LR-1 Phase 1 Task Order Statement of Work
This is a Statement of Work (SOW) for NASA's Lunar Reactor 1 (LR-1) Phase 1 Task Order, baseline version dated November 20, 2026. The procurement establishes the design and development requirements for a 20 kilowatt electrical (kWe) fission power system intended for deployment on the lunar surface by December 2030. The task must be completed within 18 months of award and encompasses preliminary design review (PDR)-level design work, an electrically heated engineering test unit (ETU) demonstration, and component-level radiation exposure testing. The contractor shall furnish all personnel, facilities, materials, and services necessary to complete the work, with acceptance contingent on successful completion of specified requirements and deliverables.
The SOW defines 40 technical requirements addressing power delivery, design life, environmental survivability, safety, radiation shielding, and operational capabilities. Key requirements include: single reactor design utilizing High-Assay Low-Enriched Uranium (HALEU) fuel; closed Brayton cycle power conversion; 20 kWe minimum continuous power output with single-failure tolerance; operation at the lunar south pole within extended darkness periods of at least 354 hours; mass not exceeding 15 metric tons; bidirectional power flow at 2700–3300 VRMS, three-phase at 1000 Hz; radiation dose rate limits of 5 rem/year within a 36-degree cone angle and 50 rem/year outside the cone at 1 km distance; automatic operation with intermittent Earth communications; and dual-independent fault detection methods for catastrophic hazards. The work includes System Requirements Review (SRR), Test Readiness Review(s) (TRR), and PDR lifecycle milestone reviews. Deliverables encompass design documentation, the ETU assembly with subsystems (reactor heat transport, power conversion, heat rejection, and power management and distribution), radiation test hardware, and control software. Applicable standards reference NASA procedural requirements, DOE standards, and military/aerospace specifications covering structural design, materials, safety, electromagnetic compatibility, and quality assurance. The procurement involves NASA, with coordination with the Department of Energy for HALEU fuel allocation.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BASELINE
National Aeronautics and Space Administration
DATE: 2026-11-20
LUNAR REACTOR 1 – PHASE 1 TASK ORDER
(LR-1 P1 TO)
STATEMENT OF WORK (SOW)
LUNAR REACTOR 1 (LR-1) DEVELOPMENT THROUGH HARDWARE-DRIVEN
PRELIMINARY DESIGN REVIEW (PDR)
Publicly Available: Release to Public Websites Requires Approval of Chief, Office of Primary Responsibility, and approval via the Scientific and Technical Information
(STI) process, if applicable
Title: LR-1 Phase 1 Task Order Statement of Work Version: Baseline
Date: 2026-11-20 Page: 2 of 21
The electronic version is the official approved document.
Verify this is the correct version before use.
LR-1 Phase 1 Task Order Statement of Work
REVISION AND HISTORY PAGE
Version No.
Description Date
- Initial Release 11/20/2026
Date: 2026-11-20 Page: 3 of 21
LR-1 Phase 1 Task Order Statement of Work
TABLE OF CONTENTS
TABLE OF CONTENTS
1 INTRODUCTION 4
1.1 OBJECTIVES 4
2 SYSTEM DEFINITINON 5
2.1 KEY SUBSYTEMS 5
2.2 CONCEPT OF OPERATIONS (LAUNCH INTEGRATION THROUGH END-OF-LIFE) 6
3 REQUIREMENTS 6
4 APPLICABLE DOCUMENTS 13
5 TECHNICAL AND PROGRAMMATIC TASK DESCRIPTIONS 16
5.1 SRR LIFECYCLE MILESTONE REVIEW 16
5.2 TRR LIFECYCLE MILESTONE REVIEW(S) 17
5.3 PDR LIFECYCLE MILESTONE REVIEW 17
5.4 ENGINEERING TEST UNIT & RADIATION TEST CAMPAIGN 18
5.5 DATA REQUIREMENT DELIVERABLES (DRDS) 18
5.6 HARDWARE AND SOFTWARE DELIVERABLES 19
5.7 LR-1 PHASE 1 TASK ORDER MEETINGS 19
APPENDIX A - ACRONYMS AND ABBREVIATIONS 20
TABLE OF TABLES
TABLE 1 – APPLICABLE DOCUMENTS 14
TABLE A1-1 ACRONYMS AND ABBREVIATIONS 20
TABLE OF FIGURES
FIGURE 1 – EXAMPLE LR-1 SYSTEM BLOCK DIAGRAM 5
FIGURE 2 – LR-1 SHIELDING REQUIREMENT ILLUSTRATION 10
Date: 2026-11-20 Page: 4 of 21
LR-1 Phase 1 Task Order Statement of Work
1 INTRODUCTION
The National Aeronautics and Space Administration (NASA) is developing nuclear systems for use in space and on the lunar surface. The Lunar Reactor 1 (LR-1) program will support NASA’s strategic objectives by building the first operational fission reactor for the lunar surface, advancing U.S. fission power technologies, supporting upcoming lunar activities, and enabling future power generation capabilities in-space and on Mars.
Through the deployment of LR-1, solar-independent electrical power will be available to lunar surface assets. Lunar polar regions experience extended periods during which little to no sunlight is observed on the surface. Missions located at these polar regions will thus experience extended periods during which it is difficult for photovoltaic systems to produce and store sufficient power.
LR-1 will provide a source of solar-independent power accessible to lunar surface assets, such as Moon Base, to assure mission success and crew safety.
