 15.305(a)(1) and NFS 1815.305(a)(1)(A) and (B). This factor, although not numerically scored, is relevant in determining the Offeror’s understanding of the requirements of the solicitation and its resource requirements.
Upward or downward adjustments may be made to the proposed cost as a result of the assessment of cost realism. This can include adjustments to all proposed direct and indirect costs.
September 25, 2024 SMAS II 46
The Government assessment of the “probable cost of doing business” with each Offeror, of the possible cost growth during the course of the contract, and of features that could cause a given proposal to cost more or less than proposed will be included in this evaluation. The probable cost will consider the unique aspects of the Offeror’s approach (e.g., technical, staffing, management).
The proposed Phase-in services price performance period, established as a separate FFP CLIN within the IDIQ value, will be performed concurrent with the incumbent contract. No probable cost adjustments will be made to the proposed FFP CLIN value.
September 25, 2024 SMAS II 47
The Offeror’s proposed and probable costs for the contract requirements will be established as the sum of
(1) the phase-in services price;
(2) an IDIQ value using the Offeror-provided fully burdened rates applied to a pre-populated estimate of labor hours for each labor category, for each location, for the contract period of performance, including all options;
(3) a calculated value using the Offeror-provided Other Direct Cost Indirect Rates applied to a pre-populated cost estimate for each location, for the contract period of performance, including all options;
(4) calculation of fee based on Government determined award fee/fixed fee formula will be applied to the total cost before fee (See Excel Pricing Model (EPM) Tab A-1, Summary of Total Cost); and
(5) a calculated six-month value for the FAR 52.217-8, Option to Extend Services, period.
September 25, 2024 SMAS II 48
For the purpose of evaluating the option to extend services (i.e., FAR 52.217-8), the Government will determine the six-month cost by prorating the cost proposed for the last year of services.
The proposed fee will not be adjusted but will be included in the probable cost in the amount proposed.
Cost information provided in this volume will constitute the Offeror's proposal submission for cost comparison purposes. If inconsistencies are identified by the Government between this volume and
Volume IV - Contract, the contract will be revised prior to execution by the contracting officer to reflect the values specified in the Cost volume.
September 25, 2024 SMAS II 49
Cost Volume Forms:
Excel Pricing Model (EPM)
EPM Workbook Tabs:
Note: These Excel worksheets are linked to each other. These links should not be broken.
Tab Tab Name
Index Specific Instructions for each tab
Tab A Summary of Total Cost Calculated
Tab B IDIQ Rate Development (To be completed by offeror and subcontractors)
Tab C Composite IDIQ Rate Development by Year (To be completed by the Prime Offeror)
Tab D Contract Management Rate Development
Tab E Schedule of Overhead, G&A and Other Indirect Rates Calculation
Tab F Fringe Benefit Rate Calculation/Detail
Tab G Productive Hours per WYE Conversion Table
Tab H Cognizant Audit Office Form
September 25, 2024 SMAS II 50
Tab A - Summary of Total Cost Calculated This tab is designed to summarize the total cost (Phase-In, Labor cost for IDIQ model) for the entire contract effort. This tab is linked to other tabs within the workbook. Most of this tab will automatically populate once the other tabs have been completed. Each EPM will generate dollars based on input to Tab B which includes the percentage of effort assigned to a company (prime or sub). The prime will submit the total subcontract dollars in this tab which should reconcile to each subcontractor’s EPM Tab A. The subcontractor's total should not include ODC cost, this is only needed for the Prime's total. Phase-in price should be input in Line 28.
Offerors shall fill in the areas highlighted in yellow.
Cost Volume Forms:
Excel Pricing Model (EPM) Tab A
September 25, 2024 SMAS II 51
Excerpt from Tab A - Summary of Total Cost Calculated
Excel Pricing Model (EPM) Tab A (continued)
September 25, 2024 SMAS II 52
Tab B - IDIQ Rate Development (To be completed by Offeror and Subcontractors):
This tab details the development of the fully burdened labor rates. The Offeror must map their labor categories to the NASA provided standard labor categories for this procurement. Columns E - I apply fringe, overhead, CMO, and G&A to the base labor rate. The final burdened rate by category should be shown in Column J. The Offeror (only) should include the Contract Management Overhead Rate on this Tab Columns G, Subcontractor/Teammates can use these columns to include their fee if applicable. Columns K - U computes the individual contractor/subcontractor's dollars based on the share of the hours assigned by the prime Offeror using the Government provided labor model. The labor dollars, fringe, OH, CMO, and G&A are all computed based on the percentage share assigned by labor category and location.
