PACE-GNC-LIST-0020.pdf
PDF 397 KB Posted
- Attached to
- Plankton, Aerosol, Cloud, ocean Ecosystem (PACE) Coarse Sun Sensors (CSS) Federal contract opportunity
- Solicitation number
- 80GSFC19Q0001
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| PACE-GNC-SOW-0037.pdf | ||
| Past_Performance_Questionnaire.pdf | ||
| PACE-GNC-SPEC-0067.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Effective Date: November 16, 2018
Expiration Date: November 16, 2023
Check https://ipdtdms.gsfc.nasa.gov to verify that this is the correct version prior to use
400-FORM-0002 (4/16/2014)
National Aeronautics and Space Administration
Goddard Space Flight Center
Greenbelt, Maryland
PACE-GNC-LIST-0020, Revision -
Plankton, Aerosol, Cloud, ocean Ecosystem (PACE), Code 427
PACE Spacecraft Coarse Sun Sensor
Deliverable Items List and Schedule (DILS)
GSFC PACE CMO
11/16/2018
Released https://ipdtdms.gsfc.nasa.gov/
PACE Coarse Sun Sensor DILS PACE-GNC-LIST-0020, Revision -ii
Use or disclosure of data contained on this page is subject to the restriction(s) on the title page of this document.
PACE Spacecraft Coarse Sun Sensor DILS
Signature/Approval Page
Prepared By:
Eric Rogstad
Reviewed By:
John Blackwood
William Sluder
Beth Weinstein
Jack Sanders
Gary Won
Nikesha Davis
Timothy Johnson
Anthony Martinez
Shavesha Rutledge
Raymond Ladbury
James Eitnier
Craig Stevens
Daniel Powers
Eric Rogstad
David Sohl
Approved By:
Andre Dress
Electronic Signatures available online at: https://ipdtdms.gsfc.nasa.gov/ iii
Use or disclosure of data contained on this page is subject to the restriction(s) on the title page of this document.
Preface
This document is under Plankton, Aerosol, Cloud, ocean Ecosystem (PACE) Mission configuration control. Changes to this document require prior approval of the PACE
Configuration Control Board (CCB) Chairperson or designee. Submit proposed changes to the
PACE Configuration Management Office (CMO), along with supportive material justifying the proposed change. Changes to this document will be made by complete revision.
iv
Use or disclosure of data contained on this page is subject to the restriction(s) on the title page of this document.
Change History Log
Revision Effective Date Description of Changes
(Reference the CCR & CCB/ERB Approval Date)
Revision - 11/16/2018 Baseline Release following the approval of PACE-CCR-0405 v
Use or disclosure of data contained on this page is subject to the restriction(s) on the title page of this document.
Table of TBDs/TBRs/TBSs [optional]
Action Item
No.
Location Summary Individual/
Organization
Actionee vi
Use or disclosure of data contained on this page is subject to the restriction(s) on the title page of this document.
400-FORM-0002 (4/16/2014)
Table of Contents
1 INTRODUCTION
1.1 Purpose
1.2 Scope
1.3 PACE Mission Overview
1.4 Related Documentation
1.4.1 Applicable Documents
1.4.2 Reference Documents
2 DELIVERABLES
Appendix A Abbreviations and Acronyms
List of Tables
Table 1. Data Delivery Documentation and Schedule
Use or disclosure of data contained on this page is subject to the restriction(s) on the title page of this document.
400-FORM-0002 (4/16/2014)
1 INTRODUCTION
1.1 Purpose
This document is the Plankton, Aerosol, Cloud, ocean Ecosystem (PACE) Coarse Sun Sensor
(CSS) Deliverable Items List and Schedule (DILS).
1.2 Scope
This document lists all of the deliverables for Coarse Sun Sensor, the SOW paragraph number where the deliverable is described further, the type of response required from NASA GSFC, the format of the deliverable, and the schedule for delivery. The information in this document will be copied into the Section B Table of the RFP/contract.
