ATTACHMENT_L-4_Historical Projects_List.pdf
PDF 41 KB Posted
- Attached to
- Minor Construction Contract (MCC) V Federal contract opportunity
- Solicitation number
- 80MSFC23R0008
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| ATTACHMENT_L-2__Past_Performance_Questionaire_Recipient_List.pdf | ||
| Attachment J-4 WAGE DETERMINATION.pdf | ||
| ATTACHMENT_L-1_Offeror_Information_Form MCC V.pdf | ||
| Minor Construction Contract V (MCC-V) TERMS.pdf | ||
| ATTACHMENT_L-3__Past_Performance_Questionnaire.pdf | ||
| SF1442.pdf | ||
| Contractor_Capabilities_Form.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FWRs Closed
Between 04/01/19 and 06/30/23
Project Type: CC
Total $$FWR # Start ClosedTitle
$24,487R000725256 9/16/2020 5/17/2021Install Pump for Tank #6
$11,904R000618165 3/25/2019 8/19/2019New LED Light Fixtures
$11,805R000714149 10/16/2019 1/2/2020Electrical Support for Systems Furniture Rms 167 & 227
$10,550R000567636 5/20/2019 7/31/2019Modify Ductwork Rm 101
$10,500R000643843 5/14/2019 7/31/2019Replace Locksets
$10,000R000749348 8/10/2020 1/28/2021Add Doorway Room 109A
$9,5744615165c 12/20/2018 7/1/2019Install Bottle Filler
$9,500R000611541 1/30/2019 4/25/2019Paint Handrails East Side B4663
$8,849R000582393 4/30/2019 9/26/2019Electrical Mods to Rm 1187B
$8,200R000706276 3/9/2020 6/19/2020Replace Sidewalk South of Bldg 4487
$7,370R000654454 8/6/2019 10/24/2019Install Window Shade Controls
$6,916R000652352 8/20/2019 7/23/2020Replace Doors in Room E-3
$6,308R000596278 2/6/2019 5/9/2019Concrete Pad for Argon Tank
$6,243R000565319 6/25/2019 11/7/2019Raised Floor Tile Replacement
$6,052R000589675 5/8/2019 7/31/2019Replace Exterior Door Frame & Door
$5,792R000644903 5/8/2019 7/31/2019Install Under Floor Receptacles
$4,990R000662801 7/23/2019 8/28/2019Install Concrete Ramp North of Bldg 4466
$4,300R000720937 10/29/2019 11/27/2019Paint Rooms 1210, 1211 & 1213
$3,980R000728559 3/2/2020 7/28/2020Electrical Mods to Room 1137
$3,450R000618164 3/25/2019 8/19/2019New LED Light Fixtures
$3,340R000694187 8/9/2019 8/28/2019Paint & Carpet Two Offices Rm 46B & 54
$3,190R000683964 7/14/2020 9/11/2020Repaint Floor Room 142A
$2,857R000581034 12/6/2018 4/10/2019Provide Power to Rm 115
$2,740R000740828 7/2/2020 10/8/2020Install Outlets at Rm 1103B
$2,473R000706533 11/7/2019 1/9/2020Power for Impact Test Facility
$2,458R000661404 4/9/2019 4/15/2019Paint Room 111
$2,365R000703448 12/3/2019 5/18/2020Install Breakers & Disconnects
$1,570R000722911 7/21/2020 9/11/2020Install GFE LED Light Fixtures
$1,290R000650560 7/23/2019 10/24/2019Install Frosting on Glass
$1,126R000731226 11/13/2019 5/18/2020Apply Anti-Slip Coating to Pavers on South Side of Courtyard
$1,080R000592438 3/12/2019 4/10/2019Install Bus Duct Switch
$855R000722638 10/28/2019 1/9/2020Install Outlet for Wall-Mounted TV
