This Request for Proposal (RFP) solicits proposals for the Kennedy Space Center Propellants and Life Support Services II contract. Key details include:

  • The contractor shall provide propellant services including receipt, storage, processing and distribution of 15 types of fluids such as cryogenic and hypergolic propellants and high-pressure gases. Propellant services also include fleet management and maintenance of over 100 mobile equipment items and 50 fixed propellant systems. Life support services such as protective equipment delivery, recycling and manufacturing shall also be provided.

  • Additional responsibilities include commodity ordering, usage analysis, accounting, support plans, efficiency studies, and sustaining engineering for government-owned propellant and life support facilities, systems and equipment. Pressure vessel management and recertification per NASA and KSC standards is required.

  • The North American Industry Classification System code is 541330 for Engineering Services. The size standard is $38.5 million. Proposals are due within 53 days. The incumbent contractor shall phase-in the new contractor. Export controls apply and access to related documentation requires System for Award Management registration and non-disclosure agreements.

View the file

Other files

File Type Posted
L-02 Price Template.xlsx XLSX spreadsheet
KPLSS II - DRFP Response to Questions.pdf PDF
80KSC019R0038.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

For the best experience, open this PDF portfolio in

Acrobat X or Adobe Reader X, or later.

Get Adobe Reader Now!

http://www.adobe.com/go/reader

Data Requirement

KSC FORM 16-246 NS 06/13 (1.0) PREVIOUS EDITIONS ARE OBSOLETE. Validate prior to use. NRRS 5/13.A

Contract Application Information for DRL KPLSS II A. Item Number 1-18

B. Line Item Title Safety and Health (S&H) Plan

C. OPR

SA-E

D. Type

E. Inspect / Accept

F. Frequency

AR/AN

G. Initial Sub.

See Block I

H. As of Date See Block I/8

I. Remarks G. The Contractor shall submit its S&H Plan no later than 30 days after Phase-In start. The approved S&H Plan shall be incorporated into the contract as Attachment J-14 prior to contract start.

H. The Contractor shall review the Plan annually and by November 1st of each year. Submit confirmation that the Plan remains current or any updates by November 1st of each year.

J. Type “D” is electronic submittal. Product shall be compatible with Microsoft Office suite of software. The approved documents shall be published electronically into TechDoc.

J. Distribution Totals

SA-E

SI-P (NASA KSC Fire) SI-E1 (NASA KSC Health)

OP-OS

SI-C3

No. Type

5 D

Data Requirement Description

1. Title Plan, Safety and Health

2. Number 1-18

3. Use To ensure the contract is conducted in a safe manner and complies with all S&H directives, instructions, policies, and regulations as listed in this contract. To verify the Contractor intends to be proactive in S&H practices.

4. Date

5. Organization

KPLSS II

6. References See Block 8 Below

7. Interrelationship

8. Preparation Information

The S&H Plan shall describe tasks and activities of the S&H program at each site where the Contractor is operational to assure identification, evaluation and elimination/control of S&H concerns. At a minimum, the plan shall include:

1. All S&H Plan requirements specified in FAR 52.236-13 Accident Prevention (NOV 1991) with Alternate I (NOV 1991) and KNPR 8715.3-1. Requirements may be incorporated by reference, however, the implementation shall be described fully.

2. Organizational charts(s) illustrating the functional relationships and lines of communication between the S&H organization and other organizational elements, including all subcontracts and NASA KSC Safety & Mission Assurance (S&MA) Representatives.

3. Descriptions of the S&H management functions within the organization including the processes through which management decisions will be made, as well as how notification to NASA KSC S&MA will be made for hazards, mishaps, and corrective action for each type of hazard. (i.e. Explosive Safety Officer, Pressure Systems Manager, Lifting Devices and Equipment Manager, etc.

should be included in the notification process for respective areas.)

4. Description of the responsibility, authority, and accountability of S&H personnel, other contractor organizational elements involved in the S&H, and subcontractor S&H personnel. Include the organizational unit responsible for the execution of S&H tasks and the position with the authority to resolve all identified S&H issues.

5. Description of the management controls that will be used to ensure compliance with S&H regulations.

6. Description of the safety program measurement system, including safety metrics and trend analysis methods. The performance measurement system should describe responsibility for identifying and implementing remedial measurement system.

7. A mishap contingency action plan that describes how support and services will continue in the event of a mishap.

8. Description of the safety analysis methodologies used to identify workplace and S&H design and operational hazards and how developed mitigations will be implemented throughout the Contractor’s organizations for NASA programs and projects resident at KSC and for the KSC institution.

9. A Drug and Alcohol-Free Workplace Policy and Plan that complies with NFS 1852.223-74, Drug and Alcohol Free Workforce.

10. A discussion of Process Safety Management in relation to systems design, operation, safing and maintenance for hypergol propellants.

The S&H plan shall include an industrial hygiene process, in accordance with KNPR 1840.1 KSC Hazard Communication Program, KNPR 1820.3 KSC Hearing Loss Prevention Program, KNPR 1820.4 KSC Respiratory Protection Program (RPP), and KNPR

1840.19 KSC Industrial Hygiene Program.

Revise the S&H Plan when major organizational changes occur in the lines of communication between the S&H organization and other organizational elements or when procedures or processes have changed that affect responsibility, authority, and accountability.

Instruction Page 1 of 1

Instructions for Completing Contract Application Information A. Line Item Number - Sequentially number line items beginning with number 001.

B. Line Item Title - Enter the title of the data item, as shown in the Statement of Work (SOW), the RFP and / or as directed by the CTM.

C. OPR (Office of Primary Responsibility) - Enter the organization designated to exercise technical and / or administrative control over the data requirement. Use approved organization code.

D. Type - Enter "Type of Data" code as follows:

Code Description 1 Data requiring written approval by the procuring activity prior to implementation into the procurement or development program.

2 Data submitted to the procuring activity for review not later than three weeks prior to project implementation. Data shall be considered approved unless the contractor has been notified of disapproval prior to project implementation.

3 Data submitted to the procuring activity for coordination, surveillance, or information.

4 Data retained by the contractor to be made available to the procuring activity upon request. The contractor shall furnish a list to the procuring activity.

5 Data to be retained by the contractor and reviewed by NASA on request.

E. Inspect / Accept - Enter inspection Acceptance code as follows:

Code Inspection Acceptance

1 Source Source 2 Destination (OPR) Destination (OPR) 3 Source Destination (OPR)

4 Certificate of Conformance (Mandatory) 5 Certificate of Conformance (Optional) 6 No Inspection Required No Acceptance Required

F. Frequency of Submission - Enter the frequency of submission code as follows:

AD As Directed AN Annual AR As Required BE Biennial BM BiMonthly (every two months) BW BiWeekly (every two weeks) DA Daily DD Deferred Delivery MO Monthly OT One-Time

PC Per Contract PD Per Failure PE Per Event PF Per Facility PG Per Program PI Per Equipment End Item PJ Per Project PL Per Launch Flight Mission PS Per System PT Per Test

PV Per Vehicle QU Quarterly RD As Released RT One Time & Revisions SA Semi Annually SM Semi Monthly TY Three Year Period UR Upon Request WK Weekly

G. Initial Submittal - Enter the date of initial submittal as follows: Month/Day/Year: If calendar date is not scheduled, enter number of days preceding, or following, event to which the data requirement is related (e.g., 90 days prior to launch). Amplify in Remarks, Item J, if necessary.

H. As Of Date - For "Onetime Only" submittals, enter date by Month/Day/Year. For recurring submittals, enter number coding (e.g., 30/10, 90/10, 15/5), etc. The first digit(s) indicate the number of calendar days from the reporting period's (Block F) start to the data preparation cut off. The second digit(s), after the slash, indicate the number of calendar days from the cut off to the submittal date. Example: If Block F were"MO" and Block H were "30/10", the data would include the entire month and would be submitted within 10 days thereafter.

I. Remarks: Enter in this space.

a. Minor exceptions to the DRD.

b. Stipulation of specific forms when multiple forms are authorized on the DRD.

c. The paragraph, page, etc., in an existing contract where the data requirement is specific. (This data may be removed at final approval.)

d. Additional submittal information, if necessary.

J. Distribution - Enter organizational symbol, number of copies, and type of copy code(s) (in parenthesis) required for each office. Type of copy codes are as follows:

A Regular B Reproducible

C Microfilm, Aperture Cards D Others (Explain in remarks, Item J)

Example Entries: Enter the total number of copies by type in the space provided.

IS-PRO-2 (1A) = One regular copy. IS-PO-3 (5, A, 1B) = Five Regular copies, One Reproducible copy.

Instructions for Completing Data Requirement Description General - The Data Requirement Description (DRD) will be prepared to describe the content and provide preparation information for data required in support of NASA programs.

1. Title - Enter the title or type of document required. The first word of the title should be a principal noun which best establishes the basic concept of the data. Subsequent words should be appropriate modifiers.

