This is a Solicitation document (80ARC027R0001) for Project Engineering, Manufacturing, and Science Services (PEMSS) at NASA Ames Research Center. The contract is structured as an indefinite-quantity, firm-fixed-price agreement with a primary performance period from April 1, 2027 through March 31, 2032, plus a 6-month option extension from April 1, 2032 through September 30, 2032. The contract will be awarded via task orders, with pricing to be determined at the task order level. PEMSS will provide specialized engineering, operations, project management, manufacturing, and science services supporting research and technology development for NASA Ames Research Center, other NASA centers, and government agencies across multiple mission directorates including the Science Mission Directorate, Research and Technology Mission Directorate, and Human Spaceflight Mission Directorate. The scope encompasses support for various projects including BioSentinel, Astrobee, HelioSwarm, Advanced Composite Solar Sail System, and multiple CubeSat and subsystem development initiatives.
The solicitation incorporates standard NASA and FAR clauses addressing government property management, intellectual property rights (including new technology and patent rights provisions), security requirements, export control compliance, and financial reporting obligations. Key contractor responsibilities include submitting monthly and quarterly progress reports, maintaining property management records and accountability systems, reporting inventions through the NIST iEdison system, and complying with NASA procedural requirements for equipment marking and identification. The contract requires three essential positions: a Site Manager/SME for Program Planning & Support, a Mechanical Engineering Group Lead, and an Electrical Engineering Group Lead, to be proposed by the offeror. Minimum order requirements are $100,000 with maximum individual order limits of $10 million for single items and $15 million for item combinations. Payment processing is handled through NASA Shared Services Center with invoices submitted electronically, and the contract includes limitations of funds provisions with periodic allotment schedules to be determined during task order issuance.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Section B - Supplies or Services and Prices/Cost
Item Supplies/Service Dates Quantity Unit
Firm-Fixed Price
Product Service Code: AR14 Severability: No Firm Fixed Price
Period of Performance From
01 APR 2027
To
31 MAR 2032
1.0 Job
Firm-Fixed Price Level-of-Effort
Product Service Code: AR14 Severability: No Fixed Price Level of Effort
Period of Performance From
01 APR 2027
To
31 MAR 2032
1.0 Job
(Option) 6-Month Extension
Product Service Code: AR14 Severability: No Firm Fixed Price
Period of Performance From
01 APR 2032
To
30 SEP 2032
1.0 Job
NFS Clauses Incorporated by Full Text
1852.216-78 Firm-Fixed-Price (Dec 2025) (DEVIATION)
The total firm-fixed-price of this contract is $ . To be determined at the task order level (End of clause)
(End Of Section)
Section C - Description/Specifications/Statement of Work
Requirements
PEMSS specialized engineering, operations and project management support, and science services that supportresearch and technology development to meet evolving NASA-ARC, other NASA Center, and GovernmentAgencies.
Section D - Packaging and Marking Section is intentionally left blank
NFS Clauses Incorporated by Full Text
1852.245-74 Identification and Marking of Government Equipment (Dec 2025) (DEVIATION)
(a) The Contractor must identify all equipment to be delivered to the Government using NASA Technical Handbook (NASA–HDBK) 6003, Application of Data Matrix Identification Symbols to Aerospace Parts Using Direct Part Marking Methods/Techniques, and NASA Standard (NASA–STD) 6002, Applying Data Matrix Identification Symbols on Aerospace Parts or through the use of commercial marking techniques that: (1) are sufficiently durable to remain intact through the typical lifespan of the property: and, (2) contain the data and data format required by the standards. This requirement includes deliverable equipment listed in the schedule and other equipment when no longer required for contract performance and NASA directs physical transfer to NASA or a third party. The Contractor must identify property in both machine and human readable form unless the use of a machine readable-only format is approved by the NASA Industrial Property Officer.
(b) Equipment must be marked in a location that will be human readable, without disassembly or movement of the equipment, when the items are placed in service unless such placement would have a deleterious effect on safety or on the item’s operation.
(c) Concurrent with equipment delivery or transfer, the Contractor must provide the following data in an electronic spreadsheet format:
(1) Item Description.
(2) Unique Identification Number (License Tag).
(3) Unit Price.
(4) An explanation of the data used to make the unique identification number.
(d) For equipment no longer needed for contract performance and physically transferred under paragraph (a) of this clause, the following additional data is required:
(1) Date originally placed in service.
(2) Item condition.
(e) The data required in paragraphs (c) and (d) of this clause must be delivered to the NASA center receiving activity listed below:
NASA Ames Research Center Central Shipping and Receiving M/S 255-23 Moffett Field, CA 94035-0001 Attn: COR
(f) The contractor must include the substance of this clause, including this paragraph (f), in all subcontracts that require delivery of equipment.
