This document is a NASA Technical Memorandum (NASA/TM20240009010) detailing the Extravehicular Activity and Human Surface Mobility Program (EHP) Exploration EVA (xEVA) System Compatibility Standards. The comprehensive document establishes design standards for hardware and systems that will interface with xEVA suits during space exploration missions in microgravity and partial gravity environments, specifically targeting lunar surface and cislunar space operations.
The standards cover critical technical specifications including translation paths, worksite design, handling capabilities, connectors, fasteners, safety requirements, and environmental considerations. Key focus areas include ensuring crew safety, defining equipment handling protocols, specifying clearance and accessibility requirements for tools and interfaces, and establishing load-bearing and mechanical interaction guidelines. The document applies to multiple Artemis System components such as Gateway Program modules, Human Landing System, Lunar Terrain Vehicle, Pressurized Rover, and associated payloads, with the ultimate goal of creating consistent and safe hardware interfaces for astronauts performing extravehicular activities during future lunar missions.
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
August 2024
NASA/TM−20240009010
EXTRAVEHICULAR ACTIVITY AND HUMAN SURFACE
MOBILITY PROGRAM (EHP)
EXPLORATION EVA (XEVA) SYSTEM COMPATIBILITY
STANDARDS
Christine N. Kovich
The Aerospace Corporation
Johnson Space Center (JSC) Houston
NASA STI Program Report Series
Since its founding, NASA has been dedicated to the advancement of aeronautics and space science. The
NASA scientific and technical information (STI) program plays a key part in helping NASA maintain this important role.
The NASA STI program operates under the auspices of the Agency Chief Information Officer. It collects, organizes, provides for archiving, and disseminates
NASA’s STI. The NASA STI program provides access to the NTRS Registered and its public interface, the
NASA Technical Reports Server, thus providing one of the largest collections of aeronautical and space science STI in the world. Results are published in both non-NASA channels and by NASA in the NASA STI
Report Series, which includes the following report types:
• TECHNICAL PUBLICATION. Reports of completed research or a major significant phase of research that present the results of NASA
Programs and include extensive data or theoretical analysis. Includes compilations of significant scientific and technical data and information deemed to be of continuing reference value.
NASA counterpart of peer-reviewed formal professional papers but has less stringent limitations on manuscript length and extent of graphic presentations.
• TECHNICAL MEMORANDUM.
Scientific and technical findings that are preliminary or of specialized interest, e.g., quick release reports, working papers, and bibliographies that contain minimal annotation. Does not contain extensive analysis.
• CONTRACTOR REPORT. Scientific and technical findings by NASA-sponsored contractors and grantees.
• CONFERENCE PUBLICATION.
Collected papers from scientific and technical conferences, symposia, seminars, or other meetings sponsored or co-sponsored by NASA.
• SPECIAL PUBLICATION. Scientific, technical, or historical information from NASA programs, projects, and missions, often concerned with subjects having substantial public interest.
• TECHNICAL TRANSLATION.
English-language translations of foreign scientific and technical material pertinent to
NASA’s mission.
Specialized services also include organizing and publishing research results, distributing specialized research announcements and feeds, providing information desk and personal search support, and enabling data exchange services.
For more information about the NASA STI program, see the following:
• Access the NASA STI program home page at http://www.sti.nasa.gov
This document has been reviewed for Proprietary, CUI, and Export Control (ITAR/EAR) and has been determined to be non-sensitive. It has been approved for public release via the NASA Scientific and Technical Information (STI) Process.
DAA #20240009010
EHP-10028
BASELINE
National Aeronautics and Space Administration
EFFECTIVE DATE: MAY 9, 2024
EXTRAVEHICULAR ACTIVITY AND HUMAN
SURFACE MOBILITY PROGRAM (EHP)
EXPLORATION EVA (XEVA) SYSTEM
COMPATIBILITY STANDARDS
VERIFY THAT THIS IS THE CORRECT VERSION BEFORE USE
Verify that this is the correct version before use
Revision: Baseline Document No: EHP-10028
Release Date: 09 MAY 2024 Page: 2 of 280
Title: EHP xEVA System Compatibility Standards
This document has been approved for public release per DAA #20240009010.
REVISION AND HISTORY PAGE
Revision No.
Change No.
Description Release
Date Baseline EHP-C0570 Initial Release- Approval and release authorized by signed Directive EHP-D0570
05/09/24
Admin Chg
EHP-D0758 Straight-to-Directive (S2D) acknowledges publicly available marking DAA #20240009010, and authorizes release of the document.
