Attachment A.1 Trajectory Requirements Amendment 001.pdf

PDF 41 KB Posted

Attached to
80KSC020R0003 - CAPSTONE - Cislunar Autonomous Positioning System Technology Operations and Navigation Experiment - Launch Service Federal contract opportunity
Solicitation number
80KSC020R0003
Issued by
National Aeronautics and Space Administration Kennedy Space Center

About this file

This solicitation seeks launch services for the CAPSTONE mission to place a 37 kg spacecraft into a 160 km x 1,330,000 km orbit at an inclination of 30 degrees. Offerors must be capable of supporting a launch attempt on any day within the launch period, with injection target parameters including characteristic energy of 8 degrees and a 3-sigma dispersion of 1 degree. Thermal, attitude separation, tipoff rate, and post-separation requirements are specified. Questions are due by December 18, 2019, with proposals due by the date and time set forth in the solicitation. The National Aeronautics and Space Administration Kennedy Space Center is the contracting agency.

View the file

Other files for this federal contract opportunity

Other files attached to 80KSC020R0003 - CAPSTONE - Cislunar Autonomous Positioning System Technology Operations and Navigation Experiment - Launch Service, newest first.
File Type Posted
01 Sections A-M Amendment 002.docx DOCX document
CAPSTONE Change Log 01.07.20.pdf PDF
SF30 80KSC020R0003 Amendment 002.pdf PDF
CAPSTONE RFP RESPONSES 1.07.2020.pdf PDF
01 Sections A-M Amendment 001.docx DOCX document
SF30 80KSC020R0003 Amendment 001.pdf PDF
01 - 1449 80KSC020R0003.pdf PDF
CAPSTONE Change Log 12.20.19.pdf PDF
CAPSTONE RFP RESPONSES 12.20.2019.pdf PDF
80KSC020R0003 SF1449 Sections A thru M.pdf PDF
Attachment A.2 Launch Requirements.pdf PDF
Attachment A.3 12U Deployer_UserGuide_TYVAK-8005_November 2019_1.pdf PDF
Attachment D - Acronyms and Abbreviations.pdf PDF
80KSC020R0003 SF1449 Sections A thru M.pdf PDF
CAPSTONE DRFP RESPONSES Version 02.pdf PDF
Change Log from DRFP to RFP final.pdf PDF
Question Card.xlsx XLSX spreadsheet
Attachment C Milestones.pdf PDF
Attachment A.1 Trajectory Requirements.pdf PDF
Attachment A - SOW.pdf PDF
Attachment B CDRLS.pdf PDF
Show all 21

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CAPSTONE ATTACHMENT A.1 – Trajectory Requirements 80KSC020R0003 Amendment 001

Launch Opportunities The launch vehicle (LV) shall be capable of supporting a launch attempt on any day within the launch period for which the mission design closes.

Reference Mass The reference mass of the spacecraft (SC) is 37 kg. This consists of the 25 kg separating SC, a

9.2 kg dispenser, and 8% margin.

Reference Mission Target Orbit Requirements The LV shall place the spacecraft into an orbit at the Target Interface Point (TIP) with the parameters shown in Table 1.

Table 1: Injection Target Orbit Parameters at TIP

Parameter Value 3-Sigma Dispersion

TIP Time(1) Daily Varying (UTC Time) N/A

Characteristic Energy (C3)(1) <= -0.6 km2/s2 ± 0.1 km2/s2

Argument of Perigee(1)

Daily Varying (between –20 and +20 degrees inclusive or between 160 and 200 degrees inclusive)

± 1.0 deg

Right Ascension of the Ascending Node (RAAN) (1)

Daily Varying (between 0 and 360 degees)

± 1.0 deg

Inclination >8 deg ± 1.0 deg

Notes:

(1) The targets and TIP time will vary depending on the result of the LV solution. The values and ranges provided reflect a 160 km x 1,330,000 km injection orbit at an inclination of 30 deg.

(2) These targets and dispersion values are preliminary. The final analyses and interfaces shall be developed with the LV.

(3) The LV target orbit parameters shall be defined using the constants defined by the World Geodetic System 1984 (WGS-84).

CAPSTONE ATTACHMENT A.1 – Trajectory Requirements 80KSC020R0003 Amendment 001

Mission Thermal Requirements The SC has no thermal requirements that impact the LV mission design nor are there any Sun angle constraints imposed on the LV by the SC mission design.

Separation Attitude The SC has no requirement on the orientation of the LV for separation of the SC.

Tipoff Rates At loss of contact between the LV and the SC, the total SC body rate induced by the LV shall not exceed 10 deg/sec.

Note: Total SC body rate is defined as the RSS of the Xsc, Ysc, and Zsc body rates.

Mission Duration The SC has no requirement on the LV mission duration.

Post SC Separation Following SC separation, the LV hardware shall not recontact the spacecraft.

File details come from the government source that posted it. Updated .