LR-1 will be a 20 kWe fission power system capable of at least 5 years of continuous, maintenance free operation, ready for launch by December 2030. The program is an initiative in response to Executive Order 14369 and National Space Technology Memorandum-3 (NSTM-3). This procurement will serve as the acquisition vehicle for the LR-1 Program to meet NASA’s objectives in Executive Order (EO) 14369, Ensuring American Space Superiority, and NSTM-3, National Initiative for American Space Nuclear Power. The preliminary design and hardware demonstration procured within this contract will leverage and advance prior NASA Fission Surface Power projects and studies. Currently, only a design phase with hardware demonstrations is authorized.
This task is to be completed within 18 months of award and includes both non-nuclear hardware demonstrations and component-level radiation exposure testing. It is NASA’s expectation that the results from this task will help inform the mission interface requirements that will be better defined for subsequent development phases. If authorized, follow-on tasks will be awarded to perform the subsequent phases to ready LR-1 for flight.
The contractor shall furnish all personnel, facilities, materials, services, and any other items and functions necessary to complete the work. Acceptance of the work by NASA will occur following the successful completion of the requirements and deliverables specified in this SOW and acceptance by the designated NASA program manager.
This Statement of Work (SOW) is structured in accordance with a tailored version of NASA project life-cycle phases as outlined in NPR 7120.5 for NASA Space Flight Program Management.
1.1 OBJECTIVES
NASA seeks clear hardware-based evidence that the key LR-1 subsystems can be assembled and operated at conditions representative of a potential future Lunar surface mission.
Objectives for Phase 1 of the LR-1 program are as follows:
Objective 1. Develop a PDR-level design for LR-1 that achieves the defined requirements and ensures the technology readiness is sufficient to proceed to flight system development.
Objective 2. Perform an electrically heated integrated system test in a relevant environment (as defined by the requirements) that incorporates representative versions of the key subsystems (an engineering test unit, ETU).
Date: 2026-11-20 Page: 5 of 21
LR-1 Phase 1 Task Order Statement of Work
Objective 3. Perform component-level radiation exposure testing to demonstrate the LR-1 design will operate as intended within the induced (reactor) and natural (Lunar surface) radiation environments.
2 SYSTEM DEFINITINON
2.1 KEY SUBSYTEMS
The diagram in Figure 1 illustrates a candidate architecture for the LR-1 system. A successful LR- 1 design will include subsystems which perform the tasks described in this section and is capable of providing 20 kWe to a user on the Lunar surface.
The boundary of the LR-1 system is as illustrated by the dashed line in the Figure below. LR-1 is a fission power system that utilizes closed-Brayton conversion. The heat is provided by a reactor that utilizes high-assay low-enrichment uranium (HALEU). A shield is needed to reduce radiation dose from the reactor at the co-located subsystems, and at a distance where the power users may reside. The power conversion system (PCS) accepts heat from the reactor via a hot-side heat exchanger (HSHX) and transfers waste heat to a heat rejection system (HRS). The HSHX transfers heat to the Brayton-cycle working gas to provide the desired turbine inlet temperature.
The HRS includes thermal radiators that reject the waste heat to the Lunar environment to maintain the desired Brayton compressor inlet temperature. The Brayton PCS includes an alternator that generates AC power. A Controller could serve multiple functions, with software to manage LR-1 system operations, process data and commands, and maintain housekeeping loads. The Controller could work in tandem with the Power Management and Distribution (PMAD) that processes the Brayton output power and provides any electrical conversion needed to permit the power to be transmitted to the user. A Parasitic Load Radiator (PLR) may be used for Brayton speed control to maintain a constant load on the alternator regardless of the user power demand.
Note that the transmission cable is not part of LR-1, and will be provided by a future user.
FIGURE 1 – EXAMPLE LR-1 SYSTEM BLOCK DIAGRAM
Fission Reactor
PCS
Brayton
HRS
Controller &
PMAD
PLR
Sh ie ld
User
LR-1 System
H
SH
X
1 km transmission cable
Date: 2026-11-20 Page: 6 of 21
LR-1 Phase 1 Task Order Statement of Work
2.2 CONCEPT OF OPERATIONS (Launch Integration through End-of-Life)
This section describes the notional sequence of events for LR-1 during its deployment, activation, surface operations, and end of life. Note that LR-1 has not been chosen for a particular mission, and this sequence was generated by anticipating the first use on a Lunar south pole mission. This sequence of events provides context for the flight system preliminary design work performed within this Task.
1. Deliver LR-1 to the launch integration facility in a flight certified, launch ready configuration.
2. Survive launch, transit, and lunar landing in a passive, safe state.
3. LR-1 is landed and is ready for operation, either on the lander or after being off-loaded and placed onto the Lunar surface.
4. Perform a controlled startup to achieve a stable operating condition with electric power shunted by a Parasitic Load Radiator.
5. Demonstrate LR-1 functionality including the ability of the system to achieve the prescribed operating states (as defined by the requirements).
6. Perform any necessary grid-forming or grid-synchronization steps to enable compatibility with the user’s high-voltage grid.
7. Begin providing power to the user’s high-voltage grid via the user-provided 1 km transmission cable.
8. Shut down safely at mission completion and enter a permanent, passive safe state.
3 REQUIREMENTS
The contractor shall design the LR-1 system to meet the requirements as defined herein.
Single Reactor Design
LR1-1: LR-1 shall utilize a single reactor.
Rationale: A single reactor design is critical to reduce risk and ensure extensibility to higher power systems. Power capacity is expected to be maximized such that LR-1 can be delivered on one lunar lander, including all the equipment needed to deploy and operate it.
Power Delivery After a Failure
LR1-2: LR-1 shall continue to provide no less than 20 kWe after a single failure within the LR-1 system.
