About this file

Updated Terms and Conditions as of 01/24/2018

View the file

Other files

File Type Posted
SF33.pdf PDF
Amendment_02.pdf PDF
Cover_Letter_Final_RFP_(Revised).pdf PDF
Amendment_01.pdf PDF
SF1449_(Update__3).pdf PDF
SF1449_(Update__2).pdf PDF
Terms_and_Conditions_(Updated).pdf PDF
SF1449-12a2_(Updated).pdf PDF
Questions_and_Responses,_Set__1.pdf PDF
Attachment_B-Specification.pdf PDF
Enclosure_L.2-Compliance_Matrix.pdf PDF
Terms_and_Conditions.pdf PDF
Attachment_A-Statement_of_Work.pdf PDF
Enclosure_L.1-Past_Performance_Questionnaire.pdf PDF
SF1449.pdf PDF
RFP_Cover_Letter,_80GSFC18R0014.pdf PDF
Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS

B.1 1852.216-78 FIRM FIXED PRICE (DEC 1988)

The total firm fixed price of this contract is $TBD

(End of clause)

B.2 GSFC 52.211-90 SUPPLIES AND/OR SERVICES TO BE PROVIDED (SEP 2017)

The Contractor shall provide all resources (except as may be expressly stated in the contract as furnished by the Government) necessary to deliver and/or perform the items below in accordance with the Statement of Work (SOW), incorporated as Attachment A

Deliverable Items List and Schedule (DILS)

Item Description Reference Schedule Delivery Method/Addressee(s)

1 SPEC Compliance Matrix Section L.11A

With proposal Electronic – Provide submittal in electronic format to the COR, Contract Specialist, and

Contracting Officer.

Approval Required.

2 Monthly Status Report As Defined in

Attachment A, SOW-

Section 3.2

Section C

GSFC 52.235-91

Fourteen (14) calendar days following the month being reported.

Electronic – Provide submittal in electronic format to the COR, Contract Specialist, and

Contracting Officer.

For Information Purposes.

3 Reserved

4 Advanced Notifications As Defined in

Attachment A, SOW-

Section 3.3

Seven (7) calendar days in advance of all mandatory hardware inspections, test activities, TIM’s, and deliveries.

Electronic – Provide submittal in electronic format to the COR, Contract Specialist, and

Contracting Officer.

Review Required.

5 Kick Off Meeting As Defined in

Attachment A, SOW-

Section 3.4.1

Fourteen (14) calendar days after contract award

In person at Contractor Facility.

Review Required.

6 Kick Off Meeting

Presentation Package

As Defined in

Attachment A, SOW-

Section 3.4.1

Three (3) working days before the meeting

Electronic – Provide submittal in electronic format to the COR, Contract Specialist, and

Contracting Officer.

Review Required

7 Design Conformance

Review (DCR)

As Defined in

Attachment A, SOW-

Section 3.4.2.1

Six (6) months after contract award In person at Contractor Facility.

Review Required.

8 DCR Presentation

Package

As Defined in

Attachment A, SOW-

Section 3.4.2.1

Five (5) calendar days before DCR

Electronic – Provide submittal in electronic format to the COR, Contract Specialist, and

Contracting Officer.

Approval Required.

9 DCR Report As Defined in

Attachment A, SOW-

Section 3.4.2.1, 7.7.2

Ten (10) calendar days after completion of DCR

Electronic – Provide submittal in electronic format to the COR, Contract Specialist, and

Contracting Officer.

Review Required.

10 Pre-Environmental

Review (PER)

As Defined in

Attachment A, SOW-

Section 3.4.3

Seven (7) calendar days before start of environmental testing on first Flight Unit

In person at Contractor Facility.

Review Required.

11 Pre-Environmental

Review Presentation

Package

As Defined in

Attachment A, SOW-

Section 3.4.3

Five (5) calendar days before PER

Electronic – Provide submittal in electronic format to the COR, Contract Specialist, and

Contracting Officer.

Review Required.

12 Flight Unit(s) Pre-Ship

Review (PSR)

As Defined in

Attachment A, SOW-

Section 3.4.4

Seven (7) calendar days prior to delivery of each Flight Unit

In person at Contractor Facility.

Review Required.

13 Flight Unit(s) Pre-Ship

Review Presentation

Package

As Defined in

Attachment A, SOW-

Section 3.4.4

Five (5) calendar days before PSR

Electronic – Provide submittal in electronic format to the COR, Contract Specialist, and

Contracting Officer.

Review Required.

14 Flight Unit(s) End Item

Data Package(s) (EIDP)

As Defined in

Attachment A, SOW-

Sections 3.4.4, 7.5.3, 7.7.1, 7.8.3, 7.8.6

With each delivered

Flight Unit and available at PSR

Electronic – Provide submittal in electronic format to the COR, Contract Specialist, and

Contracting Officer.

Approval Required.

15 Technical Interchange

Meeting (TIM)

As Defined in

Attachment A, SOW-

Section 3.4.5

As Negotiated Electronic – Provide submittal in electronic format to the COR, Contract Specialist, and

Contracting Officer.

Review Required.

16 Interface Control

Document(s)

As Defined in

Attachment A, SOW-

Section 4.1

Fourteen (14) calendar days before DCR

Electronic – Provide submittal in electronic format to the COR, Contract Specialist, and

Contracting Officer.

Approval Required.

17 Drawing Package As Defined in

Attachment A, SOW-

Section 4.2

Fourteen (14) calendar days before DCR

Electronic – Provide submittal in electronic format to the COR, Contract Specialist, and

Contracting Officer.

Review Required.

18 Computer Models As Defined in

Attachment A, SOW-

Section 4.3

Fourteen (14) calendar days before DCR

Electronic – Provide submittal in electronic format to the COR, Contract Specialist, and

Contracting Officer.

For Information Purposes.

19 Structural Analysis

Report

As Defined in

Attachment A, SOW-

Section 4.4

Fourteen (14) calendar days before DCR

Electronic – Provide submittal in electronic format to the COR, Contract Specialist, and

Review Required.

20 Structural Finite Element

Model

As Defined in

Attachment A, SOW-

Section 4.5

Fourteen (14) calendar days before DCR

Electronic – Provide submittal in electronic format to the COR, Contract Specialist, and

Contracting Officer.

Review Required.

21 Thermal Analysis Report As Defined in

Attachment A, SOW-

Section 4.6

Fourteen (14) calendar days before DCR

Electronic – Provide submittal in electronic format to the COR, Contract Specialist, and

Contracting Officer.

Review Required.