8/9/24
Release Date: 09 MAY 2024 Page: 3 of 280
TABLE OF CONTENTS
SECTION PAGE
1.0 INTRODUCTION
1.1 Purpose
1.2 Scope
1.3 Applicability/Allocations
1.4 Conventions and Notations
Shall Statements (Standards/Requirements)
Requirement Identification
Rationale
Units
1.5 Change Authority/Responsibility
2.0 DOCUMENTS
2.1 Applicable Documents
2.2 Reference Documents
3.0 REQUIREMENTS
3.1 Clearances
Microgravity Translation Path Hardware Protrusion
Partial Gravity Translation Path Hardware Protrusion
Tool Interface Clearance
Bolt Clearance
Gloved-Hand Clearance
Handrail/Handhold Mounting Clearance
Handrail/Handhold Side Clearance
APFR EVA Installation/Removal Clearance
3.2 Translation
Contiguous EVA Translation Path
Translation Path
Incapacitated Crewmember Interfaces
EVA Contact Hazards Preclusion Beyond Translation Corridor
Partial Gravity EVA Contact Hazards Preclusion
3.3 EVA Handling
Release Date: 09 MAY 2024 Page: 4 of 280
Microgravity EVA Equipment Handling Features
Partial Gravity EVA Handling Capability <TBR-EHP-10028-003>
Partial Gravity Step Design Parameter
Airlock and Hatch Transfer Volumetric Constraints
Pressurized xEVA Suit Transfer through Airlock Hatch
EVA Lunar Hatch Dimensions
Handling Alignment Criteria
Manual Locking Features
Unique Labeling
Hand Tools
EVA Actuated Controls
EVA Handrails/Handholds
3.4 Worksite Outfitting
Worksite Mobility
Worksites
Dedicated EVA Worksite
Robotic Assisted EVA Worksites
Free-Float Worksites
Installation of Passive Worksite Interface (WIF) Sockets
Foot Restraint Ingress/Egress Aids
Visual Contrast at Worksite
3.5 Loads
Equipment Tether Attach Points
Microgravity EVA Crew-Induced Loads
Partial Gravity EVA Crew-Induced Loads
EVA Actuated Loads
EVA Mechanical Feedback
WIF Structural Loading
3.6 Connectors
Release Date: 09 MAY 2024 Page: 5 of 280
One-Handed EVA Operable Connectors
Connector Accessibility
Gloved-Hand Connector Accessibility
Incorrect Connector Mating Prevention
Connector Coding
Connector Protective Caps
Connector Rotational Travel
Connector Locking Feature
Visible Connector Alignment Markings
Connector Locking Ring
Connector Mating Status
Electrical Connectors
Fluid Connectors
3.7 EVA Operable Fasteners
Captive Fastener Design
Locking Features
EVA Hand-Actuated Fasteners Operation
EVA Push-in-Pull (PIP) Pins
Tool-Actuated Fasteners
3.8 Hardware Design
Battery Powered Devices
EVA Tools
Cable Routing/Restraint
Cable Routing Spacing
Paint
3.9 Safety
Release Date: 09 MAY 2024 Page: 6 of 280
Hazardous Material Control
Venting of Hazardous Materials
Electrical and Safety Design
Shock Protection
Operation During Pressure Change
Component Hazardous Energy Provision
Detachable Parts
Touch Temperatures xEVA Suit Glove Palm External Touch-Temperature Compliance for Small, Handheld Hardware
Incidental and Unlimited Contact Heat Transfer Rates
Sharp Edge and Protrusions Protection
Levers, Cranks, Hooks, and Controls
Exposed Holes or Slots
Pinch Hazard Protection
Equipment Clearance for Entrapment Hazard
Protection from Moving or Rotating Equipment
Emergency Ingress of Pressurized Habitable Environment
Emergency Ingress/Egress of Unpressurized Mobile Asset
External Surface Cleanliness Level
Tethering / Restraint
Crew Safety Tether Attachment
Crew Safety Restraint
Color for Crew Load-Rated Handhold/Handrails, Crew Safety Tethers and Safety Restraint Attachment Points
Manual Overrides
Entanglement, Cable Clamps, Ducts, or Retractors
3.10 Environments
Magnetic Field Limit
Voltage Potential Discharge
Lunar Surface Dust Tolerance
Lunar Surface Dust Mitigation
4.0 VERIFICATION
4.1 Responsibilities
4.2 Verification approach
4.3 Verification methods
Release Date: 09 MAY 2024 Page: 7 of 280
4.4 Verification Matrix
4.5 Artemis System Verifications
4.6 EHP Verifications
APPENDIX A ACRONYMS AND ABBREVIATIONS AND GLOSSARY OF TERMS .
Appendix A-1 Acronyms and Abbreviations
Appendix A-2 Glossary of Terms
APPENDIX B EVA BEST PRACTICES (BP)
APPENDIX C NON-EVA BPS FOR CONSIDERATIONS
APPENDIX D OPEN WORK
Appendix D-1 To Be Determined
Appendix D-2 To Be Resolved
Appendix D-3 Forward Work
APPENDIX E ARTEMIS SYSTEM ALLOCATIONS
TABLES
Table 1.3.1-1 Convention and Notations Descriptions
Table 2.1-1 Applicable Documents List
Table 2.2-1 Reference Documents List
Table 3.3.1-1 Constraints for EVA Transport of Objects
Table 3.3.2 -1 Constraint for Partial Gravity Large Mass Items – Lifting
Table 3.3.2-2 Constraint for Partial Gravity Large Mass Items – Carrying
Table 3.3.2 -3 Partial Gravity Volume Limit Surface Carry
Table 3.3.3-1 Partial Gravity Step Design Parameter
Table 3.3.8.5-1 Soft Dock Force
Table 3.3.12.6.1-1 Partial Gravity Work Envelope
Table 3.4.3-1 Worksite Forces
Table 3.5.1.1-1 EVA Handling and EVA Equipment Tether Point Colors <TBR-EHP- 10028-012>
Table 3.5.2-1 Microgravity EVA Crew-Induced Loads
Table 3.5.3-1 Partial Gravity EVA Crew-Induced Loads <TBR-EHP-10028-002>
Table 3.5.4-1 Miscellaneous Crew Induced Limit Loads
Table 3.7.3.4-1 EVA External Hexagonal Drive Interface
Table 3.7.5.4-1 Fastener Torque Data
Table 3.9.5-1 Depress and Repress Rates
Table 3.9.8-1 Touch Temperatures <TBR-EHP-10028-011>
Release Date: 09 MAY 2024 Page: 8 of 280
Table 3.9.9-1 30-Minute Touch Temperature Compliance for Small, Handheld Hardware
<TBR-EHP-10028-011>
Table 3.9.9-2 30-Minute Touch Temperature Heat Rate Compliance <TBR-EHP-10028- 011>
Table 3.9.10-1 Heat Transfer Rates <TBR-EHP-10028-011>
Table 3.9.11-1 Edge, Corner, and Protrusion Criteria – Edge and In-Plane Corner Radii
Table 3.9.11-2 Edge, Corner, and Protrusions Criteria – Protrusions and Outside Corners
Table 3.9.17-1 Emergency Ingress Capability
Table 3.9.19-1 External Surface Cleanliness Level
Table 3.9.23-1 Crew Load-Rated Colors <TBR-EHP-10028-012>
Table 3.10.1-1 Magnetic Field Limit
Table 4.4-1 Artemis Systems Verification Matrix
Table 4.5-1 Artemis System Verifications
Table 4.6-1 EHP Verifications
Table B-1 PIP Pin Acceptance Vibration Test (AVT) Levels
Table C-1 Standard Interface Temperature Differential
Table D1-1 To Be Determined
Table D2-1 To Be Resolved
Table D3-1 Forward Work
Table E-1: Artemis System Allocation Matrix
FIGURES
Figure 3.1.1-1 Translation Path Hardware Protrusion Envelope
Figure 3.1.1-2 Translation Path Minimum Diameter
Figure 3.1.2-1 Top View Partial Gravity Crew Envelope Diameter
Figure 3.1.2-2 Side View Partial Gravity Crew Envelope Height
Figure 3.1.3-1 Tool Interface Clearance
Figure 3.1.5-1 Gloved-Hand Clearance
Figure 3.1.6-1 EVA Handrail/Handhold Mounting Clearance Envelope
Figure 3.1.7-1 Handrail/Handhold Side Clearance
Figure 3.1.8-1 APFR Installation/Removal EVA Clearance Envelope – Top Mounted WIF