Rationale: NASA seeks to demonstrate an LR-1 system that maximizes power output with failure tolerance. This will ensure continued power delivery to meet a minimum projected power demand. This may be accomplished through approaches including, but not limited to, operational adjustments, oversizing components, or redundancy.
Date: 2026-11-20 Page: 7 of 21
LR-1 Phase 1 Task Order Statement of Work
Electrical Power Interface
LR1-3: The LR-1 electrical power interface shall operate between 2700 and 3300 VRMS (three-phase, line-to-line) with 120 ± 1 degrees of separation between phases.
Rationale: Ensures the LR-1 electrical interface will be suitable for the planned users (such as Moon Base), which will have to transmit the LR-1 output power at least 1 km to the intended use point.
LR1-4: The LR-1 electrical power interface shall operate at 1000 Hz.
Rationale: Ensures the LR-1 electrical interface will be suitable for the planned users (such as Moon Base)
LR1-5: The LR-1 electrical power interface shall be capable of bidirectional power flow.
Rationale: Provides options for operation that may be used in fault scenarios.
LR1-6: LR-1 shall have a means to electrically disconnect from, and reconnect to, the user-provided transmission cable.
Rationale: For safety and fault handling, LR-1 needs the ability to disconnect from the long-distance transmission cable.
Fuel Type
LR1-7: The LR-1 reactor shall utilize High-Assay Low-Enriched Uranium (HALEU) fuel.
Rationale: The use of HALEU leverages on-going developments for terrestrial micro-reactors.
Note: NASA has coordinated with DOE for an allocation of HALEU. The contractor is responsible for submitting the proper application through DOE to acquire the HALEU fuel.
Power Conversion
LR1-8: LR-1 shall utilize closed Brayton cycle power conversion.
Rationale: Brayton power conversion is projected to deliver stable, reliable power, and extensibility to larger systems necessary for future NASA missions including nuclear electric propulsion.
Design Life
LR1-9: LR-1 shall be designed to operate continuously at full power output, on the Lunar surface, for a minimum of 5 years without maintenance from the time of deployment.
Rationale: 5 years represents the upper limit of what lunar surface elements can feasibly be expected to perform given the lunar surface environment. Operational life can be verified through analysis.
Environments
LR1-10: LR-1 shall be designed to survive all environments from launch through deployment, as defined by M2M-30159 (Moon to Mars Design Specification for Natural
Date: 2026-11-20 Page: 8 of 21
LR-1 Phase 1 Task Order Statement of Work
Environments (DSNE)), and defined by either GSFC-STD-7000 or vehicle-provider environmental definitions where the DSNE does not define an environment.
Rationale: LR-1 must survive all the environments preceding deployment, such that it meets all requirements once operating on the Lunar surface.
LR1-11: LR-1 shall be designed for operation at the lunar south pole within 84°S and 90°S latitude, where the lunar environment is defined by M2M-30159, “Moon to Mars Design Specification for Natural Environments (DSNE)”.
Rationale: NASA is prioritizing the lunar south pole as the location for future crewed surface missions.
LR1-12: LR-1 shall be designed for operation on slopes up to 10 degrees.
Rationale: The lunar south pole has variable terrain which must be accommodated in the LR-1 design.
LR1-13: LR-1 shall be designed for operation during darkness periods of at least 354 hours.
Rationale: An LR-1 design that provides power delivery during extended darkness periods assures extensibility for both polar and non-polar lunar missions.
Automatic Operation
LR1-14: LR-1 shall operate automatically to provide continuous power delivery after initial startup, with intermittent communications from Earth.
Rationale: Removes LR-1’s dependency on continuous or real-time communications networks during operations. Contractors will need to assess operational phases which should be dependent on real-time commands, such as initial deployment.
System Restarts
LR1-15: LR-1 shall restart without external power in all expected environmental conditions.
Rationale: While LR-1 will be designed to operate continuously, there may be conditions that demand a temporary shutdown. The contractor will need to assess the need for restarts that could potentially occur during extended periods of darkness. This requirement applies only to “restarts”, and does not apply to the initial startup of LR-1.
User Load Variability
LR1-16: LR-1 shall accommodate a user load that can vary from 0% to 100% of the PCS output power.
Rationale: The user may not always be dissipating all the power produced by LR-1. The power draw from the user will be anywhere from 0% (user load completely absent) to 100% of the PCS output. The system must operate stably regardless of the presence or magnitude of the user load.
Mass
LR1-17: LR-1 shall not exceed 15 metric tons (15,000 kg), inclusive of all adapters and harnesses for the lander.
Date: 2026-11-20 Page: 9 of 21
LR-1 Phase 1 Task Order Statement of Work
Rationale: Provides an upper bound for LR-1 system mass based on projected lander availability.
Volume
LR1-18: While in the stowed configuration (undeployed state), LR-1 shall not exceed a dynamic volumetric envelope of 4.57-meter (179.9 inch) diameter cylinder with a 7.8-meter (307 inch) height.
Rationale: Provides an upper bound for volume based on projected lander availability.
Orbital Debris Mitigation
LR1-19: LR-1 shall demonstrate, via failure modes and effects analyses, probabilistic risk assessments, or other appropriate analyses, that the integrated probability of breakup for all credible failure modes is less than 0.001 (excluding small particle impacts).
Rationale: Limiting the risk to other space systems from accidental breakup during deployment and mission operations while in orbit about Earth or the Moon or on the lunar surface. This requirement will not only support LR-1 compliance but also launch vehicle compliance with NASA’s orbital debris requirements.