22 Thermal Model &

Documentation

As Defined in

Attachment A, SOW-

Section 4.7

Fourteen (14) calendar days before DCR

Electronic – Provide submittal in electronic format to the COR, Contract Specialist, and

Contracting Officer.

Review Required.

23 Worst Case Circuit

Analysis Report

As Defined in

Attachment A, SOW-

Section 4.8

Fourteen (14) calendar days before DCR

Electronic – Provide submittal in electronic format to the COR, Contract Specialist, and

Contracting Officer.

Review Required.

24 Parts Stress Analysis

Report

As Defined in

Attachment A, SOW-

Section 4.9

Fourteen (14) calendar days before DCR

Electronic – Provide submittal in electronic format to the COR, Contract Specialist, and

Contracting Officer.

Review Required.

25 Parts Stress Analysis

Criteria if different from

EEE-INST-002

As Defined in

Attachment A, SOW-

Section 4.9

Twenty-eight (28) calendar days after contract award

Electronic – Provide submittal in electronic format to the COR, Contract Specialist, and

Contracting Officer.

Approval Required.

26 Radiation Hardness

Analysis Report

As Defined in

Attachment A, SOW-

Section 4.10

Fourteen (14) calendar days before DCR

Electronic – Provide submittal in electronic format to the COR, Contract Specialist, and

Contracting Officer.

Review Required.

27 Reliability Analysis

Report

As Defined in

Attachment A, SOW-

Section 4.11

Fourteen (14) calendar days before DCR

Electronic – Provide submittal in electronic format to the COR, Contract Specialist, and

Contracting Officer.

Review Required.

28 Failure Modes and

Effects Criticality

Analysis (FMECA)

Report

As Defined in

Attachment A, SOW-

Section 4.12

Fourteen (14) calendar days before DCR

Electronic – Provide submittal in electronic format to the COR, Contract Specialist, and

Contracting Officer.

Review Required.

29 Error Analysis Report As Defined in

Attachment A, SOW-

Section 4.13

Fourteen (14) calendar days before DCR

Electronic – Provide submittal in electronic format to the COR, Contract Specialist, and

Contracting Officer.

30 Reserved

31 Reserved

32 Fabrication, Assembly, and Inspection Flow Plan

As Defined in

Section 5.1

At DCR

Electronic – Provide submittal in electronic format to the COR, Contract Specialist, and

Contracting Officer.

Review Required.

33 Verification Plan

(Including Verification

Matrix)

As Defined in

Attachment A, SOW-

Section 6.1, 7.5.1

Fourteen (14) calendar days before DCR

Electronic – Provide submittal in electronic format to the COR, Contract Specialist, and

Contracting Officer.

Approval Required.

34 Individual Verification

Test Plan(s) (if needed)

As Defined in

Attachment A, SOW-

Section 6.1

Fourteen (14) calendar days before DCR

Electronic – Provide submittal in electronic format to the COR, Contract Specialist, and

Contracting Officer.

Approval Required.

35 Verification Test

Procedure(s)

As Defined in

Attachment A, SOW-

Section 6.2

Twenty-eight (28) calendar days before start of testing and as changes occur.

Electronic – Provide submittal in electronic format to the COR, Contract Specialist, and

Contracting Officer.

Review Required.

36 Verification Test

Report(s)

As Defined in

Attachment A, SOW-

Section 6.3

At PSR Electronic – Provide submittal in electronic format to the COR, Contract Specialist, and

Contracting Officer.

Review Required.

37 Quality Assurance Plan As Defined in

Attachment A, SOW-

Section 7.1.1

Twenty-eight (28) calendar days after contract award

Electronic – Provide submittal in electronic format to the COR, Contract Specialist, and

Contracting Officer.

Approval Required.

38 Anomaly/Failure Reports As Defined in

Attachment A, SOW-

Section 7.1.3

Seven (7) calendar days after Contractor

Failure Review

Process determines disposition

Electronic – Provide submittal in electronic format to the COR, Contract Specialist, and

Contracting Officer.

Approval Required.

39 Class I Configuration

Management (CM)

Changes

As Defined in

Attachment A, SOW-

Section 7.1.4

Seven (7) calendar days after Contractor

CM review

Electronic – Provide submittal in electronic format to the COR, Contract Specialist, and

Contracting Officer.

Approval Required.

40 Class II CM Changes As Defined in

Attachment A, SOW-

Section 7.1.4

Seven (7) calendar days after Contractor

CM review

Electronic – Provide submittal in electronic format to the COR, Contract Specialist, and

Contracting Officer.

Review Required.

41 Safety/Hazard Controls As Defined in

Attachment A, SOW-

Section 7.2

Three (3) working days after Contractor disposition

Electronic – Provide submittal in electronic format to the COR, Contract Specialist, and

42 Trended Parameters List As Defined in

Attachment A, SOW-

Section 7.3.1

Seven (7) calendar days prior to PER

Electronic – Provide submittal in electronic format to the COR, Contract Specialist, and

Contracting Officer.

Review Required.

43 Limited Life Items List As Defined in

Attachment A, SOW-

Section 7.3.2

Fourteen (14) calendar days before DCR

Electronic – Provide submittal in electronic format to the COR, Contract Specialist, and

Contracting Officer.

Approval Required.

44 Expired Shelf Life

Waiver

As Defined in

Attachment A, SOW-

Section 7.3.2

Fourteen (14) calendar days before DCR

Electronic – Provide submittal in electronic format to the COR, Contract Specialist, and

Contracting Officer.

45 Reserved

46 Advanced Packaging

Technology

Requirements Documents

As Defined in

Attachment A, SOW-

Section 7.6.2

Twenty-eight (28) calendar days after contract award

Electronic – Provide submittal in electronic format to the COR, Contract Specialist, and

Contracting Officer.

Approval Required.

47 Alternate Workmanship

Standards

As Defined in

Attachment A, SOW-

Section 7.6.3

Fourteen (14) calendar days before DCR

Electronic – Provide submittal in electronic format to the COR, Contract Specialist, and

Contracting Officer.

Approval Required.

48 Printed Circuit Board

(PCB) Procurement Plan

As Defined in

Attachment A, SOW-

Section 7.6.8

Twenty-one (21) calendar days prior to

PCB procurement

Electronic – Provide submittal in electronic format to the COR, Contract Specialist, and

Contracting Officer.

Review Required.

49 Printed Wiring Board

Coupons

As Defined in

Attachment A, SOW-

Section 7.6.8

Twenty-one (21) calendar days before start of PWB assembly Approval Required.

50 EEE Parts Identification

List

As Defined in

Attachment A, SOW-

Section 7.7.1

Fourteen (14) calendar days before DCR

Electronic – Provide submittal in electronic format to the COR, Contract Specialist, and

Contracting Officer.