Examples: Plan, Project Development (SIVB); Specification, Test (GSE); Report, Quarterly Progress; Proposal, Engineering Change (ECP)

b. Stipulation of specific forms when multiple forms are authorized on the DRD.

2. Number - Enter the appropriate number assigned to the DRD. This number will identify the appropriate data category.

3. Use - Enter a synopsis of the use of the document, stating reason for the requirement.

4. Date - Enter date of preparation.

5. Organization - Identify the installation preparing the DRD.

6. References - List applicable documents by number, (NASA Management Manual, Mil Specifications, Federal Standards, NASA Procurement

Regulation, etc.) to which the preparing office (e.g., NASA installation, contractors, etc.) may refer for additional information concerning the data requirement.

7. Interrelationship - Enter all affected approved DRDs within the scope of the program when the DRD under preparation creates a significant impact or interface relationship with existing DRDs. Include a brief narrative of the impact or relationship created and a statement that the new DRD does not cause a conflict with other DRDs.

8. Preparation Information - Provide ample information for preparation of the data required by the data requirements description; include all necessary details of preparation to satisfy the originator's formal requirements.

Contract Application Information for DRL KPLSS II A. Item Number 2-2

B. Line Item Title Propellants and Life Support Master Plan

C. OPR

D. Type

E. Inspect / Accept

F. Frequency

SA

G. Initial Sub.

See Block 8

H. As of Date See Block 8

I. Remarks

J. Type “D” is electronic submittal via email. Product shall be compatible with Microsoft Office suite of software. Publish electronically in TechDoc and notify by email the NASA Propellants and Life Support Branch.

J. Distribution Totals

OP-OS

No. Type

2 D

Data Requirement Description

1. Title Plan, Propellants and Life Support Master

2. Number 2-2

3. Use To provide for propellants planning to ensure compliance with all safety and regulatory standards and to assure facility, system, and equipment availability for support.

4. Date

5. Organization

6. References 29 CFR 1910.134; 49 CFR regs

7. Interrelationship

8. Preparation Information The Contractor shall update and maintain the Propellants and Life Support Master Plan (PRO-RCD-0001). The Master Plans shall:

1. Document the rationale for conclusions reached in propellant and life support equipment and facility planning.

2. Cover a minimum of a five year period and used as the primary tool in developing project requirements. Segregate projects by:

i) routine maintenance activities

ii) non-routine maintenance activities

iii) customer-specific

iv) at the Contractor's expense.

3. Be the principal method of documenting propellant mobile equipment, life support equipment, and supporting facility planning efforts for the Propellants organization.

4. Provide replacement and re-manufacture schedules for all life support and major propellant systems and equipment (S&E).

5. Provide a comprehensive overview of propellant mobile equipment and facility projects associated with the transfer and distribution of propellants and pressurants for customer fluid support requirements.

6. Provide a comprehensive overview of all life support equipment and facility projects

7. Include planning for the CGT/MSU recertification program.

8. Develop, prioritize, coordinate, and integrate project plans. Define project plans and requirements, including thorough supporting justification and clear, accurate, and complete project scope as outlined below:

FY+4, FY+5 Projects: General scope of work, detailed justification, high level estimate, list of equipment affected by project.

FY+3 Projects: More defined scope of work with identification of major components, major labor tasks, general schedule of implementation and project cost estimate that includes all major components.

FY+1/FY+2 Projects: Include detailed scope of work, detailed material list and labor tasks, with more specific schedule for implementation.

All projects included in the Master Plan shall be listed in consideration of priority for implementation.

Adherence to the requirements for requalifications shall comply with the OSHA Respiratory Protection Standard 29 CFR

1910.13449 CFR regulations.

Two weeks before the due date, the Contractor shall submit a copy of the updated Master Plan to the NASA Propellants and Life Support Branch for review. A week before the due date the Contractor shall input the revisions. The Contractor shall publish the final submittal into TechDoc on or before May 1st and November 1st of each calendar year and notify the NASA Propellants and Life Support Branch after publication.

Instruction Page 1 of 1

Instructions for Completing Contract Application Information A. Line Item Number - Sequentially number line items beginning with number 001.

B. Line Item Title - Enter the title of the data item, as shown in the Statement of Work (SOW), the RFP and / or as directed by the CTM.

C. OPR (Office of Primary Responsibility) - Enter the organization designated to exercise technical and / or administrative control over the data requirement. Use approved organization code.

D. Type - Enter "Type of Data" code as follows:

1 Data requiring written approval by the procuring activity prior to implementation into the procurement or development program.

2 Data submitted to the procuring activity for review not later than three weeks prior to project implementation. Data shall be considered approved unless the contractor has been notified of disapproval prior to project implementation.

3 Data submitted to the procuring activity for coordination, surveillance, or information.

4 Data retained by the contractor to be made available to the procuring activity upon request. The contractor shall furnish a list to the procuring activity.

5 Data to be retained by the contractor and reviewed by NASA on request.

E. Inspect / Accept - Enter inspection Acceptance code as follows:

1 Source Source 2 Destination (OPR) Destination (OPR) 3 Source Destination (OPR)

4 Certificate of Conformance (Mandatory) 5 Certificate of Conformance (Optional) 6 No Inspection Required No Acceptance Required

F. Frequency of Submission - Enter the frequency of submission code as follows:

AD As Directed AN Annual AR As Required BE Biennial BM BiMonthly (every two months) BW BiWeekly (every two weeks) DA Daily DD Deferred Delivery MO Monthly OT One-Time

PC Per Contract PD Per Failure PE Per Event PF Per Facility PG Per Program PI Per Equipment End Item PJ Per Project PL Per Launch Flight Mission PS Per System PT Per Test

PV Per Vehicle QU Quarterly RD As Released RT One Time & Revisions SA Semi Annually SM Semi Monthly TY Three Year Period UR Upon Request WK Weekly

G. Initial Submittal - Enter the date of initial submittal as follows: Month/Day/Year: If calendar date is not scheduled, enter number of days preceding, or following, event to which the data requirement is related (e.g., 90 days prior to launch). Amplify in Remarks, Item J, if necessary.

H. As Of Date - For "Onetime Only" submittals, enter date by Month/Day/Year. For recurring submittals, enter number coding (e.g., 30/10, 90/10, 15/5), etc. The first digit(s) indicate the number of calendar days from the reporting period's (Block F) start to the data preparation cut off. The second digit(s), after the slash, indicate the number of calendar days from the cut off to the submittal date. Example: If Block F were"MO" and Block H were "30/10", the data would include the entire month and would be submitted within 10 days thereafter.

I. Remarks: Enter in this space.

a. Minor exceptions to the DRD.

b. Stipulation of specific forms when multiple forms are authorized on the DRD.

c. The paragraph, page, etc., in an existing contract where the data requirement is specific. (This data may be removed at final approval.)

d. Additional submittal information, if necessary.

J. Distribution - Enter organizational symbol, number of copies, and type of copy code(s) (in parenthesis) required for each office. Type of copy codes are as follows:

A Regular B Reproducible

C Microfilm, Aperture Cards D Others (Explain in remarks, Item J)

Example Entries: Enter the total number of copies by type in the space provided.

IS-PRO-2 (1A) = One regular copy. IS-PO-3 (5, A, 1B) = Five Regular copies, One Reproducible copy.

Instructions for Completing Data Requirement Description General - The Data Requirement Description (DRD) will be prepared to describe the content and provide preparation information for data required in support of NASA programs.

1. Title - Enter the title or type of document required. The first word of the title should be a principal noun which best establishes the basic concept of the data. Subsequent words should be appropriate modifiers.

Examples: Plan, Project Development (SIVB); Specification, Test (GSE); Report, Quarterly Progress; Proposal, Engineering Change (ECP)

b. Stipulation of specific forms when multiple forms are authorized on the DRD.

2. Number - Enter the appropriate number assigned to the DRD. This number will identify the appropriate data category.

3. Use - Enter a synopsis of the use of the document, stating reason for the requirement.

4. Date - Enter date of preparation.

5. Organization - Identify the installation preparing the DRD.

6. References - List applicable documents by number, (NASA Management Manual, Mil Specifications, Federal Standards, NASA Procurement

Regulation, etc.) to which the preparing office (e.g., NASA installation, contractors, etc.) may refer for additional information concerning the data requirement.

7. Interrelationship - Enter all affected approved DRDs within the scope of the program when the DRD under preparation creates a significant impact or interface relationship with existing DRDs. Include a brief narrative of the impact or relationship created and a statement that the new DRD does not cause a conflict with other DRDs.

8. Preparation Information - Provide ample information for preparation of the data required by the data requirements description; include all necessary details of preparation to satisfy the originator's formal requirements.