Cost Volume Forms:
Excel Pricing Model (EPM) – Tab B
September 25, 2024 SMAS II 53
Excerpt from Tab B - IDIQ Rate Development
Excel Pricing Model (EPM) Tab B (continued)
September 25, 2024 SMAS II 54
Tab C - Composite IDIQ Rate Development by Year (To be completed by the Prime Offeror)
This tab is designed to develop the composite IDIQ rates by contract year. The composite IDIQ rates will be used to complete Attachment J-6, Schedule of Rates. The Prime Offeror shall input any handling/profit proposed on subcontractors in cell C9.
Offerors shall fill in the areas highlighted in yellow.
Cost Volume Forms:
Excel Pricing Model (EPM) Tab C
September 25, 2024 SMAS II 55
Excerpt from Tab C - Composite IDIQ Rate Development by Year
Excel Pricing Model (EPM) – Tab C
September 25, 2024 SMAS II 56
Tab D – Contract Management Overhead Rate Development (To be completed by the Prime Offeror) This tab is designed for the prime Offeror to compute a contract management overhead (CMO) rate that will be added to the fully burdened labor rate. This will account for the management burden associated with the direct labor on the contract. Labor categories with assigned WYEs are listed and should be included in the pool cost.
Additional labor categories that the Offeror deems necessary to manage the contract may be added as needed.
Cost Volume Forms:
Excel Pricing Model (EPM) – Tab D
September 25, 2024 SMAS II 57
Excerpt from Tab D - Contract Management Overhead Rate Development
Excel Pricing Model (EPM) – Tab D (continued)
September 25, 2024 SMAS II 58
Tab E - Schedule of Overhead, G&A and Other Indirect Rates Calculation (To be completed by Offeror and Subcontractors)
This tab provides insight into the composition of the burden pool(s) for the proposed indirect rates. As supporting data, there are templates below the summary data that specify a breakout of specific cost accounts that are included in the individual cost pools.
On the supporting data templates, provide cost history for the prior two fiscal years and current fiscal year (actuals and budgeted) and projected for the term of the contract.
Cost Volume Forms:
Excel Pricing Model (EPM) – Tab E
September 25, 2024 SMAS II 59
Excerpt from Tab E - Schedule of Overhead, G&A and Other Indirect Rates Calculation
Cost Volume Forms:
Excel Pricing Model (EPM) – Tab E (continued)
September 25, 2024 SMAS II 60
Excerpt from Tab E - Schedule of Overhead, G&A and Other Indirect Rates Calculation
Cost Volume Forms:
Excel Pricing Model (EPM) – Tab E (continued)
September 25, 2024 SMAS II 61
Tab F - Fringe Benefit Rate Calculation/Detail (To be completed by Offeror and Subcontractors) This tab includes the development of the fringe rate including the payroll additive computation. The Offeror shall ensure that the estimates for fringe benefits shown in this tab are incorporated into their proposed contract cost in accordance with their normal accounting and estimating practices for each contract year.
Cost Volume Forms:
Excel Pricing Model (EPM) – Tab F
September 25, 2024 SMAS II 62
Excerpt from Tab F -Fringe Benefit Rate Calculation/Detail
Excel Pricing Model (EPM) – Tab F (continued)
September 25, 2024 SMAS II 63
Tab G - Productive Hours Per WYE Conversion Table (To be completed by Offeror and Subcontractors)
This tab identifies the number of productive hours by labor type (i.e., Exempt) for each contract year. The Offeror shall indicate in the notes area how the figure was calculated (e.g., 2080 hours per year minus 100 vacation hours minus 40 sick leave hours minus 80 holiday hours to total 1860 productive hours).
Cost Volume Forms:
Excel Pricing Model (EPM) – Tab G
September 25, 2024 SMAS II 64
Excerpt from Tab G - Productive Hours Per WYE Conversion Table
Excel Pricing Model (EPM) – Tab G (continued)
September 25, 2024 SMAS II 65
Tab H - Business Information and Cognizant Audit Agency Points of Contact
This tab identifies the Cognizant Audit Agency (name, address, and telephone number) who currently approves systems and forward pricing rates.
Excerpt from Tab H – Business Information and Cognizant Audit Agency Points of Contact.