Approval Required.

See

As-Built Parts List As Defined in

Attachment A, SOW-

Section 7.7.1

As part of EIDP (DIL

#14)

Electronic – Provide submittal in electronic format to the COR, Contract Specialist, and

Contracting Officer.

Review Required.

See 9 Plastic Encapsulated

Microcircuit (PEM)

Specification Documents

As Defined in

Attachment A, SOW-

Section 7.7.2

As part of DCR (DIL

#9)

Electronic – Provide submittal in electronic format to the COR, Contract Specialist, and

51 Radiation Test Plans (if applicable)

As Defined in

Attachment A, SOW-

Section 7.7.3

Twenty-eight (28) calendar days prior to test.

Electronic – Provide submittal in electronic format to the COR, Contract Specialist, and

Contracting Officer.

Review Required.

52 Radiation Test Reports As Defined in

Attachment A, SOW-

Section 7.7.3

Fourteen (14) calendar days after test

Electronic – Provide submittal in electronic format to the COR, Contract Specialist, and

Contracting Officer.

Review Required.

53 Recertification Plans for

Parts > 7 years old (if applicable)

As Defined in

Attachment A, SOW-

Section 7.7.4

Fourteen (14) calendar days before DCR

Electronic – Provide submittal in electronic format to the COR, Contract Specialist, and

Contracting Officer.

Approval Required.

54 GIDEP Alert Disposition and Preparation

As Defined in

Attachment A, SOW-

Section 7.7.5

Three (3) working days after GIDEP alert. Also with

Monthly Status Report

Electronic – Provide submittal in electronic format to the COR, Contract Specialist, and

Contracting Officer.

Review Required.

55 Part Failure Reporting As Defined in

Attachment A, SOW-

Section 7.7.7

Twenty-four (24) hours after failure determination

Electronic – Provide submittal in electronic format to the COR, Contract Specialist, and

Contracting Officer.

Approval Required.

56 Materials and Processes

List

As Defined in

Attachment A, SOW-

Section 7.8.3

Fourteen (14) calendar days before DCR

Electronic – Provide submittal in electronic format to the COR, Contract Specialist, and

Contracting Officer.

Approval Required.

See

As-Built Materials List As Defined in

Attachment A, SOW-

Section 7.8.3

As part of EIDP (DILS

#14)

Electronic – Provide submittal in electronic format to the COR, Contract Specialist, and

Contracting Officer.

Review Required.

57 Materials Usage

Agreement

As Defined in

Attachment A, SOW-

Section 7.8.4

Fourteen (14) calendar days before DCR

Electronic – Provide submittal in electronic format to the COR, Contract Specialist, and

Contracting Officer.

Approval Required.

See

Materials Certificate of

Compliance

As Defined in

Attachment A, SOW-

Section 7.8.6

As part of EIDP (DILS

#14)

Electronic – Provide submittal in electronic format to the COR, Contract Specialist, and

Contracting Officer.

Review Required.

List of Atomic Oxygen

Exposed Materials

As Defined in

Attachment A, SOW-

Section 7.8.5

Fourteen (14) calendar days before DCR

Electronic – Provide submittal in electronic format to the COR, Contract Specialist, and

Nondestructive

Evaluation (NDE) Plan

As Defined in

Attachment A, SOW-

Section 7.8.5

Fourteen (14) calendar days before DCR

Electronic – Provide submittal in electronic format to the COR, Contract Specialist, and

Contracting Officer.

Approval Required.

Fastener Integrity Control

Plan

As Defined in

Attachment A, SOW-

Section 7.8.5

Thirty (30) calendar days before DCR

Electronic – Provide submittal in electronic format to the COR, Contract Specialist, and

Contracting Officer.

Approval Required.

List of Critical Fasteners

As Defined in

Attachment A, SOW-

Section 7.8.5

Fourteen (14) calendar days before DCR

Electronic – Provide submittal in electronic format to the COR, Contract Specialist, and

Contracting Officer.

Approval Required.

62 Contamination Control

Plan

As Defined in

Attachment A, SOW-

Section 7.9.1

Fourteen (14) calendar days before DCR

Electronic – Provide submittal in electronic format to the COR, Contract Specialist, and

Contracting Officer.

Approval Required.

63 Material Outgassing Data As Defined in

Attachment A, SOW-

Section 7.9.3

At least Fourteen (14) calendar days before

DCR. Can be part of

Materials and

Processes List

Electronic – Provide submittal in electronic format to the COR, Contract Specialist, and

Contracting Officer.

Approval Required.

64 Thermal Vacuum

Bakeout Plan

As Defined in

Attachment A, SOW-

Section 7.9.4

Twenty-eight (28) calendar days prior to beginning of Thermal

Vacuum Bakeout Tests

Electronic – Provide submittal in electronic format to the COR, Contract Specialist, and

Contracting Officer.

Approval Required.

65 Thermal Vacuum

Bakeout Test Results (if not part of Thermal

Vacuum Report)

As Defined in

Attachment A, SOW-

Section 7.9.4

Fourteen (14) calendar days after completion of Thermal Vacuum

Bakeout Tests

Electronic – Provide submittal in electronic format to the COR, Contract Specialist, and

Contracting Officer.

Approval Required.

66 TWTA Protoflight Unit

Quantity:1

As Defined in

Attachment A, SOW-

Section 5.2

Twenty-four (24) months after Award of

Contract

As specified in Clause GSFC

52.247-94

Approval Required.

67 TWTA Flight Unit

Quantity: 2

As Defined in

Attachment A, SOW-

Section 5.2

December 15, 2020 As specified in Clause GSFC

52.247-94

Approval Required.

68 TWTA Connector

Saver(s)

Quantity: 1 for every external connector

As Defined in

Attachment A, SOW-

Section 5.3

With Items #66 and #67 As specified in Clause GSFC

52.247-94

Approval Required.

69 Mating Connectors

Quantity: 1 set of external connectors for each

TWTA, plus an additional set for each unit.

As Defined in

Attachment A, SOW-

Section 5.4

With Items #66 and #67 As specified in Clause GSFC

52.247-94

70 Electrostatic Discharge

(ESD) Caps

Quantity: 1 for every external connector

As Defined in

Attachment A, SOW-

Section 5.4

With Items #66 and #67 As specified in Clause GSFC

52.247-94

Approval Required.

71 Closeout Caps

Quantity: 1 closeout cap for every test connector

As Defined in

Section 5.4

With Items #66 and #67 As specified in Clause GSFC

52.247-94

Approval Required.

72 Shipping Containers

Quantity: 1 for each unit

As Defined in

Attachment A, SOW-

Section 5.5

With Items #66 and #67 As specified in Clause GSFC

52.247-94

Approval Required.

