NASA WSTF Virtual Tour.pdf

PDF 3 MB Posted

Attached to
Environmental Compliance and Operations 3 (ECO3) Federal contract opportunity
Solicitation number
80JSC022ECO3
Issued by
National Aeronautics and Space Administration Johnson Space Center

About this file

This notice is a sources sought synopsis issued by NASA's White Sands Test Facility seeking capability statements for environmental compliance, restoration, and sustainability services with a maximum award value of $80 million over five years. The services include multi-media environmental compliance, environmental restoration program support, and sustainability program activities. Interested parties should submit capability statements no longer than seven pages by February 24th, 2022 addressing their business details, relevant past performance, and ability to perform the required services. The solicitation is anticipated to be a follow-on to the current ECO2 IDIQ contract and utilize a streamlined evaluation approach permitting a trade-off of cost, past performance, and proposed value-added approaches. Feedback is specifically requested on the draft performance work statement, suitability of requirements for firm-fixed-price contracting, barriers to competition, use of a streamlined evaluation approach including value attributes, and other topics regarding the potential procurement.

View the file

Other files for this federal contract opportunity

Other files attached to Environmental Compliance and Operations 3 (ECO3), newest first.
File Type Posted
WSTF Job Instructions.zip ZIP file
Product Processes.zip ZIP file
Env Task Orders.zip ZIP file
Plume Front_Part7 and 8.zip ZIP file
Plans Permits Documents 11.zip ZIP file
Plans Permits Documents 1.zip ZIP file
Miscellaneous.zip ZIP file
Plume Front_Part5.zip ZIP file
Plume Front_Part1.zip ZIP file
Plans Permits Documents 8.zip ZIP file
Plans Permits Documents 4.zip ZIP file
Index - TRL New.pdf PDF
WSTF Standard Instructions.zip ZIP file
Infrastructure Processes.zip ZIP file
Plume Front_Part3 and 4.zip ZIP file
Plans Permits Documents 9.zip ZIP file
Plans Permits Documents 7.zip ZIP file
Plans Permits Documents 6.zip ZIP file
Plans Permits Documents 5.zip ZIP file
Plans Permits Documents 3.zip ZIP file
WSTF Standard Procedures.zip ZIP file
Manuals.zip ZIP file
Plume Front_Part6.zip ZIP file
Plume Front_Part2.zip ZIP file
Plans Permits Documents 10.zip ZIP file
Plans Permits Documents 2.zip ZIP file
80JSC022ECO3 dRFP Q-A Round 2.pdf PDF
80JSC022ECO3 dRFP Q-A Responses.pdf PDF
ECO3 Draft RFP 80JSC022R0011.pdf PDF
ECO3 Draft RFP 80JSC022R0011- Attachments.zip ZIP file
Interested-Parties.pdf PDF
ECO3-Industry Questions and Answers.pdf PDF
Industry Bulletin (ECO3).pdf PDF
2022 Draft PWS for ECO3 Procurement.pdf PDF
Show all 34

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NASA

White Sands Test Facility

Virtual Tour

Environmental Program

• Functional Areas

• 100 Area

• Office space, gym, clinic, warehouse, trades

• 200 Area

• Laboratory, Technical Services, Hypervelocity

• 300 Area

• Propulsion Test

• 400 Area

• Propulsion Test

• 500 Area

• Propellant storage, hazardous waste management

• 600 Area

• Environmental and site infrastructure

• 700 Area

• Blast testing and landfill closure area

• 800 Area

• Hazardous test operations

White Sands Test Facility

Container Storage Area – 90 Day Hazardous Waste Above-Ground Tank Farm (under construction)

Petroleum Fueling Station (Underground Tanks) 150 Yard – Recycling Center and Antifreeze/Oil Storage

100 Area - Continued

200/800 Area - Continued

Excavated Waste Dump Tank Hazardous Waste Unit

Closure

Excavated Tank System Hazardous Waste Unit

Closure

Lagoon Closure Program

300 Area - Continued

302 Cooling Pond

300 Area Hazardous Waste Management Unit Investigation

Main Water Tank Drinking Water Compliance

400 Area - Continued

Boiler Building (Air Permit Compliance)

Wastewater Collection Pond System

300 Area Hazardous Waste Management Unit Closure

500 Area – Continued Views of the Propellant Waste Central Accumulation Area

600 Area - Continued

Wastewater Lagoon Investigation and Closure

Closed Waste Management Unit Investigation Work Environmental Storage and Staging Facilities

Plume-front Treatment System

• Objective: Stabilize leading edge of groundwater plume; stop westward migration

• Up to about 1,000 gpm

• Designed for 24/7 operation

• 5 extraction wells, dual-wall HDPE pipeline, air strippers (VOCs), UV photolysis (NDMA), four injection wells

Mid-plume Interception and Treatment System

• Objective: Intercept high-concentration groundwater in the mid-plume constriction area (confined groundwater flow)

• Designed for up to 100 gpm, but currently runs at about 10 gpm

• Designed for 24/7 operation

• 5 extraction wells, dual-wall PVC pipeline, air strippers, UV reactor, infiltration basin

• Discharge permit DP-1255 for infiltration basis (compliance requirements)

700 Area - Continued

Remote High Energy Blast Area 700 Area Landfill (Closed and Capped)

