PACE-GNC-LIST-0020.pdf

PDF 397 KB Posted

Attached to
Plankton, Aerosol, Cloud, ocean Ecosystem (PACE) Coarse Sun Sensors (CSS) Federal contract opportunity
Solicitation number
80GSFC19Q0001
Issued by
National Aeronautics and Space Administration Goddard Space Center

View the file

Other files for this federal contract opportunity

Other files attached to Plankton, Aerosol, Cloud, ocean Ecosystem (PACE) Coarse Sun Sensors (CSS), newest first.
File Type Posted
PACE-GNC-SOW-0037.pdf PDF
Past_Performance_Questionnaire.pdf PDF
PACE-GNC-SPEC-0067.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Effective Date: November 16, 2018

Expiration Date: November 16, 2023

Check https://ipdtdms.gsfc.nasa.gov to verify that this is the correct version prior to use

400-FORM-0002 (4/16/2014)

National Aeronautics and Space Administration

Goddard Space Flight Center

Greenbelt, Maryland

PACE-GNC-LIST-0020, Revision -

Plankton, Aerosol, Cloud, ocean Ecosystem (PACE), Code 427

PACE Spacecraft Coarse Sun Sensor

Deliverable Items List and Schedule (DILS)

GSFC PACE CMO

11/16/2018

Released https://ipdtdms.gsfc.nasa.gov/

PACE Coarse Sun Sensor DILS PACE-GNC-LIST-0020, Revision -ii

Use or disclosure of data contained on this page is subject to the restriction(s) on the title page of this document.

PACE Spacecraft Coarse Sun Sensor DILS

Signature/Approval Page

Prepared By:

Eric Rogstad

Reviewed By:

John Blackwood

William Sluder

Beth Weinstein

Jack Sanders

Gary Won

Nikesha Davis

Timothy Johnson

Anthony Martinez

Shavesha Rutledge

Raymond Ladbury

James Eitnier

Craig Stevens

Daniel Powers

Eric Rogstad

David Sohl

Approved By:

Andre Dress

Electronic Signatures available online at: https://ipdtdms.gsfc.nasa.gov/ iii

Use or disclosure of data contained on this page is subject to the restriction(s) on the title page of this document.

Preface

This document is under Plankton, Aerosol, Cloud, ocean Ecosystem (PACE) Mission configuration control. Changes to this document require prior approval of the PACE

Configuration Control Board (CCB) Chairperson or designee. Submit proposed changes to the

PACE Configuration Management Office (CMO), along with supportive material justifying the proposed change. Changes to this document will be made by complete revision.

iv

Use or disclosure of data contained on this page is subject to the restriction(s) on the title page of this document.

Change History Log

Revision Effective Date Description of Changes

(Reference the CCR & CCB/ERB Approval Date)

Revision - 11/16/2018 Baseline Release following the approval of PACE-CCR-0405 v

Use or disclosure of data contained on this page is subject to the restriction(s) on the title page of this document.

Table of TBDs/TBRs/TBSs [optional]

Action Item

No.

Location Summary Individual/

Organization

Actionee vi

Use or disclosure of data contained on this page is subject to the restriction(s) on the title page of this document.

400-FORM-0002 (4/16/2014)

Table of Contents

1 INTRODUCTION

1.1 Purpose

1.2 Scope

1.3 PACE Mission Overview

1.4 Related Documentation

1.4.1 Applicable Documents

1.4.2 Reference Documents

2 DELIVERABLES

Appendix A Abbreviations and Acronyms

List of Tables

Table 1. Data Delivery Documentation and Schedule

Use or disclosure of data contained on this page is subject to the restriction(s) on the title page of this document.

400-FORM-0002 (4/16/2014)

1 INTRODUCTION

1.1 Purpose

This document is the Plankton, Aerosol, Cloud, ocean Ecosystem (PACE) Coarse Sun Sensor

(CSS) Deliverable Items List and Schedule (DILS).

1.2 Scope

This document lists all of the deliverables for Coarse Sun Sensor, the SOW paragraph number where the deliverable is described further, the type of response required from NASA GSFC, the format of the deliverable, and the schedule for delivery. The information in this document will be copied into the Section B Table of the RFP/contract.