73 Drill Template

Quantity: 1

As Defined in

Attachment A, SOW-

Section 5.5

With Items #66 and #67 As specified in Clause GSFC

52.247-94

Approval Required.

74 Material Inspection and

Receiving Reports

(MIRR)

(DD Form 250)

Section E

NFS 1852.246-72

With Items #66 and #67 Hard Copy/CO, COR, and

Receiving & Inspection

For Information Purposes.

75 Small Business

Subcontracting Plan

Reporting

Section H

GSFC 52.219-90

Section I

NFS 1852.219-75

ISR–Semi-Annual

(April 30th and

October 30th) and

Final SSR–Annual

Electronic Format/ Electronic

Subcontract Reporting System

(eSRS) http://www.esrs.gov

For Information Purposes.

Notes: Approval Required means items in this category require approval from the National Aeronautics and

Space Administration (NASA)/Goddard Space Flight Center (GSFC) Contracting Officer (CO). In general, documents shall be provided in contractor format as long as required content, as specified in the Plankton, Aerosol, Cloud, ocean Ecosystem (PACE) TWTA Statement of Work (Attachment A), is addressed. The

NASA GSFC CO reserves the time-limited right of disapproval for each submission. The time-limited period is two weeks from receipt of documents.

For Information Purposes means items in this category are informal and are for information only.

Review Required means items in this category do not require formal NASA GSFC CO approval, but will be reviewed by the GSFC or its designated representatives in order to determine contractor effectiveness in meeting contract objectives. When Government review reveals inadequacies, the contractor may be requested to correct the inadequacies. GSFC shall review and comment within 20 working days of receipt.

http://www.esrs.gov/

B.3 GSFC 52.232-99 MILESTONE PAYMENT SCHEDULE (Fixed Price) (NOV 2013)

(a) Subject to other limitations and conditions specified in this contract, milestone payment shall be made to the Contractor upon delivery and acceptance of the milestone events described under paragraph (b).

(b) The payment schedule amount shall be calculated by the application of the contract percentage established per milestone event to the total fixed price amount indicated under

Section B contract clause NFS 1852.216-78, Firm-Fixed Price.

(c) The Contractor may submit requests for payment not more frequently than monthly, in a form and manner acceptable to the Contracting Officer. Unless otherwise authorized by the

Contracting Officer, all milestone payments in any period for which payment is being requested shall be included in a single request, appropriately itemized and totaled.

(d) The Contractor shall not be entitled to payment of a request for milestones payment prior to successful accomplishment and acceptance by the Government of the milestone event. The

Contracting Officer shall determine whether the milestone event or performance criterion for which payment is requested has been successfully accomplished and accepted by the

Government in accordance with the terms of the contract. The Contracting Officer may, at any time, require the Contractor to substantiate the successful performance of any event or performance criterion which has been or is represented as being payable.

[END OF SECTION B]

Item No. Event Qty Contract

Value %

Total

Amount Completion Determination

1 Kick-Off Meeting 1 12% TBP

Final presentation package received in accordance with Section 3.4.1 of SOW, Attachment A

Design Conformance

Review (DCR)

1 7% TBP

Final presentation package received in accordance with Section 3.4.2 of SOW, Attachment A

Pre-Environmental

Review (PER)

1 7% TBP

Final presentation package received in accordance with Section 3.4.3 of SOW, Attachment A

Pre-Ship Review (PSR) 1 4% TBP

Final presentation package received in accordance with Section 3.4.4 SOW, Attachment A

Protoflight Unit

Delivery

1 15% TBP

Hardware received. EIDP received in accordance with Section 3.4.4, 7.5.3, 7.7.1, 7.8.3, and 7.8.6 of SOW, Attachment A

6 Flight Unit Delivery 2 55% TBP

Hardware received. EIDP received in accordance with Section 3.4.4, 7.5.3, 7.7.1, 7.8.3, and 7.8.6 of SOW, Attachment A

SECTION C - DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK

C.1 GSFC 52.211-91 SCOPE OF WORK (FEB 2016)

The Contractor shall provide the personnel, materials, and facilities, except as otherwise specified in this contract, necessary to perform the work and to furnish the items specified in the Supplies and/or Services To Be Provided clause of this contract in accordance with the Statement of Work

(SOW), Attachment A; and Specification (SPEC), Attachment B.

C.2 GSFC 52.235-91 REPORTS OF WORK (CORE) (AUG 2013)

(a) Monthly progress reports. The Contractor shall submit monthly progress reports of all work accomplished during each month of contract performance. Reports shall address the accomplishments and progress of all work performed the month being reported. The report shall be in narrative form and brief in content. The report shall include a description of technical accomplishments and status of deliverables. Also the report shall provide a quantitative description of overall progress and identify any risks or problems, which may impede performance and proposed corrective actions. Also the report shall have a discussion of the projected work activities to be performed during the next monthly reporting period.

(b) Submission. The Contractor shall submit the reports required by this in electronic format to

COR, Contract Specialist, and Contracting Officer.

(c) Submission dates. Monthly reports shall be submitted by the fourteen (14) calendar days following the month being reported. If the contract is awarded beyond the middle of a month, the first monthly report shall cover the period from award until the end of the following month. The final report shall be submitted within 30 days after completion of the contract.

[END OF SECTION C]

SECTION D - PACKAGING AND MARKING

D.1 Section D Clauses Incorporated by Reference

The clause below is incorporated by reference, with the same force and effect as if they were given in full text. Clauses incorporated by reference which require a fill-in by the Government include the text of the affected paragraph(s) only. This does not limit the clause to the affected paragraph(s). The Contractor is responsible for understanding and complying with the entire clause. The full text of the clause is available at the addresses contained in clause 52.252-2, Clauses Incorporated by Reference, of this contract.

1852.211-70 PACKAGING, HANDLING, AND TRANSPORTATION (SEP 2005)

D.2 1852.245-74 IDENTIFICATION AND MARKING OF GOVERNMENT EQUIPMENT (JAN 2011)

(a) The Contractor shall identify all equipment to be delivered to the Government using NASA

Technical Handbook (NASA-HDBK) 6003, Application of Data Matrix Identification

Symbols to Aerospace Parts Using Direct Part Marking Methods/Techniques, and NASA

Standard (NASA- STD) 6002, Applying Data Matrix Identification Symbols on Aerospace

Parts or through the use of commercial marking techniques that: (1) are sufficiently durable to remain intact through the typical lifespan of the property: and, (2) contain the data and data format required by the standards. This requirement includes deliverable equipment listed in the schedule and other equipment when no longer required for contract performance and

NASA directs physical transfer to NASA or a third party. The Contractor shall identify property in both machine and human readable form unless the use of a machine readable-only format is approved by the NASA Industrial Property Officer.