(End of clause)
Section E - Inspection and Acceptance
FAR Clauses Incorporated by Reference
Number Title Effective Date
52.246-4 Inspection of Services-Fixed-Price. Aug 1996
52.246-9 Inspection of Research and Development (Short Form). Apr 1984
52.246-11 Higher-Level Contract Quality Requirement. Dec 2014
NFS Clauses Incorporated by Full Text
1852.246-72 Material Inspection and Receiving Report. (Sep 2025) (DEVIATION)
(a) At the time of each delivery to the Government under this contract, the Contractor must prepare and furnish a Material Inspection and Receiving Report (DD Form 250 series). The forms must be prepared and distributed as follows:
An original to the Contracting Officer;
One electronic copy to the Contracting Officer’s Representative;
One electronic copy to ARC Protective Services Office One electronic copy to ARC Central Shipping and Receiving; and One electronic copy to the Contractor’s file
(b) The Contractor must prepare the DD Form 250 in accordance with NASA FAR Supplement 1846.6. The Contractor must enclose the copies of the DD Form 250 in the package or seal them in a waterproof envelope, which must be securely attached to the exterior of the package in the most protected location.
(c) When more than one package is involved in a shipment, the Contractor must list on the DD Form 250, as additional information, the quantity of packages and the package numbers. The Contractor must forward the DD Form 250 with the lowest numbered package of the shipment and print the words "CONTAINS DD FORM 250" on the package.
(End of clause)
Section F - Deliveries or Performance
Party to Pay Transportation Cost FOB Point Type
Contractor Destination
Line Item 0001
Performance
Period of Performance
Period of Performance From
01 APR 2027
To
31 MAR 2032
Line Item 0002
Performance
Period of Performance
Period of Performance From
01 APR 2027
To
31 MAR 2032
Line Item 0003 (Option)
Performance
Period of Performance
Period of Performance From
01 APR 2032
To
30 SEP 2032
FAR Clauses Incorporated by Reference
Number Title Effective Date
52.242-15 Stop-Work Order. Aug 1989
52.242-17 Government Delay of Work. Apr 1984
52.247-34 F.o.b. Destination. Jan 1991
Section G - Contract Administration Data
NFS Clauses Incorporated by Reference
Number Title Effective Date
1852.225-73 Travel Outside of the United States Feb 2026
1852.245-70 Contractor Requests For Government-Furnished Property (Deviation)
Jul 2026
1852.245-70 Contractor Requests for Government-Furnished Property Alternate I (Deviation)
Dec 2025
1852.245-75 Property Management Changes (Deviation) Dec 2025
1852.245-78 Physical Inventory of Capital Personal Property (Deviation) Jul 2026
1852.245-79 Records and Disposition Reports for Government Property with Potential Historic or Significant Real Value (Deviation)
Dec 2025
NFS Clauses Incorporated by Full Text
1852.227-70 New Technology - Other than a Small Business Firm or Nonprofit Organization (Jun 2026)
(DEVIATION)
(a) Definitions. As used in this clause—
"Administrator" means the Administrator or Deputy Administrator of the National Aeronautics and Space Administration (NASA).
"Contract" has the meaning provided in the Federal Acquisition Regulation (FAR), Subpart 2.1-Definitions.
"Made" means—(1) When used in relation to any invention other than a plant variety, the conception or first actual reduction to practice of the invention; or(2) When used in relation to a plant variety, that the Contractor has at least tentatively determined that the variety has been reproduced with recognized characteristics.
"Nonprofit organization" means a domestic university or other institution of higher education or an organization of the type described in section 501(c)(3) of the Internal Revenue Code of 1954 (26 U.S.C. 501(c)) and exempt from taxation under section 501(a) of the Internal Revenue Code (26 U.S.C. 501(a)), or any domestic nonprofit scientific or educational organization qualified under a State nonprofit organization statute.
"Practical application" means to manufacture, in the case of a composition or product; to practice, in the case of a process or method; or to operate, in the case of a machine or system; and, in each case, under such conditions as to establish that the invention is being utilized and that its benefits are, to the extent permitted by law or Government regulations, available to the public on reasonable terms.
"Reportable item" means any invention, discovery, improvement, or innovation of the contractor, whether or not patentable or otherwise protectable under Title 35 of the United States Code, made in the performance of any work under any NASA contract or in the performance of any work that is reimbursable under any clause in any NASA contract providing for reimbursement of costs incurred before the effective date of the contract.
Reportable items include, but are not limited to, new processes, machines, manufactures, and compositions of matter, and improvements to, or new applications of, existing processes, machines, manufactures, and compositions of matter. Reportable items also include new computer programs, and improvements to, or new applications of, existing computer programs, whether or not copyrightable or otherwise protectable under Title 17 of the United States Code.
"Small business firm" means a domestic small business concern as defined at 15 U.S.C. 632 and implementing regulations of the Administrator of the Small Business Administration. (For the purpose of this definition, the criteria and size standard adopted in the FAR Subpart 2.1 definitions for “small business concern” and for “small business subcontractor” will be used.)
"Subject invention" means any reportable item which is or may be patentable or otherwise protectable under Title 35 of the United States Code, or any novel variety of plant that is or may be protectable under the Plant Variety Protection Act (7 U.S.C. 2321, et seq.).
(b) Allocation of principal rights.
(1) Presumption of title.
(i) Any reportable item that the Administrator considers to be a subject invention shall be presumed to have been made in the manner specified in paragraph (1)(A) or (1)(B) of Section 20135(b) of the National Aeronautics and Space Act (51 U.S.C. 20135(b)) (hereinafter "the Act"), and the above presumption shall be conclusive unless at the time of reporting the reportable item in accordance with paragraph (e)(2) of this clause the Contractor submits to the Contracting Officer a written statement, containing supporting details, demonstrating that the reportable item was not made in the manner specified in the Act.
