This document contains questions and responses regarding a Request for Proposal for launch services for NASA's Time-Resolved Observations of Precipitation Structure and Storm Intensity with a Constellation of Smallsats mission. The RFP seeks launch services to place six CubeSats into three low-Earth orbital planes with two satellites in each plane. All satellites must launch within a 120 day window to meet science objectives. The anticipated RFP release date is July 31, 2020, with proposals due August 31, 2020. The contract will be set aside for U.S. launch services providers and awarded on a firm-fixed price basis. Responses clarify that spacecraft can be delivered simultaneously for a single launch and provide updated acceleration load requirements.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| TROPICS RFP RESPONSES V2.pdf | ||
| Change Log in Response to RFP questions.pdf | ||
| Request for Proposal (RFP) Cover Letter.pdf | ||
| Annex 1 - TROPICS LSIRD.pdf | ||
| 80KSC020R0036-RFP.pdf | ||
| Attachment 03 - MDDR TROPICS.pdf | ||
| RFP Question Card.xlsx | XLSX spreadsheet | |
| Annex 1 - TROPICS LSIRD.pdf | ||
| Attachment 02 - CDRLs TROPICS.pdf | ||
| Attachment 01 - TROPICS SOW.pdf | ||
| Change Log from DRFP to RFP final.xlsx | XLSX spreadsheet | |
| Request for Proposal (RFP) Cover Letter.pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TROPICS DRFP QUESTIONS & RESPONSES 80KSC020R0036
GENERAL QUESTIONS
Question:
Please clarify the launch period. The Cover Letter says Jan 31 for the opening of the launch period but the RFP says Jan 8.
Question:
In the Cover Letter it says "The spacecraft availability is January 31, 2022" - can the SVs be made available sooner than January 31, 2022? If so, what is the soonest?
Response:
The launch period begins January 8, 2022.
The spacecraft availability is L-30 days for each launch per SOW Section 7.0.
The Cover Letter has been updated to remove the reference of January 31, 2022.
SECTION 4 - LIST OF ATTACHMENTS
Attachment 01 - Statement of Work (SOW)
In Section 7.0 - "TROPICS SV’s are currently scheduled to be delivered at L-30 days for each launch." Can all of the SV's be delivered simultaneously?
Response:
Yes, the Space vehicles could be delivered simultaneously in the event of a single launch solution. SV's are currently scheduled to be delivered at L-30 days for each launch as stated in Attachment 1 - SOW, Section 7.0.
Annex 1 – Launch Services Interface Requirements Document (LSIRD)
Section 3.3.3 says 20 g lateral, 20 g longitudinal. Should that be interpreted as +/- 20 g in each axis or +/- 10 g in each axis or in some other way?
Response:
Section 3.3.4 should be interpreted as +/- 20 g in each axis. The LSIRD has been updated to reflect this change.
TROPICS DRFP QUESTIONS & RESPONSES 80KSC020R0036
SECTION 7 - EVALUATION FACTORS FOR AWARD
7.2.1 VOLUME I, TECHNICAL/MANAGEMENT CAPABILITY
Does the "Statement of Acceptance/Summary of Exceptions" count against the page limits?
Question:
Does the "Contractor Acronyms and Definitions" count against the page limits?
Response:
Yes.