1.3 PACE Mission Overview
The Plankton, Aerosol, Cloud, ocean Ecosystem (PACE) mission is a strategic climate continuity mission that was defined in the 2010 document Responding to the Challenge of Climate and
Environmental Change: NASA’s Plan for Climate-Centric Architecture for Earth Observations and Applications from Space (referred to as the “Climate Initiative”). The Climate Initiative complements NASA’s implementation of the National Research Council’s Decadal Survey of
Earth Science at NASA, NOAA, and USGS, entitled Earth Science and Applications from
Space: National Imperatives for the Next Decade and Beyond.
PACE is classified as a Category 2 mission, per the criteria in NASA Procedural Requirement
(NPR) 7120.5E, NASA Space Flight Program and Project Management Requirements. The mission classification is C according to NPR 8705.4B, Risk Classification for NASA Payloads.
1.4 Related Documentation
1.4.1 Applicable Documents
PACE-GNC-SOW-0037 PACE Spacecraft Coarse Sun Sensor Statement of Work
1.4.2 Reference Documents
PACE-GNC-SPEC-0067 PACE Spacecraft Coarse Sun Sensor Specification
Use or disclosure of data contained on this page is subject to the restriction(s) on the title page of this document.
400-FORM-0002 (4/16/2014)
2 DELIVERABLES
Description: This provides the Title of the deliverable item.
Reference: This provides the reference back to the pertinent document calling out the deliverable.
Category:
A = Approval – Items in this category require approval from the National Aeronautics and Space Administration (NASA)/Goddard Space Flight Center (GSFC) Contracting
Officer (CO). In general, documents shall be provided in contractor format as long as required content, as specified in the Plankton, Aerosol, Cloud, ocean Ecosystem (PACE) Coarse Sun Sensor Statement of Work (PACE-GNC-SOW-0037), is addressed. The
NASA GSFC CO reserves the time-limited right of disapproval for each submission.
The time-limited period is two weeks from receipt of documents.
R= Review – Items in this category do not require formal NASA GSFC CO approval, but will be reviewed by the GSFC or its designated representatives in order to determine contractor effectiveness in meeting contract objectives. When Government review reveals inadequacies, the contractor may be requested to correct the inadequacies. GSFC will review and comment within 20 working days of receipt.
I = Information – Items in this category are informal and are for information only.
Format: This provides the format for the deliverable. For documents, the following format applies:
E = Electronic – Provide submittal in electronic format to the COR and Contracting
Officer. The vendor and COR shall jointly determine the type of electronic format (e.g., Word, Excel, PowerPoint, PDF, MATLAB) acceptable for each deliverable.
Use or disclosure of data contained on this page is subject to the restriction(s) on the title page of this document.
Table 1. Data Delivery Documentation and Schedule
Item
Description Reference Schedule Delivery
Method/Addressee(s)
1 Reserved - - -
2 Monthly Status Report SOW 3.2 Fourteen (14) calendar days following the month being reported.
Electronic – Provide submittal in electronic format to the COR and
Contracting Officer.
For Information Purposes.
3 Reserved - - -
4 Notifications SOW 3.3 Seven (7) calendar days in advance of all mandatory hardware inspections, test activities, TIM’s, and deliveries.
Electronic – Provide submittal in electronic format to the COR and
Contracting Officer.
Review Required.
5 Kick Off Meeting SOW 3.4.1 Fourteen (14) calendar days after contract effective date
In person at Contractor
Facility.
Review Required.
6 Kick Off Meeting Package SOW 3.4.1 Three (3) working days before the meeting
Electronic – Provide submittal in electronic format to the COR and
Contracting Officer.
Review Required
7 Design Conformance Review
(DCR)
SOW 3.4.2 Three (3) months contract effective date
In person at Contractor
Facility.
Review Required.
8 Design Conformance Review
Presentation Package
SOW
3.4.2, 7.7.2, 7.8.3
Fourteen (14) calendar days before DCR
Electronic – Provide submittal in electronic format to the COR and
Contracting Officer.
Approval Required.
9 Design Conformance Review
Report
SOW 3.4.2 Fourteen (14) calendar days after completion of DCR
Electronic – Provide submittal in electronic format to the COR and
Contracting Officer.
Review Required.
10 Pre-Environmental Review
(PER)
SOW 3.4.3 Seven (7) calendar days before start of environmental testing on first Flight Unit
In person at Contractor
Facility.
Review Required.