Attachment J-05

Technical Exhibit 3.0-1

Operations and Maintenance Instructions (OMI) List

80KSC019R0038 (KPLSS II RFP) OMI List TE 3.0-1

Doc # Rev. Title Last Rev. Date

M2023 H FACILITY GASES SYSTEM (HELIUM, NITROGEN), VALIDATION (ELECTRICAL), LC-39, KSC 5/15/2017

M3036 G HIGH PRESSURE GASEOUS HELIUM SYSTEM, CONVERTER COMPRESSOR FACILITY (CCF), LC-39, KSC 3/17/2014

M3703 F LOW PRESSURE GASEOUS NITROGEN AND HIGH-PRESSURE GASEOUS NITROGEN SYSTEMS, INDUSTRIAL GAS SUPPLY

INTERFACE, CONVERTER/COMPRESSOR FACILITY, LC-39, KSC

9/25/2008

M3704 H HPGHE, HPGN2 AND LPGN2 VALVE POSITIONING, CROSS-COUNTRY PIPELINES, KSC AND CCAFS 2/17/2017

M3710 C LIQUID HELIUM CONVERSION AND COMPRESSION SYSTEM, CONVERTER/COMPRESSOR FACILITY, KSC 9/19/2017

M3712 BASIC APCI LIQUID HELIUM PUMP OPERATION, CONVERTER/COMPRESSOR FACILITY, KSC 8/22/2017

M6104 G DC POWER SUPPLIES AND ELECTRICAL INSTRUMENTATION, CCF, KSC 4/26/2017

M6700 F HELIUM SYSTEM, MECHANICAL, CONVERTER/COMPRESSOR FACILITY, KSC 10/9/2017

M6701 F NITROGEN SYSTEMS, MECHANICAL, LC-39, KSC 10/9/2017

M6702 D HELIUM SYSTEMS, HIGH AND LOW PRESSURE GASEOUS, ELECTRICAL/INSTRUMENTATION, CONVERTER/COMPRESSOR

FACILITY (CCF), KSC

9/15/2016

M6703 G MAINTENANCE OF NITROGEN SYSTEMS, ELECTRICAL/INSTRUMENTATION, CONVERTER/COMPRESSOR FACILITY (CCF), KSC 1/31/2018

M6704 B LIQUID HELIUM CONVERSION AND COMPRESSION SYSTEM, MECHANICAL, CONVERTER/COMPRESSOR FACILITY, KSC 10/5/2017

M6705 A HPGHE, HPGN2, AND LPGN2 CROSS-COUNTRY PIPELINES, AND SLIDEWIRE BUNKER BREATHING AIR SUPPLY PIPELINE, LC-

39 AREA, KSC

3/22/2018

M6706 A DEWAR, LIQUID HELIUM, 30,000 GALLON, GARDNER CRYOGENICS, MECHANICAL, CONVERTER/COMPRESSOR FACILITY, KSC

7/21/2016

M6708 A UNDERGROUND GN2, GHE, AND BAIR PIPELINES, PROPELLANTS NORTH SERVICING AREAS, LC-39, KSC 12/15/2016

M7014 H RECORDERS, DIGITAL, SIEMENS, KSC AND CCAFS 12/22/2016

M7025 F POWER SUPPLY, LAMBDA MODEL LE 103-M AND MODEL LLS 8040, CCF, KSC 12/13/2016

M7033 G HYDROCARBON ANALYZER, TELEDYNE MODEL 4020, PANEL MOUNTED, HELIUM AND NITROGEN SYSTEMS, CONVERTER/COMPRESSOR FACILITY (CCF), KSC

12/22/2016

M7701 F PRESSURE/LIMIT SWITCHES, KSC AND CCAFS 8/29/2016

M7702 G GAUGES (PRESSURE OR VACUUM), CALIBRATION/ADJUSTMENT, KSC AND CCAFS 1/25/2016

M7703 C PNEUMATICALLY OPERATED CONTROL VALVES AND PROPORTIONAL CONTROLLERS, KSC 1/10/2007

M7704 F RELIEF VALVE FUNCTIONAL TESTING KSC AND CCAFS 11/8/2018

M7706 F DIFFERENTIAL PRESSURE GAUGES, OPERATIONAL CHECK/ADJUSTMENT, KSC AND CCAFS 12/8/2016

M7708 G PRESSURE TRANSMITTERS, DIFFERENTIAL TRANSMITTERS, POWER SIGNAL CONDITIONER UNITS, PRESSURE TRANDUCERS

AND CALIBRATIONS KSC AND CCAFS

7/25/2019

M7709 D TEMPERATURE DEVICE OPERATIONAL CHECKS, TEMPERATURE BATH OPERATIONS, MAINTENANCE NORTH INSTRUMENT

SHOP, KSC

11/9/2016

Q2007 G PNEUMATIC TEST (PNEUMASTAT) FACILITY, J7-2112, KSC 12/12/2016

Q2700 F TANKER LEAK TESTS KSC AND CCAFS 9/27/2016

Q3029 G TRANSFER PUMPS, PORTABLE, GASOLINE AND PNEUMATIC POWERED, KSC AND CCAFS 5/17/2016

Q3031 G PUMPS, VACUUM, NON-EXPLOSION PROOF, PORTABLE, KINNEY VP-4, VP-8, AND VP-16, HE, N2 AND AIR SERVICE, KSC AND

CCAFS

10/3/2017

Q3053 F TRAILERS, AMERICAN CRYOGENICS, EIDAL, AND COSMODYNE, 6,000 PSIG, COMPRESSED GAS, GN2 AND GHE, KSC, CCAFS, DFRF/EAFB, WSSH, CLS, AND TAL SITES

8/28/2009

Q3058 G TRAILER, AMERICAN CRYOGENICS AND EIDAL, 10,000 PSIG, COMPRESSED GAS, GN2 / GHE, KSC AND CCAFS 6/14/2018

Q3059 E TRAILER, COMPRESSED GAS, EIDAL, GT-76, 15,000 PSIG, GN2, KSC AND CCAFS 2/9/2011

Q3060 G CYLINDERS, COMPRESSED GAS, FILLING, GN2 AND GHE, BUILDING K7-415, KSC 4/17/2018

Q3061 F TRAILER, COMPRESSED GAS, EIDAL, 2,400-PSIG, GN2/GHE, KSC, CCAFS, DFRF/EAFB, WSSH, CLS, AND TAL SITES 12/10/2010

Q3062 BASIC COMPRESSOR, MOBILE, HYDROPAC, HP-1 AND HP-2, 10,000 PSIG, GHE, KSC AND CCAFS 9/27/2016

Q3063 F INTENSIFIER, GAS (NITROGEN), HASKEL, K7-468, KSC 5/24/2017

Q3074 G TANKER, AIR PRODUCTS, LT-1, -4, AND -8, 4,000 GALLON, LN2, KSC AND CCAFS 5/5/2017

Q3076 H DEWARS, PORTABLE LIQUID NITROGEN KSC AND CCAFS 6/26/2019

Q3080 H EQUIPMENT FILL FACILITY, GASEOUS NITROGEN, K7-415C, LC-39, KSC 5/24/2017

Q3087 F TANKER, AIR PRODUCTS, LT-3, -6, -7, -56, -57, -58, 4,000 GALLON, LO2, KSC AND CCAFS 4/4/2014

Q3097 J SYSTEM, BREATHING AIR STORAGE, K7-0415B, KSC 5/11/2017

Q3105 G TRACTOR/TRAILER/TANKER OPERATION INVOLVING HAZARDOUS AND NONHAZARDOUS MATERIALS, KSC, CCAFS, AND

KSC/CCAFS OFFSITE

12/6/2016

Q3107 H PANELS, PRESSURE-REDUCING, PORTABLE, KSC AND CCAFS 9/16/2016

Q3108 G COMPRESSED GAS CYLINDERS, HANDLING AND USE, KSC AND CCAFS 6/26/2017

Q3114 G COMPONENT CHANGEOUT OF FLUID SYSTEM COMPONENTS AND LINES, KSC, CCAFS 5/28/2014

Q3184 F TRAILERS, SCAPE SUPPORT, KSC AND CCAFS 9/28/2016

Q3186 K AIR LINE BREATHING EQUIPMENT, LIFE SUPPORT SECTION, KSC AND CCAFS 11/2/2016

Q3187 P SCAPE, ALL CATEGORIES, KSC AND CCAFS 10/26/2011

Q3190 H EMERGENCY BREATHING DEVICE CONTAINERS, LAUNCH COMPLEXES, KSC AND CCAFS 7/8/2015

Q3245 F TRAILERS, COMPRESSED GAS, STANDARD STEEL, 2,400 PSIG, GN2 AND GHE, KSC AND CCAFS 8/26/2009

Q3263 E CART, COMPRESSED GAS, GENERAL AVIATION, GC-105, 3,500 PSIG, GN2, KSC, CCAFS, DFRF/EAFB, WSSH, CLS AND TAL SITES 5/19/2008