Figure 3.2.4-1 EVA Contact Hazard Preclusions Envelope
Figure 3.2.5-1 Side View Partial Gravity EVA Contact Hazards Height
Figure 3.3.12.1-1 Handrail/Handhold Profile Dimensions
Release Date: 09 MAY 2024 Page: 9 of 280
Figure 3.3.12.1-2 Partial Gravity Handrail/Handhold Profile Dimensions
Figure 3.3.12.4-1 Handrail/Handhold Gaps
Figure 3.3.12.6.1-1 Work Envelope – Microgravity
Figure 3.3.12.6.1-2 Partial Gravity Work Envelope
Figure 3.3.12.6.1-3 Partial Gravity Work Envelope – Reach Envelope
Figure 3.3.12.6.1-4 Two-Handed Reach Envelope Width
Figure 3.3.12.6.4-1 Crew Aids for Stability
Figure 3.4.2.2-1 Microgravity Working Volume for Manipulative EVA Tasks
Figure 3.4.2.2-2 Partial Gravity Working Volume
Figure 3.4.7-1 Ingress and Egress Aids for Foot Restraint
Figure 3.5.1.2-1 EVA Equipment Tether Point Dimensions
Figure 3.5.2-1 Opposing Forces on Handrail/Handhold
Figure 3.5.6-1 Top Mounted WIF Worksite Half Loading Criteria
Figure 3.7.3.3-1 Flight Knob Examples
Figure 3.7.5.2-1 11 mm Hexagonal EVA and Robotic Compatible Bolt
Figure 3.7.5.2-2 7/16-Inch Hexagonal Eva and Robotic Compatible Bolt
Figure 3.9.11-1 Exposed Corner and Edges
Figure B-1 EVABP-27 Connector Spacing
Figure B-2 EVABP-30 Minimum Don/Doff Volume Dimensions for a Single xEVA Suit
Release Date: 09 MAY 2024 Page: 10 of 280
Preface
Over the life of the Extravehicular Mobility Unit (EMU), series of products detailing “how to build Extravehicular Activity (EVA) System hardware”, “how to interface with EVA System hardware” and “how to design hardware EVA will access and utilize” were created to provide consolidated locations of the best practices and lessons learned of the EVA Community to projects unfamiliar with EVA. There were multiple documents describing these “how to” about EVA, from three different eras of human spaceflight. While these documents may be associated with specific programs or address specific needs such as payload requirements, there is an overlap of the type of information contained in each of them. For instance, three documents refer to the needs for “handling features to interface with other mass handling systems” such as the Body Restraint Tether (BRT), with some providing outdated values, no values at all or the correct values. Since the inception of each of these documents, some have continued to receive updates due to the necessity of an on-going program while others have remained unchanged for 20+ years and have led to discrepancies between the current accepted values and these outdated documents.
To prevent conflicts between multiple sources of information and to assess what is truly applicable to Exploration EVA System (xEVA) activities at Exploration Destinations (e.g., cislunar space and lunar surface), EVA-EXP-0035, Exploration EVA System Compatibility document was generated to produce a set of EVA design standards that apply to all hardware and systems that interface with the xEVA Suit and EVA activities at Exploration Destinations. While prior Space Shuttle Program, International Space Station (ISS) and Constellation Program (CxP) documents were reviewed and in part incorporated into this document, no document from those specific programs will be directly levied on any future Exploration Mission. This does not supersede documents for current and inactive programs, as documentation applicable to any on-going program will continue until the conclusion of that program.
Efforts in the past, such as the creation of JSC 28918, EVA Design Requirements and Considerations were attempted to provide a common source, that included ISS lessons learned, for all EVA requirements for future programs, but due to the on-going churn of ISS-EVA documentation and a lack of new programs going into development, resources were spent on maintaining and updating only the active program documentation. JSC 28918 was never officially levied as an ISS program document. Thus, JSC 28918 has not been updated. Instead, the focus has continued to keep ISS Program-levied EVA requirements documents up to date.
After generation of tailored versions for Artemis Systems such as Gateway and Human Landing System (HLS) Programs, and the existing EVA-EXP-0035 document, the newly formed Extravehicular Activity and Human Surface Mobility Program (EHP) determined that there was a need to consolidate into one document that would apply to all Artemis Systems. This led to the creation of this document EHP-10028, EHP Exploration EVA (xEVA) System Compatibility Standards.
Release Date: 09 MAY 2024 Page: 11 of 280
This document establishes design standards that minimize the performance risks to EVA flight crewmembers in human space flight programs and applies to future space vehicles, habitats, facilities, or any other hardware that will interface with the suited crewmember during space flight in various missions (e.g., cislunar space and lunar surface). As Design Reference Missions (DRM) evolve, this document will be updated to reflect utilizing the xEVA System at that destination.
Release Date: 09 MAY 2024 Page: 12 of 280
1.0 INTRODUCTION
Extravehicular Activity (EVA) is a significant capability for Artemis Systems which includes Gateway Program (modules), Human Landing System (HLS) Program (Integrated Lander and Human Class Delivery Lander), Lunar Terrain Vehicle (LTV), Pressurized Rover (PR), Payloads, and any other future lunar surface assets that will be utilized for exploration or science. The EVA and Human Surface Mobility Program (EHP) will provide the following: Exploration EVA (xEVA) suits, xEVA tools and crew aids along with vehicle integration/support hardware, LTV, and PR. Being a distributed and dynamic capability (moving components), xEVA System hardware will interface with almost all elements of the Artemis architecture. As such, it is important to document a singular set of EVA compatibility standards at the programmatic level to articulate “how to interface with xEVA suit hardware” and “how to design hardware that EVA crewmembers will access and manipulate.”
1.1 PURPOSE
The EHP xEVA Compatibility Standards document establishes a set of EVA compatibility design standards for hardware and systems that have an interface with the xEVA suit and/or must facilitate EVA activities. This document will be used by all Artemis Systems and contains the fundamental necessary information required for building and verifying that Artemis Systems hardware are compatible with suited EVA flight crewmembers to perform successful EVAs in microgravity/lunar orbit and on the lunar surface. It is to be used for the development of lower-level program/project-specific requirements.