11 Pre-Environmental Review
Presentation
SOW 3.4.3 At PER Electronic – Provide submittal in electronic
Use or disclosure of data contained on this page is subject to the restriction(s) on the title page of this document.
400-FORM-0002 (4/16/2014)
format to the COR and
Contracting Officer.
Review Required.
12 Flight Unit(s) Pre-Ship
Review (PSR)
SOW 3.4.4 Seven (7) calendar days prior to delivery of each
Flight Unit
In person at Contractor
Facility.
Review Required.
13 Flight Unit(s) Pre-Ship
Review Presentation Package
SOW 3.4.4 At PSR Electronic – Provide submittal in electronic format to the COR and
Contracting Officer.
Review Required.
14 Flight Unit(s) End Item Data
Package(s) (EIDP)
SOW
3.4.4, 7.5.3, 7.7.1, 7.8.3
With each delivered Flight
Unit and available at PSR
Electronic – Provide submittal in electronic format to the COR and
Contracting Officer.
Approval Required.
15 TIM SOW 3.4.5 As Negotiated In person at Contractor
Facility.
Review Required.
16 Interface Control Document(s) SOW 4.1 Fourteen (14) calendar days before DCR
Electronic – Provide submittal in electronic format to the COR and
Contracting Officer.
Approval Required.
17 Drawing Package SOW 4.2 Fourteen (14) calendar days before DCR
Electronic – Provide submittal in electronic format to the COR and
Contracting Officer.
Review Required.
18 Computer Models SOW 4.3 Fourteen (14) calendar days before DCR
Electronic – Provide submittal in electronic format to the COR and
Contracting Officer.
For Information Purposes.
19 Structural Analysis Report SOW 4.4 Fourteen (14) calendar days before DCR
Electronic – Provide submittal in electronic format to the COR and
Contracting Officer.
Review Required.
20 Structural Finite Element
Model
SOW 4.5 Fourteen (14) calendar days before DCR
Electronic – Provide submittal in electronic format to the COR and
Contracting Officer.
Review Required.
21 Reserved
22 Reserved
23 Worst Case Circuit Analysis
Report
SOW 4.8 Fourteen (14) calendar days before DCR
Electronic – Provide submittal in electronic format to the COR and
Use or disclosure of data contained on this page is subject to the restriction(s) on the title page of this document.
400-FORM-0002 (4/16/2014)
Contracting Officer.
Review Required.
24 Parts Stress Analysis Report SOW 4.9 Fourteen (14) calendar days before DCR
Electronic – Provide submittal in electronic format to the COR and
Contracting Officer.
Review Required.
25 Parts Stress Analysis Criteria if different from EEE-INST-
SOW 4.9 Twenty-eight (28) calendar days after contract effective date
Electronic – Provide submittal in electronic format to the COR and
Contracting Officer.
Review Required.
26 Radiation Hardness Analysis
Report
SOW 4.10 Fourteen (14) calendar days before DCR
Electronic – Provide submittal in electronic format to the COR and
Contracting Officer.
Review Required.
27 Reliability Analysis Report SOW 4.11 Fourteen (14) calendar days before DCR
Electronic – Provide submittal in electronic format to the COR and
Contracting Officer.
Review Required.
28 FMECA Report SOW 4.12 Fourteen (14) calendar days before DCR
Electronic – Provide submittal in electronic format to the COR and
Contracting Officer.
Review Required.
29 Error Analysis Report SOW 4.13 Fourteen (14) calendar days before DCR
Electronic – Provide submittal in electronic format to the COR and
Contracting Officer.
Review Required.
30 Y Stray Light Analysis Report SOW 4.14 Fourteen (14) calendar days before DCR
Electronic – Provide submittal in electronic format to the COR and
Contracting Officer.
Review Required.
31 User/Instruction Manual SOW 4.15 Fourteen (14) calendar days before PSR
Electronic – Provide submittal in electronic format to the COR and
Contracting Officer.
Review Required
32 Reserved - - -
33 Verification Plan (Including
Verification Matrix)
SOW 6.1,
7.5.1
Fourteen (14) calendar days before DCR
Electronic – Provide submittal in electronic format to the COR and
Contracting Officer.