1.3 PACE Mission Overview

The Plankton, Aerosol, Cloud, ocean Ecosystem (PACE) mission is a strategic climate continuity mission that was defined in the 2010 document Responding to the Challenge of Climate and

Environmental Change: NASA’s Plan for Climate-Centric Architecture for Earth Observations and Applications from Space (referred to as the “Climate Initiative”). The Climate Initiative complements NASA’s implementation of the National Research Council’s Decadal Survey of

Earth Science at NASA, NOAA, and USGS, entitled Earth Science and Applications from

Space: National Imperatives for the Next Decade and Beyond.

PACE is classified as a Category 2 mission, per the criteria in NASA Procedural Requirement

(NPR) 7120.5E, NASA Space Flight Program and Project Management Requirements. The mission classification is C according to NPR 8705.4B, Risk Classification for NASA Payloads.

1.4 Related Documentation

1.4.1 Applicable Documents

PACE-GNC-SOW-0037 PACE Spacecraft Coarse Sun Sensor Statement of Work

1.4.2 Reference Documents

PACE-GNC-SPEC-0067 PACE Spacecraft Coarse Sun Sensor Specification

Use or disclosure of data contained on this page is subject to the restriction(s) on the title page of this document.

400-FORM-0002 (4/16/2014)

2 DELIVERABLES

Description: This provides the Title of the deliverable item.

Reference: This provides the reference back to the pertinent document calling out the deliverable.

Category:

A = Approval – Items in this category require approval from the National Aeronautics and Space Administration (NASA)/Goddard Space Flight Center (GSFC) Contracting

Officer (CO). In general, documents shall be provided in contractor format as long as required content, as specified in the Plankton, Aerosol, Cloud, ocean Ecosystem (PACE) Coarse Sun Sensor Statement of Work (PACE-GNC-SOW-0037), is addressed. The

NASA GSFC CO reserves the time-limited right of disapproval for each submission.

The time-limited period is two weeks from receipt of documents.

R= Review – Items in this category do not require formal NASA GSFC CO approval, but will be reviewed by the GSFC or its designated representatives in order to determine contractor effectiveness in meeting contract objectives. When Government review reveals inadequacies, the contractor may be requested to correct the inadequacies. GSFC will review and comment within 20 working days of receipt.

I = Information – Items in this category are informal and are for information only.

Format: This provides the format for the deliverable. For documents, the following format applies:

E = Electronic – Provide submittal in electronic format to the COR and Contracting

Officer. The vendor and COR shall jointly determine the type of electronic format (e.g., Word, Excel, PowerPoint, PDF, MATLAB) acceptable for each deliverable.

Use or disclosure of data contained on this page is subject to the restriction(s) on the title page of this document.

Table 1. Data Delivery Documentation and Schedule

Item

Description Reference Schedule Delivery

Method/Addressee(s)

1 Reserved - - -

2 Monthly Status Report SOW 3.2 Fourteen (14) calendar days following the month being reported.

Electronic – Provide submittal in electronic format to the COR and

Contracting Officer.

For Information Purposes.

3 Reserved - - -

4 Notifications SOW 3.3 Seven (7) calendar days in advance of all mandatory hardware inspections, test activities, TIM’s, and deliveries.

Electronic – Provide submittal in electronic format to the COR and

Contracting Officer.

Review Required.

5 Kick Off Meeting SOW 3.4.1 Fourteen (14) calendar days after contract effective date

In person at Contractor

Facility.

Review Required.

6 Kick Off Meeting Package SOW 3.4.1 Three (3) working days before the meeting

Electronic – Provide submittal in electronic format to the COR and

Contracting Officer.

Review Required

7 Design Conformance Review

(DCR)

SOW 3.4.2 Three (3) months contract effective date

In person at Contractor

Facility.

Review Required.

8 Design Conformance Review

Presentation Package

SOW

3.4.2, 7.7.2, 7.8.3

Fourteen (14) calendar days before DCR

Electronic – Provide submittal in electronic format to the COR and

Contracting Officer.

Approval Required.

9 Design Conformance Review

Report

SOW 3.4.2 Fourteen (14) calendar days after completion of DCR

Electronic – Provide submittal in electronic format to the COR and

Contracting Officer.

Review Required.