(b) Equipment shall be marked in a location that will be human readable, without disassembly or movement of the equipment, when the items are placed in service unless such placement would have a deleterious effect on safety or on the item's operation.

(c) Concurrent with equipment delivery or transfer, the Contractor shall provide the following data in an electronic spreadsheet format:

(1) Item Description.

(2) Unique Identification Number (License Tag).

(3) Unit Price.

(4) An explanation of the data used to make the unique identification number.

(d) For equipment no longer needed for contract performance and physically transferred under paragraph (a) of this clause, the following additional data is required:

(1) Date originally placed in service.

(2) Item condition.

(e) The data required in paragraphs (c) and (d) of this clause shall be delivered to the NASA center receiving activity listed below:

NASA Goddard Space Flight Center Building 35, Code 279 Greenbelt MD 20771

(f) The contractor shall include the substance of this clause, including this paragraph (f), in all subcontracts that require delivery of equipment.

[END OF SECTION D]

SECTION E - INSPECTION AND ACCEPTANCE

E.1 Section E Clauses Incorporated by Reference

The clauses below are incorporated by reference, with the same force and effect as if they were include the text of the affected paragraph(s) only. This does not limit the clause to the affected paragraph(s). The Contractor is responsible for understanding and complying with the entire

52.246-2 INSPECTION OF SUPPLIES—FIXED PRICE (AUG 1996)

52.246-16 RESPONSIBILITY FOR SUPPLIES (APR 1984)

E.2 1852.246-71 GOVERNMENT CONTRACT QUALITY ASSURANCE FUNCTIONS (OCT 1988)

In accordance with the inspection clause of this contract, the Government may perform quality assurance functions at the facilities of the contractor, subcontractors, and suppliers or at the

Goddard Space Flight Center

E.3 1852.246-72 MATERIAL INSPECTION AND RECEIVING REPORT (APR 2015)

(a) At the time of each delivery to the Government under this contract, the Contractor shall prepare and furnish a Material Inspection and Receiving Report (DD Form 250 series). The form(s) shall be prepared and distributed as follows:

(1) Via mail and marked "Advance Copy", one copy each to the Contracting Officer, the

Contracting Officer's Representative (if designated in the contract), and to the cognizant

Administrative Contracting Officer, if any.

(2) Via mail, the original and 1 copy (unfolded) to the shipment address (delivery point) specified in Section F of this contract. Mark the exterior of the envelope "CONTAINS

DD FORM 250". This must arrive prior to the shipment.

(3) With shipment in waterproof envelope (one copy) for the consignee.

(4) If the shipment address is not directly to the Goddard Space Flight Center (Greenbelt) or

GSFC/Wallops Flight Facility (Wallops) central receiving areas, then one copy of the DD

Form 250 must be provided (via mail) to one on the following addresses:

Receiving and Inspection (Code 279), Goddard Space Flight Center, Greenbelt, MD 20771.

(b) The Contractor shall prepare the DD Form 250 in accordance with NASA FAR Supplement

1846.6. The Contractor shall enclose the copies of the DD Form 250 in the package or seal them in a waterproof envelope, which shall be securely attached to the exterior of the package in the most protected location.

(c) When more than one package is involved in a shipment, the Contractor shall list on the DD

Form 250, as additional information, the quantity of packages and the package numbers. The

Contractor shall forward the DD Form 250 with the lowest numbered package of the shipment and print the words “CONTAINS DD FORM 250” on the package.

E.4 GSFC 52.246 94 MATERIAL INSPECTION AND RECEIVING REPORT NOT

REQUIRED (APR 1989)

NASA FAR Supplement clause 1852.246-72 of this contract requires the furnishing of a Material

Inspection and Receiving Report (MIRR) (DD Form 250 series) at the time of each delivery under this contract. However, a MIRR is not required for the deliverable items one through sixty five (1-65) and seventy four through seventy five (74-75).

E.5 GSFC 52.246-102 INSPECTION SYSTEM RECORDS (APR 2013)

The Contractor shall maintain records evidencing inspections in accordance with the Inspection clause of this contract for six (6) years after delivery of all items and/or completion of all services called for by the contract.

[END OF SECTION E]

SECTION F - DELIVERIES OR PERFORMANCE

F.1 Section F Clauses Incorporated by Reference include the text of the affected paragraph(s) only. This does not limit the clause to the affected paragraph(s). The Contractor is responsible for understanding and complying with the entire

52.211-17 DELIVERY OF EXCESS QUANTITIES (SEP 1989)

52.242-15 STOP-WORK ORDER (AUG 1989)

52.242-17 GOVERNMENT DELAY OF WORK (APR 1984)

52.247-34 F.O.B. DESTINATION (NOV 1991)

F.2 1852.247-72 ADVANCE NOTICE OF SHIPMENT (OCT 1988)

Five (5) work days prior to shipping item(s) sixty six through seventy three (66-73) from Clause

B.2, the Contractor shall furnish the anticipated shipment date, bill of lading number (if applicable), and carrier identity to the Contracting Officer’s Representative and to the

F.3 GSFC 52.247-94 SHIPPING INSTRUCTIONS--CENTRAL RECEIVING (FEB 2016)

Shipments of the items required under this contract shall be to:

Receiving Officer, Goddard Space Flight Center

Building 35, Code 279

Greenbelt, Maryland 20771

Marked for:

Technical Officer: Adán Rodriguez-Arroyo, Code 567

Building: 19, Room: S038

Contract No.: TBD

Item(s) No.: TBD (from Clause B.2)

Compliance with this clause is necessary to assure verification of delivery and acceptance and prompt payment.

As this is a fixed price type contract, delivery--for purposes of the Prompt Payment Act--must be through the above shipping address unless another location has been authorized by the

Contracting Officer. If delivery is made to other than the Receiving Officer listed above and shipment to that other location has not been authorized by the Contracting Officer, a delivery for the purposes of the Prompt Payment Act has not occurred and no interest penalty under the Act shall result. Shipment to other than Receiving Officer listed above will be construed as contract noncompliance.