(ii) Regardless of whether title to a given subject invention would otherwise be subject to an advance waiver or is the subject of a petition for waiver as described in paragraph (b)(3) of this clause, the Contractor may nevertheless file the statement described in paragraph (b)(1)(i) of this clause. The Administrator will review the information furnished by the Contractor in any such statement and any other available information relating to the circumstances surrounding the making of the subject invention and will notify the Contractor whether the Administrator has determined that the subject invention was made in the manner specified in paragraph (1)(A) or (1)(B) of Section 20135(b) of the Act.
(2) Property rights in subject inventions. Each subject invention for which the presumption of paragraph (b)(1)
(i) of this clause is conclusive or for which there has been a determination that it was made in the manner specified in paragraph (1)(A) or (1)(B) of Section 20135(b) of the Act shall be the exclusive property of the United States as represented by NASA unless the Administrator waives all or any part of the rights of the United States, as provided in paragraph (b)(3) of this clause.
(3) Waiver of rights.
(i) Section 20135(g) of the Act provides for the promulgation of regulations by which the Administrator may waive all or any part of the rights of the United States with respect to any invention or class of inventions made or that may be made under conditions specified in paragraph (1)(A) or (1)(B) of Section 20135(b) of the Act. The promulgated NASA Patent Waiver Regulations, 14 CFR Part 1245, Subpart 1, provide procedures for the Contractor to submit petitions (requests) for waiver of rights and guidance for NASA in acting on petitions for such waiver of rights.
(ii) As provided in 14 CFR 1245, Subpart 1, the Contractor may petition, either prior to execution of the contract or within 30 days after execution of the contract, for advance waiver of rights to any invention or class of inventions that may be made under a contract. If such a petition is not submitted, or if after submission it is denied, the Contractor (or an employee inventor of the Contractor) may petition for waiver of rights to an identified subject invention within eight months of first disclosure of invention in accordance with paragraph (e)(2) of this clause, or within such longer period as may be authorized in accordance with
14 CFR 1245.105.
(c) Minimum rights reserved by the Government.
(1) With respect to each subject invention for which a waiver of rights has been granted, the Government reserves--
(i) An irrevocable, nonexclusive, nontransferable, royalty-free license for the practice of such invention throughout the world by or on behalf of the United States or any foreign government in accordance with any treaty or agreement with the United States; and
(ii) Such other rights as stated in 14 CFR 1245.107.
(2) Nothing contained in this paragraph (c) shall be considered to grant to the Government any rights with respect to any invention other than a subject invention.
(d) Minimum rights to the Contractor.
(1) The Contractor is hereby granted a revocable, nonexclusive, royalty-free license in each patent application filed in any country on a subject invention in which the Government has title and in any resulting patent, unless the Contractor fails to disclose the subject invention within the times specified in paragraph (e)(2) of this clause.
The Contractor's license extends to its domestic subsidiaries and affiliates, if any, within the corporate structure of which the Contractor is a party and includes the right to grant sublicenses of the same scope to the extent the Contractor was legally obligated to do so at the time the contract was awarded. The license is transferable only with the approval of the Administrator except when transferred to the successor of that part of the Contractor's business to which the invention pertains.
(2) The Contractor's domestic license may be revoked or modified by the Administrator to the extent necessary to achieve expeditious practical application of the subject invention pursuant to an application for an exclusive license submitted in accordance with 37 CFR Part 404, Licensing of Government Owned Inventions.
The Contractor’s license will not be revoked in that field of use or the geographical areas in which the Contractor has achieved practical application and continues to make the benefits of the invention reasonably accessible to the public. The license in any foreign country may be revoked or modified at the discretion of the Administrator to the extent the Contractor, its licensees, or its domestic subsidiaries or affiliates have failed to achieve practical application in that foreign country.
(3) Before revoking or modifying the Contractor’s license, the Contractor will be provided a written notice of the Administrator's intention to revoke or modify the license, and the Contractor will be allowed 30 days (or such other time as may be authorized by the Administrator for good cause shown) after the notice to show cause why the license should not be revoked or modified. The Contractor has the right to appeal to the Administrator any decision concerning the revocation or modification of its license.
(e) Contractor’s obligations.
(1) The Contractor shall establish and maintain active and effective procedures to assure that reportable items are promptly identified and disclosed to Contractor personnel responsible for the administration of this New Technology-Other than a Small Business Firm or Nonprofit Organization clause within six months of conception and/or first actual reduction to practice, whichever occurs first in the performance of work under this contract. These procedures shall include the maintenance of laboratory notebooks or equivalent records and other records as are reasonably necessary to document the conception and/or the first actual reduction to practice of the reportable items, and records that show that the procedures for identifying and disclosing reportable items are followed. Upon request, the Contractor shall furnish the Contracting Officer a description of such procedures for evaluation and for determination as to their effectiveness.