Total: $196,114Number of Projects: 32
Project Type: FWR
Total $$FWR # Start ClosedTitle
$2,564,1374404974 12/17/2015 6/7/2021Revitalize Bldg 4755 Electrical
$2,350,178R000486236 9/27/2018 11/19/2020Replace Roof + Lighting Protection
Wednesday, August 9, 2023 Page 1 of 7
$2,146,6054465402 9/22/2017 3/9/2020Install High Efficiency Boilers
$1,789,292R000553151 9/27/2018 1/13/2023Lightning Protection System Upgrades - Various Bldgs
$1,265,2314248722 9/24/2018 3/25/2022Replace Roof
$876,3564509114 6/11/2021 11/2/2022Parking Lot Lighting for 4600 Complex (4600, 4601, 4602)
$727,495R000789342 5/21/2021 12/6/2022Mods to 5th Floor Office Suite Bldg 4221
$696,800R000797165 5/4/2021 10/25/2022Replace Roofs & Install LPS
$607,3354702787 8/9/2017 10/24/2019Test Area 500 - Demo Buildings 4522, 4523, 4524, 4524A, 4525 & 4526
$469,797R000461590 4/17/2018 12/16/2020Install Heat Recovery Chiller
$421,568R000713269 9/22/2020 3/30/2022Install Potable Water Meters 18 Bldgs
$404,182R000525915 9/17/2018 1/27/2021Mods to Process Water Plant
$396,4024158357 9/26/2017 8/28/2019Demolish Building 4567
$394,478R000521561 9/18/2019 11/30/2021Reconfigure Security Fence and Gate at 4700 Complex
$394,078R000769576 7/30/2021 2/8/2023Utilities for Paint Booth
$334,4654397198 9/27/2018 3/25/2021Replace Roof Sections 001 & 002
$321,250R000726887 9/3/2020 12/7/2021Paint Above Ground Process Piping
$256,0843251628 9/17/2018 7/31/2019Replace Asphalt Pavement in Parking Lot
$246,1144195094 9/6/2018 1/2/2020Replace Pneumatic Actuators
$245,000R000855129 4/6/2022 1/24/20234205 EUS Lab Phase II
$237,3684385919 9/17/2020 11/8/2022Convert to LED Lighting, East Test Bay
$231,4673173618 8/23/2016 4/4/2019New Enclosure for Rooftop HVAC Unit
$229,287R000692485 9/12/2019 10/28/2020Prepare and Paint Exterior of Bldg 4653
$225,988R000772869 9/17/2020 3/22/2021Relocation of MAV Team to Bldg 4708
$222,4243744405 9/26/2017 4/24/2019Mods to 4th Floor
$222,005R000744416 7/31/2020 12/19/2022Static Transfer Switch
$199,820R000529813 9/15/2020 10/14/2021Renovate Restrooms
$187,456R000729104 8/20/2020 3/25/2021Asphalt Improvements
$175,416R000781573 7/9/2020 2/17/2021Construct Metal Shed in 4624 Laydown Yard
$173,4554195499 8/21/2018 2/6/2020Reseal Exterior Siding
$172,808R000756633 9/23/2020 4/14/2022Replace AHU006
$162,974R000667594 9/11/2019 1/29/2021Install Access Control Gate
$162,381R000581038 3/25/2020 12/21/2021Construct Explosive Containment Facility
$157,7884165963 9/28/2020 7/20/2021Demolish SOFI Booth
$155,7154173373 9/24/2018 2/27/2020Install LED Lights C Wing
$141,454R000484932 6/24/2019 3/16/2022Additional Cooling AB105
$138,798R000619928 9/24/2019 3/16/2021Modify Landscaping
$138,440R000838244 8/19/2021 8/22/2022Renovate Bldg 4306
$131,487R000650661 3/4/2020 1/19/2021Power Supply for Sump Pumps