10 Pre-Environmental Review

(PER)

SOW 3.4.3 Seven (7) calendar days before start of environmental testing on first Flight Unit

In person at Contractor

Facility.

Review Required.

11 Pre-Environmental Review

Presentation

SOW 3.4.3 At PER Electronic – Provide submittal in electronic

Use or disclosure of data contained on this page is subject to the restriction(s) on the title page of this document.

400-FORM-0002 (4/16/2014)

format to the COR and

Contracting Officer.

Review Required.

12 Flight Unit(s) Pre-Ship

Review (PSR)

SOW 3.4.4 Seven (7) calendar days prior to delivery of each

Flight Unit

In person at Contractor

Facility.

Review Required.

13 Flight Unit(s) Pre-Ship

Review Presentation Package

SOW 3.4.4 At PSR Electronic – Provide submittal in electronic format to the COR and

Contracting Officer.

Review Required.

14 Flight Unit(s) End Item Data

Package(s) (EIDP)

SOW

3.4.4, 7.5.3, 7.7.1, 7.8.3

With each delivered Flight

Unit and available at PSR

Electronic – Provide submittal in electronic format to the COR and

Contracting Officer.

Approval Required.

15 TIM SOW 3.4.5 As Negotiated In person at Contractor

Facility.

Review Required.

16 Interface Control Document(s) SOW 4.1 Fourteen (14) calendar days before DCR

Electronic – Provide submittal in electronic format to the COR and

Contracting Officer.

Approval Required.

17 Drawing Package SOW 4.2 Fourteen (14) calendar days before DCR

Electronic – Provide submittal in electronic format to the COR and

Contracting Officer.

Review Required.

18 Computer Models SOW 4.3 Fourteen (14) calendar days before DCR

Electronic – Provide submittal in electronic format to the COR and

Contracting Officer.

For Information Purposes.

19 Structural Analysis Report SOW 4.4 Fourteen (14) calendar days before DCR

Electronic – Provide submittal in electronic format to the COR and

Contracting Officer.

Review Required.

20 Structural Finite Element

Model

SOW 4.5 Fourteen (14) calendar days before DCR

Electronic – Provide submittal in electronic format to the COR and

Contracting Officer.

Review Required.

21 Reserved

22 Reserved

23 Worst Case Circuit Analysis

Report

SOW 4.8 Fourteen (14) calendar days before DCR

Electronic – Provide submittal in electronic format to the COR and

Use or disclosure of data contained on this page is subject to the restriction(s) on the title page of this document.

400-FORM-0002 (4/16/2014)

Contracting Officer.

Review Required.

24 Parts Stress Analysis Report SOW 4.9 Fourteen (14) calendar days before DCR

Electronic – Provide submittal in electronic format to the COR and

Contracting Officer.

Review Required.

25 Parts Stress Analysis Criteria if different from EEE-INST-

SOW 4.9 Twenty-eight (28) calendar days after contract effective date

Electronic – Provide submittal in electronic format to the COR and

Contracting Officer.

Review Required.

26 Radiation Hardness Analysis

Report

SOW 4.10 Fourteen (14) calendar days before DCR

Electronic – Provide submittal in electronic format to the COR and

Contracting Officer.

Review Required.

27 Reliability Analysis Report SOW 4.11 Fourteen (14) calendar days before DCR

Electronic – Provide submittal in electronic format to the COR and

Contracting Officer.

Review Required.

28 FMECA Report SOW 4.12 Fourteen (14) calendar days before DCR

Electronic – Provide submittal in electronic format to the COR and

Contracting Officer.

Review Required.

29 Error Analysis Report SOW 4.13 Fourteen (14) calendar days before DCR

Electronic – Provide submittal in electronic format to the COR and

Contracting Officer.

Review Required.

30 Y Stray Light Analysis Report SOW 4.14 Fourteen (14) calendar days before DCR

Electronic – Provide submittal in electronic format to the COR and

Contracting Officer.

Review Required.

31 User/Instruction Manual SOW 4.15 Fourteen (14) calendar days before PSR

Electronic – Provide submittal in electronic format to the COR and

Contracting Officer.

Review Required

32 Reserved - - -

33 Verification Plan (Including

Verification Matrix)

SOW 6.1,

7.5.1

Fourteen (14) calendar days before DCR

Electronic – Provide submittal in electronic format to the COR and

Contracting Officer.