Q3271 I CYLINDERS, DOT 110A SPECIFICATION, HYPERGOLIC OXIDIZER, KSC AND CCAFS 2/7/2017

Q3274 G HANDLING, NONSPECIFICATION HYPERGOLIC OXIDIZER/ OXIDIZER SOLUTIONS/TOXIC CHEMICAL, KSC AND CCAFS 8/25/2015

Q3291 G TANKER, VENDOR, LIQUID OXYGEN, KSC AND CCAFS 12/22/2016

Q3292 E TANKER, VENDOR, LIQUID NITROGEN, KSC AND CCAFS 3/18/2015

Q3422 E MANUFACTURE OF LIQUID AIR FROM LO2/LN2, KSC 4/4/2014

Q3424 G HANDLING OF NONSPECIFICATION HYPERGOLIC FUEL/FUEL SOLUTIONS/TOXIC CHEMICAL, KSC AND CCAFS 8/25/2015

Q3430 J HIGH PURITY OXYGEN FACILITY, K7-412, LC-39, KSC 9/20/2011

Q3447 G SCRUBBER, TOXIC VAPOR FUEL, FLUID SCIENTIFIC, VS-1, SPECIALITY MAINTENANCE AND CONSTRUCTION, INC., VS-3, KSC

AND CCAFS

3/5/2014

Q3448 F SCRUBBER, TOXIC VAPOR OXIDIZER, FLUID SCIENTIFIC, VS-2, SPECIALTY MAINTENANCE AND CONSTRUCTION, INC., VS-4, MARTIN MARIETTA

3/5/2014

Q3470 D GASEOUS NITROGEN (GN2), GASEOUS HELIUM (GHE) DISTRIBUTION MANIFOLD SYSTEM, KSC, DFRF/EAFB, WSSH, CLS, AND

TAL SITES

5/27/2008

Q3472 F TRAILER, THIOKOL, 6,000 PSIG, COMPRESSED GAS, GN2/GHE, KSC, CCAFS, DFRF/EAFB, WSSH, CLS, TAL SITES, AND KSC

OFFSITE

8/28/2009

Q3474 F STORAGE AND DISTRIBUTION SYSTEM, GASEOUS NITROGEN, FUEL STORAGE NO. 1, CCAFS 6/19/2014

Q3487 G PANEL, PRESSURE REDUCING, GASEOUS OXYGEN, PPRP 101 KSC AND CCAFS 8/30/2018

Q3488 E MOVABLE STORAGE UNIT, COMPRESSED GAS, GN2, GHE, 2,400 PSIG, 100 SERIES, KSC AND CCAFS 7/7/2010

Q3499 F TANKER, GARDNER CRYOGENICS, VENDOR, LIQUID HELIUM, KSC AND CCAFS 1/30/2018

Q3718 G ENVIRONMENTAL CONTROL UNIT BACKPACK, 2-HOUR LIQUID AIR (ARO) KSC 6/26/2019

Q3719 D MOVABLE STORAGE UNIT, COMPRESSED GAS, GHE, GN2, 2,400 PSIG, 200 SERIES, KSC AND CCAFS 11/24/2010

Q3738 G FLARED TUBING, FABRICATION, ASSEMBLY, AND INSTALLATION, KSC AND CCAFS 3/27/2019

Q3750 F TANKER, LINDE, LT-59, -60, AND -62, 4,000 GALLON, LAIR KSC AND CCAFS 5/23/2019

Q3751 F TANKER, LINDE, LT-59, -60, AND -62, 4,000 GALLON, LN2, KSC, CCAFS 5/5/2017

Q3754 E TRAILERS, COMPRESSED GAS, STANDARD STEEL, 2,400-PSIG, BREATHING AIR (BAIR), KSC AND CCAFS 7/1/2009

Q3755 C TANKER, AIR PRODUCTS, LT-3, -6, -7, -56, -57, -58, -121 AND -141, 4,000 GALLON, LN2, KSC, CCAFS, DFRF/EAFB, WSSH, CLS, AND TAL SITES

11/14/2006

Q3756 D SHOWER, SOAP AND WATER, SCAPE, M6-0490, KSC AND CCAFS 3/3/2016

Q3759 D MOVABLE STORAGE UNITS, COMPRESSED GAS, BREATHING AIR, 2,400 PSIG, 100 SERIES, KSC AND CCAFS 7/1/2009

Q3760 I FACILITY BREATHING AIR SYSTEM OPERATIONS, LIFE SUPPORT EQUIPMENT FACILITY, BUILDING M6-0490, KSC AND CCAFS 7/29/2015

Q3761 E TANKER, AIR PRODUCTS, LT-3, -6, -7, -56, -57, -58, 4,000 GALLON, LIQUID AIR, KSC, CCAFS 8/7/2014

Q3762 H IRON REMOVAL, N2O4, IR-3, NASA-WSTF, KSC AND CCAFS 4/7/2014

Q3764 E TRAILERS, COMPRESSED GAS, THIOKOL, 6,000-PSIG, BREATHING AIR (BAIR), KSC, CCAFS, DFRF/EAFB, WSSH, CLS, TAL SITES, AND KSC OFFSITE

3/20/2015

Q3766 C CYLINDERS, COMPRESSED GAS, BREATHING AIR (BAIR) FILLING, BAIR K-BOTTLE FILL FACILITY, KSC 7/25/2011

Q3767 F HYDROSTATIC TEST UNIT, WATER CCAFS 11/30/2017

Q3769 E TESTING OF VACUUM-JACKETED CRYOGENIC PIPE, COLD SHOCK NON-VACUUM-JACKETED LINES, AND MISCELLANEOUS

COMPONENTS, KSC

5/3/2017

Q3776 E OXYGEN SUPPLY AND DISTRIBUTION SYSTEM, OCCUPATIONAL HEALTH BUILDING, M6-495, KSC 4/29/2019

Q3784 F AIR VENTILATOR, PORTABLE KSC 5/30/2019

Q3785 E PNEUMATIC AMPLIFIER, PORTABLE, KING NUTRONICS, BUILDING K7-468, KSC AND CCAFS 4/25/2017

Q3786 E CITRIC ACID SOLUTIONS, HANDLING, KSC AND CCAFS 1/20/2016

Q3790 D CART, CRYO ENERGY, LT-83 AND LT-84, 50-GALLON, LIQUID OXYGEN, KSC AND CCAFS 1/11/2010

Q3800 F TANKER, PETRO-STEEL, LT-67 AND LT-68, 5,000 GALLON, SOLVENT 113, KSC, CCAFS, AND PAFB 4/28/2010

Q3802 I TANKER, DEMINERALIZED WATER, PETRO-STEEL, 5,000 GALLON LT-75 AND LT-76, KSC, CCAFS, AND PAFB 2/15/2018

Q3810 B MOVABLE STORAGE UNIT, COMPRESSED GAS, BAIR, GN2, GHE, MSU-301 AND MSU-304, KSC AND CCAFS 12/18/2007

Q3816 D VACUUM SYSTEMS OPERATIONS, KSC 6/14/2017

Q3822 D TRAILERS, COMPRESSED GAS, EIDAL, 2,400 PSIG, BREATHING AIR (BAIR), KSC, CCAFS, DRFR/EAFB, WSSH, CLS, AND TAL

SITES

7/1/2009

Q3825 D DEWARS, PORTABLE, LIQUID AIR KSC & CCAFS 6/25/2019

Q3829 F TANKERS, PROCESS ENGINEERING CORPORATION, LT-87, LT-93, AND PEI VENDOR, 2,500 GALLON HYPERGOLIC OXIDIZER, KSC AND CCAFS

12/12/2012

Q3839 H CYLINDERS, PORTABLE, SST, COLUMBIANA, HARLISS, AND HYDRA-RIG, 120-, 55-, 35-, 30-, AND 5-GALLON, HYPERGOLIC

FUEL (N2H4, MMH, AND MIXTURES), KSC AND CCAFS

10/18/2012

Q3842 E TANKERS, PROCESS ENGINEERING CORPORATION, LT-89, LT-91, AND PEI VENDOR, 2,500 GALLON, HYPERGOLIC FUEL, KSC

12/12/2012

Q3843 D PUMPS, VACUUM, PORTABLE TRIBODYN (VP-19, -21, -22), KSC, CCAFS AND PAFB 10/3/2017

Q3844 D HYPERGOLIC OXIDIZER TRANSFER FACILITY, BUILDING 80520, FUEL STORAGE AREA #1, CCAFS 8/15/2016

Q3845 E OXYGEN ANALYZER, PRESSURE REDUCER, 50 PSIG, KSC AND CCAFS 7/13/2015

Q3853 D PANEL, AUXILIARY GN2 SUPPLY, 2,400 PSIG, UTILITY ANNEX, K6-947, KSC 12/6/2016

Q3854 D DEWARS, PORTABLE, LIQUID OXYGEN KSC AND CCAFS 2/6/2019

Q3855 D TUBE FLARE AND BEND EVALUATION, STAINLESS STEEL AND ALUMINUM TUBING 37-DEGREE FORMED FLARE, CCF-39, KSC 10/4/2018

Q3857 E PUMPS, VACUUM, EXPLOSION PROOF, PORTABLE, KINNEY, VP-9, VP-10, VP-20, VP-34, O2, H2, N2, HE, AIR SERVICE, KSC AND

10/3/2017

Q3860 E TANKS, GENERIC PROPELLANTS TRANSFER UNITS, TN-1, TN-2, AND TN-3, 500 GALLONS HYPERGOLIC OXIDIZER, KSC AND

7/27/2017

Q3861 E TANKS, GENERIC PROPELLANTS TRANSFER UNITS, TN-4, TN-5, TN-6, TN-7, TN-8, TN-9 AND TN-10, 500 GALLONS HYPERGOLIC

FUEL, KSC AND CCAFS

7/27/2017

Q3863 G TANKERS, CHEMICAL, PETRO-STEEL, 5,000 GALLON, LT-66, LT-70, AND LT-71, KSC, CCAFS, AND PAFB 8/31/2017

Q3875 D HEATER, CHROMALOX, GASEOUS NITROGEN, KSC AND CCAFS 9/28/2016

Q3877 F CART, 700-LITER LIQUID AIR, M6-0490, KSC 4/2/2018

Q3881 E CYLINDERS, DOT 110A SPECIFICATION, HYPERGOLIC FUEL, KSC AND CCAFS 2/7/2017

Q3883 D THERMAL PROTECTION SYSTEM FACILITY (TPSF) GN2 PANEL, K6-0794, KSC 2/3/2015

Q3884 G CYLINDERS, PORTABLE, SST, COLUMBIANA, HARLISS, AND HYDRA-RIG, 120-, 55-, 30-, AND 5-GALLON, HYPERGOLIC

OXIDIZER (N2O4), KSC AND CCAFS

11/14/2012

Q3885 B COMPRESSED GAS DISTRIBUTION SYSTEMS, PROCESSING FACILITIES, OPERATION, KSC 10/12/2012

Q3886 C RECHARGER, MOBILE, PAUL, R-11, R-12,. R-13. AND R-14, 10,000-PSIG, NITROGEN, KSC ANC CCAFS 9/21/2017

Q3887 C RECHARGER, MOBILE, PAUL, R-11, R-12, R-13, AND R-14, 10,000 PSIG, AIR, KSC AND CCAFS 3/31/2010

Q3888 B RECHARGER, MOBILE, PAUL, R-11, R-12, R-13, AND R-14, 10,000-PSIG, OXYGEN, KSC AND CCAFS 4/8/2013

Q3889 B TRAILER, COMPRESSED GAS, COSMODYNE, 10,000-PSIG, GN2/GHE, KSC AND CCAFS 5/26/2010

Q3890 D STORAGE AND DISTRIBUTION SYSTEM, COMPRESSED GAS, 7,500 PSIG (GN2), 14,000 PSIG (GN2), AND 14,000 PSIG (GHE), K6-

1697, KSC

9/7/2017

Q3891 B MOBILE STORAGE UNIT, COMPRESSED GAS, GHE, GN2, 2,400 PSIG, 500 SERIES, KSC AND CCAFS 12/14/2010

Q3893 C MAINTENANCE FACILITY, 73720, FSA #1, CCAFS 1/22/2010

Q3894 C WATER PLANT, DEMINERALIZED, BUILDING K6-1697, LC-39, KSC 4/23/2015

Q3895 B COMPRESSOR, MOBILE HENDERSON HELIUM, 6,000 PSIG, CONVERTER/COMPRESSOR FACILITY (CCF), LC-39, KSC 11/2/2011

Q3897 C CART, ESSEX CRYOGENICS, INC. LT-95 AND LT-96, 50-GALLON, LIQUID OXYGEN, KSC ANC CCAFS 5/14/2014

Q3898 F HYPERGOLIC FUEL TRANSFER FACILITY 77800, FUEL STORAGE AREA #1, CCAFS 6/9/2014

Q3900 A CART, COMPRESSED GAS, GENERAL AVIATION GC-109, 3,500 PSIG, GN2, KSC, CCAFS 3/13/2014

Q3901 C STORAGE AND DISTRIBUTION SYSTEM, COMPRESSED GAS, 5,000 PSIG, BREATHING AIR STORAGE, CRCA, K6-1697, KSC 8/31/2015

Q3907 D MANIFOLD, K-BOTTLE UNREGULATED ASSEMBLY, 20 CYLINDER RACK, 2,265 AND 2,400 PSIG, GN2, GHE, B/AIR, KSC, CCAFS 6/14/2017

Q3908 D MANIFOLD, K-BOTTLE UNREGULATED ASSEMBLY 20 CYLINDER RACK, 2,400 PSIG, OXYGEN KSC AND CCAFS 7/7/2017

Q3910 C DEWAR FILL FACILITY, K7-314A, LIQUID NITROGEN, KSC 2/21/2014

Q3912 B MOBILE STORAGE UNIT, COMPRESSED GAS, GN2/GHE, 600 SERIES, KSC AND CCAFS 1/4/2011

Q3914 B TRAILER, FIBA TECHNOLOGIES, 6,000 PSIG, COMPRESSED GAS, GN2/GHE, KSC AND CCAFS 12/2/2010

Q3915 C PROPELLANT EQUIPMENT MAINTENANCE FACILITY, GASEOUS NITROGEN SYSTEM, M6-688, KSC 12/7/2016

Q3918 B TRUCK, VACUUM INDUCTOR, NONHAZARDOUS WASTES, BEST ENTERPRISES, INC., LT-97, KSC, CCAFS, AND PAFB 7/13/2016

Q3919 C PANELS, TRANSFER, PORTABLE, HYPERGOLIC FUEL, CCAFS 8/17/2016

Q3920 C PANELS, TRANSFER, PORTABLE, HYPERGOLIC OXIDIZER, CCAFS 8/17/2016

Q3922 B CART, COMPRESSED GAS, AERO SPECIALTIES #5001LH, GC-106, 2,500 PSIG, GN2, KSC & CCAFS 12/16/2016

Q3923 B FUNCTIONAL TEST FACILITY 1050A, FUEL STORAGE AREA NO. 1, CCAFS 9/14/2016

Q3924 A TRAILER, FIBA TECHNOLOGIES, GT-261, 6,000 PSIG, COMPRESSED GAS, OXYGEN, KSC AND CCAFS 1/11/2011

Q3928 BASIC TANKER, AIR PRODUCTS, S/N 613009, 613018, 613020 AND 613022, 13,000 GALLON, LIQUID HYDROGEN, KSC AND CCAFS 2/16/2007

Q3933 B RECHARGERS, MOBILE, CS&P R-18 & R-19, 10,000 PSIG UNITS, NITROGEN SERVICE, KSC AND CCAFS 9/18/2015

Q3935 A TRAILER, COMPRESSED GAS, AMERICAL CRYOGENICS, GT-72, 10,000 PSIG, KSC AND CCAFS 7/13/2011

Q3936 BASIC TRAILER, AMERICAN CRYOGENICS, GT-73, 10,000 PSIG, COMPRESSED GAS, OXYGEN, KSC AND CCAFS 4/4/2013

Q3937 BASIC TANKER, PETRO-STEEL, LT-69, 5,000 GALLON, SOLVENT 113, KSC AND CCAFS 3/2/2011

Q3939 A LOADING CART, SPACEX, 190 GALLON, HYPERGOLIC FUEL, CCAFS 11/14/2016

Q3940 A LOADING CART, SPACEX, 190 GALLON, HYPERGOLIC OXIDIZER, CCAFS 11/14/2016

Q3941 BASIC TANKER, HYDRA-RIG, LT-81, 3,000 GALLON, LIQUEFIED NATURAL GAS, KSC 7/9/2012

Q3942 BASIC TANKS, SPACEX, UN PORTABLE, 265 GALLONS, HYPERGOLIC FUEL, CCAFS 12/21/2012

Q3943 BASIC TANKS, SPACEX, UN PORTABLE, 265 GALLONS, HYPERGOLIC OXIDIZER, CCAFS 8/15/2017

Q3944 BASIC IRON AND WATER REMOVAL UNIT, N2O4, IR-5, KSC AND CCAFS 7/28/2014

Q3945 BASIC HIGH CAPACITY TANK, COLUMBIANA BOILER COMPANY, 700-GALLONS, HYPERGOL FUEL, CCAFS 3/1/2017

Q3946 BASIC HIGH CAPACITY TANK, COLUMBIANA BOILER COMPANY, 700-GALLONS, HYPERGOL OXIDIZER, CCAFS 3/1/2017

Q3947 BASIC FACILITY PNEUMATIC SYSTEMS OPERATION, MPPF, M7-1104, KSC 5/28/2019

Q3950 BASIC OPERATIONS FOR MOBILE LAUNCHER CONNECTION AT VAB, PAD B & PARK SITE 3/21/2018

Q3951 BASIC TANKER, LINDE, LT-59, -60, AND -62, 4,000 GALLON, LOX KSC AND CCAFS 3/15/2019

Q6016 E TANKER, CART, AIR PRODUCTS 4,000 GALLON, LINDE 4,000 GALLON, LOX EQUIPMENT 4,700 GALLON, ESSEX CRYOGENICS, INC. 50 GALLON, LAIR, LN2, LO2, KSC

