This document is a pre-award survey template for prospective contractors seeking to demonstrate accounting system adequacy for the Space Power and Reactor Capabilities (SPARC) Multiple Award Indefinite Delivery/Indefinite Quantity (MAIDIQ) contract.

The template requires offerors to either confirm they hold a certified accounting system already audited by the Federal Government or complete a comprehensive evaluation checklist. For those with prior federal audits, offerors must provide the audit date, evaluating agency (such as NASA or DCMA), and agency point of contact information. For those without prior audits, the checklist assesses compliance across multiple accounting system requirements including: adherence to generally accepted accounting principles; proper segregation and identification of direct and indirect costs; general ledger control; timekeeping and labor distribution systems; interim monthly cost determinations; exclusion of unallowable costs per FAR Part 31; cost identification by contract line items and units; segregation of preproduction from production costs; financial information supporting limitation of cost clauses and progress payment requests; system design for pricing follow-on acquisitions; and current full operational status. Any items marked "No" or "N/A" require narrative explanations from the offeror. Offerors may invoke a "Single Exception for Fixed-Price-Only Contractors" described in Section K of the SPARC solicitation to avoid completing this template entirely.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Space Power and Reactor Capabilities

(SPARC)

Multiple Award Indefinite Delivery/Indefinite Quantity (MAIDIQ) Contract

Attachment J.2-7

Pre-Award Survey of Prospective Contractor Accounting System

Instructions: The Offeror shall complete and submit as Attachment J.2-7 the following template regarding its accounting system unless it invokes the “Single Exception for Fixed- Price-Only Contractors” described in Section K of the SPARC solicitation.

SPARC Attachment J.2-7

Pre-Award Survey of Prospective Contractor Accounting System

1. Does the offeror hold a certified accounting system that has already been audited by the Federal Government?

Yes No (Offerors shall indicate with “X”)

• If “Yes” is indicated above, the offeror shall provide the following information:

Date of Most Recent Audit:

Evaluating Agency (i.e. NASA, DCMA):

Agency Point of Contact Name:

Agency Point of Contact Email Address:

• If “No” is indicated above, the Offeror shall complete the information under 2.

Evaluation Checklist.

2. Evaluation Checklist:

MARK “X” IN THE APPROPRIATE COLUMN. FOR ANY ITEMS

RESPONDED TO AS “NO” OR “N/A”, THE OFFEROR SHALL

PROVIDE A NARRATIVE EXPLANATION UNDER 3. Narratives

YES NO N/A

2.1 – IS THE ACCOUNTING SYSTEM IN ACCORD WITH GENERALLY

ACCEPTED ACCOUNTING PRINCIPLES APPLICABLE IN THE

CIRCUMSTANCES?

2.2 – THE ACCOUNTING SYSTEM PROVIDES FOR:

2.2a – Proper segregation of direct costs from indirect costs.

2.2b – Identification and accumulation of direct costs by contract.

2.2c – A logical and consistent method for the allocation of indirect costs to intermediate and final cost objectives. (A contract is the final cost objective).

2.2d – Accumulation of costs under general ledger control.

2.2e – A timekeeping system that identifies employees' labor by intermediate or final cost objectives.

2.2f – A labor distribution system that charges direct and indirect labor to the appropriate cost objectives

2.2g – Interim (at least monthly) determination of costs charged to a contract through routine posting of books of account.

SPARC Attachment J.2-7

2.2h – Exclusion from costs charged to government contracts of amounts which are not allowable in terms of FAR 31, Contract Cost Principles and Procedures, or other contract provisions.

2.2i –Identification of costs by contract line item and by units (as if each unit or line item were a separate contract) if required by the proposed contract

2.2j – Segregation of preproduction costs from production costs.

2.3 – THE ACCOUTING SYSTEM PROVIDES FINANCIAL

INFORMATION:

2.3a – Required by contract clauses concerning limitation of cost (FAR 52.232-20 and 21) or limitation on payments (FAR 52.216- 16)

2.3b – Required to support requests for progress payments.

2.4 – IS THE ACCOUNTING SYSTEM DESIGNED, AND ARE THE

RECORDS MAINTAINED IN SUCH A MANNER THAT ADEQUATE,

RELIABLE DATA ARE DEVELOPED FOR USE IN PRICING FOLLOW-ON

ACQUISITIONS?

2.5 – IS THE ACCOUNTING SYSTEM CURRENTLY IN FULL

OPERATION?

3. Narratives:

For any items marked as “No” or “N/A” under Section 2. Evaluation Checklist, the Offeror shall provide a narrative explanation below

Item Number (e.g. 2.1, 2.2a)

Narrative Explanation (Offerors may add additional rows if necessary)

File details come from the government source that posted it. Updated .