Attachment L-5 Model Task Order (MTO) Statement of Work (SOW).pdf
PDF 276 KB Posted
- Solicitation number
- 80LARC27R0003
About this file
This is a Model Task Order (MTO) Statement of Work for the 2028 Heliophysics University-class Explorer (UNEX) Mission of Opportunity single-step Technical, Management, and Cost (TMC) proposal evaluation. NASA's Science Office for Mission Assessments (SOMA) at NASA Langley Research Center requires contractor support to evaluate proposals submitted in response to the 2028 Heliophysics UNEX Mission of Opportunity Announcement of Opportunity. The evaluation involves assessing 11 total proposals across two independent subpanels, each performing 11 distinct functions: Form Lead, Mission Design & Operations, Systems Engineering, Flight Systems, Management, Schedule, Instrument #1, Instrument #2, Cost #1, Cost #2, and Consistency. All task personnel must be U.S. persons with Personal Identity Verification (PIV) certification for access to NASA's Remote Evaluation System (RES). The contractor must provide Form C evaluations capturing strengths, weaknesses, and robustness of proposed descopes for each proposal, with two independent cost estimates for development and operations.
Key assumptions include a $20M FY28 cost cap per proposal (excluding rideshare access), January 2031 launch readiness date, two years of operational specifications, and firm-fixed-price requirements for Phases A, B, E, and F. The evaluation schedule runs from task order issuance (approximately October 15, 2027) through September 30, 2028, with critical milestones including NOI-based Conflicts of Interest (COI) checks (January 24, 2028), proposal submission (February 7, 2028), Kickoff conference (February 18, 2028), proposal-based COI and technical compliance checks (March 3, 2028), Fat Matrix and Forms C web conferences (March-May 2028), virtual site visits (June 2028), hybrid Plenary (July 2028), and final deliverables through September 2028. Other Direct Costs cover travel for up to 26 personnel for NASA badging (two one-day trips each), classified heritage appendix evaluations (two half-day trips), and Plenary attendance, with the Plenary requiring seven days (one travel day, five 10-hour workdays, one return day) and logistics support including meeting room and Audio/Visual equipment procurement. The contractor must provide pre-priced adjustment increments for proposal quantity changes (±2 proposals), classified appendix evaluation variations (±2 appendices), and per-trip cost adjustments down to zero trips.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Model Task Order (MTO) Statement of Work (SOW) MTO Task Title: 2028 Heliophysics UNiversity-class Explorer (UNEX) Mission of Opportunity (MO)
Single-Step Technical, Management, and Cost (TMC) Proposal Evaluation
1.0 INTRODUCTION/BACKGROUND
This requirement is within scope of Sections 3.0 and 5.0 of Exhibit A - Performance Work Statement (PWS) for
80LARC27R0003.
The NASA Science Office for Mission Assessments (SOMA) at NASA Langley Research Center (LaRC) requires technical expertise and administrative support for the Technical, Management, and Cost (TMC) evaluation of proposals expected to be submitted in response to the 2028 Heliophysics UNEX MO Announcement of Opportunity (AO).
The purpose of this MTO is to provide required technical expertise and administrative support to SOMA at NASA/LaRC to assist in the evaluation of proposals solicited through the 2028 Heliophysics UNEX MO AO. As part of the evaluation process, the Contractor must provide a Form C for each proposal. Form C captures the TMC evaluation of each proposed investigation concept in the form of findings (strengths and weaknesses), including robustness afforded by proposed descopes.
2.0 KEY ASSUMPTIONS
The following key assumptions apply to this MTO:
2.1 The AO Cost Cap will be $20M Fiscal Year (FY)28, not including AO-provided access to space by way of Rideshare; the Launch Readiness Date will be January 2031; two (2) years of operations will be specified;
proposed investigations will be required to be firm-fixed-price in Phases A, B, E, and F; proposers will be highly incentivized to provide tailoring of NASA Procedural Requirements (NPR) 7120.5 allowed for in Science Mission Directorate (SMD) Policy Document (SPD)-48 SMD Category 3/Class D Projects Implementation Policy.
2.2 There will be a total of 11 proposals, evaluated by two (2) subpanels. All proposals are expected to contain export-controlled material. Two (2) proposals are projected to provide classified heritage appendices at the Top Secret (TS) / Sensitive Compartmented Information (SCI) level.