Miscellaneous Site-Wide Environmental Program Activities

• Compliance

• Sampling

• Analyses

• Data Review

• Reporting

• Recordkeeping

Site-Wide Environmental Program Area Drinking Water System

• Compliance

• Sampling

• Analyses

• Data Evaluation

• Reporting

• Recordkeeping

• Spill response

Sanitary Sewer System

• Investigations and Clean-Up

• Solid Waste Management Units

• Hazardous Waste Management Units

Core Drilling in 200 Area

Air Rotary Drilling in 300 Area

Firing Range InvestigationSub-Surface Work – Soil Gas Study

• Groundwater Monitoring

• Sampling

• Analyses

• Data management

• Reporting

• Recordkeeping

Hazardous Waste Management

Typical Waste Management Areas Throughout Facility

Paint Booth Facility

Typical Industrial Area Waste Generation

• Sustainability

• Recycling

• Waste Minimization

• Pollution Prevention

• Outreach and Awareness

• Sustainable Acquisition

• Energy and water conservation assistance

Project Support to Achieve Sustainability Goals

Awareness and Outreach

Structure Bookmarks
NASA
NASA
NASA
NASA
White Sands Test Facility
Virtual Tour
Virtual Tour
Virtual Tour
Environmental Program
Environmental Program

Figure

•
•
•
•
•
•
Functional Areas
•
•
•
•
100 Area
•
•
•
•
Office space, gym, clinic, warehouse, trades
•
•
•
200 Area
•
•
•
•
Laboratory, Technical Services, Hypervelocity
•
•
•
300 Area
•
•
•
•
Propulsion Test
•
•
•
400 Area
•
•
•
•
Propulsion Test
•
•
•
500 Area
•
•
•
•
Propellant storage, hazardous waste management
•
•
•
600 Area
•
•
•
•
Environmental and site infrastructure
•
•
•
700 Area
•
•
•
•
Blast testing and landfill closure area
•
•
•
800 Area
•
•
•
•
Hazardous test operations
Figure
Figure
White Sands Test Facility
White Sands Test Facility
White Sands Test Facility
Sect
Figure
Figure
Figure
Figure
Figure
100 Area
100 Area
100 Area
-
Continued
Sect
Figure
200/800 Area
200/800 Area
200/800 Area
-
Continued
Figure
Figure
Figure
Sect
Figure
300 Area
300 Area
300 Area
-
Continued
Figure
Figure
Figure
Sect
Figure
400 Area
400 Area
400 Area
-
Continued
Figure
Figure
Figure
Sect
Figure
500 Area
500 Area
500 Area
–
Continued
Views of the Propellant Waste Central Accumulation Area
Figure
Figure
Sect
Figure
600 Area
600 Area
600 Area
-
Continued
Figure
Figure
Figure
Figure
Plume
Plume
Plume
Plume
-
front Treatment System
Figure
Figure
•
•
•
•
•
•
Objective: Stabilize leading edge of
groundwater plume; stop westward
migration
•
•
•
Up to about 1,000
gpm
•
•
•
Designed for 24/7 operation
•
•
•
5 extraction wells, dual
-
wall HDPE
pipeline, air strippers (VOCs), UV
photolysis (NDMA), four injection wells

Figure

Mid
Mid
Mid
Mid
-
plume Interception and Treatment System
•
•
•
•
•
•
Objective: Intercept high
-
concentration
groundwater in the mid
-
plume
constriction area (confined groundwater
flow)
•
•
•
Designed for up to 100
gpm
, but
currently runs at about 10
gpm
•
•
•
Designed for 24/7 operation
•
•
•
5 extraction wells, dual
-
wall PVC
pipeline, air strippers, UV reactor,
infiltration basin
•
•
•
Discharge permit DP
-
1255 for infiltration
basis (compliance requirements)
Figure
Figure
Figure
Sect
Figure
700 Area
700 Area
700 Area
-
Continued
Figure
Figure
Sect
Figure
Miscellaneous Site
Miscellaneous Site
Miscellaneous Site
-
Wide
Environmental Program Activities
•
•
•
•
•
•
Compliance
•
•
•
Sampling
•
•
•
Analyses
•
•
•
Data Review
•
•
•
Reporting
•
•
•
Recordkeeping
Figure
Site
Site
Site
-
Wide Environmental Program Area
Drinking Water System
Drinking Water System

Figure

•
•
•
•
•
•
Compliance
•
•
•
Sampling
•
•
•
Analyses
•
•
•
Data Evaluation
•
•
•
Reporting
•
•
•
Recordkeeping
•
•
•
Spill response
Figure
Figure
Site
Site
Site
-
Wide Environmental Program Area
Sanitary Sewer System
Sanitary Sewer System
Site
Site
Site
Site
-
Wide Environmental Program Area
•
•
•
•
•
Investigations and Clean
-
Up
•
•
•
•
Solid Waste Management Units
•
•
•
Hazardous Waste Management
Units
Figure
Figure
Figure
Figure
Figure
Site
Site
Site
Site
-
Wide Environmental Program Area
•
•
•
•
•
Groundwater Monitoring
•
•
•
•
Sampling
•
•
•
Analyses
•
•
•
Data management
•
•
•
Reporting
•
•
•
Recordkeeping
Figure
Figure
Site
Site
Site
Site
-
Wide Environmental Program Area
Hazardous Waste Management
Figure
Figure
Figure
Figure
Figure
Sect
Figure
Site
Site
Site
-
Wide Environmental Program Area
•
•
•
•
•
Sustainability
•
•
•
•
Recycling
•
•
•
Waste Minimization
•
•
•
Pollution Prevention
•
•
•
Outreach and Awareness
•
•
•
Sustainable Acquisition
•
•
•
Energy and water conservation
assistance
Figure
Figure
Figure
Figure
Figure

File details come from the government source that posted it. Updated .