Attachment G Site Visit Attendees and Presentation.pdf

PDF 2 MB Posted

Attached to
Mobile Shelter Structure for Lunar Lander
Solicitation number
80LARC891866Q
Issued by

About this file

The document is a Site Visit Attendee Roster and Presentation for NASA Langley Research Center's Solicitation 80LARC891866Q for a Mobile Shelter Structure (MSS) for the Human Landing System (HLS) Moon Landing Test Project. The solicitation seeks a large mobile shelter structure capable of fully enclosing a Boilerplate Lunar Lander, providing protection against wind and precipitation for six years during testing at the Landing and Impact Research Facility.

Key details include: a 100% small business set-aside under NAICS code 332311 with a 750-employee size standard, requiring end products from certified small business manufacturers. Critical dates include a site visit on February 20, 2025, with attendee requests due by February 13, 2025, questions due by February 24, 2025, and quotation submissions due by March 5, 2025. The MSS must be mobile, movable by a 10,000 lb. Telehandler, have specific door configurations, and be anchorable to the Gantry concrete. Initial delivery is required by May 16, 2025, with final assembly and commissioning by June 13, 2025. Payment terms are NET 30, with no partial payments or deliveries accepted.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

80LARC891866Q

SITE VISIT ATTENDEE ROSTER

Solicitation 80LARC891866Q Site Visit – LaRC Gantry Facility

5 Total Attendees:

A. Fortress Fabric Structures

1) Greg Jones

B. Apex Construction Solutions LLC

1) Michael Clayton

C. Brandsafway

1) Jordan Schoonover

D. Faraday Defense Corporation

1) Chad Herring

E. Amentum Technology INC

1) John McIntruff

T h e c o r n e r s t o n e o f N A S A ’ s c u r r e n t a n d f u t u r e m i s s i o n swww.nasa.gov

The cornerstone of NASA’s current and future missions

Langley Research Center - Gantry Facility

Moon Lander Testing Project

February 25, 2025, at 11:00am EST

Site Visit for Mobile Shelter Structure

RFQ Notice ID 80LARC891866Q

T h e c o r n e r s t o n e o f N A S A ’ s c u r r e n t a n d f u t u r e m i s s i o n s

Agenda

❖ Introductions

❖ Opening Remarks – Office of Procurement

❖ Technical Presentation - Structural Dynamics Branch (D322)

▪ Procurement Overview & Summary of deliverables as identified in the Statement of Work (SOW)

❖ Question & Answer

❖ Tour of Gantry Facility (dependent upon weather conditions)

T h e c o r n e r s t o n e o f N A S A ’ s c u r r e n t a n d f u t u r e m i s s i o n s

Opening Remarks – LaRC Office of Procurement

❖ Any discussions, comments, etc., made by Government personnel during the site visit are considered unofficial responses.

❖ Nothing stated at today’s site visit should be construed as a revision of the Request for Quotation (RFQ) posted on Sam.gov unless it is posted as an Amendment to the solicitation on Sam.gov.

❖ In the event of an inconsistency between information provided in today’s presentation and the posted RFQ, the language in the posted RFQ shall govern.

❖ No oral understanding or agreement shall be binding on either party.

National Aeronautics and Space Administration www.nasa.gov

HLS Moon Landing Test (MLT) Project

Mobile Shelter Structure (MSS) Procurement

Landing and Impact Research Facility, NASA Langley Research Center

February 25, 2025

A Mobile Shelter Structure (MSS) for NASA’s Moon Landing Test Project

➢ The Human Landing System (HLS) Moon Landing Test (MLT) Project will be testing new Boilerplate Lunar Landers beginning late 2025.

➢ Shelter is mobile and can be moved 200 ft in the plane of the Gantry concrete using a 10,000 lb. Telehandler and a Truck and anchored in 1 hr.

➢ Protect the stationary Boilerplate Lunar Lander (BLL) and its installed instruments from rain/snow/ice/wind/debris in between tests by moving over the BLL from the west.

➢ MSS will have 1 large bay door on east end & 1 personnel door.

➢ Shelter can be anchored to the Gantry concrete.

➢ Mobile Shelter will be usable with minimal maintenance for 6 yr operational use period.

➢ Proposed MSS design shall not require modifications to the Gantry facility

Apollo Lunar Excursion Module on Impact Barrier

3/6/2025 10

Anchor Point Locations at LandIR

BLL at Primary Position

Hydro Impact Basin

West Bent

Center Bent East Bent

Building 1297

Minimum Door Opening Dimensions

3/6/2025 11

Gantry Floor Layout

3/6/2025 12

Crosshatched area can be used for Shelter anchoring if needed.

Minimum Interior Shelter Dimensions

3/6/2025 13

Dimensions at Primary Shelter Location

3/6/2025 14

Rasied

IB (51’ N-S)

Shelter (46’ x 46’)

21.7’

9.3’

23’

9.8’12.1’

BLL Ø31’

88.8’

25.7’

GRASS

File details come from the government source that posted it. Updated .