2.3 Each subpanel will perform 11 functions:
1. Form Lead
2. Mission Design & Operations
3. Systems Engineering
4. Flight Systems, including constellations
5. Management
6. Schedule
7. Instrument #1
8. Instrument #2
9. Cost #1
10. Cost #2
11. Consistency
Except for Cost, Evaluators are permitted to be responsible for more than one function.
All task personnel must be U.S. persons. Each will be provided with a NASA End User Services Office (EUSO) computer that will enable the use of SOMA’s Remote Evaluation System (RES) that resides behind the NASA firewall and must therefore be subject to a Personal Identity Verification (PIV) submission.
Cost must address both development and operations, with two (2) distinct models each, to be provided.
One (1) specialist function for the evaluation of two (2) classified heritage appendices is projected to be required. One (1) appendix will be delivered to NASA Headquarters (HQ) and the other will be provided at a To Be Determined (TBD) facility in the Continental United States (CONUS).
One (1) specialist function will be required to provide technical editing of Forms C after the Plenary, in preparation for Categorization, Steering, and Selection by NASA HQ.
2.4 The two (2) Form Leads will need to meet biweekly, independent of the two (2) subpanels, with the NASA Task Monitor (TM). Evaluators responsible for Consistency will also need to meet independent of the two (2) subpanels.
2.5 The web conferences in Section 3 must be limited to the following hours: the Kickoff Meeting three (3) hours or less, and the “Fat Matrix,” Form C1, and Form C2 webometrics each two and one half (2.5) hours or less.
2.6 Other Direct Costs consist of travel for up to 26 sets (11 subpanel functions plus 2 specialist functions, across 2 subpanels) of two (2) one-day trips to a NASA Center to initiate (trip #1) and complete (trip #2) NASA badging, two (2) trips for half-day evaluations of classified heritage appendices, and Plenary Meeting travel*; as well as logistics support to the Plenary Meeting.
*For the Plenary travel, all TMC Evaluators and the Contractor Task Manager will be highly encouraged to travel (for a total of 24 travelers). The Plenary Meeting must have a duration of seven (7) days, consisting of one (1) travel day to the site, five (5) workdays, and one (1) return travel day. The Plenary workdays must be 10 hours per day.
For logistics support, the Contractor must be responsible for securing meeting rooms for the plenary meetings, including all required Audio/Visual (A/V) and computer equipment.
Pre-priced per-proposal adjustment increments for a proposal number increase of up to two (2) and decrease of up to two (2) must be provided. Analogously, pre-priced per-function adjustment increments for the evaluation of one (1), and two (2) fewer classified heritage appendices must be provided. Finally, pre-priced per-travel-adjustment increments must be provided for each trip type, down to zero trips for each.
Any change to the key assumptions will result in a modification, potentially resulting in an adjustment to the proposed price.
3.0 DESCRIPTION OF THE WORK TO BE PERFORMED
The Contractor must perform the activities below.
3.1 Proposal Assessment Preparation and Process Definition Support
The Contractor must perform schedule planning, product planning, and preparation of presentation materials for the TMC kickoff meeting. The Contractor must complete the staffing plan with a final roster of expert evaluators to cover the anticipated scope of the proposals. The Contractor must make preparations to initiate the evaluation process. The Contractor must also perform a scan of the proposals for any evidence of any Conflicts of Interest
(COIs). Specifically, the Contractor must search for evidence of participation by itself or participation of organizations/institutions of any of the evaluators, document any instances, and suggest COI mitigation strategies if appropriate. Any actual COI must be immediately reported to the Contracting Officer (CO), Contracting Officer’s Representative (COR), and TM.
3.1.1 Task Manager
The Contractor must provide a Task Manager, who will have the overall responsibility (along with the Contractor Program Manager (PM)) for Task requirement completion, to ensure all deliverables are provided in a quality fashion and on time.
The Task Manager will work closely with the NASA TM to Plan the Evaluation, including defining roles, responsibilities, and skill mix. More specifically, the Task Manager’s responsibilities must include, but are not limited to:
• Searching for potential Evaluation Team candidates.
• Assisting the PM with identifying/resolving COI issues and obtaining required forms/certifications from required members of the Evaluation Team.
• Maintaining an Evaluation Team Contact List.
• Assisting with development of the Proposal Evaluation Schedule.
• Assisting with development of the Kickoff Meeting presentation materials and assisting and facilitating the Kickoff Meeting.
• Assisting with documenting Technical Compliance of all Proposals.
• Assisting with completing a COI scan on all proposal materials to document any potential or actual
COIs.