Compatibility standards are in section 3.0 with gravity field (microgravity and partial gravity) associated with each requirement.
As an interface standard, EHP-10028 levies requirements on the xEVA System (managed by EVA Development Project), interfacing EHP Projects (LTV and PR) and cross-program partners (Human Landing System, Gateway, and Payloads). It contains verification guidance for Hardware Providers as well as EHP.
The Gateway Program is maintained and inspected both by the Gateway External Robotics Systems (GERS) capability (reference GP 10027, Gateway Concept of Operations) and by EVA capability. GERS is the Extravehicular Robotics (EVR) capability on Gateway. EVA capability is used for certain pre-defined maintenance tasks as well as for contingencies such as failure of the GERS, inability of the GERS to complete a task that was intended for GERS compatibility, or unforeseen tasks. When both accommodations of EVA and GERS operations are required, which are not explicitly defined in this document, an integrated strategy which will be certified or evaluated on a mission-specific basis to determine how best to account for both GERS and EVA design constraints and requirements necessary to support mission objectives.
1.2 SCOPE
This document defines standards controlled by the EHP ensuring that all hardware and Artemis System’s design are compatible with the xEVA suits and EVA activities in any
Release Date: 09 MAY 2024 Page: 13 of 280 given mission destination (e.g., cislunar space, and lunar surface). The standards herein are applicable to any hardware internally or externally that will be near, come in contact with or has features that can present hazards in any way to the xEVA crewmember.
Projects developed for the International Space Station (ISS) will continue to reference SSP 30256 EVA Interface Control Document (ICD), other applicable Interface Requirements Documents (IRDs), and JSC 26626 EVA Hardware Generic design Requirements Document as appropriate.
This document does not include information on the interfaces for space suit servicing, performance, and checkout equipment (e.g., items that directly interface with the space suit, such as fluid and electrical connectors), or non-mechanical interfaces (such as wireless communication, data, video, and audio). All these items will be defined in EHP- 10029, xEVA System to Artemis Systems Interface Requirements Document (IRD)
<TBR-EHP-10028-016>.
As part of the construction of this document, active EVA documents from the Shuttle Program, ISS Program and Constellation Program (CxP) eras were assessed for requirements pertaining to hardware compatibility with the EVA System and operations.
These documents were cross compared, and the relevant information was used to form the basis of the standards included in EHP-10028 and updates were made to correspond with the latest mission destinations. The initial documents reviewed with the specified revisions included the following:
• JSC 26626 Revision A, Extravehicular Activity (EVA) Hardware Generic Design Requirements Document (GDRD)
• JSC 26626 Draft Revision B, GDRD (unreleased)
• JSC 28918 Baseline, EVA Design Requirements and Considerations
• SSP 30256 Revision J, Extravehicular Activity (EVA) Standard ICD
• SSP 57003 Revision L, ISS External Payload IRD
• SSP 50005 Revision F, International Space Station (ISS) Flight Crew Integration Standard (NASA-STD-3001/T) – intent of this document for ISS is satisfied by
NASA-STD-3001
• SSP 50021 Baseline Document Change Notice (DCN) 005, Safety Requirements Document (Note – this document was superseded by Baseline of SSP 51721, Safety Requirements Document)
• CxP 70130 Revision A, CxP EVA Design and Construction Specification (document no longer active)
• NASA–STD-3001 V2 Revision A, Human Factors, Habitability, and Environmental Health.
**Evaluation of revisions to the still active documents are assessed for impacts to standards contained in this document.
In many cases the values used for defining microgravity compatibility with a space suit are based on heritage United States (US) EVA capabilities as carried over from the Space
Release Date: 09 MAY 2024 Page: 14 of 280
Shuttle Program and modified for the International Space Station (ISS) Program. It is expected that the xEVA Suit will either meet or exceed the capabilities of the original EVA suit capabilities. The xEVA System is provided to National Aeronautics and Space Administration (NASA) on a competitive service contract in which vendors are awarded Task Orders for future missions, tasks, and activities in an ongoing basis. Due to the uncertainty of the specific suit design that will be used for each individual mission/task/activity as a result of the ongoing Task Order award schedule, the terminology and noted dimensions/values in this document will be based on the government reference next generation EVA Suit design, also known as the Exploration Extravehicular Mobility Unit (xEMU). In general, an xEVA System consists of the EVA Suit (interchangeable with “xEVA Suit” or “xEMU” for the purposes of this document), EVA tools, and ancillary hardware that support EVA functions.
Each standard was assessed for application in a partial gravity environment and captures partial gravity considerations in the standard. As the xEVA suit design matures and/or as other suppliers of EVA hardware are identified, updates to the standards will be proposed to the appropriate change authority to reflect the improvement/changes in EVA capabilities. This document covers both microgravity and partial gravity EVA requirements. Partial gravity references in this document are specific to the lunar gravity field (1/6 gravity). As missions beyond lunar surface are developed, consideration of additional gravity fields (e.g., Martian gravity) will be addressed. References to weight in this document take into account the applicable gravity field (e.g., approximately 1/6th of Earth gravity for Lunar conditions).
For the purposes of this document, the term payload applies to any utilization science/research specific hardware that will interact with EVA equipment or tools.
Appendix A-2 provides glossary terms associated with payloads. There are external payloads on Gateway, which are not expected to be EVA serviceable but will be designed to protect EVA crewmembers. Gateway Payloads, Maintenance Items (MI), etc. designed for EVA cannot preclude GERS operations.
GP 10031, Gateway Visiting Vehicle Interface Requirements Document (IRD) defines the subset of EVA compatibility requirements for those Visiting Vehicles that may protrude into Gateway EVA translation paths. Any hardware that protrudes into the EVA contact hazard preclusion envelope must meet EVA kickloads, touch temperatures, and EVA safety requirements to protect the crewmember while performing an EVA on Gateway as well as protect the docked Visiting Vehicle hardware, even though the Visiting Vehicle may not have EVA requirements imposed on it. GP 10031, Gateway Visiting Vehicle IRD Annex 1: HLS Requirements requirement INFO-VV-HLS-0112 specifies that when HLS is docked to Gateway that both vehicles will meet EVA compatibility requirements.