12/19/2017

Q6021 E EQUIPMENT, MISCELLANEOUS MOBILE AND PORTABLE, KSC 1/23/2014

Q6022 F DEWAR, TAYLOR-WHARTON, MINNESOTA VALLEY ENGINEERING, CRYOGENIC SERVICES INCORPORATED, CHART INDUSTRIES 450-LITER, 209-LITER, 180-LITER, 165-LITER, 50-LITER LNG, LN2, LO2, LAIR, KSC

8/20/2019

Q6024 F COMPRESSED GAS TRAILERS AND MOVEABLE STORAGE UNITS; AMERICAN CRYOGENICS, COSMODYNE, EIDAL, STANDARD STEEL, THIOKOL, U.S. STEEL, FIBA, A. O. SMITH, TAYLOR FORGE; 2,400 PSIG, 6,000 PSIG, 10,000 PSIG, 15,000 PSIG; SERIES 100, 200 300 400 500 600; BAIR GH2 GHE GN2 GO2 AND SPARE CYLINDERS; KSC DFRF/EAFB WSSH CLS AND TAL SITES

4/24/2013

Q6031 G RECHARGER, PAUL, R-11 THROUGH R-14, 10,000 PSIG, BAIR, N2, O2, KSC 2/4/2017

Q6044 H EQUIPMENT, LIFE SUPPORT RECYCLE AND OVERHAUL BUILDING M6-0490, KSC 4/20/2019

Q6191 F FIXED SYSTEMS, CCAFS 10/31/2014

Q6192 F VACUUM PUMPS, KSC AND CCAFS 4/26/2017

Q6712 A SCBA, SCOTT, AIR-PAK 75, NFPA, KSC AND CCAFS 2/20/2018

Q6713 I ELSA ESCAPE UNITS, 7-, AND 10-MINUTE, KSC AND CCAFS 1/18/2012

Q6714 A SCBA, SCOTT, AIR-PAK 75i, INDUSTRIAL, KSC AND CCAFS 9/14/2015

Q6715 F TRAILERS, SCAPE SUPPORT, QUARTERLY AND ANNUAL MAINTENANCE, KSC AND CCAFS 8/1/2016

Q6716 G ENVIRONMENTAL CONTROL UNIT, 2 HOUR LIQUID AIR (ARO), MAINTENANCE, M6-0490, KSC 7/25/2017

Q6717 F FACILITY AND PORTABLE OXYGEN INHALATOR LIFE SUPPORT FACILITY, M6-0490, AND MEDICAL FACILITIES, KSC AND

8/29/2018

Q6720 J RESUSCITATOR, ALLIED HEALTHCARE PRODUCTS, INC., MAINTENANCE INSTRUCTIONS, KSC AND CCAFS 2/20/2018

Q6723 O PROPELLANT HANDLER’S ENSEMBLE (PHE) REPAIR M6-0490, KSC 8/2/2019

Q6727 G ASSEMBLIES, FLEXHOSE, METAL OR FABRIC-BRAID REINFORCED, KSC & CCAFS 9/23/2015

Q6743 F BACKPACK, 2-HOUR, LIQUID AIR (ARO), M6-0490, KSC 9/27/2016

Q6745 E N204 IRON AND WATER REMOVAL UNIT, IR-3, NASA-WSTF,KSC AND CCAFS 12/23/2013

Q6757 L AIRLINE EQUIPMENT, MAINTENANCE, KSC 5/18/2016

Q6760 G MISCELLANEOUS PROTECTIVE CLOTHING EQUIPMENT MAINTENANCE, CCAFS 1/3/2012

Q6763 E VACUUM PUMPS, PORTABLE, OVERHAUL, MAINTENANCE, KSC AND CCAFS 4/6/2012

Q6767 C PUMP, LIQUID NITROGEN/OXYGEN/LAIR, HIGH-PRESSURE, PAUL MOBILE RECHARGER, OVERHAUL, KSC 10/16/2007

Q6768 C PUMP, WATER GLYCOL, PAUL RECHARGER, OVERHAUL, KSC 10/29/2007

Q6769 C PUMP, BOOSTER, OVERHAUL, PAUL MOBILE RECHARGER, LIQUID NITROGEN, KSC 7/14/2011

Q6772 C ENGINES, V-71 DETROIT DIESEL, PAUL RECHARGER, PETERBILT TRACTOR, LC-39, KSC 10/29/2007

Q6779 E SCRUBBER, TOXIC VAPOR FUEL AND OXIDIZER; (VS-1 AND VS-2) FLUID SCIENTIFIC; (VS-3 AND VS-4) SPECIALTY

MAINTENANCE AND CONSTRUCTION, INC.; (VS-6) MARATIN MARIETTA; KSC AND CCAFS

1/15/2015

Q6783 F RESUSCITATOR, HOPE III, OHMEDA, CCAFS 9/3/2015

Q6785 M TANKER, PETRO-STEEL, 5,000 GALLON, LT-65 THROUGH LT-76, KSC AND CCAFS 9/27/2016

Q6793 H CYLINDERS, PORTABLE, SST, COLUMBIANA, HARLISS, AND HYDRA-RIG, 120-, 55-, 35-, 30-, AND 5-GALLON, HYPERGOL, KSC

7/18/2016

Q6797 E PANELS, PRESSURE-REDUCING, PORTABLE, KSC AND CCAFS 8/1/2017

Q6805 E TANKERS, PROCESS ENGINEERING CORPORATION, LT-87, LT-89, LT-91, AND LT-93, 2,500 GALLON, HYPERGOLIC FUEL AND

OXIDIZER, KSC AND CCAFS

3/31/2017

Q6807 D PANELS, PRESSURE-REDUCING, PORTABLE, PPRP-21, PPRP-22, AND PPRP-23, 0-6,000 PSIG, NITROGEN AND HELIUM, KSC AND

12/19/2016

Q6811 D HYPERGOLIC OXIDIZER TRANSFER FACILITY 80520 FUEL STORAGE AREA #1 CCAFS 3/7/2019

Q6816 E AIR VENTILATOR, PORTABLE, MAINTENANCE KSC 5/30/2019

Q6819 E TANKS, GENERIC PROPELLANTS TRANSFER UNITS TN-1 THROUGH TN-10, 500-GALLON HYPERGOLIC OXIDIZER & FUEL AND

DEDICATED TRAILERS TRD-1, TRD-2, TRS-4 AND TRS-5 KSC AND CCAFS

4/23/2014

Q6824 G FIXED SYSTEMS, KSC 6/13/2014

Q6831 D VENTILATOR, AUTOVENT, MAINTENANCE AND CALIBRATION INSTRUCTIONS, KSC AND CCAFS 8/13/2015

Q6832 D CART, LIQUID AIR, 700-LITER, CCAFS 5/4/2009

Q6833 D FILTER AND ADAPTER ASSEMBLIES, CRYOGENIC AND PNEUMATIC, PORTABLE, HANDLING AND CARE OF KSC AND CCAFS 12/14/2016

Q6836 C HYPERGOLIC FUEL TRANSFER FACILITY 77800, FUEL STORAGE AREA #1, CCAFS 3/7/2019

Q6840 C WATER PLANT, DEMINERALIZED, K6-1697, KSC 7/18/2019

Q6864 F PROPELLANT HANDLER'S ENSEMBLE (PHE), RECYCLE MAINTENANCE, 60 USE MAINTENANCE BUILDING M6-0490, KSC 6/2/2015

Q6874 B TRUCK, VACUUM INDUCTOR, NONHAZARDOUS WASTES, BEST ENTERPRISES, INC., LT-97, KSC AND CCAFS 3/21/2016

Q6878 B DEWAR FILL FACILITY, LN2, MAINTENANCE INSTRUCTIONS, K 7-314A, KSC 9/9/2013

Q6879 B TRANSFER PUMPS, PORTABLE, GASOLINE AND PNEUMATIC POWERED, KSC AND CCAFS 5/17/2016

Q6890 BASIC RECHARGERS, MOBILE, CS&P R-18 & R-19, 10,000 PSIG UNITS, NITROGEN SERVICE, MAINTENANCE, KSC AND CCAFS 11/19/2009