[END OF SECTION F]

SECTION G - CONTRACT ADMINISTRATION DATA

G.1 Section G Clauses Incorporated by Reference include the text of the affected paragraph(s) only. This does not limit the clause to the affected paragraph(s). The Contractor is responsible for understanding and complying with the entire

52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND

CERTIFICATIONS (DEC 2014)

1852.223-71 AUTHORIZATION FOR RADIO FREQUENCY USE (APR 2015)

G.2 GSFC 52.232-95 INVOICES – SUBMISSION OF (AUG 2016)

Invoices shall be prepared in accordance with the Prompt Payment clause of this contract and submitted to the NASA Shared Services Center (NSSC), Financial Management Division (FMD)

– Accounts Payable, Bldg 1111, Jerry Hlass Road, Stennis Space Center, MS 39529, Email:

NSSC-AccountsPayable@nasa.gov. For purposes of the Prompt Payment Act, the above office is considered to be the "Designated Billing Office" and the "Designated Payment Office".

Note: Invoices must contain an invoice date in order for an invoice to be considered “Proper.”

Invoices without an invoice date will be deemed to be “Improper” and will be rejected by the

NSSC.

[END OF SECTION G]

SECTION H - SPECIAL CONTRACT REQUIREMENTS

H.1 Section H Clauses Incorporated by Reference include the text of the affected paragraph(s) only. This does not limit the clause to the affected paragraph(s). The Contractor is responsible for understanding and complying with the entire

1852.223-75 MAJOR BREACH OF SAFETY OR SECURITY (FEB 2002)

1852.228-78 CROSS-WAIVER OF LIABILITY FOR SCIENCE OR SPACE

EXPLORATION ACTIVITIES UNRELATED TO THE INTERNATIONAL

SPACE STATION (OCT 2012)

H.2 1852.225-70 EXPORT LICENSES (FEB 2000)

(a) The Contractor shall comply with all U.S. export control laws and regulations, including the International Traffic in Arms Regulations (ITAR), 22 CFR Parts 120 through 130, and the

Export Administration Regulations (EAR), 15 CFR Parts 730 through 799, in the performance of this contract. In the absence of available license exemptions/exceptions, the

Contractor shall be responsible for obtaining the appropriate licenses or other approvals, if required, for exports of hardware, technical data, and software, or for the provision of technical assistance.

(b) The Contractor shall be responsible for obtaining export licenses, if required, before utilizing foreign persons in the performance of this contract, including instances where the work is to be performed on-site at any NASA facility, where the foreign person will have access to export- controlled technical data or software.

(c) The Contractor shall be responsible for all regulatory record keeping requirements associated with the use of licenses and license exemptions/exceptions.

(d) The Contractor shall be responsible for ensuring that the provisions of this clause apply to its subcontractors.

H.3 1852.232-77 LIMITATION OF FUNDS (FIXED PRICE CONTRACT) (DEC 1988)

a) Of the total price of items one (1) through eight (8), the sum of $TBD is presently available for payment and allotted to this contract. It is anticipated that from time to time additional funds will be allocated to the contract in accordance with the following schedule, until the total price of said items is allotted:

Schedule for Allotment of Funds

Date(s) Amount(s)

$TBD $TBD

(b) The Contractor agrees to perform or have performed work on the items specified in paragraph of this clause up to the point at which, if this contract is terminated pursuant to the

Termination for Convenience of the Government clause of this contract, the total amount payable by the Government (including amounts payable for subcontracts and settlement costs) pursuant to paragraphs (f) and (g) of that clause would, in the exercise of reasonable judgment by the Contractor, approximate the total amount at the time allotted to the contract.

The Contractor is not obligated to continue performance of the work beyond that point. The

Government is not obligated in any event to pay or reimburse the Contractor more than the amount from time to time allotted to the contract, anything to the contrary in the Termination for Convenience of the Government clause notwithstanding.

(c) (1) It is contemplated that funds presently allotted to this contract will cover the work to be performed until TBD.

(2) If funds allotted are considered by the Contractor to be inadequate to cover the work to be performed until that date, or an agreed date substituted for it, the Contractor shall notify the

Contracting Officer in writing when within the next 60 days the work will reach a point at which, if the contract is terminated pursuant to the Termination for Convenience of the

Government clause of this contract, the total amount payable by the Government (including amounts payable for subcontracts and settlement costs) pursuant to paragraphs (f) and (g) of that clause will approximate 75 percent of the total amount then allotted to the contract.

(3) (i) The notice shall state the estimated date when the point referred to in paragraph (c)(2) of this clause will be reached and the estimated amount of additional funds required to continue performance to the date specified in paragraph (c)(1) of this clause, or an agreed date substituted for it.

(ii) The Contractor shall, 60 days in advance of the date specified in paragraph (c)(1) of this clause, or an agreed date substituted for it, advise the Contracting Officer in writing as to the estimated amount of additional funds required for the timely performance of the contract for a further period as may be specified in the contract or otherwise agreed to by the parties.

(4) If, after the notification referred to in paragraph (c)(3)(ii) of this clause, additional funds are not allotted by the date specified in paragraph (c)(1) of this clause, or an agreed date substituted for it, the Contracting Officer shall, upon the Contractor's written request, terminate this contract on that date or on the date set forth in the request, whichever is later, pursuant to the Termination for Convenience of the Government clause.

(d) When additional funds are allotted from time to time for continued performance of the work under this contract, the parties shall agree on the applicable period of contract performance to be covered by these funds. The provisions of paragraphs (b) and (c) of this clause shall apply to these additional allotted funds and the substituted date pertaining to them, and the contract shall be modified accordingly.

(e) If, solely by reason of the Government's failure to allot additional funds in amounts sufficient for the timely performance of this contract, the Contractor incurs additional costs or is delayed in the performance of the work under this contract, and if additional funds are allotted, an equitable adjustment shall be made in the price or prices (including appropriate target, billing, and ceiling prices where applicable) of the items to be delivered, or in the time of delivery, or both.

(f) The Government may at any time before termination, and, with the consent of the Contractor, after notice of termination, allot additional funds for this contract.

(g) The provisions of this clause with respect to termination shall in no way be deemed to limit the rights of the Government under the default clause of this contract. The provisions of this

Limitation of Funds clause are limited to the work on and allotment of funds for the items set forth in paragraph (a). This clause shall become inoperative upon the allotment of funds for the total price of said work except for rights and obligations then existing under this clause.

(h) Nothing in this clause shall affect the right of the Government to terminate this contract pursuant to the Termination for Convenience of the Government clause of this contract.

H.4 GSFC 52.211-100 CONTRACTOR PROPOSED ENHANCEMENTS (SEP 2013)

The Contractor shall provide the enhancements that are described in Attachment D. These enhancements, which are over and above the requirements required by the contract terms and conditions, Statement of Work and other contract attachments, were proposed by the Contractor in the proposal submitted in response to the Request for Proposal (RFP) 80GSFC18R0014 for

TWTA . The incorporation of these enhancements does not relieve the Contractor from the responsibilities of meeting all other contract terms and conditions and requirements in the

Statement of Work and other contract attachments. The Contractor shall perform these enhancements on all work performed, unless specifically waived by the Contracting Officer in writing.

H.5 GSFC 52.219-90 SMALL BUSINESS SUBCONTRACTING PLAN AND REPORTS (NOV 2016)

a. Subcontracting Plan (Contractor)

FAR clause 52.219 9, "Small Business Subcontracting Plan", is included in this contract. The agreed to Subcontracting Plan required by the clause is included as an attachment to the contract.

b. Subcontracting Plan (Subcontractors)

In accordance with FAR clause 52.219 9 Small Business Subcontracting Plan, the Contractor must require that certain subcontractors adopt a plan similar to the Plan agreed to between the

Contractor and the Government.

c. Individual Subcontract Reports (ISRs)

The Contractor shall prepare and submit their Individual Subcontract Reports (ISRs) (formerly known as the Standard Form 294), in accordance with the instructions listed in the Electronic

Subcontract Reporting System (eSRS), available at http://esrs.gov.

ISRs must be submitted electronically in eSRS on a semi-annual basis. This report must be received no later than April 30 and October 30 each year for the reporting periods ending March

31 and September 30, respectively. Reports are required when due, regardless of whether there has been any subcontracting activity since the inception of the contract or since the last reporting period. A final ISR must be submitted after contract completion. The final ISR submittal must be received no later than the due date for what would have been the next semi-annual report.

d. Summary Subcontract Reports (SSRs)

The Contractor shall prepare and submit Summary Subcontract Reports (SSRs) (formerly known as the Standard Form 295), in accordance with the instructions listed in the eSRS, available at http://esrs.gov and in accordance with FAR clause 52.219-9 Small Business Subcontracting Plan of this contract.

The SSRs must be submitted electronically in eSRS on an annual basis. This report must be submitted no later than October 30 each year for the twelve month period ending September 30.

e. Subcontractor Reporting

FAR clause 52.219 9 Small Business Subcontracting Plan requires that the Contractor ensure that

ISR and SSR reports are submitted by those subcontractors that have been required to adopt a

Subcontracting Plan under the terms of the clause. These subcontractor reports must be submitted as required by paragraphs (c) and (d) above. The reports may be submitted through the Contractor or submitted directly. Regardless, the Contractor is responsible for ensuring proper and timely submittal of the required reports.

H.6 GSFC 52.227-93 APPLICABILITY OF RIGHTS IN DATA – SPECIAL WORKS (MAR 2008)

The "Rights in Data - Special Works" clause of this contract applies to the following aspects (or items):

Any data requested by the Government for any legitimate government use.

H.7 GSFC 52.227-99 RIGHTS IN DATA (JUN 2012)

The default Data Rights clause under this contract is FAR 52.227-14 RIGHTS IN DATA-

GENERAL— Alternate II and Alternate III as modified by NASA FAR Supplement 1852.227-

14 and GSFC 52.227-90. Any exceptions to this clause will be covered by FAR 52.227-17

RIGHTS IN DATA--SPECIAL WORKS as modified by NASA FAR Supplement 1852.227-

17, if applicable, and GSFC 52.227-93.

[END OF SECTION H]

SECTION I - CONTRACT CLAUSES

I.1 Section I Clauses Incorporated by Reference

The Clauses below are incorporated by reference, with the same force and effect as if they were include the text of the affected paragraph(s) only. This does not limit the clause to the affected paragraph(s). The Contractor is responsible for understanding and complying with the entire

52.202-1 DEFINTIONS (NOV 2013)

52.203-3 GRATUITIES (APR 1984)

52.203-5 COVENANT AGAINST CONTINGENT FEES (MAY 2014)

52.203-6 RESTRICTIONS ON SUBCONTRACTOR SALES TO THE GOVERNMENT

(APR 1984)

52.203-7 ANTI-KICKBACK PROCEDURES (MAY 2014)

52.203-8 CANCELLATION, RESCISSION, AND RECOVERY OF FUNDS FOR

ILLEGAL OR IMPROPER ACTIVITY (MAY 2014)

52.203-10 PRICE OF FEE ADJUSTMENT FOR ILLEGAL OR IMPROPER ACTIVITY

(MAY 2014)

52.203-12 LIMITATION ON PAYMENTS TO INFLUENCE CERTAIN FEDERAL

TRANSACTIONS (OCT 2010)

52.203-13 CONTRACTOR CODE OF BUSINESS ETHICS AND CONDUCT (OCT 2015)

52.203-19 PROHIBITION ON REQUIRING CERTAIN INTERNAL

CONFIDENTIALITY AGREEMENTS OR STATEMENTS (JAN 2017)

52.204-4 PRINTED OR COPIED DOUBLE-SIDED ON POSTCONSUMER FIBER

CONTENT PAPER (MAY 2011)

52.204-10 REPORTING EXECUTIVE COMPENSATION AND FIRST-TIER

SUBCONTRACT AWARDS (OCT 2016)

52.204-13 SYSTEM FOR AWARD MANAGEMENT MAINTENANCE (OCT 2016)

52.204-18 COMMERCIAL AND GOVERNMENT ENTITY CODE MAINTENANCE

(JUL 2016)

52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND

CERTIFICATIONS (DEC 2014)

52.204-22 ALTERNATIVE LINE ITEM PROPOSAL (JAN 2017)

52.209-6 PROTECTING THE GOVERNMENT’S INTEREST WHEN

SUBCONTRACTING WITH CONTRACTORS DEBARRED, SUSPENDED,

OR PROPOSED FOR DEBARMENT (OCT 2015)

52.209-10 PROHIBITION ON CONTRACTING WITH INVERTED DOMESTIC

CORPORATIONS (NOV 2015)

52.211-5 MATERIAL REQUIREMENTS (AUG 2000)

52.215-2 AUDIT AND RECORDS—NEGOTIATION (OCT 2010)

52.215-8 ORDER OF PRECEDENCE—UNIFORM CONTRACT FORMAT (OCT 1997)

52.215-14 INTEGRITY OF UNIT PRICES (OCT 2010)

52.215-17 WAIVER OF FACILITIES CAPITAL COST OF MONEY (OCT 1997)

52.217-2 CANCELLATION UNDER MULTI-YEAR CONTRACTS (OCT 1997)

52.219-4 NOTICE OF PRICE EVALUATION PREFERENCE FOR HUBZONE SMALL

BUSINESS CONCERNS (OCT 2014)

52.219-8 UTILIZATION OF SMALL BUSINESS CONCERNS (NOV 2016)