Crew health and safety standards that describe the human-to-suit interfaces (like anthropometric requirements), or Intravehicular Activity (IVA) suit-to-vehicle interfaces are not included in this document. Those standards and their requirement guidance are
Release Date: 09 MAY 2024 Page: 15 of 280 included in NASA-STD-3001, Volume 1: Crew Health and Volume 2: Human Factors, Habitability, and Environmental Health, or tailored through respective Program/Project System Requirements Documents (SRDs). Specific crew health and safety related standards are found in NASA-STD-3001 V2. A supplementary NASA document, NASA/SP-2010-3407, Human Integration Design Handbook (HIDH) is a compilation of human space flight history and provides a resource for deriving program-specific requirements in accordance with NASA-STD-3001, Volume 2. EHP Projects, Gateway and HLS tailor NASA-STD-3001 through respective Project/Program documents.
1.3 APPLICABILITY/ALLOCATIONS
All requirements in this standard are applicable to the development of all Artemis program/projects that perform EVA operations or interact with the xEVA System. Each requirement contains the Gravity Field Applicability along with Allocation to the Artemis Systems. For the purposes of this document, “Artemis System” is considered to include the following:
1. External Program Spacecraft with EVA Capabilities – This document is applicable to vehicles that require EVA operations performing nominal and contingency:
maintenance, repair, and replacement, payload, and science utilization. Currently two external Programs (Gateway and HLS) have been identified, but any future EHP external Exploration Programs will utilize this document for EVA compatibility standards. HLS Assumptions for microgravity application: Microgravity requirements would only apply in cases where translation paths are required from HLS airlock to HLS EVA worksites (if vehicle had any), and that being docked to the staging vehicle cannot impede the HLS translation paths with no identified hazards. If no microgravity worksites required, then N/A, but requirement is applicable to drive review of scenarios and vehicle design.
2. Internal EHP Project Spacecrafts (e.g., LTV and PR) with EVA Capabilities – This document is applicable to vehicles that require EVA operations performing nominal and contingency: maintenance, repair and replacement, and payload operations.
3. EVA System (managed by EVA Development Project – This document is applicable to the xEVA System and decomposition of allocated requirements will be performed by EVA Development Project. This document applies to the xEVA System, and specifically to portions of the xEVA System that will be operated by the suited crewmember.
4. Payloads – This document is applicable to science and research instrument hardware that will be near to, come in contact with, or present hazards in any way to xEVA suits or suited EVA flight crewmembers.
All hardware providers need to make provisions for protecting the EVA crewmember from anything that presents a danger or safety hazard. EVA hazards that are not controlled on hardware that are outside the translation paths or associated zones will be declared a keep out zone or no touch area and this information provided to the Flight Operations Directorate (FOD) as operational controls.
Release Date: 09 MAY 2024 Page: 16 of 280
1.4 CONVENTIONS AND NOTATIONS
Shall Statements (Standards/Requirements)
The convention used in this document which indicates requirements, standards, goals, and statements of facts is as follows:
TABLE 1.3.1-1 CONVENTION AND NOTATIONS DESCRIPTIONS
Designation Description
“Shall” used to indicate a requirement that is binding, which must be implemented, and its implementation verified in the design.
“Should” used to indicate good practice or a goal which is desirable, but not mandatory and does not require a formal verification.
“Will” used to indicate a statement of fact or declaration of purpose on the part of the government that is reflective of decisions or realities that exist and are to be taken as a given and not open to debate or discussion.
Those statements that fall more into a design consideration/best practice are in APPENDIX B and APPENDIX C. While not considered requirements, these best practices are highly desirable for the design of hardware compatibility with EVA operations.
Requirement Identification
As documents are revised, there are cases where sections will move; therefore, each requirement in this document is uniquely numbered, and identified by the presence of a tag. The requirements tag “[EVASC.XXXX]” provides a trace to historical information across multiple Programs and Projects.
Rationale
A rationale statement is included for each requirement only when necessary. The purpose of the rationale statement is to indicate why the requirement is needed, the basis for its inclusion in a requirements document, and to provide context and examples to stakeholders. It is important to note that a rationale is not binding, and it only provides supporting information. In the event there is an inconsistency between the requirement and the rationale, the requirement is binding and takes precedence.
Units
Artemis Systems utilize NIST SP 811, Guide for the Use of International System of Units (SI), for standardization and conversions of the units of measure. For the purposes of this document, the unit of measure should be considered as metric as primary with English units in parenthesis unless otherwise noted. Microgravity requirements with associated figures and tables were derived from heritage ISS EVA requirements documents that contained English units. SI units in this document for those microgravity
Release Date: 09 MAY 2024 Page: 17 of 280 applications were converted from the heritage ISS English values. Therefore, the English units are considered to be the driver for metric conversion.
NOTE: Some referenced drawings and documents may use English units as primary and may or may not have metric units as secondary.
1.5 CHANGE AUTHORITY/RESPONSIBILITY
The Extravehicular Activity and Human Surface Mobility Program (EHP) Board Authority for Approval of this product is the EHP Control Board (EHPCB). Board Authority for future revisions of this product is not delegated. Board Authority for changes is the
EHPCB.
The administration of future revisions will be managed by the Office of Primary Responsibility (OPR). Proposed changes to this product shall be submitted via Change Management Workflow (CMW). All such requests will adhere to the EHP-20000, Extravehicular Activity and Human Surface Mobility Program (EHP) Configuration and Data Management Plan.
The appropriate NASA Office of Primary Responsibility (OPR) identified for this product is the EHP Systems Engineering and Integration (SE&I) Office (DI). The EHP Requirements, Interfaces, Verification, and Analysis (RIVA) Panel will be used to bring updates for community and stakeholder review prior to CR release. Approval of the technical accuracy of this document resides within the EHP SE&I Control Board (CB), with Programs/Projects providing agreement/concurrence at the EHPCB.
Release Date: 09 MAY 2024 Page: 18 of 280
2.0 DOCUMENTS
2.1 APPLICABLE DOCUMENTS
The following documents include specifications, models, standards, guidelines, handbooks, and other special publications. The documents listed in Table 2.1-1 are applicable to the extent specified herein. The EHP specific applicable documents and standards revisions listed are in accordance with EHP-10012, Extravehicular Activity and Human Surface Mobility Program (EHP) Systems Requirement Document, section
2.2.1. Any notation of NASA approved alternate standard needs to have Cross-Program Chief Engineer approval. Gateway Program applicable document revisions listed in Table 2.1-1 are in accordance with GP 10000, Gateway Program System Requirements section
2.2.1. HLS Program applicable document revisions listed in Table 2.1-1 are in accordance with the respective HLS SRD (reference Table 2.2-1).