• Assisting with coordinating/setting up Federal Information Processing Standard (FIPS) 140-2 Level I compliant web conferences for the Kickoff meeting, subpanel web conferences, and the Plenary, and special team meetings.
• Coordinating logistics for the Plenary.
• Assisting with conducting the Plenary (ensuring the room is set up) and assisting with coordinating activities during the meeting to ensure it flows efficiently and smoothly.
• Providing assistance to ensure all deliverables are provided on time and in a quality fashion.
• Facilitating technical editing and formatting of Forms C to ensure they have proper proposal references, and they are produced in a standardized quality manner.
• Providing miscellaneous support to Evaluation Team members, as required, to facilitate accomplishment of the Evaluation.
3.1.2 Subpanel Definition/Team Building
The Contractor Task Manager and the Contractor PM must familiarize themselves with the AO. With this information, and working with the NASA TM, and taking into account the information contained in the Notices of Intent (NOIs) submitted by proposers, the Contractor must assemble the subpanels with the skill sets necessary to conduct the Evaluation.
The estimated number of proposals and expertise needed to evaluate the proposals are identified in Section 2.0, and the required completion date for the Evaluation is identified in Section 2. The Contractor must provide two
(2) independent cost estimates for both development and operations of each proposal.
The Contractor must provide the required non-conflicted SMEs with recent and relevant expertise to conduct this Evaluation. To assess the possibility of COIs, a Projected Participating Parties List is provided in Section 7 below.
The Contractor must assign one Form Lead for each subpanel, who must lead their respective subpanel through the evaluation of its assigned proposals. These individuals must be experienced team leaders capable of handling the job.
3.1.3 Proposal Assignment Plan
Based on the expertise of each subpanel the Contractor must work with the NASA TM to determine what proposals will be evaluated by each subpanel.
3.1.4 Train Team on Ethics, Organizational Conflicts of Interest (OCI), and Export Control
The Contractor must provide training and obtain certifications in accordance with the Contractor’s OCI Plan and overall training plan.
3.1.5 Obtain Final Resolution on any Potential or Actual COIs
Each and every person supplied by the Contractor including Contractor employees, consultants, and Contractor-sponsored subcontractor personnel (at all tiers) who are to be assigned to work on this Task must be screened for COIs. The Contractor must conduct Conflicts of Interest (COI) training with its Evaluators and obtain certifications in accordance with the contract’s OCI Plan.
Final resolution of any potential or actual COIs must be accomplished as indicated in the Contractor’s OCI Plan.
3.1.6 Team Contact List
The Task Manager must maintain a Contact List of all individuals who are added to the Evaluation Team. This will include all Contractor-supplied individuals (employees, consultants, and subcontractor personnel) and civil servants or other government personnel added to the Evaluation Team. The Team Contact List must include (but is not limited to) each individual’s name; role and responsibility on the Evaluation Team; primary area of expertise; affiliation; name, address, and phone number; and email address.
3.1.7 RES Utilization
The NASA TM has the sole decision authority/responsibility for allowing RES access to individuals. The NASA TM will require input from the Task Manager on appropriate settings at the folder level for individual read, write, and read/write privileges. Only the NASA TM will have delete capabilities.
The Contractor must test the RES for functionality prior to the Kickoff Meeting. The Contractor must provide instructions to the Evaluation Team on how to obtain the Kickoff materials from the RES.
3.1.8 Kickoff Meeting
The Contractor must work with the NASA TM and develop a draft Kickoff Meeting Presentation (PowerPoint slides) and must assist in briefing the Evaluation Team. The presentation must review COI responsibilities, Non- Disclosure Agreement (NDA) responsibilities, handling of Sensitive Information requirements and responsibilities, export-control responsibilities, contractual Limitation on Future Contracting, and the consequences of not following all requirements as indicated in the presentation. The presentation must include pertinent information from the AO that is required to conduct the Evaluation. It must include the Evaluation Criteria, an Evaluation Schedule, and identify the membership on each subpanel. It must also include a preliminary Proposal Review Schedule, including tentatively when web conferences for each subpanel might be held, and when the Plenary will be held.
The Contractor must provide a web conference service that has been certified at FIPS 140-2 Level I. The Contractor must notify all participants of the time and date for each web conference and how to obtain presentation materials from the RES. For the Plenary, the Contractor must set up the meeting room, ensuring that all provided audio/visual equipment is functional.
Each member of the Evaluation Team must attend the Kickoff Meeting or a make-up session before access to proposals is provided.