Safety
LR1-20: LR-1 shall be designed to minimize radiation footprint at end of life through a permanent reactor shutdown.
Rationale: Shutdown of the reactor at the end of life enables future proximity operations by stopping the nuclear fission process and minimizing the radiation that is emitted.
LR1-21: LR-1 shall be designed to deplete and/or control all sources of stored energy when no longer required for mission operations for post mission passivation.
Rationale: Design for passivation of the system through depletion burns, venting, system disconnects, and/or discharge of stored energy sources after completion of mission operations or end of life of the system. Minimize the probability of accidental release or deflagration large enough to break up the system after completion of mission operations or end of life of the system. This includes the ability to ensure the reactor remains in a subcritical state.
Habitation Zone Radiation Exposure
LR1-22: LR-1 shall be designed to limit radiation dose rate to no greater than 5 rem per year above the lunar background radiation at a distance no greater than 1 km within a 36° three-dimensional cone angle and no greater than 50 rem per year above the lunar background radiation at that distance outside the 36° cone angle, as shown in Figure 2.
Rationale: The notional habitation zone is assumed to be a 1 km diameter circular region with a center point 1.5 km away from the reactor, resulting in the boundaries shown in Figure 2. The actual reactor separation distance may be less than 1 km, provided that the resulting cone angle fully subtends the 1 km diameter notional habitation zone. The radiation calculation should assume an evenly distributed dose rate to an unshielded crew member at the notional user location. The radiation calculation should assume a flat surface with no geographic features. The exact location of the reactor and the relative direction of
Date: 2026-11-20 Page: 10 of 21
LR-1 Phase 1 Task Order Statement of Work the user interface will be determined at a future date. The 5 rem/yr limit needs to be met for both nominal and off-nominal operations. The lunar background radiation is specified in Section 3.3.1 of the M2M-30159, Moon to Mars Design Specification for Natural Environments (DSNE).
FIGURE 2 – LR-1 SHIELDING REQUIREMENT ILLUSTRATION
Single Failure Tolerance to Catastrophic Events
LR1-23: LR-1 shall be designed to provide at least single failure tolerance to catastrophic events.
Rationale: A Catastrophic event is any event which may cause death, permanent disabling injury, significant environmental impact, total loss of facilities, loss of mission or loss of a lunar asset. Control of catastrophic events ensures proper handling of system hazards to prevent such risks. Specific approaches to failure tolerance and implementation must be derived via an integration of the design and safety analyses. See NASA-STD-8719.29 for strategies for implementing failure tolerance.
Emergency Commanded Shutdown
LR1-24: LR-1 shall be designed to be capable of a commanded shutdown with no detriment to performance, quickly enough to prevent catastrophic events, and such that LR-1 can be restarted later.
Rationale: An emergency shutdown should initiate a safe shutdown of the reactor either from ground command or the lunar surface (crew). Local control supports the crew in self-management of risks in the event they receive an alert of an impending hazard, and the ground is unable to act, or communication is lost. Additional controls may be made available at the Contractor’s discretion, but the minimum is an emergency stop to neutralize the hazard. LR-1 must not be damaged by any commanded shutdown so that it doesn’t introduce any hazards to the user, can be restarted later, and can continue providing nominal power to the user.
LANDER
Crew habitable zone
USERLR-1
Date: 2026-11-20 Page: 11 of 21
LR-1 Phase 1 Task Order Statement of Work
Fault Annunciation
LR1-25: LR-1 shall be designed to provide the capability to annunciate detected faults to Lunar assets that affect critical systems, subsystems, or crew health.
Rationale: It is necessary to alert the crew/operator to faults (not just failures) that affect critical functions.
Fault Detection, Isolation, and Recovery
LR1-26: LR-1 shall be designed to automatically detect, isolate, and recover from faults.
Rationale: The LR-1 design is expected to provide isolation and recovery from faults. This may be accomplished through approaches including, but not limited to, redundancy or part isolation.
LR1-27: LR-1 shall have two independent methods of detecting faults that lead to catastrophic hazards.
Rationale: Provides a second means of detecting faults leading to catastrophic events.
Independent detection could involve, but is not limited to, redundant data, secondary information sources, dissimilar detection logic, or oversight capabilities.
Radiation Monitoring
LR1-28: LR-1 shall be designed to include, at a minimum, continuous radiation monitoring sensors at the power output location.
Rationale: Continuous In-situ monitoring of radiation is required to support crew operations and monitor system performance.
Cyber Security
LR1-29: LR-1 shall meet the requirements of draft version of MB-40022, “Moon Base Space Systems Security Requirements”.
Rationale: Ensures compatibility with planned users such as Moon Base.
Electrical, Electronic, and Electromechanical (EEE) Parts Assurance
LR1-30: LR-1 shall be designed to use grade 1 parts.
Rationale: Grade 1 EEE parts typically meet the highest reliability standards and have been subjected to independent verification. Additionally, Grade 1 parts are manufactured with the greatest amount of element evaluation, traceability, in-process testing and final screening as compared to other parts of the same type, but different reliability grades.
Military specification documents (e.g. MIL-PRF 19500P, Semiconductor Devices, General Specification For) describe the Grade 1 designation level as being intended for space applications. Lower grade parts can be used in the design when higher grade parts are unavailable, not in critical systems, or approved by NASA.
Nuclear Launch Authorization
LR1-31: LR-1’s reactor shall not be operated at power prior to arrival on the lunar surface.
Note that this does not preclude a zero-power critical test prior to launch.