Q6891 C COMPRESSED GAS CYLINDERS INSPECTION, CYLINDERS MAINTENANCE AND REFURBISHMENT, BUILDING K7-0415, KSC 6/19/2017

Q6892 A COMPRESSED GAS DISTRIBUTION SYSTEMS, PROCESSING FACILITIES, KSC 3/15/2013

Q6893 BASIC HIGH-PURITY OXYGEN FACILITY, MAINTENANCE, K7-412, LC-39, KSC 10/6/2010

Q6901 BASIC MOBILE HENDERSON HELIUM COMPRESSOR, MECHANICAL, CONVERTER/COMPRESSOR FACILITY, KSC 12/6/2010

Q6906 A MSA SCAPE VENTILATOR, KSC AND CCAFS 4/11/2018

Q6908 BASIC COMPRESSOR, MOBILE, HYDROPAC, HP-1 AND HP-2, 10,000 PSIG, GHE KSC AND CCAFS 6/30/2017

Q6910 BASIC RELIEF VALVE TESTER MAINTENANCE BARBEE MODEL TP-RV-TC KSC 2/20/2018

Q6911 BASIC PHSF FUEL AND OXIDIZER EMERGENCY SPILL CONTAINMENT TANKS KSC 3/23/2018

Q7016 F TESTING, GROUNDING AND BONDING, CROSS-COUNTRY LINE, HELIUM COMPRESSORS, AND LHE CONVERSION SYSTEM, CCF AREA, LC-39

12/16/2016

Attachment J-05

Technical Exhibit 3.0-2

Job Plans

80KSC019R0038 (KPLSS II RFP) Job Plans TE 3.0-2

JPNUM TASK SHORT DESCRIPTION FREQUENCY

LAST

REV

DATE

DOT00A10 [DOT] AE/UE Acoustic Emission/Ultrasonic Examination Certification - DECENNIAL Decennial NO DATE

DOT010A5 [DOT] Perform Visual Inspection - QUINQUENNIAL Quinquennial NO DATE

DOT01A10 [DOT] NT - Neck Thread Inspection Certification - DECENNIAL Decennial NO DATE

DOT020A5 [DOT] Perform Cylinder Requalification – QUINQUENNIAL Quinquennial NO DATE

DOT030A5 [DOT] Perform 5-year Cylinder Requalification – QUINQUENNIAL Quinquennial NO DATE

HEL027A Forklift Lifting, Fixed Attachment LOAD TEST - ANNUAL Annual NO DATE

HEM032A Tractor, Tug - ANNUAL Annual NO DATE

HEM032SA Tractor, Tug - SEMIANNUAL Semiannual NO DATE

HEM106A Strap LOAD TEST - ANNUAL Annual NO DATE

HEM107A SHACKLE LOAD TEST - ANNUAL Annual NO DATE

LSS001A CALIBRATION, GAGE, MAGNAHELIC - ANNUAL Annual NO DATE

MPPF0A Pneumatic Panel Visual Inspection – ANNUAL Annual NO DATE

MPPF0SA Pneumatic Panel Visual Inspection – SEMIANNUAL Semiannual NO DATE

OPFPNL1A OPF GN2 Reg Panel Annual Annual NO DATE

PRN001M Runtime hours JOY, Henderson Compressors, HYDROPAC HP-1 & HP-2-CCF, K7-0468 - MONTHLY Monthly NO DATE

PRN002M Runtime hours CS&P RECHARGER MOBILE, R-18 & R-19, 10,000 PSIG, NITROGEN - MONTHLY Monthly NO DATE

PRN003A OVEN BAKE MAINTENANCE - ANNUAL Annual NO DATE

PRN003M Runtime hours Rechargers PAUL, R-12 & R-14 10,000 PSIG, M6-0688 - MONTHLY Monthly NO DATE

PRN004A VACUUM PUMP XDS35i MAINTENANCE - ANNUAL Annual NO DATE

PRN005A WI-127 INDICATOR AND LHE LOAD CELL CALIBRATION - ANNUAL Annual NO DATE

PRN006A CS&P PURGE PANEL, K7-0517A - ANNUAL Annual NO DATE

PRN061A Flexim Flow Meter - ANNUAL Annual NO DATE

PRNDRUM1M1 [SPCC] PROPN Drum Inspection - MONTHLY Monthly NO DATE

PRNDRUM2M1 [SPCC] PROPN Drum Inspection - MONTHLY Monthly NO DATE

PRNPROCA1 [SPCC] PROPN Process Equipment Inspection - ANNUAL Annual NO DATE

PRNTANKA1 [SPCC] PROPN Tank Inspection - ANNUAL Annual NO DATE

PRNTANKM1 [SPCC] PROPN Tank Inspection - MONTHLY Monthly NO DATE

PRS001SA Fall Protection Inspection - SEMIANNUAL Semiannual NO DATE

PRS003A PRESSURE STEAM CLEANER - ANNUAL Annual NO DATE

PRS004A PRESSURE STEAM CLEANER - ANNUAL Annual NO DATE

PRSDRUM1M1 [SPCC] PROPS Drum Inspection - MONTHLY Monthly NO DATE

PRS-FSA00M PROPS Perform Checks at FSA#1 - MONTHLY Monthly NO DATE

PRS-FSA01Q PROPS Perform Visual Inspection cylinders at FSA#1 - QUARTERLY Quarterly NO DATE

PRSTANKA1 [SPCC] PROPS Tank Inspection - ANNUAL Annual NO DATE

PRSTANKM1 [SPCC] PROPS Tank Inspection - MONTHLY Monthly NO DATE

PRSU001A5 OXIDIZER EMERGENCY SPILL CONTAINMENT TANK, M7-1354A - QUINQUENNIAL Quinquennial NO DATE

PRSU001Q OXIDIZER EMERGENCY SPILL CONTAINMENT TANK, M7-1354A - QUARTERLY Quarterly NO DATE

PRSU002A5 FUEL EMERGENCY SPILL CONTAINMENT TANK, M7-1354B - QUNIQUENNIAL Quniquennial NO DATE

PRSU002Q FUEL EMERGENCY SPILL CONTAINMENT TANK, M7-1354B - QUARTERLY Quarterly NO DATE

PRSWASTM1 [HAZ] PROPS 90 Day Hazardous Waste Inspection - MONTHLY Monthly NO DATE