Approval Required.
Use or disclosure of data contained on this page is subject to the restriction(s) on the title page of this document.
400-FORM-0002 (4/16/2014)
34 Individual Verification Test
Plan(s) (if needed)
SOW 6.1 Fourteen (14) calendar days before DCR
Electronic – Provide submittal in electronic format to the COR and
Contracting Officer.
Approval Required.
35 Verification Test Procedure(s) SOW 6.2 Twenty-eight (28) calendar days before start of testing and as changes occur.
Electronic – Provide submittal in electronic format to the COR and
Contracting Officer.
Review Required.
36 Verification Test Report(s) SOW 6.3 At PSR Electronic – Provide submittal in electronic format to the COR and
Contracting Officer.
Review Required.
37 Quality Assurance Plan SOW 7.1.1 Fourteen (14) calendar days after contract effective date
Electronic – Provide submittal in electronic format to the COR and
Contracting Officer.
Approval Required.
38 Anomaly/Failure Reports SOW 7.1.3 Deliver initial submission within 24 hours of occurrence for information for Major Anomaly.
Deliver notice of a change in status within 24 hours of occurrence for information.
Deliver the proposed closure prior to closure for approval.
Electronic – Provide submittal in electronic format to the COR and
Contracting Officer.
Approval Required.
39 Class I Configuration
Management (CM) Changes
SOW 7.1.4 Seven (7) calendar days after Contractor CM review
Electronic – Provide submittal in electronic format to the COR and
Contracting Officer.
Approval Required.
40 Class II CM Changes SOW 7.1.4 Seven (7) calendar days after Contractor CM review
Electronic – Provide submittal in electronic format to the COR and
Contracting Officer.
For Information Purposes.
41 Safety/Hazard Controls SOW 7.2 Three (3) working days after Contractor disposition
Electronic – Provide submittal in electronic format to the COR and
Contracting Officer.
Review Required.
Use or disclosure of data contained on this page is subject to the restriction(s) on the title page of this document.
400-FORM-0002 (4/16/2014)
42 Trended Parameters List SOW 7.3.1 Seven (7) calendar days prior to PER
Electronic – Provide submittal in electronic format to the COR and
Contracting Officer.
Review Required.
43 Limited Life Items List SOW 7.3.2 Fourteen (14) calendar days before DCR
Electronic – Provide submittal in electronic format to the COR and
Contracting Officer.
Approval Required.
44 Expired Shelf Life Waiver SOW 7.3.2 Fourteen (14) calendar days before DCR
Electronic – Provide submittal in electronic format to the COR and
Contracting Officer.
Approval Required.
45 Reserved - - -
46 Advanced Packaging
Technology Requirements
Documents (if applicable)
SOW 7.6.2 Twenty-eight (28) calendar days after contract effective date
Electronic – Provide submittal in electronic format to the COR and
Contracting Officer.
Review Required.
47 Alternate Workmanship
Standards
SOW 7.6.3 Fourteen (14) calendar days before DCR
Electronic – Provide submittal in electronic format to the COR and
Contracting Officer.
Approval Required.
48 Reserved - - -
49 Printed Wiring Board
Coupons (if applicable)
SOW 7.6.8 Twenty-one (21) calendar days before start of PWB assembly
Review Required.
50 EEE Parts Identification List SOW 7.7.1 Fourteen (14) calendar days before DCR
Electronic – Provide submittal in electronic format to the COR and
Contracting Officer.
Review Required.
51 Radiation Test Plans (if applicable)
SOW 7.7.3 Twenty-eight (28) calendar days prior to test.
Electronic – Provide submittal in electronic format to the COR and
Contracting Officer.
Review Required.
52 Radiation Test Reports (if applicable)
SOW 7.7.3 Fourteen (14) calendar days after test
Electronic – Provide submittal in electronic format to the COR and
Contracting Officer.
Review Required.
53 Recertification Plans for Parts
> 7 years old (if applicable)
SOW 7.7.4 Fourteen (14) calendar days before DCR
Electronic – Provide submittal in electronic format to the COR and
Contracting Officer.
Use or disclosure of data contained on this page is subject to the restriction(s) on the title page of this document.
400-FORM-0002 (4/16/2014)
Approval Required.