Date: 2026-11-20 Page: 12 of 21
LR-1 Phase 1 Task Order Statement of Work
Rationale: Launching a reactor that has not been operated minimizes pre-launch radiation hazards. This requirement also addresses the issues of fires and explosions since it keeps the hazard (the un-fissioned uranium fuel) low. Additionally, it addresses the issue of cold re-entry since it keeps the radiological hazard from the uranium fuel low and the dispersal of cold uranium fuel will have minimal dose consequences to the Earth.
LR1-32: LR-1 shall comply with NSPM-20 “National Security Presidential Memorandum on the Launch of Spacecraft Containing Space Nuclear Systems”, Space Policy Directive-6 (SPD-6) “National Strategy for Space Nuclear Power and Propulsion” and NPR 8715.26 “NASA Nuclear Flight Safety”.
Rationale: NSPM-20 defines the compliance process for U.S. spacecraft launches involving nuclear systems. SPD-6 establishes the U.S. national strategy for the development and use of space nuclear power and propulsion systems to advance scientific, exploration, national security, and commercial objectives. NPR 8715.26 implements NASA’s nuclear flight safety policy, requiring protection of the public, workforce, assets, and environment by embedding safety into all activities and operations.
LR1-33: LR-1 shall be designed to prevent inadvertent reactor criticality using two independent hardware methods for both normal and accident conditions in accordance with the safety guidelines identified in NSPM-20.
Rationale: Per NSPM-20, the U.S. shall develop and use space nuclear systems when such systems safely enable or enhance space exploration or operational capabilities.
Designing a reactor to prevent inadvertent criticality minimizes radiation hazards. Potential launch accident scenarios should include, but are not limited to, dry land, wet sand, water (ocean).
LR1-34: The Contractor shall adopt a safety process that is similar to the Payload Safety Process in NPR 8715.7 Payload Safety Program and NASA-STD-8719.24 Payload Safety.
Rationale: LR-1 is expected to operate safely in all phases of development, test, and operations. This should include a robust safety review process to ensure safety is designed into the system. The contractor is expected to provide data in support of the governments phased safety review process.
Department of Energy (DOE) Requirements
LR1-35: LR-1 shall be designed to comply with the standards provided below. The Contractor may propose equivalent requirements in lieu of these or propose tailoring of these requirements as appropriate.
• DOE-STD-1271-2026 Authorization Pathway for Nuclear Facilities
• DOE O 414.1 Quality Assurance
• DOE O 420.1 Facility Safety
• DOE-STD-1237-2021 Documented Safety Analysis for DOE Reactor Facilities
While not applicable to TO-1, the LR-1 system shall be designed to meet the following standards while operating on the lunar surface:
• DOE O 225.1 Accident Investigations
Date: 2026-11-20 Page: 13 of 21
LR-1 Phase 1 Task Order Statement of Work
• DOE O 231.1B Environment, Safety and Health Reporting
• DOE O 232.2 Occurrence Reporting and Processing of Operations Information
• DOE O 442.1B Department of Energy Employee Concerns Program
• DOE O 422.1 Conduct of Operations
Rationale: All terrestrial activities including, but not limited to, nuclear ground testing, fabrication, storage, and transportation of nuclear materials are subject to federal regulations of nuclear materials and reactors.
Operating States
LR1-36: LR-1 shall be capable of receiving commands to achieve prescribed operating states including at a minimum: full-power, partial-power, warm-standby, and shutdown.
Rationale: NASA may choose to adjust LR-1 power output in relation to mission needs and radiation constraints. Full power could be based on the maximum electric power that can be delivered to the electrical interface. Partial power could be based on operating the system at the minimum electric power to assure LR-1 health and safety (e.g., keeping fluids from freezing). Warm standby could maintain the reactor in a critical state at a nominal temperature to allow an efficient transition to electric power production. Shutdown should be based on the reactor being sub-critical and no electrical power being generated. Other operating states could be defined by the provider.
Command and Data Handling
LR1-37: LR-1 shall have an Ethernet interface that is compatible with fiber optic transmission and capable of transmitting data and receiving commands.
LR1-38: LR-1 shall conform to the Consultative Committee for Space Data Systems Space Data Systems (CCSDS) Space Packet Protocol Standard CCSDS 133.0-B-2 for data exchange.
LR1-39: LR-1 shall define telemetry and commands following XML Telemetric and Command Exchange – Version 1.2 CCSDS 660.0-B-2.
Rationale: The requirements in this section maintain compatibility with expected user C&DH interface.
Radio Frequency Communications
LR1-40: LR-1 shall include a radio frequency communications interface capable of transmitting data and receiving commands via a NASA-provided Lunar orbital relay asset.
Rationale: LR-1 needs an independent communications pathway to enable operation before any communications provided by a user connection.
4 APPLICABLE DOCUMENTS
The following standards are deemed by the program’s engineering team to be relevant for the LR-1 system and will be imposed on the flight design. Use of an alternative standard, or tailoring of these standards, may be proposed by the contractor which will be subject to NASA approval.
Date: 2026-11-20 Page: 14 of 21
LR-1 Phase 1 Task Order Statement of Work
TABLE 1 – APPLICABLE DOCUMENTS
Document Number Title
10 CFR Part 71 Packaging and Transportation of Radioactive Material
AIAA S-080A-2018 Metallic Pressure Vessels, Pressurized Structures, and Pressure Components
AIAA S-081B-2018 Composite Overwrapped Pressure Vessels (COPV)
AIAA-S-110A Space Systems – Structures, Structural Items, and Pressurized Structures
AIAA S-120A-2015 Mass Properties Control for Space Systems
ANSI/ESD S20.20-
For the Development of an Electrostatic Discharge Control Program for – Protection of Electrical and Electronic Parts, Assemblies and Equipment (Excluding Electrically Initiated Explosive Devices)
ASTM E595-15 Low Outgassing in a Vacuum Environment
GEIA-STD-0007-C Logistics Product Data
IEC 61000-4-2-2025 Electromagnetic Compatibility (EMC) Testing and Measurement Techniques-Electrostatic Discharge Immunity Test
IPC-2226 Rev A Sectional Design Standard for High Density Interconnect (HDI) Printed Boards
IPC-6018 Rev D Qualification and Performance Specification for High Frequency (Microwave) Printed Boards
JSC-20793 Rev D Crewed Space Vehicle Battery Safety Requirements
JSC-64399 Rev A Handbook for Designing MMOD Protection
JSC 65828 Rev B Structural Design Requirements and Factors of Safety for Spaceflight Hardware
MB-40022 Moon Base Space Systems Security Requirements
MB-40023 Moon Base Program Security Policy
MIL-STD-1522A General Requirements for Safe Design and Operation of Pressurized Missile and Space Systems
MIL-STD-1576 (1984) Electroexplosive Subsystem Safety Requirements and Test Methods for Space Systems
MIL-STD-461H Requirements for the Control of Electromagnetic Interference Characteristics of Subsystems and Equipment
MIL-STD-464D Electromagnetic Environmental Effects Requirements for Systems
MIL-STD-981C w/ Change 2
Design, Manufacturing and Quality Standards for Custom Electromagnetic Devices for Space Applications
MSFC-SPEC-3746 Flow-Induced Vibration Assessment Requirements for Metal Bellows and Flexhoses
NASA-HDBK-4008
Baseline w/ Change 2
Programmable Logic Devices Handbook
Date: 2026-11-20 Page: 15 of 21
LR-1 Phase 1 Task Order Statement of Work
Document Number Title
NASA-STD-1006A Space System Protection Standard
NASA-STD-1008 Testing Systems and Hardware to be Exposed to Dust in Planetary Environments
NASA-STD-4003A w/ Change 1
Electrical Bonding for NASA Launch Vehicles, Spacecraft, Payloads, and Flight Equipment
NASA-STD-5001B w/ Change 3
Structural Design and Test Factors of Safety for Spaceflight Hardware
NASA-STD-5002B Load Analyses of Spacecraft and Payloads
NASA-STD-5005D w/ Change 2
Design and Fabrication of Ground Support Equipment
NASA-STD-5006A w/ Change 2
General Welding Requirements for Aerospace Materials
NASA-STD-5009C Nondestructive Evaluation Requirements for Fracture Critical Metallic Components
NASA-STD-5017B Design And Development Requirements for Mechanisms
NASA-STD-5018 w/ Change 1
Strength Design And Verification Criteria for Glass, Ceramics, and Windows
NASA-STD-5019A w/ Change 4
Fracture Control Requirements for Spaceflight Hardware
NASA-STD-5020B Requirements for Threaded Fastening Systems in Spaceflight Hardware
NASA-STD-6001B w/ Change 3
Flammability, Offgassing, and Compatibility
NASA-STD-6012A Corrosion Protection for Space Flight Hardware
NASA-STD-6016C w/ Change 1
Standard Materials and Processes Requirements for Spacecraft
NASA-STD-7001C Payload Vibroacoustic Test Criteria
NASA-STD-7002B w/ Change 1
Payload Test Requirements
NASA-STD-7009B Standard for Models and Simulations
NASA-STD-7012A Leak Test Requirements
NASA-STD-8719.14C Process for Limiting Orbital Debris
NASA-STD-8719.24A Payload Safety Requirements
NASA-STD-8719.25 Range Flight Safety Requirements
NASA-STD-8719.27 Implementing Planetary Protection Requirements for Space Flight
NASA-STD-8719.9C Lifting Standard
NASA-STD-8739.6B Workmanship Standards
NASA-STD-8739.10 Electrical, Electronic, and Electromechanical (EEE) Parts Assurance Standard
SAE/AS9100D Quality Management Systems – Requirements for Aviation, Space, and Defense Organizations
SAE/EIA-649-2A Configuration Management Requirements for NASA Enterprises
SMC-S-010 Parts, Materials, and Processes (PMP) Technical Requirements For Space and Launch Vehicles
Date: 2026-11-20 Page: 16 of 21
LR-1 Phase 1 Task Order Statement of Work
Document Number Title
SMC-S-016 Test Requirements for Launch, Upper-Stage And Space Vehicles
SMC-S-024 Test Requirements for Ground Systems
5 TECHNICAL AND PROGRAMMATIC TASK DESCRIPTIONS
The contractor shall perform the engineering design and analysis to produce a viable LR-1 system design sufficient for a PDR occurring at the end of this task. The contractor shall perform the work necessary to support the meetings and produce the deliverables described in the following sections. The scope of this work includes but is not limited to:
a. Regular weekly virtual status meetings with minutes
b. Regular monthly reports
c. Presentations for various meetings
d. Schedule composition
e. Requirements decomposition – the contractor is free to add requirements beyond those defined in this SOW
f. System requirements review (SRR) – described below
g. Perform trade studies and analyses
h. Develop a candidate concept of operations – the contractor shall develop the ConOps details including flight system assembly, checkout testing, launch, landing, startup, and continuous operation. This shall include details that define the communications need and power delivery profile of LR-1.
i. Technical interchange meetings (TIMs)
j. Document risks and mitigations
k. Identifying needed technology development
l. Developing a path for the flight unit after PDR
m. Test readiness review(s) (TRR) – described below
n. Engineering Test Unit – described below
o. Radiation Test Campaign – described below
p. Documenting the hardware demonstration design(s) (via drawings, solid models, assembly procedures) and preliminary flight design (via solid models, requirements tracing, analysis results)
q. Preliminary design review (PDR) – described below
5.1 SRR Lifecycle Milestone Review
The contractor shall conduct a System Requirements Review (SRR) in accordance with contractor defined Major Review Plans and Documentation as referenced in the Project Management Plan deliverable. To define the SRR, the contractor may refer to, and/or utilize a
Date: 2026-11-20 Page: 17 of 21
LR-1 Phase 1 Task Order Statement of Work tailored approach to, the SRR entrance and success criteria defined in NPR 7123.1 Systems Engineering Processes and Requirements.