Cost Volume Forms:
Excel Pricing Model (EPM) – Tab H
September 25, 2024 SMAS II 66
Virtual Site Tour
September 25, 2024 SMAS II 67
September 25, 2024 68SMAS II
Primary location: MSFC, Huntsville, AL
Support work at following locations:
MAF in New Orleans, LA SSC near Bay St. Louis, MS
KSC, FL
MSFC Resident Management Offices SMAS II Contractor’s facilities Other locations as approved by the contracting officer
September 25, 2024 69SMAS II
September 25, 2024 70SMAS II
MSFC Building 4221 MSFC Headquarters Program Offices Engineering Offices
MSFC Building 4220 SLS Program Offices SLS Elements
Chief Safety Officer
September 25, 2024 SMAS II 71
September 25, 2024 72SMAS II
MSFC Building 4203 Engineering Offices (including SMA)
MSFC Exchange Cafeteria
MSFC Building 4205 Propulsion Research Facility Engineering Office and Labs
September 25, 2024 SMAS II 73
September 25, 2024 74SMAS II
System Integration Test Facility Artemis III, Software Functionality
System Integration Lab (SIL) Avionics Flight Hardware
September 25, 2024 75SMAS II
Thrust Vector Control Test Lab Early Flight Fission Test Facility
September 25, 2024 76SMAS II
MSFC Building 4208 Uninterruptible Power Supply (UPS) Facility
September 25, 2024 77SMAS II
MSFC Facilities Management Buildings Complex
September 25, 2024 78SMAS II
MSFC Building 4260 Procurement Offices
MSFC Building 4249 Medical Center
September 25, 2024 79SMAS II
MSFC Building 4316 Activities Center
MSFC Building 4315 Wellness Center (Gym)
September 25, 2024 80SMAS II
MSFC Building 4487 Flight Avionics Engineering Facilities
Specialized Labs
September 25, 2024 81SMAS II
MFSC 4600 Engineering Complex
Specialized Labs
September 25, 2024 82SMAS II
MSFC Building 4619 Structural Strength Test Lab
September 25, 2024 83SMAS II
MSFC Building 4663 Huntsville Operations Support Center (HOSC)
Engineering and mission operations support for International Space Station
Artemis missions NASA’s Commercial Crew Program
Science and technology demonstration missions
September 25, 2024 84SMAS II
Payload Operations Integration Center at the HOSC
SLS Engineering Support Center at the HOSC
September 25, 2024 85SMAS II
MSFC Building 4705 Machine shops
September 25, 2024 86SMAS II
MSFC Building 4707 Advanced Manufacturing Facility
September 25, 2024 87SMAS II
MSFC Building 4708 Engineering Offices and
Manufacturing
MSFC Building 4732 Wind Tunnel Facility
September 25, 2024 88SMAS II
MSFC Building 4755
September 25, 2024 89SMAS II
MSFC Building 4755 - North Side Environmental System and Life Support System (ESLSS)
September 25, 2024 90SMAS II
MSFC Building 4755 - South Side Friction Stir Welding Facility
September 25, 2024 91SMAS II
MSFC Test Stands Aerial View
MSFC 4693 Test Stand MSFC Test Stand 500
Examples of MSFC Pressure Vessels
September 25, 2024 93SMAS II
MSFC Building 4473 Central Chiller Facility
MSFC Building 4220 Mechanical Room
September 25, 2024 94SMAS II
Stennis Space Center (SSC) Mississippi
September 25, 2024 95SMAS II
SSC Buffer Zone
September 25, 2024 96SMAS II
Stennis Space Center (SSC) Mississippi
SSC
A-3 Test Stand
Virtual Site Tour
SSC
E-3 Test Facility
September 25, 2024 SMAS II 97 https://www.nasa.gov/wp-content/uploads/2019/04/a-3-test-stand-ssc-2013-00374-v2.jpg
E-2 Test Facility
Virtual Site Tour
SSC
E-1 Test Facility
September 25, 2024 SMAS II 98
A-2 Test Stand
September 25, 2024 SMAS II 99
September 25, 2024 100SMAS II
MSFC SMA
Resident Management Offices
September 25, 2024 101SMAS II
Michoud Assembly Facility (MAF) New Orleans, LA
MAF
Boeing SLS Core Stage Facilities
September 25, 2024 SMAS II 102
Kennedy Space Center (KSC) Merritt Island, Florida
September 25, 2024 SMAS II 103
104September 25, 2024 SMAS II
SLS Systems Engineering and Integration RMO-KSC Hardware Post-Transfer
Rotation, Processing and Surge Facility (RPSF)
September 25, 2024 105SMAS II
SLS Systems Engineering and Integration RMO - KSC Hardware Post-Transfer
Vehicle Assembly Building (VAB)
September 25, 2024 106SMAS II
SLS Core Stage RMO - KSC Space Systems Processing Facility (SSPF)
September 25, 2024 107SMAS II
SLS Booster RMO @ Promontory, Utah Orbital ATK Facilities
SLS Booster RMO @ KSC - Booster Fabrication Facility (BFF)
Orbital ATK Facilities
September 25, 2024 108SMAS II
SLS Engines RMO @ Canoga Park, CA
Aerojet Rocketdyne Facilities
Concluding Remarks
September 25, 2024 SMAS II 109
The solicitation number for the Final RFP will be 80MSFC24R0002.
