80KSC024R0003 0003.pdf

PDF 149 KB Posted

Attached to
80KSC023ZCS003L, Replace Overhead Power Line B at Kennedy Space Center
Solicitation number
80KSC024R0003
Issued by

About this file

This document contains an amendment to solicitation number 80KSC024R0003 for replacing an overhead power line at the Kennedy Space Center. The amendment provides responses to bidder questions to clarify requirements. Bidders must acknowledge receipt of the amendment by the specified date and time to have their offers considered. For Phase 1 of the qualification package, offerors need only submit a letter from their bonding company stating the offeror's single project bonding capacity is at least $10 million, rather than providing an actual bond. The amendment clarifies that a bond is not required for Phase 1 of the solicitation process. The replacement of the overhead power line is required at the Kennedy Space Center, which is part of the National Aeronautics and Space Administration. The solicitation number is 80KSC024R0003 and responses from bidders are due by the dates specified.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

OP-CS

n/a

LaCorsha Whitmore Noel, Contracting Officer

The purpose of Amendment 0003 is to provide Government responses to bidder inquiries, see attached.

OP-CS

John F. Kennedy Space Center, NASA Procurement Office Code: OP-CS Kennedy Space Center, FL 32899

John F. Kennedy Space Center, NASA Procurement Office Code: OP-CS Bldg M7-0301 (HQ), Rm 5226C, Attn: LaCorsha Noel Kennedy Space Center, FL 32899 or email to Lacorsha.d.noel@nasa.gov

TBD

N/A

80KSC024R0003

99535

1 2

01/24/2024

12/21/2023

LaCorsha Whitmore Noel Digitally signed by LaCorsha Whitmore Noel Date: 2024.01.24 08:06:03 -05'00'

01/24/2024

1 1/10/2024 2.3.1 Specialized experience and technical competence Define specific elements which would determine a contract/project similar in content and complexity to this acquisition.

Specialized experience in the removal, replacement or placement of overhead and underground distributed high voltage electrical power line systems, to include, but not limited to, associated earth and ground work, wire, poles (both wood and concrete), load break equipment and transformers.

2 1/23/2024 3.4.2 Qualifications Package Preparation Instructions For the Phase 1 Qualification package, the Government is requesting: "One electronic copy of the offerors “Single Project Bonding Capacity” letter, from an approved Surety, confirming the offeror has a single project bonding capacity of at least $10,000,000."

For clarification purposes would this requirement be something that is normally required this early in the process or would this wait until Phase 2 or the award of the contract? If needed now, do we just need to provide showing a general Bonding Bid policy in place, not naming NASA on the policy?

Per section 3.4.2, offerors are to submit a letter from their bonding company stating the offeror could get a bond for $10M for Phase 1.

A bond is not necessary for Phase 1.

Amend No.

Solicitation No. 80KSC024R0003 Project Title: Replace Overhead Power Line B

No. Date Received

Reference (Section Paragraph/Page, Drawing Sheet/Page) QUESTION GOVERNMENT RESPONSE

80KSC024R0003 0003 print
Power Line govt Consolidated Questions Log 24jan2024

File details come from the government source that posted it. Updated .