TABLE 2.1-1 APPLICABLE DOCUMENTS LIST
Document Number Document Title EHP-10012 Extravehicular Activity and Human Surface Mobility Program
(EHP) Systems Requirements Document
EHP-10013 Extravehicular Activity and Human Surface Mobility Program (EHP) Verification and Validation Plan
EHP-10029
<TBR-EHP-10028-016>
Exploration Extravehicular Activity (xEVA) System to Artemis System Interface Requirements Document (IRD)
EHP-10074
<TBR-EHP-10028-008>
EHP EVA Tool List and Process for EVA Operations
EHP-20000 Extravehicular Activity and Human Surface Mobility Program (EHP) Configuration and Data Management Plan
EVA-EXP-0049 Extravehicular Activity (EVA) Office Exploration EVA (xEVA) System Labeling Guidelines
GP 10000 Gateway Program System Requirements
GP 11461 Gateway Requirements for the Control of Electromagnetic Interference (EMI) Characteristics of Subsystems and Equipment
GSDO-RQMT-1080 Cross-Program Contamination Control Requirements
HLS-STD-007 Human Landing System (HLS) Requirements for the Control of Electromagnetic Interference (EMI) Characteristics of Subsystems and Equipment
JPR 5322.1 Contamination Control Requirements Manual
NASA-STD-4003 Electrical Bonding for NASA Launch Vehicles, Spacecraft, Payloads, and Flight Equipment
SDG33107728 Tube – Handrail and Handgrip (via SEG33106347, Top Mounted Handrail Assy)
2.2 REFERENCE DOCUMENTS
The following documents contain supplemental information to guide the user in the application of this document and can include Type 3 Technical Authority (TA) Standards.
Reference Documents may be called out in any section or as a part of a requirement
Release Date: 09 MAY 2024 Page: 19 of 280 rationale and are not binding. Table 2-2.1 only lists the reference documents and revisions for this product.
TABLE 2.2-1 REFERENCE DOCUMENTS LIST
Document Number Document Revision
Document Title
2024-ABF-001 January 2024 Suited Capability Requirements for Partial Gravity – Anthropometry and Biomechanical Perspective
ACD-50012 Current Artemis Campaign Development (ACD) Enterprise Verification and Validation Plan
AML-01-02-R1 March 22, 2001 Advanced Materials Laboratory Test Report: Hot D-Ring / Space Suit Assembly (SSA) Lay-up Incidental Contact Test
EHP-10004 Current Extravehicular Activity and Human Surface Mobility Program (EHP) Systems Engineering Management Plan
(SEMP)
ES6-23-044 September 18, Lunar EVA Crew Induced Loads on Restraint Attachment Points from Crew Fall
ES6-24-001 February 22, 2024 Lunar EVA Crew Induced Loads
EX-24-008 April 23, 2024 EX-24-005, Artemis System Lunar Dust Tolerance – Amount of Dust Justification and Calculation
EVA-EXP-0031 Baseline EVA Office Extravehicular Activity (EVA) Airlocks and Alternative Ingress/Egress Methods Document
EVA-EXP-0032 Baseline EVA Office EVA-ISS Interface Definition Document
EVA-EXP-0034 Revision C Extravehicular Activity (EVA) Office Exploration EVA (xEVA) System Technical Standards
EVA-EXP-0035 Baseline w/Admin Change 1
EVA Office xEVA System Compatibility
EVA-EXP-0067 Revision C Human Landing System (HLS) Program Extravehicular Activity (EVA) Interface Requirements Control Document
(IRCD)
EVA-EXP-0070 Revision D with Change 2
HLS Program Extravehicular Activity (EVA) Compatibility Interface Requirements Document (IRD)
GP 10027 Current Gateway Concept of Operations
GP 10031 Current Gateway Visiting Vehicle IRD
GP 10031-01 Current Gateway Visiting Vehicle IRD Annex 1: HLS Requirements
HLS-RQMT-002 Current HLS Partner System Requirements Document (PaSRD) HLS-RQMT-006 Current HLS Integrated Lander Requirements Document –
Sustained Phase
HLS-RQMT-007 Current HLS Human-Class Delivery Lander (HDL) Requirements Document – Sustained Phase
HLS-RQMT-009 Current HLS Provider Integrated Lander Systems Requirements Document -Sustained - SpaceX
HLS-RQMT-109 Current HLS Provider Integrated Lander Systems Requirements Document -Sustained – Blue Origin
JSC 28528 A Preparation and Revision of Cx Mockup Development Requirements Document (MDRD) javascript:void(0)
Release Date: 09 MAY 2024 Page: 20 of 280
TABLE 2.2-1 REFERENCE DOCUMENTS LIST
Document Number Document Revision
Document Title
JSC 39117 C Extravehicular Mobility Unit (EMU) International Space Station (ISS) Extravehicular Activity (EVA) Thermal Environment Requirements for Certification
JSC 39198 3/14/2018 Incidental Contact Temperature Test on Extravehicular Mobility Unit (EMU) Softgoods Materials Lay-Up
JSC 65828 B w/ Change 1 Structural Design Requirements and Factors of Safety for Spaceflight Hardware
MIL-PRF-19500 R Semiconductor Devices, General Specification
MIL-DTL-81381 C
Amendment 1
Wire, Electric, Polyimide-Insulated, Copper, or Copper Alloy, Detail Specification
NASA/SP-2010-
Rev 1 Human Integration Design Handbook (HIDH)
NASA-STD-3001
Volume 2
D NASA Spaceflight Human-System Standard Volume 2:
Human Factors, Habitability, and Environmental Health
NASA-STD-5020 B Requirements for Threaded Fastening Systems in Spaceflight Hardware
NASA-STD-6016 C Standard Materials and Processes Requirements for Spacecraft
NIST SP 811 3/2008 Guide for the Use of the International System of Units (SI)
NPR 8705.4 A Risk Classification for NASA Payloads
SDG33107506 Latest Knob, Push, Pitch Joint Assembly Articulating Portable Foot Restraint (APFR), ISS
SED33107181 Latest EVA Knob Assembly, Bridge Clamp
SEG33114987 Latest 1.0 Inch Quick Disconnect (QD) Button Depress Tool Assy
SLS-SPEC-159 I Cross-Program Design Specification for Natural Environments (DSNE)
SSP 30256 Revision K Extravehicular Activity (EVA) Standard Interface Control Document (ICD)
SSP 30423 L Space Station Approved Electrical, Electronic and Electromechanical (EEE) Part List
SSP 57003 M ISS Payloads Interface Requirements Document (IRD)
Release Date: 09 MAY 2024 Page: 21 of 280
3.0 REQUIREMENTS
This section defines the minimum requirements and constraints that apply to performance, design, interoperability, maintainability, and safety of hardware that may come in contact or be operated by crew in pressurized EVA suits. The gravity field applicability (microgravity and partial gravity) is included after each requirement along with allocation to Artemis Systems. Variances to these requirements may be proposed to EHP, considered by the EHP RIVA Panel in accordance with EHP-10004, Extravehicular Activity and Human Surface Mobility Program (EHP) Systems Engineering Management Plan (SEMP), and approved via the EHP Variance CR process described in EHP-20000, Extravehicular Activity and Human Surface Mobility Program (EHP) Configuration and Data Management Plan.