$129,448R000611078 5/23/2019 12/5/2019Mods to NTP Lab
$124,5904268402 9/6/2018 10/3/2019Construct a Communications Duct Bank
$122,730R000735289 9/14/2020 2/25/2021UCS Infrastructure for CBM, 4220, 4221, 4260,4600, 4601
$121,019R000733933 9/22/2020 12/17/2021UCS Chilled Water Auto Failover
$116,820R000466963 5/9/2018 9/26/2019Replace Oxygen Monitoring System
$113,618R000868591 9/20/2021 4/21/2022Carpet & Paint Multiple Rms 1st Floor
$111,292R000652265 9/11/2019 10/6/2020Install Liebert Unit, Room 150
Wednesday, August 9, 2023 Page 2 of 7
$109,080R000603352 3/6/2019 9/12/2019Construct Bin Wall
$105,295R000577917 8/28/2018 12/5/2019HVAC Mods, Rm BC143D
$103,158R000910367 2/25/2022 1/13/2023Paint/Carpet SW Corner
$101,2115741032 5/2/2019 9/26/2019Mods to Room M101
$98,100R000928204 6/13/2022 2/8/2023Re-Route Potable Water
$97,8504435157 9/24/2018 11/14/2019Install New Parking Lot Lighting
$97,600R000827450 7/13/2021 7/14/2022Resurface Foam Roof
$89,9405361540 4/11/2019 11/14/2019Power to Communication Rooms
$89,893R000562823 8/13/2018 7/31/2019Construct Bin Walls
$87,495R000708978 3/26/2020 3/3/2021Paint East Side of Bldg
$87,183R000790662 5/18/2021 11/4/2021Epoxy Flooring for Clean Rm
$85,7054040510 12/3/2021 11/9/2022Mods to Campus Potable Water Meters
$85,644R000652259 9/18/2019 9/11/2020Electrical Modifications to Bldg 4207 Annex
$84,650R000634167 9/12/2019 10/8/2020New Conference Room
$84,223R000548531 8/8/2019 3/15/2021Reroute Chilled Water Line
$83,7904028567 9/25/2018 8/15/2019Minimum Humidity Levels BC Wing
$81,266R000730341 9/3/2020 8/31/2021Construct Wastewater Tank
$80,080R000646605 9/5/2019 6/16/2021Install Foundations
$79,260R000625225 7/15/2019 2/27/2020LED Fixtures for West High Bay
$78,873R000497983 8/2/2018 9/30/2019Asphalt Paving Improvements
$78,702R000877031 10/21/2021 6/28/2022Paint Corridors & Restrooms
$78,680R000733974 6/24/2021 9/27/2022 Replace DXAC 0002
$78,546R000766538 6/23/2021 7/21/2022Replace DXAC Unit
$78,3004717707 4/15/2019 9/26/2019Install Disconnect South High Bay
$70,730R000710006 5/22/2020 9/29/2020Paint Shop Floor
$69,595R000905697 8/11/2022 2/8/2023Install Electric Vehicle Charging Station
$68,850R000865002 1/7/2022 7/7/2022Install Lightning Protection System Bldgs 4672, 4630, 4539
$68,125R000676595 6/22/2020 10/28/2020Secondary Containment Coatings @ B4635-2&3
$66,682R000538121 5/17/2019 1/6/2020HVAC & Building Mods
$66,260R000552052 6/6/2019 12/4/2019Goes Tour Stop
$66,213R000826407 5/10/2021 10/4/2022Mods to Rm 119 for Photo Archive
$65,020R000869112 9/10/2021 2/24/2022Replace Epoxy Floor Rm 100
$65,000R000560313 9/6/2018 3/9/2020Replace CRU #3 Rm 112
$64,969R000734046 8/19/2020 11/4/2021Replace Valves and Actuators
$64,8144385918 9/11/2018 2/27/2020Replace East End Highbay Lights
$64,700R000763019 11/24/2020 6/8/2021Install New Oxygen Monitors at Bldgs. 4464 &
$63,971R000589357 7/8/2019 1/21/2020Install CRU in Room 111
$63,430R000736246 8/10/2020 11/30/2021Replace Catwalk Planks for Cranes
$61,000R000881177 2/10/2022 2/8/2023Install Bottle Fillers @ Bldg 4718 & 4718-1
$59,840R000650075 8/21/2019 1/27/2021Install Door & CRU Room 114
$59,6704017901 12/3/2020 10/27/2021Replace Meter at Bldg 4650
$58,788R000816441 5/11/2021 10/7/2022Finish Upgrades Bldg 4663
$58,200R000687093 9/17/2019 5/4/2021Utilities to Concept Laser Machine
$57,6005345385 7/9/2018 4/25/2019Mods to Room E180
$57,600R000819633 9/21/2021 3/10/2022Replace Lighting Fixtures Test Stand
Wednesday, August 9, 2023 Page 3 of 7
$56,050R000538742 8/13/2018 7/3/2019Raised Beds with Irrigation System
$55,938R000679707 3/10/2020 8/22/2022Update Mens Bathroom A Wing
$54,7344786313 3/30/2021 8/23/2022Install Guardrails Around & Stairs on Roof
$54,640R000790770 8/27/2020 1/7/2021Widen Gravel Road into Laydown Yard (4624)
$54,500R000851585 8/25/2021 3/25/2022Install Privacy Glass Windows Rm B202
$53,555R000630042 8/8/2019 7/9/2020Deactivate Bldgs 4557A, 4666A & 4666B
$53,146R000568512 8/14/2018 5/29/2019Construct Bin Wall
$52,959R000553934 9/26/2018 8/28/2019Utility Mods for Diamond Cutting Machine
$52,9504881715 9/27/2018 8/15/2019Mods to Four Rms
$52,416R000544115 9/6/2018 9/26/2019Replace Obsolete Electric Panels
$50,200R000562824 8/6/2018 5/29/2019Construct Bin Wall
$49,747R000703770 9/22/2020 1/13/2023Construct Concrete Pad & Plaza
$49,6984845164 12/4/2017 5/16/2019Convert Room 108A to Control Room
$49,670R000688318 11/8/2019 1/28/2020Provide Power to Shock Test Stand 400
$48,869R000726969 8/20/2020 5/14/2021Repaint Exterior of Bldg 4676
$48,416R000849697 8/27/2021 6/28/2022Install Automatic Doors East Entrance
$48,370R000491160 6/27/2018 4/25/2019Install Cage and Outlets
$47,700R000692716 8/5/2020 8/26/2021Replace Automatic Doors
$47,593R000905722 7/18/2022 2/8/2023Install Electric Vehicle Charging Station
$46,166R000602127 3/5/2019 7/31/2019Install New UCS Panels
$45,994R000682724 9/22/2020 9/13/2021Replace Rm 165 Lighting Fixtures
$45,980R000705186 6/7/2021 5/17/2022Carpet and Paint Main Corridor/Hallway
$45,4464764322 8/14/2018 5/29/2019Repair Sink Hole
$44,694R000567674 9/17/2019 10/31/2019Replace Rubber Padding at Daycare
$44,634R000871840 9/27/2021 12/7/2022Install Electric Vehicle Charging Station Bldg 4241 / 4250
$43,928R000465003 12/5/2017 5/9/2019Finish Upgrades to Cafeteria & Lobby
$42,644R000813756 9/9/2021 11/9/2022Walkway & Light Mods
$42,400R000725342 8/17/2020 6/29/2021Replace CRU Rm 10
$42,093R000853172 8/20/2021 3/16/2022Paint Hallways & Offices
$41,6155107185 3/7/2018 8/15/2019Electrical Mods
$41,280R000757915 6/29/2021 12/20/2021Install O2 Monitors Rm BC143
$41,160R000714246 9/10/2020 7/15/2021Install Water Bottle Fillers - Multiple Bldgs.
$40,757R000603386 8/5/2020 10/26/2021Install Nitrogen Vent Stack
$40,355R000480555 6/19/2018 4/25/2019Install Hot Water Temp Control Unit
$39,850R000679884 9/19/2019 3/3/2021Install Break Room Rm 1051
$39,664R000901637 4/13/2022 8/22/2022Utilities for Lunar Regolith
$38,675R000757327 4/23/2021 2/9/2022Replace Floor Tiles Various Locations Bldg 4207
$38,480R000736383 8/3/2020 2/25/2021Renovations to Data Center Area
$38,313R000748267 9/14/2020 9/14/2021Temperature Control Units for Rm 1178
$37,738R000692213 5/25/2021 4/26/2022Fire Protection for DED Booth
$37,688R000823427 3/22/2021 8/26/2021Mods to Rm 1109
$37,226R000810710 7/8/2021 10/4/2022Replace High Bay Curtain Rm 1110
$36,682R000622862 4/25/2019 10/31/2019Install Disconnect and Panels
$35,425R000758804 9/8/2020 9/13/2021Replace Oxygen Monitoring System
$34,699R000793588 9/3/2020 3/10/2022Modify and Replace Roll-Up Door Rm 165
$34,060R000672085 3/26/2020 3/30/2021Install PDU with B-Side Power
Wednesday, August 9, 2023 Page 4 of 7
$33,850R000503220 9/22/2020 1/25/2021Detach Spherical Vacuum Tank
$33,7482538269 8/20/2018 7/31/2019Recoat Exterior Walls
$33,676R000842108 7/1/2021 7/7/2022Install Flag Pole
$32,500R000906269 8/1/2022 1/24/2023Electrical Mods to Rms 1124 & 1126
$32,040R000609274 3/4/2019 10/31/2019Replace Roll Up Door
$31,800R000858234 8/11/2021 3/10/2022Renovate Room B32A for Closed Storage
$30,798R000794760 4/23/2021 3/10/2022Install PDU
$29,930R000698559 11/8/2019 1/21/2020Mods to Room 145
$29,800R000584741 4/15/2019 9/30/2019Replace Natural Gas Meter
$29,585R000788370 2/9/2021 10/21/2021Install New Egress Door
$29,504R000650433 7/23/2020 2/19/2021Replace Diesel Storage Tank
$29,460R000734367 3/1/2021 6/30/2021Access Ladder for AH20 & AH21
$29,075R000832927 5/6/2021 9/20/2021Install Carpet in Rm B107
$28,634R000830365 4/29/2021 12/7/2021Electrical Mods to Rm 1189
$28,4914958989 9/10/2018 7/31/2019South Parking Lot Lighting
$28,244R000865077 12/1/2021 6/7/2022Re-Stripe Parking Lots @ Various Bldgs 4203, $26,815R000711800 3/2/2020 3/29/2021Provide Power Feed Bldg 4699
$26,675R000503780 9/18/2019 2/11/2020Install Oxygen Deficiency Alarm
$26,354R000714366 9/24/2019 7/29/2020Replace Carpet and Paint in Hallways
$26,000R000865057 11/15/2021 6/30/2022Install Lightning Protection System
$25,525R000731100 9/16/2020 6/17/2021Install Smart Tint Room M203
$25,425R000613947 6/6/2019 8/28/2019Renovate Rooms 125 and 126
$24,490R000755700 9/14/2020 3/29/2021UCS Controls for Lift Station
$23,800R000794036 8/27/2020 11/19/2020Replace Glass and Glazing Bldgs. 4659 & 4661
$23,410R000714945 9/3/2020 8/31/2021Replace Parking Lot Lights
$23,251R000672129 1/31/2020 11/19/2020Install LED Lights in Annex
$22,740R000796838 3/11/2021 5/13/2021Install Epoxy Floor South High Bay
$21,373R000859898 9/27/2021 6/30/2022Install Air Compressor & Piping
$21,300R000830464 4/19/2021 7/19/2021Mods to Bldg 4485
$21,210R000702750 1/6/2020 8/23/2021Mods to Rm 105
$21,190R000662037 9/10/2019 7/8/2020Replace Natural Gas Meter
$21,000R000535536 2/13/2019 9/5/2019Removal of UPS, Transformers Rm 217
$21,000R000662114 9/10/2019 2/4/2020Replace Natural Gas Meter
$19,951R000470837 5/27/2021 3/1/2022Install Emergency Egress Lights
$19,710R000648999 8/8/2019 10/24/2019Install Bollards and Sidewalks
$19,413R000643494 8/6/2019 6/25/2020Mods to High Bay 119 for DED Booth
$19,400R000918250 7/12/2022 1/24/2023Install Shades 2nd Floor Corridor Windows
$19,200R000577913 6/3/2019 1/9/2020Replace Natural Gas Meter
$18,794R000611056 5/8/2019 9/26/2019Mods to Rooms 109 and 110
$18,773R000780077 7/31/2020 10/6/2020Install Door Locks
$18,310R000851082 7/12/2021 2/17/2022Mods to Rm 111A
$17,737R000831967 8/24/2021 12/6/2022Replace Door E101
$17,652R000660781 11/4/2019 2/27/2020Accessible Parking Upgrades
$17,240R000823865 5/18/2021 8/23/2021Utility Mods to Rm 1168
$17,213R000617619 8/24/2020 6/17/2021Install Cantilever Jib Crane
$16,800R000826518 5/17/2021 3/17/2022Install Security Wall in Rm 150A
Wednesday, August 9, 2023 Page 5 of 7
$16,632R000538747 9/17/2018 5/9/2019Asphalt Pavement
$16,431R000685687 9/19/2019 7/28/2020Mods to Conference Room 1054
$16,310R000883633 2/15/2022 6/7/2022Paint North Hallway 2nd Floor
$15,902R000880273 5/24/2022 12/6/2022Construct New Wall Rm 107
$15,890R000827198 5/6/2021 10/21/2021Mods to Construct Office A101
$15,797R000710324 7/31/2020 10/21/2020Install Industrial Water Pressure Sensors Bldgs.
4220, 4241,4557,4619,4718
$15,400R000858648 8/20/2021 12/21/2021Replace Carpet in Suite 3098
$14,890R000734139 9/1/2020 9/13/2021Sump Pump Upgrades
$14,500R000757830 9/2/2021 1/12/2022Concrete Footings for Wind Tunnel Piping
$14,215R000881175 1/7/2022 8/22/2022Install LED Lighting in Rms 1192 & 1196
$14,124R000587622 8/15/2019 11/18/2019Remove Floor Coating Room 105
$13,971R000797142 9/24/2021 2/9/2022Install UPS Panel Rm 121A
$13,816R000689603 8/19/2020 11/19/2020Install New Concrete Sidewalk Bldg 4619
$13,668R000857833 9/21/2021 12/17/2021Provide Power for T2 Pump
$13,634R000717624 7/6/2021 9/9/2021Remove Containment Area
$13,490R000513942 9/12/2018 4/9/2019Restripe Parking Lots - Various Bldgs
$13,200R000859658 9/15/2021 4/26/2022Install Bottle Filler/ Water Fountain System
$13,064R000881862 11/17/2021 6/15/2022Paint & Tint Windows Rm C260 & Corridor
$12,978R000501743 4/30/2018 5/16/2019Install Antenna Mast
$12,361R000892806 2/17/2022 2/8/2023Install Bottle Filler 2nd Floor
$12,210R000665057 9/17/2019 6/25/2020Paint E85 Fuel Tank
$12,120R000664359 9/17/2019 6/25/2020Paint Hallways and Conference Room
$11,651R000769569 9/1/2020 2/17/2021Install Industrial Water Line Rm 104
$11,490R000610483 9/19/2019 2/27/2020New Ground for Instrumentation
$11,430R000877248 1/7/2022 6/30/2022Install Safety Exits for Fence
$11,424R000889781 3/10/2022 8/23/2022Replace/Install Rubber Fenders NASA Docks
$11,394R000725129 3/26/2020 10/15/2020Install Plywood & Receptacles SLS Monitors A- Wing
$11,380R000916518 8/16/2022 12/7/2022Occupancy Sensors Suite 5300
$10,500R000831029 6/23/2021 11/30/2021Replace Flooring Rms 100, 109 & 115
$10,418R000688845 9/18/2019 5/18/2020Improve Drainage
$10,3713896663 3/19/2021 10/21/2021Fill in Flume Area around Bldg 4640
$10,350R000549433 8/20/2018 5/20/2019Smoking Shelter
$9,800R000833410 8/4/2021 12/22/2021Replace Flooring in Rm E179A
$9,750R000893708 12/20/2021 5/17/2022Paint/Patch Walls & Install Corner Guards Rm
$9,547R000915555 7/8/2022 11/8/2022Provide Power to Velo Printer
$9,350R000532265 6/6/2019 11/14/2019Replace Roll-Up Door
$8,859R000856128 8/25/2021 10/14/2021Utility Mods to Rm 114
$8,800R000619993 7/15/2019 12/10/2019Install Potable Water Source
$8,230R000909478 4/18/2022 7/7/2022Electrical Mods Room 137
$7,940R000673338 9/9/2019 1/9/2020Install Cable Chase Between Rooms 110 & 114
$7,882R000685333 3/12/2020 10/26/2020Install Sump Pumps in MH73
$7,854R000815577 3/9/2021 8/23/2021Remove & Replace Door Frame
$7,751R000544152 9/17/2018 11/14/2019Create Opening Between Rms 164C & 164E
$7,700R000654905 12/2/2019 5/18/2020Remove Closet Room 102
Wednesday, August 9, 2023 Page 6 of 7
$7,590R000677252 9/11/2019 2/3/2020Emergency Signs and Lights
$7,580R000851086 7/7/2021 3/1/2022Mods to Rm 108C
$7,490R000606778 7/10/2019 9/26/2019Restripe South Parking Lot
$7,359R000690190 2/5/2021 8/23/2021Restripe Parking Lot
$7,170R000846297 8/23/2021 12/10/2021Replace Carpet in Rms 1080, 1082 1082A
$7,111R000560822 9/18/2018 4/18/2019Electrical Mods to Rm 155
$6,310R000676024 9/24/2019 4/12/2021Soundproofing Rm 400
$5,992R000886225 2/14/2022 6/28/2022Install Floor Surface Treatment Rm 107
$5,805R000674454 8/26/2019 2/3/2020Provide Power for Cubicles
$5,700R000840020 4/27/2021 6/10/2021Install Outlets in Rms 1007 & 1102
$5,530R000690324 9/24/2019 5/18/2020Install Disconnect Box 4628C
$5,400R000935328 8/25/2022 12/19/2022Install Carpet in Rm 4301
$5,220R000797293 9/2/2021 11/30/2021Power for Furniture 407C
$4,870R000827455 5/14/2021 3/10/2022Drainage System for Rm 1166
$4,800R000840657 6/1/2021 8/23/2021Eletrical Mods in Rm A102
$4,710R000745158 8/28/2020 1/5/2021Provide Shade Controls
$4,370R000688275 9/11/2019 2/13/2020Electrical Mods Bldgs 4776 & 4777
$4,353R000928703 11/14/2022 12/19/2022Replace Outlets in Rm 140C
$4,1265201521 3/7/2018 5/29/2019Install Cage in High Bay
$3,851R000828628 5/13/2021 7/26/2021LED Lighting Replacement Rm 100
$3,693R000819536 5/26/2021 8/24/2021Power for Vacuum Pump
$3,670R000693093 10/21/2019 5/19/2020Electrical Mods in Room 1155
$3,490R000661670 8/26/2019 1/7/2020Replace Carpet with VCT Tile Room C136
$2,910R000666754 10/22/2019 2/27/2020Outlets for Countdown Clocks
$2,909R000690322 9/24/2019 2/6/2020Install Disconnect Box 4628D
$2,855R000837649 4/26/2021 7/21/2021Finish Upgrades Carpet & Paint Rm A103
$2,802R000890782 4/12/2022 7/14/2022Electrical Mods in Room 1167
$2,760R000687151 9/18/2019 2/4/2020Install Chain Link Fence
$2,476R000642274 9/24/2019 5/19/2020Install Chair Rail
$2,220R000824562 2/19/2021 4/13/2021Electrical Mods to Rm 100
Total: $28,563,755Number of Projects: 257