(2) The Contractor shall disclose in writing each reportable item to the Contracting Officer within two months after the inventor discloses it in writing to Contractor personnel responsible for the administration of this New Technology-Other than a Small Business Firm or Nonprofit Organization clause or within six months after the Contractor becomes aware that a reportable item has been made, whichever is earlier, but in any event for subject inventions before any on sale, public use, or publication of such invention known to the Contractor. The disclosure to the agency shall identify the inventor(s) or innovator(s) and this contract under which the reportable item was made. It shall be sufficiently complete in technical detail to convey a clear understanding, to the extent known at the time of the disclosure, of the nature, purpose, operation, and physical, chemical, biological, or electrical characteristics of the reportable item. The disclosure shall also identify any publication, sale or offer for sale, or public use of any subject invention and whether a manuscript describing such invention has been submitted for publication and, if so, whether it has been accepted for publication at the time of disclosure. In addition, after disclosure to the agency, the Contractor will promptly notify the agency of the acceptance of any manuscript describing a subject invention for publication or of any sale, offer for sale, or public use planned by the Contractor for such invention.
(3) The contractor must report all reportable items required in paragraph (e)(2) above to NASA by:
(i) First, completing input of all such subject inventions into the National Institute of Standards and Technology (NIST) iEdison website at https://www.nist.gov/iedison. No such input shall be considered to be complete until the iEdison system assigns the inputted report an Invention Report Number.
(ii) Next, to complete the process of disclosing the invention to NASA, the contractor shall report the resulting number to:
(A) The Contracting Officer’s Representative (COR);
(B) The New Technology Representative (identified in this contract at 1852.227.72);
(C) The Patent Representative (identified in this contract at 1852.227.72); and
(D) The Contracting Officer (CO).
(iii) The contractor shall complete the disclosure by the deadline stated in paragraph (e) (2) above.
(4) The Contractor agrees, upon written request of the Contracting Officer, to furnish additional technical and other information available to the Contractor as is necessary for the preparation of a patent application on a subject invention and for the prosecution of the patent application, and to execute all papers necessary to file patent applications on subject inventions and to establish the Government's rights in the subject inventions.
(5) The Contractor agrees, subject to paragraph 27.302(j) of the Federal Acquisition Regulation (FAR), that the Government may duplicate and disclose subject invention disclosures and all other reports and papers furnished or required to be furnished pursuant to this clause.
(f) Examination of records relating to inventions.
(1) The Contracting Officer or any authorized representative shall, until 3 years after final payment under this contract, have the right to examine any books (including laboratory notebooks), records, and documents of the Contractor relating to the conception or first actual reduction to practice of inventions in the same field of technology as the work under this contract to determine whether—
(i) Any such inventions are subject inventions;
(ii) The Contractor has established and maintained the procedures required by paragraph (e)(1) of this clause; and
(iii) The Contractor and its inventors have complied with the procedures.
(2) If the Contracting Officer learns of an unreported Contractor invention that the Contracting Officer believes may be a subject invention, the Contracting Officer may require the Contractor to disclose the invention to the agency for a determination of ownership rights.
(3) Any examination of records under this paragraph will be subject to appropriate conditions to protect the confidentiality of the information involved.
(g) Withholding of payment (this paragraph does not apply to subcontracts).
(1) Any time before final payment under this contract, the Contracting Officer may, in the Government's interest, withhold payment until a reserve not exceeding $50,000 or 5 percent of the amount of this contract, whichever is less, shall have been set aside if, in the Contracting Officer's opinion, the Contractor fails to--
(i) Establish, maintain, and follow effective procedures for identifying and disclosing reportable items pursuant to paragraph (e)(1) of this clause;
(ii) Disclose any reportable items pursuant to paragraph (e)(2) of thisclause;
(iii) Provide the information regarding subcontracts pursuant to paragraph (h)(4) of this clause.
(2) Such reserve or balance shall be withheld until the Contracting Officer has determined that the Contractor has rectified whatever deficiencies exist and has delivered all reports, disclosures, and other information required by this clause.
(3) Final payment under this contract shall not be made before the Contractor delivers to the Contracting Officer all disclosures of reportable items required by paragraph (e)(2) of this clause;
(4) The Contracting Officer may decrease or increase the sums withheld up to the maximum authorized above. No amount shall be withheld under this paragraph while the amount specified by this paragraph is being withheld under other provisions of the contract. The withholding of any amount or the subsequent payment thereof shall not be construed as a waiver of any Government rights.
(h) Subcontracts.
(1) Unless otherwise authorized or directed by the Contracting Officer, the Contractor shall—
(i) Include this clause (suitably modified to identify the parties) in any subcontract hereunder (regardless of tier) with other than a small business firm or nonprofit organization for the performance of experimental, developmental, or research work; or
(ii) Include the clause at FAR 52.227-11, as modified by 1852.277-11, (suitably modified to identify the parties) in any subcontract hereunder (regardless of tier) with a small business firm or nonprofit organization for the performance of experimental, developmental, or research work; and
(iii) Modify the applicable clause in any subcontract hereunder (regardless of tier) to identify the parties as follows: references to the Government are not changed, and in all references to the Contractor, the subcontractor is substituted for the Contractor so that the subcontractor has all rights and obligations of the Contractor in the clause.
(2) In the event of a refusal by a prospective subcontractor to accept such a clause the Contractor:
(i) Shall promptly submit a written notice to the Contracting Officer setting forth the subcontractor’s reasons for such refusal and other pertinent information that may expedite disposition of the matter; and
(ii) Shall not proceed with such subcontract without the written authorization of the Contracting Officer.
(3) In the case of subcontracts at any tier, the agency, subcontractor, and Contractor agree that the mutual obligations of the parties created by this clause constitute a contract between the subcontractor and NASA with respect to those matters covered by this clause.