Approval Required.

Use or disclosure of data contained on this page is subject to the restriction(s) on the title page of this document.

400-FORM-0002 (4/16/2014)

34 Individual Verification Test

Plan(s) (if needed)

SOW 6.1 Fourteen (14) calendar days before DCR

Electronic – Provide submittal in electronic format to the COR and

Contracting Officer.

Approval Required.

35 Verification Test Procedure(s) SOW 6.2 Twenty-eight (28) calendar days before start of testing and as changes occur.

Electronic – Provide submittal in electronic format to the COR and

Contracting Officer.

Review Required.

36 Verification Test Report(s) SOW 6.3 At PSR Electronic – Provide submittal in electronic format to the COR and

Contracting Officer.

Review Required.

37 Quality Assurance Plan SOW 7.1.1 Fourteen (14) calendar days after contract effective date

Electronic – Provide submittal in electronic format to the COR and

Contracting Officer.

Approval Required.

38 Anomaly/Failure Reports SOW 7.1.3 Deliver initial submission within 24 hours of occurrence for information for Major Anomaly.

Deliver notice of a change in status within 24 hours of occurrence for information.

Deliver the proposed closure prior to closure for approval.

Electronic – Provide submittal in electronic format to the COR and

Contracting Officer.

Approval Required.

39 Class I Configuration

Management (CM) Changes

SOW 7.1.4 Seven (7) calendar days after Contractor CM review

Electronic – Provide submittal in electronic format to the COR and

Contracting Officer.

Approval Required.

40 Class II CM Changes SOW 7.1.4 Seven (7) calendar days after Contractor CM review

Electronic – Provide submittal in electronic format to the COR and

Contracting Officer.

For Information Purposes.

41 Safety/Hazard Controls SOW 7.2 Three (3) working days after Contractor disposition

Electronic – Provide submittal in electronic format to the COR and

Contracting Officer.

Review Required.

Use or disclosure of data contained on this page is subject to the restriction(s) on the title page of this document.

400-FORM-0002 (4/16/2014)

42 Trended Parameters List SOW 7.3.1 Seven (7) calendar days prior to PER

Electronic – Provide submittal in electronic format to the COR and

Contracting Officer.

Review Required.

43 Limited Life Items List SOW 7.3.2 Fourteen (14) calendar days before DCR

Electronic – Provide submittal in electronic format to the COR and

Contracting Officer.

Approval Required.

44 Expired Shelf Life Waiver SOW 7.3.2 Fourteen (14) calendar days before DCR

Electronic – Provide submittal in electronic format to the COR and

Contracting Officer.

Approval Required.

45 Reserved - - -

46 Advanced Packaging

Technology Requirements

Documents (if applicable)

SOW 7.6.2 Twenty-eight (28) calendar days after contract effective date

Electronic – Provide submittal in electronic format to the COR and

Contracting Officer.

Review Required.

47 Alternate Workmanship

Standards

SOW 7.6.3 Fourteen (14) calendar days before DCR

Electronic – Provide submittal in electronic format to the COR and

Contracting Officer.

Approval Required.

48 Reserved - - -

49 Printed Wiring Board

Coupons (if applicable)

SOW 7.6.8 Twenty-one (21) calendar days before start of PWB assembly

Review Required.

50 EEE Parts Identification List SOW 7.7.1 Fourteen (14) calendar days before DCR

Electronic – Provide submittal in electronic format to the COR and

Contracting Officer.

Review Required.

51 Radiation Test Plans (if applicable)

SOW 7.7.3 Twenty-eight (28) calendar days prior to test.

Electronic – Provide submittal in electronic format to the COR and

Contracting Officer.

Review Required.

52 Radiation Test Reports (if applicable)

SOW 7.7.3 Fourteen (14) calendar days after test

Electronic – Provide submittal in electronic format to the COR and

Contracting Officer.

Review Required.

53 Recertification Plans for Parts

> 7 years old (if applicable)

SOW 7.7.4 Fourteen (14) calendar days before DCR

Electronic – Provide submittal in electronic format to the COR and

Contracting Officer.

Use or disclosure of data contained on this page is subject to the restriction(s) on the title page of this document.