52.219-9 SMALL BUSINESS SUBCONTRACTING PLAN (JAN 2017)

52.219-16 LIQUIDATED DAMAGES—SUBCONTRACTING PLAN (JAN 1999)

52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REREPRESENTATION

(JUL 2013)

52.222-3 CONVICT LABOR (JUN 2003)

52.222-19 CHILD LABOR—COOPERATION WITH AUTHORITIES AND REMEDIES

(OCT 2016)

52.222-20 CONTRACTS FOR MATERIALS, SUPPLIES, ARTICLES, AND

EQUIPMENT EXCEEDING $15,000 (MAY 2014)

52.222-21 PROHIBITION OF SEGREGATED FACILITIES (APR 2015)

52.222-26 EQUAL OPPORTUNITY (SEP 2016)

52.222-29 NOTIFICATION OF VISA DENIAL (APR 2015)

52.222-37 EMPLOYMENT REPORTS ON VETERANS (FEB 2016)

52.222-40 NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE NATIONAL

LABOR RELATIONS ACT (DEC 2010)

52.222-50 COMBATING TRAFFICKING IN PERSONS (MAR 2015)

52.222-54 EMPLOYMENT ELIGIBILITY VERIFICATION (OCT 2015)

52.223-6 DRUG-FREE WORKPLACE (MAY 2001)

52.223-18 ENCOURAGING CONTRACTOR POLICIES TO BAN TEXT MESSAGING

WHILE DRIVING (AUG 2011)

52.225-1 BUY AMERICAN —SUPPLIES (MAY 2014)

52.225-8 DUTY-FREE ENTRY (OCT 2010)

52.225-13 RESTRICTIONS ON CERTAIN FOREIGN PURCHASES (JUN 2008)

52.225-14 INCONSISTENCY BETWEEN ENGLISH VERSION AND TRANSLATION

OF CONTRACT (FEB 2000)

52.227-1 AUTHORIZATION AND CONSENT (DEC 2007)

52.227-2 NOTICE AND ASSISTANCE REGARDING PATENT AND COPYRIGHT

INFRINGEMENT (DEC 2007)

52.229-3 FEDERAL, STATE, AND LOCAL TAXES (FEB 2013) FEDERAL, STATE,

AND LOCAL TAXES (FEB 2013)

52.232-1 PAYMENTS (APR 1984)

52.232-8 DISCOUNTS FOR PROMPT PAYMENT (FEB 2002)

52.232-11 EXTRAS (APR 1984)

52.232-17 INTEREST (MAY 2014)

52.232-18 AVAILABILITY OF FUNDS (APR 1984)

52.232-23 ASSIGNMENT OF CLAIMS (MAY 2014)

52.232-25 PROMPT PAYMENT (JAN 2017)

52.232-33 PAYMENT BY ELECTRONIC FUNDS TRANSFER—SYSTEM FOR

AWARD MANAGEMENT (JUL 2013)

52.232-39 UNENFORCEABILITY OF UNAUTHORIZED OBLIGATIONS (JUN 2013)

52.232-40 PROVIDING ACCELERATED PAYMENTS TO SMALL BUSINESS

CONTRACTORS (DEC 2013)

52.233-1 DISPUTES (MAY 2014)

52.233-3 PROTEST AFTER AWARD (AUG 1996)

52.233-4 APPLICABLE LAW FOR BREACH OF CONTRACT CLAIM (OCT 2004)

52.242-5 PAYMENTS TO SMALL BUSINESS SUBCONTRACTORS (JAN 2017)

52.242-13 BANKRUPTCY (JUL 1995)

52.243-1 CHANGES—FIXED PRICE (AUG 1987)

52.243-6 CHANGE ORDER ACCOUNTING (APR 1984)

52.244-6 SUBCONTRACTS FOR COMMERCIAL ITEMS (NOV 2017)

52.246-24 LIMITATION OF LIABILITY—HIGH-VALUE ITEMS (FEB 1997)

52.247-63 PREFERENCE FOR U.S.-FLAG AIR CARRIERS (JUN 2003)

52.249-2 TERMINATION FOR CONVENIENCE OF THE GOVERNMENT (FIXED-

PRICE) (APR 2012)

52.249-8 DEFAULT (FIXED-PRICE SUPPLY AND SERVICE) (APR 1984)

52.251-1 GOVERNMENT SUPPLY SOURCES (APR 2012)

52.253-1 COMPUTER GENERATED FORMS (JAN 1991)

1852.203-71 REQUIREMENT TO INFORM EMPLOYEES OF WHISTLEBLOWER

RIGHTS (AUG 2014)

1852.215-84 OMBUDSMAN (NOV 2011)

1852.219-75 INDIVIDUAL SUBCONTRACTING REPORTS (APR 2015)

1852.219-77 NASA MENTOR-PROTÉGÉ PROGRAM (APR 2015)

1852.228-75 MINIMUM INSURANCE COVERAGE (OCT 1988)

1852.237-73 RELEASE OF SENSITIVE INFORMATION (JUN 2005)

1852.243-71 SHARED SAVINGS (MAR 1997)

I.2 52.204-21 BASIC SAFEGUARDING OF COVERED CONTRACTOR INFORMATION

SYSTEMS (JUN 2016)

(a) Definitions. As used in this clause—

Covered contractor information system means an information system that is owned or operated by a contractor that processes, stores, or transmits Federal contract information.

Federal contract information means information, not intended for public release, that is provided by or generated for the Government under a contract to develop or deliver a product or service to the Government, but not including information provided by the Government to the public (such as on public Web sites) or simple transactional information, such as necessary to process payments.

Information means any communication or representation of knowledge such as facts, data, or opinions, in any medium or form, including textual, numerical, graphic, cartographic, narrative, or audiovisual (Committee on National Security Systems Instruction (CNSSI)

4009).

Information system means a discrete set of information resources organized for the collection, processing, maintenance, use, sharing, dissemination, or disposition of information (44

U.S.C. 3502).

Safeguarding means measures or controls that are prescribed to protect information systems.

(b) Safeguarding requirements and procedures.

(1) The Contractor shall apply the following basic safeguarding requirements and procedures to protect covered contractor information systems. Requirements and procedures for basic safeguarding of covered contractor information systems shall include, at a minimum, the following security controls:

(i) Limit information system access to authorized users, processes acting on behalf of authorized users, or devices (including other information systems).

(ii) Limit information system access to the types of transactions and functions that authorized users are permitted to execute.

(iii) Verify and control/limit connections to and use of external information systems.

(iv) Control information posted or processed on publicly accessible information systems.

(v) Identify information system users, processes acting on behalf of users, or devices.

(vi) Authenticate (or verify) the identities of those users,…