(4) The Contractor shall promptly notify the Contracting Officer in writing upon the award of any subcontract hereunder (regardless of tier) by identifying the subcontractor, the applicable patent rights clause in the subcontract, the work to be performed under the subcontract, and the dates of award and estimated completion.
Upon request of the Contracting Officer, the Contractor shall furnish a copy of such subcontract, and, no more frequently than annually, a listing of the subcontracts that have been awarded.
(5) The subcontractor will retain all rights provided for the Contractor in the clause of subparagraph (h)(1)(i) or (ii) of this clause, whichever is included in the subcontract, and the Contractor will not, as part of the consideration for awarding the subcontract, obtain rights in the subcontractor’s subject inventions.
(i) Preference for United States industry. Unless provided otherwise, no Contractor that receives title to any subject invention and no assignee of any such Contractor shall grant to any person the exclusive right to use or sell any subject invention in the United States unless such person agrees that any products embodying the subject invention will be manufactured substantially in the United States. However, in individual cases, the requirement may be waived by the Administrator upon a showing by the Contractor or assignee that reasonable but unsuccessful efforts have been made to grant licenses on similar terms to potential licensees that would be likely to manufacture substantially in the United States or that under the circumstances domestic manufacture is not commercially feasible.
(End of clause)
1852.227-72 Designation of New Technology Representative and Patent Representative (Jun 2026)
(DEVIATION)
(a) For purposes of administration of the clause of in this contract entitled either “New Technology-Other than a Small Business Firm or Nonprofit Organization” or “Patent Rights—Ownership by the Contractor,” the cognizant center New Technology Representatives and Patent Representatives identified at https://prod.nais.
nasa.gov/pub/pub_library/techrep.html are hereby designated by the Contracting Officer to administer such clause for the installation(s) involved.
(b) Disclosures of reportable items and of subject inventions, utilization reports, and other reports required by the applicable “New Technology” or “Patent Rights-Ownership by the Contractor” clause, as well as any correspondence with respect to such matters, must be directed to the New Technology Representative unless transmitted in response to correspondence or request from the Patent Representative. Inquiries or requests regarding disposition of rights, election of rights, or related matters must be directed to the Patent Representative. This clause must be included in any subcontract hereunder requiring a “New Technology-Other than a Small Business Firm or Nonprofit Organization” clause or “Patent Rights—Ownership by the Contractor” clause, unless otherwise authorized or directed by the Contracting Officer.
(End of clause)
1852.232-80 Submission of Vouchers/Invoices for Payment. (Apr 2018)
(a) The designated payment office is the NASA Shared Services Center (NSSC) located at FMD Accounts Payable, Bldg. 1111, Jerry Hlass Road, Stennis Space Center, MS 39529.
(b) Except for classified vouchers, the Contractor shall submit all vouchers and invoices using the steps described at NSSC's Vendor Payment information Web site at: .https://www.nssc.nasa.gov/vendorpayment Please contact the NSSC Customer Contact Center at 1–877–NSSC123 (1–877–677–2123) with any additional questions or comments.
(c) Payment requests.
(1) The payment periods are stipulated in the payment clause(s) contained in this contract.
(2) Vouchers submitted under cost type contracts and invoices submitted under fixed-price contracts shall include the items delineated in FAR 32.905(b) supported by relevant back-up documentation. Back-up documentation shall include at a minimum, the following information:
(i) Vouchers.
(A) Breakdown of billed labor costs and associated contractor generated supporting documentation for billed direct labor costs to include rates used and number of hours incurred.
(B) Breakdown of billed other direct costs (ODCs) and associated contractor generated supporting documentation for billed ODCs.
(C) Indirect rate(s) used to calculate the amount of billed indirect expenses.
(D) Progress reports, as required.
(ii) Invoices.
(A) Description of goods and services delivered as part of the contract's terms and conditions, including the dates of delivery/performance.
(B) Progress reports, as required.
(C) Date goods and services were performed.
(iii) Fee vouchers.
(A) Listing of all provisionally-billed fee by period or date earned since contract award.
(B) A reconciliation of all billed and earned fee.
(C) A clear explanation of the fee calculations.
(d) The Contractor may submit a non-electronic voucher/invoice using the Non-electronic payment requests.
steps for non-electronic payment requests described at when any of ,https://www.nssc.nasa.gov/vendorpayment the following conditions are met:
(1) The Contracting Officer administering the contract for payment has determined, in writing, that electronic submission would be unduly burdensome to the Contractor.
(2) The contract includes provisions allowing the contractor to submit vouchers or invoices using the steps for non-electronic payment. In such instances the Contractor agrees to submit non-electronic payment requests using the method or methods specified in Section G of the contract.
(e) Improper vouchers/invoices. The NSSC Payment Office will notify the contractor of any apparent error, defect, or impropriety in a voucher/invoice within seven calendar days of receipt by the NSSC Payment Office.
Inquiries regarding requests for payment should be directed to the NSSC as specified in of this paragraph (b) section.
(f) In addition to the requirements of this clause, the Contractor shall meet the Other payment clauses.
requirements of the appropriate payment clauses in this contract when submitting payment requests.