3.1 CLEARANCES
Microgravity Translation Path Hardware Protrusion
[EVASC.0001] The Artemis System shall design or configure equipment to not protrude into the minimum 1.1 m (43 in) diameter translation path envelope, excluding translation aids (handrails/handholds) in microgravity as outlined in Figure 3.1.1-1 Translation Path Hardware Protrusion Envelope and Figure 3.1.1-2 Translation Path Minimum Diameter.
Rationale: In microgravity, the minimum diameter of the translation corridor of
1.1 m (43 in) is to accommodate hand-over-hand EVA crewmember translation.
Interference in translation paths may pose hazards to EVA crewmembers or impact the success of EVA activities by precluding translation to worksites. This includes any obstructions or intrusions in the envelope. This microgravity minimum diameter is based on the heritage ISS EMU suit and is associated with microgravity application.
Gravity Field Applicability: Microgravity
Allocation: EVA Dev, Gateway, HLS
Release Date: 09 MAY 2024 Page: 22 of 280
FIGURE 3.1.1-1 TRANSLATION PATH HARDWARE PROTRUSION ENVELOPE
FIGURE 3.1.1-2 TRANSLATION PATH MINIMUM DIAMETER
Partial Gravity Translation Path Hardware Protrusion
[EVASC.0171] The Artemis System shall design or configure equipment to not protrude into the minimum 1.1 m (43 in) diameter translation path envelope, excluding translation aids (handrails/handholds) and provide a translation path free of equipment and protrusions that accommodates the volume of the suited crewmember in partial gravity as outlined in Figure 3.1.2-1 Top View Partial Gravity Crew Envelope Diameter and Figure 3.1.2-2 Side View Partial Gravity Crew Envelope Height.
1.1 m (43 in)
1.1 m (43 in)
0.61 m
(24 in)
Release Date: 09 MAY 2024 Page: 23 of 280
Rationale: In partial gravity, the breadth and height of the translation path must accommodate the volume of the suited crewmember in any direction which the crew is expected to move. Interference in translation paths may pose hazards to EVA crewmembers or impact the success of EVA activities by precluding translation to worksites. This includes any obstructions or intrusions in the envelope. Partial gravity application ensures crewmembers can traverse around, to and from vehicle worksite areas (e.g., catwalk around a cargo lander, walking under the lander, ingress/egress of vehicle to the surface, areas around unpressurized and PRs).
Gravity Field Applicability: Partial Gravity
Allocation: EVA Dev, LTV, PR, HLS
FIGURE 3.1.2-1 TOP VIEW PARTIAL GRAVITY CREW ENVELOPE DIAMETER
EVA Translation Crew Envelope Diameter:
1.1 m (43 in)
[99th percentile shown]
Release Date: 09 MAY 2024 Page: 24 of 280
FIGURE 3.1.2-2 SIDE VIEW PARTIAL GRAVITY CREW ENVELOPE HEIGHT
Tool Interface Clearance
[EVASC.0002] The Artemis System shall maintain 7.6 cm (3.0 in) of clearance between the gripping portions of a tool interface and any surrounding hardware or obstructions with a tool handle offset maximum of 35.6 cm (14.0 in) as defined in Figure 3.1.3-1 Tool Interface Clearance.
Rationale: Tools to be used during EVAs are to be identified by the Artemis System, and clearances for efficient application are to be accommodated to ensure that the EVA task can be accomplished. The intent is that this requirement applies to EVA crew operated manual tools interfacing with EVA fasteners. To ensure the task can be accomplished, the clearance between the work surface and the tool design needs to include operation by a pressurized gloved hand. This includes
Release Date: 09 MAY 2024 Page: 25 of 280 protecting for the 7.6 cm (3.0 in) clearance to the nearest obstruction(s) in addition to the grasp length of the tool handle. Reference [EVASC.0004] which defines the handrail mounting clearance distance that accommodates grasp of the pressurized gloved hand. The bolt head tool clearance is defined in requirement [EVASC.0007]. Minimum grip length is assumed to be length of handrail/handhold/handle requirement [EVASC.0030].
Gravity Field Applicability: Microgravity, Partial Gravity
Allocation: EVA Dev, LTV, PR, Gateway, HLS, Payloads
FIGURE 3.1.3-1 TOOL INTERFACE CLEARANCE
Bolt Clearance
[EVASC.0007] The Artemis System shall maintain a 2.5 cm (1.0 in) clearance around the bolt head outer edge with a minimum tool head engagement height of 0.8 cm (0.3 in) to
7.6 cm (3 in) clearance radially around handle grasp surface, and from end of tool to nearest adjacent obstructions/structure
Release Date: 09 MAY 2024 Page: 26 of 280 ensure access as defined in requirement [EVASC.0002] Figure 3.1.3-1 Tool Interface Clearance.
Rationale: The intent of this requirement is to ensure tool access with the fastener head.
Gravity Field Applicability: Microgravity, Partial Gravity
Allocation: EVA Dev, LTV, PR, Gateway, HLS, Payloads
Gloved-Hand Clearance
[EVASC.0003] The Artemis System shall maintain minimum clearance envelope for a gloved hand access as specified in Figure 3.1.5-1 Gloved-Hand Clearance.