A pre-proposal conference after release of the Final RFP is not anticipated.
This information is preliminary and subject to change when the Final RFP is released.
Industry Briefing charts and a listing of attendees will also be posted to SAM.gov.
September 25, 2024 110
Concluding Remarks
Written comments and questions shall be submitted to the Contracting Officer no later than October 4, 2024, 4:00 p.m., Central Time by electronic mail to maranda.b.mccord@nasa.gov
Responses to questions/clarifications will be provided as an attachment to the Final RFP or as changes in the Final RFP which will be posted in the same manner as the Draft RFP (SAM.gov).
Offerors should monitor the SAM.gov website for periodic updates.
Please ensure that your company’s name and POC information have been entered in the meeting chat.
Concluding Remarks (con’t)
The NASA Marshall Space Flight Center would like to thank you for your interest and participation in this important acquisition.
Thank You
Services (SMAS) II
Draft Request for Proposal (DRFP)
80MSFC24R0002
Virtual Industry Day Briefing Please make sure you have entered your company's name and POC information in the Teams’ meeting chat
| Virtual Industry �Day Briefing� |
| Virtual Industry �Day Briefing� |
| Meeting Logistics |
| Meeting Logistics |
| Agenda and Presenters |
| Opening Remarks |
| Comments and Questions |
| Comments & Questions |
| Purpose and Requirements Overview |
| Program Overview |
| Work Breakdown Structure |
| Section 1.0 �Contract Scope |
| Section 2.0 �Contract Integration Requirements |
| Section 3.0 �Program and Project Discipline Support |
| Section 4.0�Institutional Discipline Support |
| Procurement Overview |
| Contracting Approach |
| Fee Type and Structure |
| Period of Performance |
| Place of Performance |
| Special Clauses |
| Special Clauses (Continued) |
| Special Provisions |
| Small Business Objectives |
| Organizational Conflict of Interest |
| Required On-Site Training |
| Contract Phase-in |
| Things to Consider |
| Proposal Submission Guidelines |
| Schedule |
| Proposal Submission Guidelines |
| Enterprise File Sharing and Sync Box (EFSS) |
| Proposal Submission Guidelines (Continued) |
| Basis For Award—General |
| Mission Suitability |
| Total Compensation Plan Overview |
| Total Compensation Plan Overview (Continued) |
| Total Compensation Plan Overview (Continued) |
| Past Performance Evaluation |
| Safety and Health |
| Cost Volume Overview |
| Cost Forms Overview |
| Cost Forms Overview (continued) |
| Slide Number 44 |
| Slide Number 45 |
| Slide Number 46 |
| Slide Number 47 |
| Cost Forms Overview (continued) |
| Cost Forms Overview (continued) |
| Cost Volume Forms: �Excel Pricing Model (EPM) |
| Slide Number 51 |
| Slide Number 52 |
| Slide Number 53 |
| Slide Number 54 |
| Slide Number 55 |
| Slide Number 56 |
| Slide Number 57 |
| Slide Number 58 |
| Slide Number 59 |
| Slide Number 60 |
| Slide Number 61 |
| Slide Number 62 |
| Slide Number 63 |
| Slide Number 64 |
| Slide Number 65 |
| Slide Number 66 |
| Virtual Site Tour |
| Slide Number 68 |
| Slide Number 69 |
| Slide Number 70 |
| Slide Number 71 |
| Slide Number 72 |
| Slide Number 73 |
| Slide Number 74 |
| Slide Number 75 |
| Slide Number 76 |
| Slide Number 77 |
| Slide Number 78 |
| Slide Number 79 |
| Slide Number 80 |
| Slide Number 81 |
| Slide Number 82 |
| Slide Number 83 |
| Slide Number 84 |
| Slide Number 85 |
| Slide Number 86 |
| Slide Number 87 |
| Slide Number 88 |
| Slide Number 89 |
| Slide Number 90 |
| Slide Number 91 |
| Slide Number 92 |
| Slide Number 93 |
| Slide Number 94 |
| Slide Number 95 |
| Slide Number 96 |
| Slide Number 97 |
| Slide Number 98 |
| Slide Number 99 |
| Slide Number 100 |
| Slide Number 101 |
| Slide Number 102 |
| Slide Number 103 |
| Slide Number 104 |
| Slide Number 105 |
| Slide Number 106 |
| Slide Number 107 |
| Slide Number 108 |
| Concluding Remarks |
| Concluding Remarks |
| Concluding Remarks (con’t) |
| Thank You |
| Virtual Industry �Day Briefing� |
File details come from the government source that posted it. Updated .