(g) In the event that amounts are withheld from payment in accordance with provisions of this contract, a separate payment request for the amount withheld will be required before payment for that amount may be made.
(End of clause)
1852.245-71 Installation-Accountable Government Property (Dec 2025) (DEVIATION)
(a) The Government property described in paragraph (c) of this clause may be made available to the Contractor on a no-charge basis for use in performance of this contract. This property must be utilized only within the physical confines of the NASA installation that provided the property unless authorized by the Contracting Officer under (b)(1)(iv). Under this clause, the Government retains accountability for, and title to, the property, and the Contractor must comply with the following:
NASA Procedural Requirements (NPR) 4100.1F NASA Supply Support and Materiel Management
NASA Procedural Requirements (NPR) 4200.1G, NASA Equipment Management Procedural Requirements.
NASA Procedural Requirement (NPR) 4300.1C, NASA Personal Property Disposal Procedural Requirements: .No additional property management responsibilities identified
NASA Procedural Requirements (NPR) 4500.1A, Administration of Property in the Custody of Award Recipients: TBD[Insert any additional property management responsibilities.
Property not recorded in NASA property systems must be managed in accordance with the requirements of the clause at FAR 52.245–1, as incorporated in this contract.
The Contractor must establish and adhere to a system of written procedures to assure continued, effective management control and compliance with these user responsibilities. In accordance with FAR 52.245-1(h)(1) the contractor must be liable for property lost, damaged, destroyed or stolen by the contractor or their employees when determined responsible by a NASA Property Survey Board, in accordance with the NASA guidance in this clause.
(b)(1) The official accountable recordkeeping, financial control, and reporting of the property subject to this clause must be retained by the Government and accomplished within NASA management information systems prescribed by the installation Supply and Equipment Management Officer (SEMO) and Financial Management Officer. If this contract provides for the Contractor to acquire property, title to which will vest in the Government, the following additional procedures apply:
(i) The Contractor's purchase order must enquire the vendor to deliver the property to the installation central receiving area.
(ii) The Contractor must all furnish a copy of each purchase order, prior to delivery by the vendor, to the installation central receiving area.
(iii) The Contractor must establish a record for Government titled property as required by FAR 52.245-1, as incorporated in this contract, and must maintain that record until accountability is accepted by the Government.
(iv) Contractor use of Government property at an off-site location and off- site subcontractor use requires advance approval of the Contracting Officer and notification of the Industrial Property Officer.
The property must be considered Government furnished and the Contractor must assume accountability and financial reporting responsibility. The Contractor must establish records and property control procedures and maintain the property in accordance with the requirements of FAR 52.245–1, Government Property (as incorporated in this contract), until its return to the installation. NASA Procedural Requirements related to property loans must not apply to offsite use of property by contractors.
(2) After transfer of accountability to the Government, the Contractor must continue to maintain such internal records as are necessary to execute the user responsibilities identified in paragraph (a) of this clause and document the acquisition, billing, and disposition of the property. These records and supporting documentation must be made available, upon request, to the SEMO and any other authorized representatives of the Contracting Officer.
(c) The following property and services are provided if checked:
(1) Office space, work area space, and utilities. Government telephones are available for official purposes only.
(2) Office furniture.
(3) Property listed in .Attachment J-5
(i) If the Contractor acquires property, title to which vests in the Government pursuant to other provisions of this contract, this property also must become accountable to the Government upon its entry into Government records.
(ii) The Contractor must not bring to the installation for use under this contract any property owned or leased by the Contractor, or other property that the Contractor is accountable for under any other Government contract, without the Contracting Officer's prior written approval.
(4) Supplies from stores stock.
(5) Publications and blank forms stocked by the installation.
(6) Safety and fire protection for Contractor personnel and facilities.
(7) Installation service facilities: IT Services through NASA"s mandatory End User Device contract, as .identified in the NFS Companion Guide, Enterprise Procurement Strategies, PSL A.102-2, IT Services.
(8) Medical treatment of a first-aid nature for Contractor personnel injuries or illnesses sustained during on-site duty.
(9) Cafeteria privileges for Contractor employees during normal operating hours.
(10) Building maintenance for facilities occupied by Contractor personnel.
(11) Moving and hauling for office moves, movement of large equipment, and delivery of supplies.
Moving services may be provided on-site, as approved by the Contracting Officer.
(End of clause)
1852.245-73 Financial Reporting of NASA Property in the Custody of Contractors (Dec 2025)
(DEVIATION)
(a) The Contractor with furnished and acquired property must submit an electronic property submissions in NASA’s Accountable Property System of Record (APSR)/NASA Electronic Submission System (NESS) annually; and a final property submission via https://ness.nasa.gov/contractor when the period of performance or award has ended. Once electronic property submission is completed, the contractor will be able to download their electronic forms, in accordance with this clause, the instructions on the form and NFS subpart 1845.71, and any supplemental instructions for the current reporting period issued by NASA.
(b)(1) Subcontractor use of the APSR/NESS is not required by this clause; however, the Contractor must include data on property in the possession of subcontractors in the electronic annual property submission. The Contractor must mail the original signed NF 1018 directly to the cognizant NASA Center Industrial Property Officer and a copy to the cognizant NASA Center Deputy Chief Financial Officer, Finance, unless the Contractor is required by their contract to report with zero value award, that never had property associated.