3.1.9 NOI and Proposal COI scan
Upon submission of mandatory NOIs, the Contractor must consolidate separate inputs into a Participating Parties List that captures all potential proposing institutions and organizations. The Contractor must use this List to initiate its COI assessment process. Adjudication Requests must be developed and submitted to the NASA TM for all potential and actual COIs.
Upon receipt of proposals, the Contractor must update the Participating Parties List with appropriate additions and deletions. A word search must be conducted on this file looking for any occurrences of participation by the Contractor or by any subcontractors, at all tiers, that are assisting the Contractor in conducting this Evaluation, and for substantial affiliates (e.g., funding organizations). In addition, a search must also be conducted on the names of all Evaluation Team Members, along with a search for any key words or names suggested by the NASA TM or the NASA Program Scientist (PS) for the UNEX AO. All flagged instances must be documented with a proposal name, page and paragraph number, along with the pertinent wording from the paragraph in question such that identification and evaluation of any COI issues can quickly be made. Adjudication Requests must be developed and submitted to the NASATM for all potential and actual COIs.
3.1.10 Compliance Check
Upon receipt of proposals, the Contractor must conduct a Technical Compliance Check (as defined in the AO) and must document any possible non-compliances. This information must be provided to the NASA TM to assist in the determination by NASA HQ SMD of non-compliance.
3.2 TMC Assessment and Analysis of Proposals
3.2.1 Proposal Evaluation
Each Contractor Evaluation Team Member must perform a detailed evaluation of each proposal assigned to their subpanel, concentrating on their assigned area(s) of expertise. However, Evaluation Team Members may comment on any area in which they feel qualified.
3.2.2 Development of Findings
Each Contractor Evaluation Team Member must enter their comments for each assigned proposal into the RES in time to support subpanel deliberations on derived strengths and weaknesses. The Contractor must indicate cases where individual Evaluators will need to coordinate prior to submission of findings.
After all members of a subpanel enter their comments for a proposal, the respective Subpanel Lead must utilize the RES to produce a “Fat Matrix” that combines all the Evaluation Team Members’ comments for that particular proposal. Subpanel Contractor Evaluation Team Members must then participate in a proposal-specific “Fat Matrix” web conference to develop initial findings that the Subpanel Lead will document in a Form C1. The Subpanel Lead must be responsible for further editing, consolidating, and refining Forms C1 after a subsequent Form C1 web conference, into Forms C2. Unless previously approved by the Subpanel Lead and NASA TM, all members assigned to a subpanel must participate in all relevant web conferences.
3.2.3 Virtual Site Visits
One (1) week before each Site Visit the Contractor must hold a Form C2 web conference to finalize significant weaknesses for provision to the proposing team. Each proposing team will be afforded a two (2) hour virtual Site Visit to clarify significant weaknesses. Participation by Evaluators will be limited to the subpanel to which the proposing team’s proposal was assigned. The Contractor must assign a Steward for each significant weakness;
each Steward must be responsible for recommending how to disposition their significant weakness to the Subpanel Lead prior to the Plenary.
3.2.4 Plenary
All the Contractor team members, including Task Manager, must participate in the Plenary. Over the course of the Plenary the Contractor must:
• Provide summary presentations on cost, schedule, and mission design.
• Participate in the Plenary by judging the completeness, accuracy, and consistent treatment of each proposal’s evaluation.
• Determine, via a polling process, the final assignment of Form C ratings for each proposal as directed by the Government. The Contractor must also prepare a “polling log” indicating who will be polled for each proposal and that must automatically (via formulas developed in an Excel Spreadsheet) determine the median, average, or mode of each tallied poll for each proposal.
• Document the findings in Plenary versions of the Form C for each proposal.
• Secure meeting rooms for the Plenary, including all required A/V and computer equipment.
3.3 Prepare Document and Support Presentation of Findings
The Contractor must prepare supporting documents and presentation materials as required and must:
• Provide the final Forms C upon completion of technical editing.
• Provide relevant input from the evaluation to the Science Panel.
• Prepare or provide input to briefing books and/or a history book documenting all evaluation panel activity, findings, and recommendations, as directed by the NASA TM.
• Prepare and present to the Heliophysics Explorers Program a Transition Briefing Presentation on the
Selected proposal.
• Develop a Lessons Learned presentation that addresses potential improvements to the Evaluation process.
• Archive the final forms, as well as copies of presentation materials and summaries to the RES.