PRU000A Filter Element Maintenance - ANNUAL Annual 5/23/2018

PRU000A3 Filter Element Maintenance - TRIENNUAL Triennual NO DATE

PRU000A5 Filter Element Maintenance - QUINQUENNIAL Quinquennial NO DATE

PRU002A CRCA GHe / GN2 Panel K60-3370-21 - ANNUAL Annual NO DATE

PRU003A CRCA GHe / GN2 Panel K60-3370-22 - ANNUAL Annual NO DATE

PRU004A CRCA GHe / GN2 Panel K60-3370-24 - ANNUAL Annual NO DATE

PRU005A CRCA Freon Panel K60-3378 - ANNUAL Annual NO DATE

PRU006A CRCA GN2 Panel K61-3571 - ANNUAL Annual NO DATE

PRU007A CRCA GN2 Panel K61-3599 - ANNUAL Annual NO DATE

PRU008A CRCA GN2 Panel K61-3829 -- Annual Annual 9/21/2018

PRU009A CRCA GN2 Panel K61-3830 -- Annual Annual 9/21/2018

PRU010A CRCA Breathing Air Panel K61-4255 -- Annual Annual 11/5/2018

PRU011A CRCA GO2 Panel K61-4256 -- Annual Annual 11/5/2018

PRU012A CRCA GHe Panel K61-4258 -- Annual Annual 11/5/2018

PRU013A CRCA N2O Panel K61-4259 - ANNUAL Annual NO DATE

PRU014A CRCA GOX Panel K61-4260 - ANNUAL Annual NO DATE

PRU015A CRCA GOX Panel K61-4261- ANNUAL Annual NO DATE

PRU016A CRCA Breathing Air Panel K61-4262 - ANNUAL Annual NO DATE

PRU017A CRCA Breathing Air Panel K61-4263- ANNUAL Annual NO DATE

PRU018A CRCA GH2 Panel K61-4265 - ANNUAL Annual NO DATE

PRU019A CRCA GHe Panel K61-4266 - ANNUAL Annual NO DATE

PRU020A CRCA GHe Panel K61-4267 - ANNUAL Annual NO DATE

PRU021A CRCA GN2 Panel K61-4268 - ANNUAL Annual NO DATE

PRU022A CRCA GN2 Panel K61-4269 - ANNUAL Annual NO DATE

PRU023A CRCA GH2 / GN2 Panel K61-4270 - ANNUAL Annual NO DATE

PRU024A CRCA C2H2 Panel K61-4271 - ANNUAL Annual NO DATE

PRU025A CRCA CH4 / Ar Panel K61-4272 - ANNUAL Annual NO DATE

PRU026A CRCA GAr Panel K61-4273 - ANNUAL Annual NO DATE

PRU027A CRCA GHe Panel K61-4274 - ANNUAL Annual NO DATE

PRU028A CRCA Hydrogen Panel K61-4275 -- Annual Annual 5/29/2018

PRU029A CRCA Multi-gas Panel K61-4276 - ANNUAL Annual NO DATE

PRU030A CRCA GN2 Panel K61-4277 -- Annual Annual 11/27/2018

PRU031A CRCA GOX Panel K61-4278 - ANNUAL Annual NO DATE

PRU032A CRCA GN2 Panel K61-4279 - ANNUAL Annual NO DATE

PRU033A CRCA GHe Panel K61-4280 - ANNUAL Annual NO DATE

PRU034A CRCA Breathing Air Panel K61-4281 - ANNUAL Annual NO DATE

PRU035A CRCA GN2 Panel K61-4394 -- Annual Annual 11/5/2018

PRU036A CRCA GH2 Panel K61-4264 -- Annual Annual 11/5/2018

PRU037A CRCA GHe Panel K61-4404 - ANNUAL Annual 5/29/2018

PRU038A CRCA DM Water / GN2 Panel K61-4405 - ANNUAL Annual NO DATE

PRU039A CRCA GN2 Panel K61-4391 -- Annual Annual 11/27/2018

PRU040A CRCA Flowmeter Cal Panel S72-1268 - ANNUAL Annual NO DATE

PRU041A3 CRCA HFE Tanks K60-3365 -- Triennial Triennial 5/30/2018

PRU042A3 CRCA Vertrel Panel K60-3366 -- Triennial Triennial 5/30/2018

PRU043A CRCA GN2 Panel K61-3827 -- Annual Annual 5/29/2018

PRU044A CRCA GN2 Panel K61-3828 -- Annual Annual 5/29/2018

PRU045A CRCA GN2 Panel K61-3831 -- Annual Annual 7/18/2018

PRU046A CRCA GN2 Panel K61-3885 -- Annual Annual 5/29/2018

PRU047A CRCA Argon Panel K61-4254 -- Annual Annual 5/29/2018

PRU048A CRCA GN2 Panel K62-5872 -- Annual Annual 5/23/2018

PRU049A CRCA GN2 Panel K62-5873 -- Annual Annual 9/21/2018

PRU050A CRCA GN2 Panel K62-5874 -- Annual Annual 9/21/2018

PRU051A CRCA GN2 Panel K61-4398 -- Annual Annual 6/19/2018

PRU052A CRCA GN2 Panel K61-4403 -- Annual Annual 6/19/2018

PRU053A3 CRCA GN2 Vertrel Tanks K61-5366 – Triennial Triennial 9/4/2018

PRU054A3 CRCA HFE Lectrodryer K60-3365 -- Triennial Triennial NO DATE

PRU055A3 CRCA Vertrel Lectrodryer K61-5366 – Triennial Triennial NO DATE

PRU056A3 CRCA Solvent Jet Mole Panel K61-4406-01 – Triennial Triennial 9/20/2019

PRU057A CRCA GHe GN2 Panel K60-3370-23 - ANNUAL Annual NO DATE

PRU058A3 GN2 at Hypergol Decontamination Bldg – Triennial Triennial 9/4/2018

PRU059A5 Hose Tower GN2 System – Quinquennial Quinquennial 9/4/2018

PRU060A5 Captured Vent Control Panel K60-3366 – Quinquennial Quinquennial 9/4/2018

PRU061A CRCA BAir Panel 81K06134-2, Decon Bldg – Annual Annual 9/20/2019

PRU061A5 Breathing Air Panel 81K06134-2 at Decon Bldg – Quinquennia Quinquennial NO DATE

PRU061SA CRCA BAir Panel 81K06134-2, Decon Bldg – SemiAnnual Semiannual 43728

PRU062A3 Hydrostat Test Panel K61-4397 – Triennial Triennial 9/4/2018

PRU063A CRCA GN2 Panel K62-5914, Gas Battery – Annual Annual 9/20/2019

PRU063SA CRCA GN2 Panel K62-5914, Gas Battery – SemiAnnual Semiannual 9/20/2019

PRU064A CRCA GN2/GHe Flow Test Panel K61-3832 – Annual Annual NO DATE

PRU065A CRCA GN2 Panel K61-4977, Gas Battery – Annual Annual 9/20/2019

PRU065SA CRCA GN2 Panel K61-4977, Gas Battery – SemiAnnual Semiannual 9/20/2019

PRU066A CRCA BAir Distribution Panel, Gas Battery – Annual Annual 9/20/2019

PRU066SA CRCA BAir Distribution Panel, Gas Battery – SemiAnnual Semiannual 9/20/2019

PRU067A CRCA 5K GHe System, Gas Battery – Annual Annual 9/20/2019

PRU067SA CRCA 5K GHe System, Gas Battery – SemiAnnual Semiannual 9/20/2019

PRU068A CRCA 14K GHe System, Gas Battery – Annual Annual 9/20/2019

PRU068SA CRCA 14K GHe System, Gas Battery – SemiAnnual Semiannual 9/20/2019

PRU069A CRCA 7.5K GN2 System, Gas Battery – Annual Annual 9/20/2019

PRU069SA CRCA 7.5K GN2 System, Gas Battery – SemiAnnual Semiannual 9/20/2019

PRU070A CRCA 14K GN2 System, Gas Battery – Annual Annual 9/20/2019

PRU070SA CRCA 14K GN2 System, Gas Battery – SemiAnnual Semiannual 9/20/2019

PRU071A CRCA BAir Fill Panel and Vessels, Gas Battery – Annual Annual 9/20/2019

PRU071SA CRCA BAir Fill Panel and Vessels, Gas Battery – SemiAnnual Semiannual 9/20/2019

PRU072A CRCA Intensifier Drive Panel K62-5911, Gas Battery – Annual Annual 9/20/2019

PRU072SA CRCA Intensifier Drive Panel K62-5911, Gas Battery – SemiAnnual Semiannual 9/20/2019

PRU10010A Pad-B GHe, 3k Helium Reg Panel, GG-K00026-1 - Annual Annual NO DATE

PRU10020A Pad-B GN2, T-4 H2O Tank Reg Panel, K61-2414 - Annual Annual NO DATE

PRU10030A Pad-B GN2, Sound Supression Supply Panel (IOPSS) - Annual Annual NO DATE

PRU10427A5 Filter Element Changeout - QUINQUENNIAL Quinquennial NO DATE

PRU10428A GN2 PRS-3, PAD-B - ANNUAL Annual NO DATE

PRU10436A GH2 Storage Facility Maintenance - ANNUAL Annual NO DATE

PRU10442A5 Pad, GHe, Filter element changeout verification - QUINQUENNIAL Quinquennial NO DATE

PRU10445A5 Filter Element change out - QUINQUENNIAL Quinquennial NO DATE

PRU11717A CRCA GN2 Panel K61-4257 -- Annual Annual 5/29/2018

PRU11745A CRCA GN2 Panel K61-3787 -- Annual Annual 9/21/2018

PRU12472 VAB Room 1K9 GN2 Panel #11 (B007355) Shop - ANNUAL Annual NO DATE

PRU12863A Pad-B GN2 PRS-11/LO2 Area (B007259) - ANNUAL Annual NO DATE

PRU12865A Pad-B GN2 PRS-5/LH2 Area (B007261) Shop - ANNUAL Annual NO DATE

PRU12869A PRS-7 GN2, VAB D Tower 1st FL (B007360) - ANNUAL Annual NO DATE

PRU12871 VAB D Tower 3rd floor S72-0636-04 GN2 (B007363) Shop - ANNUAL Annual NO DATE

PRU13150A Facility GN2 System (B007401), M7-1212 - ANNUAL Annual NO DATE

PRU13403A PRS-1, PRS-13, PRS-14, VAB (B007356) - ANNUAL Annual NO DATE

PRU13591SA GO2 System Maintenance: Pad-A - SEMIANNUAL Semiannual NO DATE

PRU13630 VAB E Tower 3rd floor S72-0680-04 GHe (B007368) Shop - ANNUAL Annual NO DATE

PRU13636 K6-0794 TPS Facility, K61-1632-01, Shop - ANNUAL Annual NO DATE

PRU13734A Storage Battery GHe System (B007354), VAB - ANNUAL Annual NO DATE

PRU13843A GN2 Stor Batt Filter Change File VI, PAD-B - ANNUAL Annual NO DATE

PRU14495A VAB E Tower 3rd floor S72-0636-01 GN2 Shop - ANNUAL Annual NO DATE

PRU14983 Pad-B GHe Storage Battery (B007251) Shop - ANNUAL Annual NO DATE

PRU14985A Pad-B GN2 Storage Battery Shop - ANNUAL Annual NO DATE

PRU14995 VAB E-Tower 3rd Floor S72-0636-01 GN2 (B007361) Shop - ANNUAL Annual NO DATE

PRU14997A VAB Storage Battery GN2 System (B007365) Shop - ANNUAL Annual NO DATE

PRU15001A L-146 SRB BFF Facility GN2 Reg Pnl (B007430) Shop - ANNUAL Annual NO DATE

PRU15629 Pad-A GHe Storage Battery (B007206) Shop - ANNUAL Annual NO DATE

PRU15631A GN2 PRS-5 / LH2 Area (B007216), PAD-A - ANNUAL Annual NO DATE

PRU16002A Pad-A GN2 Storage Battery (B007207) Shop - ANNUAL…