Rationale: Pressurized EVA gloves have their own thickness in addition to the human hands they protect. Interfaces to be operated by the EVA crewmember must accommodate the dimensions of the hand/glove combination.
FIGURE 3.1.5-1 GLOVED-HAND CLEARANCE
Handrail/Handhold Mounting Clearance
[EVASC.0004] The Artemis System shall maintain a minimum clearance distance between the lower surface of the handrail/handhold and the mounting surface of 5.72 cm
20 cm (8 in)
46 cm (18 in)
36 cm (14 in)
Release Date: 09 MAY 2024 Page: 27 of 280
(2.25 in) as shown in Figure 3.1.6-1 EVA Handrail/Handhold Mounting Clearance Envelope.
Rationale: EVA handrail cross sections themselves have been designed to facilitate grasping by the gloved EVA crewmember’s hand. However, it is theoretically possible to mount a handrail in such a way (such as immediately next to structure or over an exposed structural rib) that the EVA crewmember’s gloved hand cannot access the EVA handrail. To ensure EVA handrails are mounted in a manner that preserves/facilitates their use, the area around and underneath handrails/handholds must be free of obstructions within the specified clearance dimensions. Adequate clearance is required to facilitate use by a pressurized gloved hand. This also supports clearance for tether hook attachment to the stanchions.
FIGURE 3.1.6-1 EVA HANDRAIL/HANDHOLD MOUNTING CLEARANCE ENVELOPE
Note: The 71 cm (28 in) handrail is an example.
Handrail/Handhold Side Clearance
[EVASC.0005] The Artemis System shall maintain a minimum 10 cm (4 in) clearance to both sides of handrail/handholds as defined in Figure 3.1.7-1 Handrail/Handhold Side Clearance.
Rationale: To ensure EVA handrails are mounted in a manner that preserves/facilitates their use, the area around and underneath handrails/handholds must be free of obstructions within the specified clearance
5.72 cm (2.25 in)
8.1 cm
(3.2 in)
Release Date: 09 MAY 2024 Page: 28 of 280 dimensions. Adequate clearance is required to facilitate use by a pressurized gloved hand.
FIGURE 3.1.7-1 HANDRAIL/HANDHOLD SIDE CLEARANCE
APFR EVA Installation/Removal Clearance
[EVASC.0006] The Artemis System shall maintain a clearance envelope around the Passive Worksite Interface (WIF) to support EVA installation/removal of the APFR as defined in Figure 3.1.8-1 APFR Installation/Removal EVA Clearance Envelope – Top Mounted WIF.
Rationale: The intent is to ensure adequate clearance is provided to support installation/removal of hardware designed to interface with the passive WIF.
Contact EHP for consideration and potential use of other EVA WIF configurations.
Nominally used in microgravity environment.
Gravity Field Applicability: Microgravity
Allocation: Gateway, HLS
10 cm
(4 in)
Minimum handrail clearance
10 cm
(4 in)
10 cm
(4 in)
10 cm
(4 in)
Minimum handrail clearance
Release Date: 09 MAY 2024 Page: 29 of 280
Notes:
1. Drawing not to scale
2. Point C is the centroid of the bolt pattern
FIGURE 3.1.8-1 APFR INSTALLATION/REMOVAL EVA CLEARANCE ENVELOPE – TOP
MOUNTED WIF
10 cm
(4 in)
10 cm
(4 in)
20 cm
(8.0 in)
44.7 cm
(17.6 in)
10 cm
(4 in) radius
Release Date: 09 MAY 2024 Page: 30 of 280
3.2 TRANSLATION
Contiguous EVA Translation Path
[EVASC.0152] The Artemis System shall provide EVA compatible accommodations to support contiguous translation paths to adjacent berthed/docked vehicles.
Rationale: A contiguous translation path is defined as the path from/to the airlock to/from any vehicle worksite that a crewmember needs to access for EVA operations. For vehicles that are berthed/docked to other vehicles, these contiguous translation paths need to provide for translation from one vehicle to another. Intentionally designed translation paths include illumination and features such as handrails and tether points free from contact hazards that promote safe and efficient EVA translation. These translation paths allow the EVA crewmember to safely translate across multiple vehicles which may include a safe and quick emergency return to the airlock. Translation paths to EVA worksites are addressed in [EVASC.0008].
Gravity Field Applicability: Microgravity
Allocation: Gateway, HLS
Translation Path
[EVASC.0008] The Artemis System shall design a translation path to all EVA worksites.
Rationale: These translation paths within the design constraints of the host vehicle. Intentionally designed translation paths include illumination and features such as handrails and tether points free from contact hazards that promote safe and efficient EVA translation. These translation paths allow the EVA crewmember to safely access worksites as well as to return to the airlock safely and quickly in case of an emergency for microgravity application. Partial gravity application ensures crewmembers can traverse around, to and from vehicle worksite areas (e.g., catwalk around a cargo lander, walking under the lander, ingress/egress of vehicle to the surface).
Gravity Field Applicability: Microgravity, Partial Gravity
Allocation: Gateway, HLS
Incapacitated Crewmember Interfaces
[EVASC.0154] The Artemis System shall provide hardware that aids a suited crewmember in the rescue of an incapacitated suited crewmember from the surface or microgravity location and return for ingressing the vehicle through the EVA hatch, culminating in positioning the suited incapacitated crewmember in an xEVA System for extraction which may require a 1st percentile female to rescue a 99th percentile male.
Release Date: 09 MAY 2024 Page: 31 of 280
Rationale: Incapacitated pressurized-suited crewmembers may be unable to ingress the vehicle (e.g., Tool cart, LTV, PR, HLS) on their own and may require assistance from a second crewmember. Depending on architecture and hatch height from the lunar surface, this can include items such as winch and rescue harness, deck space/porch, hatch seal cover, etc. Devices may need to be operated by a suited crewmember both internal and external to the vehicle.
Microgravity considerations include increased stability and aids for the incapacitated crew handling and/or restraint. NASA will assist in the design definition by identifying credible scenarios and the degree by which a crewmember is incapacitated.
This includes the volume to perform the assisted task, hatch opening size and operation, as well as the external translation path and mobility/stabilization aids.
Removing an incapacitated crewmember from a rear entry suit could be challenging and could require extra support structure, or possible tools to assist the crewmember inside as well as removal from the suit.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .