About this file
This Statement of Work (SOW) details critical repairs and refurbishment of Central Process Systems (CPS) at NASA Glenn Research Center's Lewis Field campus. The project focuses on replacing aging infrastructure to improve safety, reliability, and operational efficiency across multiple aeronautics ground test facilities, including wind tunnels, propulsion laboratories, and the Zero Gravity Facility. Specific scope items include: 1) demolition and replacement of Building 64 Phase 1 Start Breakers in August-September 2025, 2) replacing the Desi Burner System in Building 95 in July-August 2026, 3) procuring and delivering Central Air Dispatch Pressure and Temperature Transmitters in Building 64 by June 2025, and 4) UPS system replacements in Buildings 23 and 64 in August 2025. The equipment being replaced is 50-70 years old, with components that are antiquated, lacking replacement parts, and falling out of calibration, which could potentially create safety risks and impact critical testing for NASA's aeronautics research missions.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SOW - CPS Phase 1.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DESCRIPTION
This Central Process Systems Phase 1 Repairs (CPS Phase 1) provides for critical repairs and refurbishment of Central Process System equipment at Glenn Research Center’s Lewis Field campus.
Age and condition of the existing system dictates that infrastructure be repaired or replaced to promote safety, reliability and efficiency of operations for the Center.
This Synopsis describes the nature and extent of the construction services required to complete the project located at the National Aeronautics and Space Administration, Glenn Research Center, 21000 Brookpark Road, Cleveland, Ohio 44135.
BACKGROUND
The GRC Lewis Field CPS supports multiple aeronautics ground test facilities across the Central Campus including the 10x10 Supersonic Wind Tunnel, the 8x6/9x15 Wind Tunnel Complex, the Icing Research Tunnel (IRT), the Propulsion Systems Laboratory (PSL), the Aero-Acoustic Propulsion Laboratory (AAPL), Advanced Subsonic Combustion Rig (ASCR) and approximately sixty test rigs within the Engine Research Building (ERB) Complex. The CPS also provides services to the Zero Gravity Facility, which provides ground testing in support of International Space Station (ISS) experiments.
Much of the Combustion Air and Altitude Exhaust System equipment and components are 50 to 70 years old. The CAEB Bldg. No. 64 starter breakers and DESI Burner System are antiquated and parts are no longer available. The pressure/temperature transmitters are antiquated and are falling out of calibration.
This could create a safety concern if the transmitters fail to read properly and personnel attempt to work on energized piping. The UPS systems for Buildings 23 and 64, which supports the CPS control systems, are antiquated and failing. The batteries have exceeded their design life.
Failures of these systems impact testing in multiple AETC facilities that support ARMD missions including tests associated with the Advanced Air Transport Technology Project (AAVP) and the Transformational Tools and Technologies Project (TACP).
SCOPE
The scope of this project is as follows:
1. Building 64 Phase 1 Start Breakers demolition and replacement in August and September 2025
2. Replace Desi Burner System in Building 95 demolition and replacement in July and August 2026
3. Procure and deliver Central Air Dispatch Pressure Transmitter in Building 64 by June 2025
4. Procure and deliver Central Air Dispatch Temperature Transmitter in Building 64 by June 2025
5. Building 23 UPS Replacement demolition and replacement in August 2025
6. Building 64 UPS Replacement demolition and replacement in August 2025