400-FORM-0002 (4/16/2014)

Approval Required.

54 GIDEP Alert Disposition and

Preparation

SOW 7.7.5 Three (3) working days after Contractor evaluation

Summary in Monthly Status

Report

Electronic – Provide submittal in electronic format to the COR and

Contracting Officer.

For Information Purposes.

55 Part Failure Reporting SOW 7.7.7 Twenty-four (24) hours after failure determination

Electronic – Provide submittal in electronic format to the COR and

Contracting Officer.

Approval Required.

56 Reserved - - -

57 Reserved - - -

58 Reserved - - -

59 Reserved - - -

60 Reserved - - -

61 Reserved - - -

62 Contamination Control Plan SOW 7.9.1 Fourteen (14) calendar days before DCR

Electronic – Provide submittal in electronic format to the COR and

Contracting Officer.

Review Required.

63 Reserved - - -

64 Thermal Vacuum Bakeout

Plan

SOW 7.9.4 Twenty-eight (28) calendar days prior to beginning of

Thermal Vacuum Bakeout

Tests

Electronic – Provide submittal in electronic format to the COR and

Contracting Officer.

Approval Required.

65 Thermal Vacuum Bakeout

Test Results (if not part of

Thermal Vacuum Report)

SOW 7.9.4 Fourteen (14) calendar days after completion of Thermal

Vacuum Bakeout Tests

Electronic – Provide submittal in electronic format to the COR and

Contracting Officer.

Approval Required.

66 Reserved - -

67 Coarse Sun Sensor Flight

Units and Flight Baffles

Qty: 12

SOW 5.2 Twelve (12) months after contract effective date

As specified in Clause

GSFC 52.247-94

Approval Required.

68 Coarse Sun Sensor Connector

Saver(s)

SOW 5.3 With Item #67 As specified in Clause

GSFC 52.247-94

Approval Required.

69 Coarse Sun Sensor Supporting

Hardware

SOW 5.4 With Item #67 As specified in Clause

GSFC 52.247-94

Approval Required.

Use or disclosure of data contained on this page is subject to the restriction(s) on the title page of this document.

400-FORM-0002 (4/16/2014)

70 Coarse Sun Sensor

Stimulators and Stimulator

Controller

SOW 5.5 With Item #67 As specified in Clause

GSFC 52.247-94

Approval Required.

71 Shipping Container SOW 5.5 With Item #67 As specified in Clause

GSFC 52.247-94

For Information Purposes.

72 Option: Drill Template SOW 5.5 At DCR As specified in Clause

GSFC 52.247-94

For Information Purposes

73 Option: CSS ETU (Loaner) SOW 5.2 No earlier than Six (6) months after contract effective date

As specified in Clause

GSFC 52.247-94

Approval Required

74 Calibration Test Report SOW 4.16 Seven (7) calendar days prior to PSR

Electronic – Provide submittal in electronic format to the COR and

Contracting Officer.

Review Required.

Use or disclosure of data contained on this page is subject to the restriction(s) on the title page of this document.

400-FORM-0002 (4/16/2014)

Appendix A Abbreviations and Acronyms

Abbreviation/

Acronym Definition

A Approve

CCB Configuration Control Board

CCR Configuration Change Request

CM Configuration Management

CMO Configuration Management Office

CO Contracting Officer

COR Contracting Officer's Representative

CSS Coarse Sun Sensor

DCR Design Conformance Review

DILS Deliverable Items List and Schedule

EEE Electrical, Electronic, and Electromechanical

FMEA Failure Modes and Effects Analysis

GIDEP Government Industry Data Exchange Program

GSE Ground Support Equipment

GSFC Goddard Space Flight Center

I Information

INST Instrument

MIS Management Information System

NASA National Aeronautics and Space Administration

NDE Nondestructive Evaluation

PACE Plankton, Aerosol, Cloud, ocean Ecosystem

PDL Product Design Lead

PEM Plastic Encapsulated Microcircuit

PER Pre-Environmental Review

PSR Pre-Ship Review

PWB Printed Wiring Board

R Review

SCoRe Signature Controlled Request

SOW Statement of Work

TBD To Be Determined

TBR To Be Resolved

TIM Technical Interchange Meeting

Yrs years

File details come from the government source that posted it.