4.0 GOVERNMENT FURNISHED PROPERTY (GFP)/INFORMATION (GFI)
The Government will provide the following GFP/GFI:
GFP/GFI Qty DATE TO BE FURNISHED EUSO Devices TBD At award RES access At award Cost models and data relevant to the establishment development and operations error bounds
2 weeks after award
Proposals 1 week after proposal due date
5.0 DELIVERABLES
The Contractor must deliver all documents (reports and presentations) in Microsoft® Office or Adobe® Portable Document Format (PDF) format, unless otherwise specified herein. The Contractor must provide the deliverables to the NASA TM electronically (via RES upload).
THE CONTRACTOR MUST PROVIDE THE DELIVERABLES BELOW:
5.1 Evaluation planning material (Sec 3.1)
5.2 Draft Kickoff Meeting Presentation (Sec 3.1.8)
5.3 NOI-based and proposal-based COI checks (Sec 3.1.9)
5.4 Technical compliance check of proposals (Sec 3.1.10)
5.5 “Fat Matrices,” Forms C1, and Forms C2 (Sec 3.2)
5.6 Final Forms C (Sec 3.3)
5.7 Transition Briefing Presentation (Sec 3.3)
5.8 Lessons Learned Presentation (Sec 3.3)
5.9 Archival of deliverables on the RES (Sec 3.3)
6.0 MILESTONES
The NASA TM will communicate any changes to event dates. The current schedule of Milestones with associated deliverables is listed below.
Item No. Milestone Title
Approximate Completion Date /
Range of Dates Deliverables* (see Note below)
6.1 Task start N/A
6.2 AO release November 1, 2027
6.3 NOIs due December 13, 2027
6.4 NOI-based COI check January 24, 2028
5.3 Delivery of NOI-based COI
Adjudication Requests for Team as defined at time of NOI submissions
$Offeror Fill-In (OFI)
6.5 Recommendations of cost error ranges for both development and operations.
January 31, 2028
6.6 Proposal due date February 7, 2028
6.7 Kickoff web conference February 18, 2028 5.2 Kickoff Draft Presentation
$OFI
6.8 Proposal-based COI and Technical Compliance Checks
March 3, 2028
5.3 Delivery of Proposal-based
COI Adjudication Requests for Team as defined at time of proposal submissions and Technical Compliance checks
$OFI
6.9 Fat Matrix and Forms C
Web conferences March 2028 – May 2028
5.5 Delivery of full set of Form
C1 web conferences
$OFI
6.10 Virtual Site Visits June 2028
5.6 Delivery of Steward
dispositions for Virtual Site Visits
$OFI
6.11 Hybrid Plenary July 2028
5.6 Delivery of Technical Editing
of Forms C after Plenary
$OFI
6.12 Virtual Transition
Briefing August 2028
5.7 Transition Briefing
Presentation
$OFI
6.13 Lessons Learned
Presentation August 2028 5.8 Lessons Learned Presentation
$OFI
6.14 Documentation
Archival September 2028
5.9 Archival of all Section 5.0
Deliverables
$OFI
*Note: Where marked $OFI (Offeror Fill-In), the Contractor must propose the invoice value of that milestone in its MTO proposal.
7.0 Projected Participating Parties List
For the purposes of a pre-task award COI check, the following sets of institutions are projected to propose. In accordance with the Final RFP Section L.18, Subsection 4 MTO General Instructions under Mission Suitability, the Offeror must identify the strategies (e.g., avoiding, mitigation, limitation on future contracting) for resolving each potential or actual COI that is identified by the Offeror’s relationship(s) to the parties in the List below, explain the process for implementing that strategy, and explain the effect of such strategy on performance of the MTO.
University of California, Berkeley/Space Sciences Laboratory (SSL) Hampton University (HU)/LaRC University of Colorado, Boulder/National Center for Atmospheric Research (NCAR) Johns Hopkins University (JHU)/Applied Physics Laboratory (APL) University of New Hampshire (UNH)/U.S. Naval Research Laboratory (NRL) University of California, Los Angeles (LA)/Goddard Space Flight Center (GSFC) University of Alabama, Huntsville/Marshall Space Flight Center (MSFC) Laboratory for Atmospheric and Space Physics (LASP)/Ames Research Center (ARC) Smithsonian Astrophysical Observatory (SAO)/Lockheed Martin Advanced Technology Laboratories California Institute of Technology (Caltech)/Jet Propulsion Laboratory (JPL) University of Iowa/Southwest Research Institute (SwRI)
8. Period of Performance: Date of Task Order issuance (~October 15, 2027) through
September 30, 2028.
9. NASA Task Monitor (TM): TBD