54 GIDEP Alert Disposition and
Preparation
SOW 7.7.5 Three (3) working days after Contractor evaluation
Summary in Monthly Status
Report
Electronic – Provide submittal in electronic format to the COR and
Contracting Officer.
For Information Purposes.
55 Part Failure Reporting SOW 7.7.7 Twenty-four (24) hours after failure determination
Electronic – Provide submittal in electronic format to the COR and
Contracting Officer.
Approval Required.
56 Reserved - - -
57 Reserved - - -
58 Reserved - - -
59 Reserved - - -
60 Reserved - - -
61 Reserved - - -
62 Contamination Control Plan SOW 7.9.1 Fourteen (14) calendar days before DCR
Electronic – Provide submittal in electronic format to the COR and
Contracting Officer.
Review Required.
63 Reserved - - -
64 Thermal Vacuum Bakeout
Plan
SOW 7.9.4 Twenty-eight (28) calendar days prior to beginning of
Thermal Vacuum Bakeout
Tests
Electronic – Provide submittal in electronic format to the COR and
Contracting Officer.
Approval Required.
65 Thermal Vacuum Bakeout
Test Results (if not part of
Thermal Vacuum Report)
SOW 7.9.4 Fourteen (14) calendar days after completion of Thermal
Vacuum Bakeout Tests
Electronic – Provide submittal in electronic format to the COR and
Contracting Officer.
Approval Required.
66 Reserved - -
67 Coarse Sun Sensor Flight
Units and Flight Baffles
Qty: 12
SOW 5.2 Twelve (12) months after contract effective date
As specified in Clause
GSFC 52.247-94
Approval Required.
68 Coarse Sun Sensor Connector
Saver(s)
SOW 5.3 With Item #67 As specified in Clause
GSFC 52.247-94
Approval Required.
69 Coarse Sun Sensor Supporting
Hardware
SOW 5.4 With Item #67 As specified in Clause
GSFC 52.247-94
Approval Required.
Use or disclosure of data contained on this page is subject to the restriction(s) on the title page of this document.
400-FORM-0002 (4/16/2014)
70 Coarse Sun Sensor
Stimulators and Stimulator
Controller
SOW 5.5 With Item #67 As specified in Clause
GSFC 52.247-94
Approval Required.
71 Shipping Container SOW 5.5 With Item #67 As specified in Clause
GSFC 52.247-94
For Information Purposes.
72 Option: Drill Template SOW 5.5 At DCR As specified in Clause
GSFC 52.247-94
For Information Purposes
73 Option: CSS ETU (Loaner) SOW 5.2 No earlier than Six (6) months after contract effective date
As specified in Clause
GSFC 52.247-94
Approval Required
74 Calibration Test Report SOW 4.16 Seven (7) calendar days prior to PSR
Electronic – Provide submittal in electronic format to the COR and
Contracting Officer.
Review Required.
Use or disclosure of data contained on this page is subject to the restriction(s) on the title page of this document.
400-FORM-0002 (4/16/2014)
Appendix A Abbreviations and Acronyms
Abbreviation/
Acronym Definition
A Approve
CCB Configuration Control Board
CCR Configuration Change Request
CM Configuration Management
CMO Configuration Management Office
CO Contracting Officer
COR Contracting Officer's Representative
CSS Coarse Sun Sensor
DCR Design Conformance Review
DILS Deliverable Items List and Schedule
EEE Electrical, Electronic, and Electromechanical
FMEA Failure Modes and Effects Analysis
GIDEP Government Industry Data Exchange Program
GSE Ground Support Equipment
GSFC Goddard Space Flight Center
I Information
INST Instrument
MIS Management Information System
NASA National Aeronautics and Space Administration
NDE Nondestructive Evaluation
PACE Plankton, Aerosol, Cloud, ocean Ecosystem
PDL Product Design Lead
PEM Plastic Encapsulated Microcircuit
PER Pre-Environmental Review
PSR Pre-Ship Review
PWB Printed Wiring Board
R Review
SCoRe Signature Controlled Request
SOW Statement of Work
TBD To Be Determined
TBR To Be Resolved
TIM Technical Interchange Meeting
Yrs years