(c)(1) The annual reporting period must be from October 1 of each year through September 30 of the following year. The report must be submitted in time to be received by October 31st. The information contained in these reports is entered into the NASA accounting system to reflect current asset values for agency financial statement purposes. Therefore, it is essential that required reports be received no later than October 31st.
(2) Some activity may be estimated for the month in which the report is submitted, if necessary, to ensure the electronic annual or final property submission is received when due. However, contractors’ procedures must document the process for developing these estimates based on planned activity such as planned purchases or NASA Form 533 (NF 533) Contractor Financial Management Report) cost estimates. It should be supported and documented by historical experience or other corroborating evidence, and be retained in accordance with FAR Subpart 4.705, Specific Retention Periods. Contractors must validate the reasonableness of the estimates and associated methodology by comparing them to the actual activity once that data is available and adjust them accordingly. In addition, differences between the estimated cost and actual cost must be adjusted during the next reporting period. Contractors must have formal policies and procedures, which address the validation of the electronic annual property or final property submission data, including data from subcontractors, and the identification and timely reporting of errors. The objective of this validation is to ensure that information reported is accurate and in compliance with the NASA FAR Supplement. If errors are discovered on the electronic annual or final property submission after submittal the contractor must contact the cognizant NASA Center Industrial Property Officer (IPO) within 10 days after discovery of the error to discuss corrective action.
If there is an error found during the Contractor’s property submission, it will be disapproved, and Contractor will receive an automatic email explaining what is needed for it to be approved.
(3) In addition to an annual report, if at any time during performance of the contract, NASA-owned property in the custody of the Contractor has a value of $10 million or more, the Contractor must also submit a report no later than the 21st of each month in accordance with the requirements of paragraph (c)(2) of this clause.
(4) The Contracting Officer may, in NASA’s interest, withhold payment until a reserve not exceeding $25,000 or 5 percent of the amount of the contract, whichever is less, has been set aside, if the Contractor fails to submit the electronic annual or final property submission reports in accordance with NFS subpart 1845.7101, any monthly report in accordance with (c)(3) of this clause, and any supplemental instructions for the current reporting period issued by NASA. Such reserve must be withheld until the Contracting Officer has determined that NASA has received the required reports. The withholding of any amount or the subsequent payment thereof must not be construed as a waiver of any Government right.
(d) An electronic final report must be submitted in the APSR/NESS within 30 days after disposition of all property subject to reporting when the contract performance period is complete in accordance with paragraph (b)
(1) through (3) of this clause.
1852.245-76 List of Government Property Furnished Pursuant to FAR 52.245-1 (Dec 2025) (DEVIATION)
For performance of work under this contract, the Government will make available Government property identified below or in Attachment of this contract on a no charge-for-use basis pursuant to the clause at FAR J-5 52.245– 1, Government Property, as incorporated in this contract. The Contractor must use this property in the performance of this contract at and at other location(s) as may be approved NASA Ames Research Center (ARC) by the Contracting Officer. Under FAR 52.245–1, the Contractor is accountable for the identified property.
(End of clause)
1852.245-77 List of Government Property Furnished Pursuant to FAR 52.245-2 (Dec 2025) (DEVIATION)
For performance of work under this contract, the Government will make available Government property identified below or in Attachment of this contract on a no charge-for-use basis pursuant to FAR 52.245–2, J-5 Government Property Installation Operation Services, as incorporated in this contract. The Contractor must use this property in the performance of this contract at and at other location(s) NASA Ames Research Center (ARC) as may be approved by the Contracting Officer.
See attachment J-5.
(End of clause)
1852.245-82 Occupancy Management Requirements (Dec 2025) (DEVIATION)
(a) In addition to the requirements of the clause at FAR 52.245–1, Government Property, as included in this contract, the Contractor must comply with the following in performance of work in and around Government real property:
(1) NPD 8800.14F Policy for Real Estate Management.
(2) NPR 8831.2F, Facilities Maintenance and Operations Management. No additional Center occupancy requirements required.
(b) The Contractor must obtain the written approval of the Contracting Officer before installing or removing Contractor-owned property onto or into any Government real property or when movement of Contractor-owned property may damage or destroy Government-owned property. The Contractor must restore damaged property to its original condition at the Contractor’s expense.
(c) The Contractor must not acquire, construct or install any fixed improvement or structural alterations in Government buildings or other real property without the advance, written approval of the Contracting Officer.
Fixed improvement or structural alterations, as used herein, means any alteration or improvement in the nature of the building or other real property that, after completion, cannot be removed without substantial loss of value or damage to the premises. Title to such property must vest in the Government.
(d) The Contractor must report any real property or any portion thereof when it is no longer required for performance under the contract, as directed by the Contracting Officer.
Section H - Special Contract Requirements
NFS Clauses Incorporated by Reference
Number Title Effective Date
1852.226-71 Safety and Health Measures and Mishap Reporting Feb 2026
1852.226-73 Major Breach of Safety or Security Feb 2026
1852.242-72 Denied Access to NASA Facilities (Deviation) Dec 2025
NFS Clauses Incorporated by Full Text
1852.208-82 Federal Automotive Statistical Tool Reporting (Mar 2026)
If authorized to operate Government-owned or leased vehicles, including General Service Agency (GSA) Fleet vehicles or related services in performance of this contract, the Contractor must report the data describing vehicle usage required by the Federal Automotive Statistical Tool (FAST) by October 15 of each year. FAST is accessed through https://fastweb.inl.gov.