The scope of the SRR shall include at a minimum the LR-1 Flight System requirements with traceability to the NASA defined requirements in Section 3 of this SOW and decomposition of the contractor-defined LR-1 Flight System requirements to ETU requirements.
5.2 TRR Lifecycle Milestone Review(s)
The contractor shall conduct Test Readiness Review(s) (TRRs) in accordance with contractor defined Major Review Plans and Documentation as referenced in the Project Management Plan deliverable. To define the TRR, the contractor may refer to, and/or utilize a tailored approach to, the TRR entrance and success criteria defined in NPR 7123.1 Systems Engineering Processes and Requirements.
A TRR shall be held for all system and major subsystem hardware demonstration tests performed as part of this task order.
5.3 PDR Lifecycle Milestone Review
The contractor shall conduct a Preliminary Design Review (PDR) in accordance with contractor defined Major Review Plans and Documentation as referenced in the Project Management Plan deliverable. To define the PDR, the contractor may refer to, and/or utilize a tailored approach to, the PDR entrance and success criteria defined in NPR 7123.1 Systems Engineering Processes and Requirements. At a minimum, the contractor’s plan shall include the following PDR success criteria:
a. All requests for action are adequately addressed
b. The top-level requirements—including mission success criteria, technical performance measures, and any sponsor-imposed constraints—are agreed upon, finalized, stated clearly, and consistent with the preliminary design
c. The preliminary design is expected to meet the requirements at an acceptable level of risk
d. Definition of the system interfaces (both external entities and between internal elements) is consistent with the overall technical maturity, associated risks have been identified and represent an acceptable level of risk
e. Any required new technology has been developed to an adequate state of readiness, or backup options exist and are supported to make them viable alternatives
f. Safety and mission assurance (e.g., safety, reliability, quality controls, quality verifications, supplier risk management, and EEE parts) have been adequately addressed in preliminary designs and any applicable S&MA products (e.g., system safety analysis, and failure modes and effects analysis) meet requirements, are at the appropriate maturity level for this phase of the program/project life-cycle, and indicate that the program/project safety/reliability residual risks will be at an acceptable level
g. Technical margins have been quantified
h. Technical trade studies are complete to sufficient detail for the design and remaining trade studies are identified, plans exist for their closure, and potential impacts are understood
i. The design demonstrates compliance with the proposed tailoring of the standards, processes, and procedures applicable to LR-1
Date: 2026-11-20 Page: 18 of 21
LR-1 Phase 1 Task Order Statement of Work
j. Manufacturability has been adequately included in design
k. Procurement and supply chain risk management execution is complementary with the technical development schedule
5.4 Engineering Test Unit & Radiation Test Campaign
A primary work element of this task is to design, build, and test a non-nuclear Engineering Test Unit (ETU) that incorporates the key subsystem technologies needed for a future LR-1 flight system. In addition to the contractor satisfying the typical criteria for PDR-level design work, NASA expects to see clear hardware-based evidence that the major subsystems can be assembled and operated at conditions representative of the future flight mission including thermal-vacuum testing as necessary to verify system-level performance. NASA also expects a detailed ETU Test Plan in accordance with the Test Plans for ETU deliverable. The goal of the ETU demonstration is proof of the contractor’s readiness to move forward with the final flight system design.
The ETU shall demonstrate, at minimum, the following major LR-1 subsystems: reactor heat transport, power conversion, heat rejection, and power management and distribution (PMAD).
The ETU shall utilize subsystem prototypes with fidelity sufficient to demonstrate critical engineering aspects of the design when integrated into an end-to-end power system.
Components of the ETU shall be full-scale power and provide flight-like functionality.
Components do not need to match the flight unit packaging, volume, mass, or design life. If the proposed flight system design uses parallel power strings which operate fully independently, the ETU may utilize only one full-scale power string.
The integrated ETU shall demonstrate overall performance through operation in a thermal-vacuum environment representative of the lunar operating conditions. The ETU shall be operated over a range of nominal, off-nominal, and faulted states to demonstrate resiliency. Realistic support elements shall mimic critical thermal and electrical interfaces at the ETU system boundary. Interfaces should include an electrically heated reactor simulator to deliver the required heat to the PCS at the proper temperature and a load simulator representative of downstream electrical attributes of a lunar power grid.
A separate radiation test campaign shall be completed to the extent required to prove the design will perform as intended in the lunar environment for the required lifetime. The contractor shall identify the components and subsystems that are vulnerable to the radiation environment and drive the LR-1 design. Test plans shall consider all sources of radiation in the operating environment, including induced radiation from the LR-1 reactor and natural space radiation present on the Lunar surface. The dedicated radiation exposure testing shall address both the ETU components and other LR-1 nuclear components not included in the ETU.
Detailed analytical models shall be validated with ETU and radiation test data. The ETU and radiation test results shall provide clear evidence to permit accurate performance projections for subsequent development phases. Performance projections should be available at the component, subsystem, and system levels.
5.5 Data Requirement Deliverables (DRDs)
DRDs specific to this Task Order are referenced in the Contract Data Requirements List (CDRL).
Refer to the attached CDRL for the comprehensive list of deliverables expected for this Task Order.
Date: 2026-11-20 Page: 19 of 21
LR-1 Phase 1 Task Order Statement of Work
5.6 Hardware and Software Deliverables
This Task Order includes hardware and software deliverables associated with the ETU and radiation test campaign. A list of hardware deliverables is provided below. The ETU may be delivered as a complete assembly or as separate subsystems. The contractor is required to deliver only hardware or software produced under this contract. The contractor is not required to deliver previously funded hardware or software. NASA retains the right to decline delivery of any items. The contractor will be responsible for disposition of any items for which delivery is declined, including any radioactive test articles from the radiation test campaign.
1) Electrically heated reactor simulator
2) Reactor heat transport assembly
3) Brayton power conversion unit(s)
4) HRS including radiator(s) and fluid loop(s)
5) PMAD equipment including any electrical load simulators
6) ETU data acquisition and control software
7) Any other test support equipment needed to assemble or operate the ETU
5.7 LR-1 Phase 1 Task Order Meetings
The contractor shall support the meetings described below. Meeting dates are to be finalized during contract negotiations and durations are approximate. In addition to the meetings shown below, the contractor shall lead weekly virtual status meetings and provide an agenda and minutes for each.
Month (after Authority To Proceed)
Meeting Name Location
1 Kickoff & Planning Review Contractor
3 (coincide with first Quarterly
PMR)
System Requirements Review Contractor
As Needed Test Readiness Review(s) Contractor
Monthly /
Quarterly Project Management Review
Virtual (monthly) /
Contractor (quarterly)
As Needed Technical Interchange Meetings (TIMs)
(up to 6 as needed) Virtual or in person
As Needed Hardware Demo(s) Contractor
17 Preliminary Design Review NASA GRC
Date: 2026-11-20 Page: 20 of 21
LR-1 Phase 1 Task Order Statement of Work
APPENDIX A - ACRONYMS AND ABBREVIATIONS
TABLE A1-1 ACRONYMS AND ABBREVIATIONS
Acronym Full Term
AIAA American Institute of Aeronautics and Astronautics
ANSI American National Standards Institute
ASTM American Society for Testing and Materials
CDRL Contract Data Requirement List
CFR Code of Federal Regulations
COPV Composite Overwrapped Pressure Vessels
CUI Controlled Unclassified Information
D&C Design and construction
DOE Department of Energy
DRD Data Requirement Deliverable
DSNE Design Specification for Natural Environments
EEE Electrical Electronics Electromechanical
EMC Electromagnetic Compatibility
EO Executive Order
ESD Electrostatic Discharge
ETU Engineering Test Unit
GRC Glenn Research Center
HALEU High-Assay Low-Enriched Uranium
HBM Human Body Model
HDBK Handbook
HDI High Density Interconnect
HRS Heat Rejection System
HSHX Heat Source Heat Exchanger
IEC International Electrotechincal Commission
IPC Institute for Interconnecting and Packaging Electronic Circuits / Association Connecting Electronics Industries
IT Information Technology
JSC Johnson Space Center km kilometer kVRMS kilovolt root mean square kWe kilowatt electrical
LR-1 Lunar Reactor 1
Date: 2026-11-20 Page: 21 of 21
LR-1 Phase 1 Task Order Statement of Work
TABLE A1-1 ACRONYMS AND ABBREVIATIONS
Acronym Full Term
M2M Moon-to-Mars
MIL military
MMOD Micro-Meteoroid Orbital Debris
MSFC Marshall Space Flight Center
NASA National Aeronautics and Space Administration
NIST National Institute of Standards and Technology
No. number
NPR NASA Procedural Requirement
NSPM National Security Presidential Memo
NSTM National Space Technology Memorandum
O order
P1 Phase 1
PCS Power Conversion System
PDR Preliminary Design Review
PLR Parasitic Load Radiator
PMAD Power Management and Distribution
PMP Parts, Materials, and Processes
PMR Project Management Review
PRF Performance Requirement Specification rem Roentgen Equivalent Man
RFP Request for Proposal
SMC Space and Missiles Systems Center
SOW Statement of Work
SPD Space Policy Directive
SPEC Specification
STD Standard
STI Scientific and Technical Information t tonnes (metric tons)
TO Task Order
U.S. United States of America yr year
| 1 INTRODUCTION |
| 1.1 OBJECTIVES |
| 2 SYSTEM DEFINITINON |
| 2.1 KEY SUBSYTEMS |
| 2.2 CONCEPT OF OPERATIONS (Launch Integration through End-of-Life) |
| 3 REQUIREMENTS |
| 4 APPLICABLE DOCUMENTS |
| 5 TECHNICAL AND PROGRAMMATIC TASK DESCRIPTIONS |
| 5.1 SRR Lifecycle Milestone Review |
| 5.2 TRR Lifecycle Milestone Review(s) |
| 5.3 PDR Lifecycle Milestone Review |
| 5.4 Engineering Test Unit & Radiation Test Campaign |
| 5.5 Data Requirement Deliverables (DRDs) |
| 5.6 Hardware and Software Deliverables |
| 5.7 LR-1 Phase 1 Task Order Meetings |
Appendix A - Acronyms and Abbreviations