(End of clause)
1852.209-71 Limitation of Future Contracting. (Dec 1988)
(a) The Contracting Officer has determined that this acquisition may give rise to a potential organizational conflict of interest. Accordingly, the attention of prospective offerors is invited to FAR Subpart 9.5— Organizational Conflicts of Interest.
(b) The nature of this conflict is This may arise when the Contractor (1) Unfair Competitive Advantage.
develops hardware or software requirements, specifications, or statements of work, or uses nonpublic information for business development, including research, opportunities, cost estimates, proposals, or strategic planning or future contract efforts;
. This may arise when the contractor evaluates its own performance, products, or 2) Impaired objectivity services (e.g., performs a safety review of its own work product for a spaceflight mission); and
This includes access to another contractor’s confidential or proprietary 3) Unequal Access to Information.
information, Government plans for upcoming projects or acquisitions, or nonpublic business-development
.information concerning research, opportunities, cost estimates, proposals, or strategic planning..
(c) The restrictions upon future contracting are as follows:
(1) If the Contractor, under the terms of this contract, or through the performance of tasks pursuant to this contract, is required to develop specifications or statements or work that are to be incorporated into a solicitation, the Contractor shall be ineligible to perform the work described in that solicitation as a prime of first-tier subcontractor under an ensuing NASA contract. This restriction shall remain in effect for a reasonable time, as agreed to by the Contracting Officer and the Contractor, sufficient to avoid unfair competitive advantage or potential bias (this time shall in no case be less than the duration of the initial production contract).
NASA shall not unilaterally require the Contractor to prepare such specifications or statements of work under this contract.
(2) To the extent that the work under this contract requires access to proprietary, business confidential, or financial data of other companies, and as long as these data remain proprietary or confidential, the Contractor shall protect these data from unauthorized use and disclosure and agrees not to use them to compete with those other companies.
(End of clause)
1852.225-70 Export Licenses (Dec 2025) (DEVIATION)
(a) The contractor shall comply with all U.S. export control laws and regulations, including the International Traffic in Arms Regulations (ITAR), 22 CFR Parts 120 through 130, and the Export Administration Regulations (EAR), 15 CFR Parts 730 through 799, in the performance of this contract. In the absence of available license exemptions/exceptions, the contractor shall be responsible for obtaining the appropriate licenses or other approvals, if required, for exports of hardware, technical data, and software, or for the provision of technical assistance.
(b) The contractor shall be responsible for obtaining export licenses, if required, before utilizing foreign persons in the performance of this contract, including instances where the work is to be performed on-site at
, where the foreign person will have access to export-controlled technical data or NASA Ames Research Center software.
(c) The contractor shall be responsible for all regulatory record keeping requirements associated with the use of licenses and license exemptions/exceptions.
(d) The contractor shall be responsible for ensuring that the provisions of this clause apply to its subcontractors.
(End of clause)
1852.232-77 Limitations of Funds (Fixed-Price Contract). (Mar 1989)
(a) Of the total price of itemsTBD at task order level throughTBD at task order level, the sum of $TBD at task order level is presently available for payment and allotted to this contract. It is anticipated that from time to time additional funds will be allocated to the contract in accordance with the following schedule, until the total price of said items is allotted:
SCHEDULE FOR ALLOTMENT OF FUNDS
DATE
AMOUNTS
(b) The Contractor agrees to perform or have performed work on the items specified in paragraph (a) of this clause up to the point at which, if this contract is terminated pursuant to the Termination for Convenience of the Government clause of this contract, the total amount payable by the Government (including amounts payable for subcontracts and settlement costs) pursuant to paragraphs (f) and (g) of that clause would, in the exercise of reasonable judgment by the Contractor, approximate the total amount at the time allotted to the contract. The Contractor is not obligated to continue performance of the work beyond that point. The Government is not obligated in any event to pay or reimburse the Contractor more than the amount from time to time allotted to the contract, anything to the contrary in the Termination for Convenience of the Government clause notwithstanding.
(c)
(1) It is contemplated that funds presently allotted to this contract will cover the work to be performed until .TBD at task order level
(2) If funds allotted are considered by the Contractor to be inadequate to cover the work to be performed until that date, or an agreed date substituted for it, the Contractor shall notify the Contracting Officer in writing when within the next 60 days the work will reach a point at which, if the contract is terminated pursuant to the Termination for Convenience of the Government clause of this contract, the total amount payable by the Government (including amounts payable for subcontracts and settlement costs) pursuant to paragraphs (f) and
(g) of that clause will approximate 75 percent of the total amount then allotted to the contract.
(3)
(i) The notice shall state the estimated date when the point referred to in paragraph (c)(2) of this clause will be reached and the estimated amount of additional funds required to continue performance to the date specified in paragraph (c)(1) of this clause, or an agreed date substituted for it.
(ii) The Contractor shall, 60 days in advance of the date specified in paragraph (c)(1) of this clause, or an agreed date substituted for it, advise the Contracting Officer in writing as to the estimated amount of additional funds required for the timely performance of the contract for a further period as may be specified in the contract or otherwise agreed to by the parties.
(4) If, after the notification referred to in…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .