Attachment J-1_Project Engineering_Manufacturing_and Science Services Performance Work Statement_06Nov2026.pdf

PDF 330 KB Posted

Attached to
Project Engineering, Manufacturing, and Science Services (PEMSS)
Solicitation number
80ARC027R0001
Issued by

About this file

This is a Performance Work Statement (PWS) for the Project Engineering, Manufacturing, and Science Services (PEMSS) contract supporting NASA Ames Research Center, effective November 6, 2026. The contractor shall provide comprehensive engineering, manufacturing, and science services to support NASA's science, exploration, and aeronautics missions through task orders executed under an Indefinite Delivery/Indefinite Quantity (IDIQ) contract structure in accordance with NFS 1852.216-80 Task Ordering Procedure.

The PWS encompasses four primary technical domains: (1) Support of NASA Programs and Projects, including mission design center operations, proposal development, science programmatic support, project records management, technical writing, configuration management, thermal/fluid/cryogenic systems design, electrical/electronics development, sensors and instrumentation, embedded systems, power systems, control systems, chemical/biological/biomedical systems, assembly/integration/test, operations and sustainment, project technical review, engineering support, flight project IT support, Engineering Evaluation Laboratory operations, Flight Processing Center management, and metal fabrication/machining/instrumentation services; (2) Engineering Support, including systems engineering per NPR 7123.1, design and development of spaceflight systems and facilities, and mechanical engineering expertise; (3) Science Support, encompassing scientific research operations, biosciences management, laboratory safety and controlled space compliance, and facility operations; and (4) Manufacturing Support, including mechanical hardware fabrication, electronics fabrication, inspection services, production planning and scheduling, and Space Shop operations. The contractor must maintain a Top-Secret facility clearance, comply with ITAR and EAR regulations, provide Software Management Plans per NPR 7150.2, implement comprehensive cybersecurity controls including FISMA compliance for the Multi-Mission Operations Center, disclose any use of Super Intelligence technologies, and manage records in accordance with Federal Records Act requirements. Work will be performed primarily on-site at NASA Ames Research Center with occasional support at other NASA centers, government agencies, and principal investigator laboratories, with the majority of personnel requiring appropriate qualifications, security clearances, and certifications in relevant technical disciplines and workmanship standards including NASA, AWS, ASME, and ANSI requirements.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NASA Ames Research Center

PERFORMANCE WORK STATEMENT

(PWS)

PROJECT ENGINEERING, MANUFACTURING,

AND SCIENCE SERVICES (PEMSS)

November 06, 2026

Table of Contents

1.0 Introduction/Background

2.0 Scope

3.0 Contract Management

4.0 Technical Requirements

5.0 Phase-In / Phase-out

6.0 ACRONYMS

7.0 APPENDICES

1.0 Introduction/Background

This Performance Work Statement (PWS) defines the requirements to support engineering, science, and technology development in order to meet evolving NASA Ames Research Center mission objectives, along with interrelated mission functions of the Agency, other NASA Centers, and Government Agencies. The Project Engineering, Manufacturing, and Science Services (PEMSS) contract requirements will be executed on Task Orders (TOs) in accordance with NFS 1852.216-80 “Task Ordering Procedure” identified in Section H of the contract.

2.0 Scope

NASA Ames Research Center (ARC) develops and manages programs, projects, and technologies that support NASA's science, exploration, and aeronautics goals, with a focus on innovation. Currently Ames supports a variety of mission types and programs, including planetary science, astrophysics, space biosciences, astrobiology, heliophysics, and earth science missions; small satellite missions; technology development;

aeronautics; and collaborative science programs. NASA ARC is a large campus environment consisting of approximately 125 facilities spread over an area of 2,000 acres. It is located on Moffett Field, CA, a property that includes ARC, Moffett Federal Airfield and the NASA Research Park (NRP). The campus includes general office space and state of the art research facilities including research laboratories, aerospace/aeronautics facilities (e.g., airfield/hangars, wind tunnels, arc jets, and simulators), computer laboratories, ballistic ranges, general testing facilities, lunar regolith testbed, fabrication facilities (e.g., machine shops, metal shops, and model shops), flight/mission operations facilities, motor pool, test chambers, and storage facilities.

ARC Website: https://www.nasa.gov/ames/

PEMSS will provide engineering services and specialized science supporting these activities and NASA’s mission. Work will include cooperative activities with other contractors, NASA Centers, and Federal Agencies.

The requirements in this PWS will provide program, engineering, science, operations and project management support for such efforts as flight development projects (e.g., mission implementation, instrument development, and technology advancement efforts), scientific programs (e.g., astrobiology, space biosciences, planetary science), spaceflight, ground based systems, facility and mission support.

The Contractor must have the responsibility to allocate resources as requirements change and have access to employees with the necessary capabilities to perform the required work. The requirements and capabilities projected below are provided as the parameters of the overall effort that may be required and will be specified, in work packages or task orders to accommodate emerging mission and customer requirements.

This contract requires the Contractor to provide management, personnel, equipment, materials, and facilities, not otherwise provided by the Government, to meet the requirements described in this PWS.

The Government will provide the end user devices needed in the performance of this contract through NASA's mandatory End User Device contract, as identified in the NFS Companion Guide, Enterprise Procurement Strategies, PSL A.102-2, IT Services.

The majority of the work will be performed on-site at NASA Ames with occasional support to be provided at other NASA Centers, other Government agencies, principal investigator laboratories, other countries, and at such other locations as directed by the Contracting Officer.

3.0 Contract Management

The Contractor shall provide an overall effective, efficient, and responsive management and administrative function to ensure the proper resources are available and allocated, adequate reports and documentation are prepared, and the overall work environment supports the PWS requirements. The Contractor shall provide an organizational structure with clear lines of authority and clearly identified Government interfaces. The Contractor shall be responsible for ensuring that all contractor and subcontractor personnel engaged in performance of this PWS have appropriate qualifications, knowledge, clearances, certifications, and are free from conflicts of interest, to perform work in accordance with the PWS requirements.

The Contractor shall maintain a Facility Clearance at the Top-Secret level with no safeguarding required in accordance with Exhibit F – Contract Security Classification Specification (DD254). The Contractor will access classified information at a Government facility to be identified on the Department of Defense Contract Security Classification Specification, DD Form 254.

The Contractor shall comply with all U.S. export control laws and regulations including, but not limited to, the International Traffic in Arms Regulations (ITAR), 22 CFR Parts 120 through 130, and the Export Administration Regulations (EAR), 15 CFR Parts 730 through 799, in performance of this contract. In the absence of available license exemptions/exceptions, the Contractor shall be responsible for obtaining the appropriate license or other approvals, if required, for exports of hardware, technical data, and software, or for the provisions of technical assistance. The Contractor shall screen individuals at appropriate times to ensure ITAR compliance and shall insert this requirement in all subcontracts that may involve ITAR or EAR controlled information.

3.1 General

3.1.1 Contractor-Furnished Equipment

The Contractor shall furnish shop coats or coveralls and provide laundry service for all work elements associated with Code RM shops. The Contractor shall also furnish all required Personal Protective Equipment (PPE), with the exception of breathing respirators, in accordance with the Ames Safety and Health Manual (APR 8715.1). All PPE provided shall comply with applicable safety standards and support safe execution of work activities across supported operations.

3.2 Technical Requirements Management

The Contractor shall provide technical management functions and processes to ensure that all engineering design, development, and test for NASA programs as authorized by NASA are accomplished in accordance with the highest engineering standards. The Contractor shall implement technical management processes commensurate to the technical product or service being provided in accordance with contract provisions and the relative risks to flight program success. The Contractor shall provide technical discipline expertise, independent assessment, engineering analysis, technical insight, technology assessment and development, and programmatic support, as required to assure high degree of technical accuracy and quality. The Contractor shall interface with but remain distinctly independent from all other Contractors supporting NASA programs.

3.3 Foreign Travel Management

Foreign Travel and supplemental requirements can be found in attachment J-1a – Requirements Statements List.

3.4 Management Meetings

The Contractor shall participate in periodic meetings with the CO to discuss contract performance issues, process improvements, risks and related issues, corrective actions, recovery plans, and other details of contract operations. These informal meetings will be attended by the CO, COR, and Technical Point of Contacts (TPOCs).

The Contractor shall participate in reviews with the CO to discuss cost planning, phasing, and performance of the overall progress of the Contractor, subcontractors and vendors as required by the CO. These reviews may include both formal and informal discussions with multiple customers requiring multiple products/reports, sometimes due concurrently.

Contractor personnel shall participate in semi-annual meetings with CO, COR, and discipline representatives to discuss SMIRP requirements.

Contractor personnel shall maintain frequent communications with the Government regarding technical challenges, accomplishments, findings, problems, risks, corrective actions, progress, and other details of contract operations. The Contractor shall participate in meetings including, but not limited to, program/project status meetings and teleconferences, team planning meetings, technical interchange meetings, and conferences.

3.5 Training

The Contractor shall provide specialized training to Government personnel regarding products including, but not limited to, tools, methods, procedures, and techniques developed or implemented by the Contractor.

3.6 Software Management

The Contractor shall develop and maintain a Software Management Plan (SMP), including supporting documents, in accordance with NPR 7150.2, NASA Software Engineering Requirements depending on the software class, identified as follows:

Class A: Human-rated Space Software Systems

Class B: Non-Human Space Rated Software Systems or Large-Scale Aeronautics Vehicles

Class C: Mission Support Software or Aeronautics Vehicles, or Major Engineering / Research Facility Software

Class D: Basic Science/Engineering Design and Research and Technology Software

Class E: Small Light Weight Design Concept and Research Technology Software

Based on software class (identified in NPR 7150.2) additional requirements, software products, and documentation contents will be specified by NASA in TDNs or TOs.

The Contractor shall manage and track data delivery requirements to differentiate between open-source, unlimited rights, and restricted computer software/limited rights data. The Contractor shall proactively notify the CO and COR of any proposed delivery of restricted computer software or limited rights data in accordance with FAR 52.227-14.

3.6.1 Use of Off-the-shelf, Reused, or Open-source Software

The Contractor shall notify the COR whether off-the-shelf, reused, or open-source software will be included in code developed for the project and to obtain all necessary licenses to permit use of such software. The Contractor shall satisfy the following conditions when a Commercial, Government, Modified Off-the-Shelf (COTS, GOTS, MOTS), open source, or reused software component is acquired or used:

OCIO’s Commercial IT Request (CITR) Application. This includes, but is not limited to, FITARA, Supply Chain Risk Management (SCRM), IPv6, and 508 compliance. No purchases of commercial IT products or services should be made prior to coordination and approval by the OCIO. Contractor shall report purchases monthly utilizing DRD 12, CITAR.

This contract shall only be used to purchase software, software maintenance, hardware, or hardware maintenance necessary for the performance of this contract. NASA shall own the license(s) or subscriptions for any software or applications purchased. All hardware shall be titled to NASA.

Section 508 Conformance - The contractor shall ensure that all products, platforms, services, and communications delivered as part of this work statement that are Information and Communication Technology (ICT) or contain ICT, conform to the Revised Section 508 of the Rehabilitation Act Standards, 36 C.F.R. § 1194.1 & Apps. A, C & D. The Standards may be found at https://www.access-board.gov/ict/.

3.6.2 Automatic Generation of Software Source Code

The Contractor shall define the approach to the automatic generation of software source code including but not limited to:

• Validation and verification of auto-generation tools

• Configuration management of the auto-generation tools and associated data

• Identification of the allowable scope for the use of auto-generated software

• Verification and validation of auto-generated source code

• Monitoring the actual use of auto-generated source code compared to the planned use

• Policies and procedures for making manual changes to auto-generated source code

• Configuration management of the input to the auto-generation tool, the output of the auto- generation tool, and modifications made to the output of the auto-generation tools

3.6.3 Software Cybersecurity

The contractor shall consult with a designated NASA Information System Security Official (ISSO) to perform a software cybersecurity assessment on the software components per the Agency security policies and the project requirements, including risks posed by the use of COTS, GOTS, MOTS, OSS, or reused software components.

3.6.4 IT Security Control

For a FIS that uses Internet Protocol, the contractor shall provide full feature functionality in both dual stack (IPv4 and IPv6) and IPv6-only environments in compliance with the NIST USGv6 Testing Program as described in NIST SP-500-267, NIST SP-500-273, and NIST

SP-500-281.

The contractor shall integrate records management and preservation considerations into the design, development, enhancement, and implementation of electronic information systems in accordance with NPR 1441.1, NASA Records Management Program Requirements.

3.6.4.1 Records Management

The Contractor shall maintain all records created for Government use or created in the course of performing the contract and/or delivered to, or under the legal control of the Government and must be managed in accordance with Federal law, including but not limited to, the Federal Records Act (44 U.S.C. chs. 21, 29, 31, 33), NARA regulations at 36 CFR Chapter XII Subchapter B, as well as NASA records policies (NPD 1440.6, NASA Records Management Program, and NPR 1441.1, NASA Records Management Program Requirements).

The Contractor shall ensure that NASA-owned/Contractor-held records are segregated from contractor-owned records and from non-record materials and report holdings of NASA records.

The Contractor shall immediately notify the Contracting Officer and NASA Records Officer upon discovery of any inadvertent or unauthorized removal, defacing, alteration, or destruction of Federal records. Destruction of Federal Records is EXPRESSLY PROHIBITED unless in accordance with records retention schedules or as directed by the

Contracting Officer.

All Contractor employees assigned to this contract who create, work with, or otherwise handle Federal Records are required to complete mandatory NASA- provided records management training. The Contractor shall ensure that training has been completed according to agency policies, including initial training and any required annual or refresher training.

The Contractor shall incorporate the substance of this clause, its terms and requirements including this paragraph, in all subcontracts under this contract, and require written subcontractor acknowledgment of same.

3.6.5 Use of Super Intelligence (SI) During Contract Performance

The contractor must disclose any potential or intended use of Super Intelligence (SI) technologies, tools, or systems in the performance of this contract. If it is unknown at the time of contract award whether SI will be used, the contractor must provide written notice to the Government prior to the deployment of any SI systems during contract performance. If SI technologies are introduced after the commencement of contract performance, the contractor must notify the contracting officer in writing prior to the release or deployment of any SI component, capability, or system in the NASA environment.

The Government reserves the right to review, approve, or disapprove the proposed use of SI technology in the performance of this contract. The contractor must obtain written approval from the contracting officer before implementing SI systems.

If any subcontractor intends to use SI technologies in the performance of work under this contract, the contractor must ensure that similar notification and disclosure requirements apply to all subcontractors. The contractor is responsible for collecting the notification and disclosure requirements from subcontractors and submitting them to the Government.

4.0 Technical Requirements

Services shall be required in one or more of the areas described in the scope below for any given task order. Services within the scope of this PWS and as specified in TOs shall include, but not be limited to, the specific services delineated in the following sections:

4.1 Support of NASA Programs and Projects

The Contractor shall perform Project Management for all requirements defined in this PWS in accordance with the latest version of the NASA Procedural Requirements (i.e., NPD 7120.4, NPR 7120.8, and NPR 8820.2, as applicable) unless otherwise specified in work package requirements. Project management support requirements include:

coordinating all resources within a functional area necessary to meet the technical, schedule, and budget requirements, as well as support for planning and development of ARC proposals and mission concepts, work breakdown structure development, project cost/schedule estimation and tracking. Requirements also include use of Microsoft (MS) Project software and Milestone Pro, support for project requirements development and management, communication with customers, coordination with the NASA ARC Safety and Mission Assurance (SMA) Directorate, configuration management, quality assurance, and safety/risk management.

All work shall be performed in a manner that complies with environmental regulations and NASA policy, including, APR 8500.1, ARC Environmental Procedural Requirements. This includes, but is not limited to, protecting the environment through the ongoing planning, implementation, integration and management control. With respect to hazardous materials, observe and adhere to requirements for handling, storage, and disposal of hazardous, toxic, and combustible supplies, materials, and waste. At least 14 days prior to bringing additional hazardous materials onsite, notify EMD for review and approval. Only bring and use hazardous materials onsite that EMD has approved.

The Contractor shall participate in project team meetings and reviews with a level of engagement and support consistent with their role in the project. Some examples are requirements reviews, conceptual design reviews, system definition reviews, preliminary design reviews, peer reviews, critical design reviews, test reviews, operational reviews, system safety reviews, airworthiness review boards, and flight readiness reviews as specified in customer task, subtask, and work package requirements. The frequency of these meetings will be specified in the work packages and will be based on the necessary communications and understanding amongst the project staff.

The Contractor shall provide support to government staff in the development, monitoring, and collection of performance metrics used to evaluate system and team performance against goals, requirements, and expectations. This support includes assistance throughout the full lifecycle of performance measurement and assessment activities to ensure accurate tracking and reporting of program and project progress.

The Contractor shall provide versatile, adaptable, multi-functional project teams capable of supporting end‑to‑end activities spanning Pre‑Phase A through Phases E and F for a range of spaceflight projects. These teams shall be able to adjust to varying project scopes and requirements and provide sustained technical and administrative support throughout all phases.

The Contractor shall support development of full life-cycle project documentation as required by NPR 7120.5. This includes preparation, maintenance, and integration of documentation necessary to meet NASA project management standards and lifecycle milestones.

The Contractor shall implement and ensure that contractor personnel can perform all processes and procedures required for the design, manufacture, testing, operations, maintenance, and refurbishment of spaceflight hardware. Personnel must be able to execute all required activities in alignment with applicable NASA processes, constraints, and mission requirements.

The Contractor shall also provide proper training and instruction for contractor personnel regarding flight hardware development and integration processes, including all on‑site ARC flight protocols, procedures, and work instructions. Training shall ensure that personnel adhere to required technical, safety, and procedural standards for the development and handling of spaceflight hardware.

4.1.1 Mission Design Center (MDC)

The NASA ARC’s MDC conducts early-stage concept development and technology maturation supporting the Center's space and aircraft missions, and critical research facilities proposals. The Contractor shall support NASA/ARC’s development of mission concepts and architectures, proposal development with associated cost and schedule estimation, design of spacecraft busses in support of instruments, and design of instruments in support of NASA/ARC’s science, technology, and exploration objectives.

The Contractor shall provide technical Subject Matter Experts (SMEs) and licensed professionals, as required in specific work packages, to support early-stage concept development and technology maturation for ARC’s MDC-generated aerospace and aircraft missions, and critical research facilities proposals. The Contractor shall perform scheduled as well as rapid-response design cycles to support the development of initial mission and research facility concepts into proposal-ready, fully supportable technical packages.

4.1.1.1 Design Tools Development

The MDC staff use, develop and customize design tools supporting the full mission, including, for example, orbit/trajectory design, thermal and electrical analyses, avionics and guidance, navigation and control design, development of operations concepts, and costing. The Contractor therefore shall be capable in the use of standard Government-supplied design tools including STK, Matlab, Simulink, GMAT, Microsoft Office suite, Confluence, Jira, Thermal Desktop, and CREO, as well as the languages (C, C++, Python) toolchains (Gnu, Microsoft) and development environments (Git, Eclipse, Microsoft Visual Studio).

4.1.1.2 Proposal Development

A key role for the MDC is the creation, leadership and support of proposals for new work performed by Ames. These may be in response to NASA or other agency solicitations or developed by ARC for direct submission to NASA programs or other opportunities. The Contractor shall support ARC proposal development in roles including proposal development lead; volume manager responsible for coordinating the written content of a proposal section; technical or scientific content lead; or in a variety of other lead and supporting roles as appropriate to the proposal. The Contractor shall support Ames’s proposal development by providing technical input, as well as technical writing, editorial, and graphics support.

4.1.2 Science Programmatic Support

The Contractor shall provide comprehensive program and project management support to oversee, execute, and evaluate complex scientific, technical, and engineering initiatives. This encompasses full life-cycle project management to facilitate coordination among decentralized research teams, manage program resources, and oversee technical portfolio execution across division objectives and strategic partnerships including programs such as Solar System Exploration Research Virtual Institute (SSERVI), projects within Space Biosciences Division, and the NASA Astrobiology Program.

4.1.2.1 Strategic Program Integration & Management

4.1.2.1.1 Program Oversight & Performance Evaluation

Provide support functions to enable strategic oversight of distinct scientific and technical portfolios. Design and implement program evaluation frameworks, manage project funds, track progress against agency milestones, and utilize appropriate metrics to measure and report technical effectiveness into agency-wide databases.

4.1.2.1.2 Scientific Working Group & Event Management

Coordinate and lead specialized working groups, executive councils, and large-scale scientific conferences. Facilitate complex collaborations across multiple disciplines, managing the technical execution, production, and project management infrastructure required for these efforts.

4.1.2.1.3 Strategic Partnerships & Complex Initiatives

Provide support functions to manage and cultivate strategic partnerships with internal and external organizations. Provide technical expertise and project management for robust research initiatives, including citizen science programs, international partnerships, challenges, integrating these efforts with broader agency research objectives.

4.1.2.2 Science Project Support & Technical Leadership

4.1.2.2.1 Scientific Portfolio & Subject Matter Expertise

Provide targeted scientific and technical subject matter expertise to assist Program Scientists and Division leadership. Support the execution of technical objectives, research efforts, and the adaptation of highly technical scientific data into usable platforms.

4.1.2.2.2 Exploration Science & Data Visualization

Provide technical support, strategic planning, and leadership for advanced scientific visualization and planetary mapping projects, coordinating directly with agency leadership and partner research centers.

4.1.2.2.3 Scientific Asset & Resource Management

Oversee the technical and program management, tracking, handling protocols, and specialized training programs required for the safe utilization and distribution of scientific assets and planetary materials to research and educational partners.

4.1.2.2.4 Science Initiatives & Facility Safety Management

Provide technical evaluation, subject matter expertise, and project management for science initiatives (e.g., Lunar Lab, scientific evaluation). Develop, review, and maintain comprehensive technical documentation and safety plans for specialized engineering test facilities and test beds.

4.1.2.2.5 Scientific Content Development & Strategic Communications

Produce and manage high-level scientific data products, technical publications, graphics, and reports (e.g., annual reports, newsletters). Synthesize complex research into scientifically accurate content for digital platforms, websites, databases, interactive applications, and executive presentations. Develop strategic communications to disseminate research, publicize scientific discoveries, and connect researchers with external stakeholders.

4.1.2.3 Technical Systems Management

4.1.2.3.1 Digital Systems & Platform Management

Oversee the technical development, architecture, enhancement, and maintenance of web-based applications, technical databases, and digital infrastructure required to support program operations and data dissemination.

4.1.2.3.2 Technical Infrastructure & Systems Integration

Manage the technical, hardware, and engineering requirements for distributed scientific teams and major events. This includes coordinating specialized audiovisual systems, interactive digital presentation boards, multi-media production and virtual engagement networks to support high-level technical seminars and data reviews.

4.1.2.4 Virtual Communications and Collaboration Support

The contractor shall provide expertise and knowledge of the state of the art in collaboration technologies, periodically assess developments with respect to new tools and technologies, and advise NASA on their integration and use.

4.1.3 Project Records and Documents Support

The contractor shall provide records and document management support, and records archiving support for supported programs and projects. The support will include configuring and maintaining electronic file storage systems according to NASA records management and records archiving standards. The contractor shall support engineering and directorate information collaboration, and configuration management tools and processes, and engineering quality information systems and processes. The support needs to closely align with the projects and engineers producing the content, the engineering database systems, and the tools utilized by the Programs and Projects and Engineering Directorates.

4.1.4 Data Document Management and Archival Support

As authorized by a fully executed Task Order, the Contractor shall establish and maintain project operational and documentation databases, including those used for requirement traceability. The Contractor shall collect, maintain, analyze, and disseminate data from operational scientific missions and shall provide data‑analysis and archival services in support of these efforts. Additional responsibilities include providing integration of information and data across systems and organizations and providing mapping of areas of expertise and capabilities to one another and to proposal development activities.

4.1.5 Technical Writing

The Contractor shall develop, maintain and deliver, upon request, technical and business documentation, such as the written content of proposal sections, technical papers, manuals, engineering and business reports, and presentation packages. The Contractor shall develop and maintain documentation in accordance with requirements described in the work package.

4.1.6 Configuration Management

The Contractor shall follow the NASA procedures for configuration management and control of documentation generated during the life of the work element as required by applicable NASA Procedural Requirements (NPR), Ames Management System (AMS) directives, and the customer. The Contractor shall also participate on ARC Change Control Boards (CCBs) as needed to satisfy contract requirements.

4.1.7 Proposal and Solicitation Support

The Contractor shall support NASA in developing and enhancing proposal processes and submission outcomes for both NASA and non-NASA opportunities. Responsibilities include recommending alternative technical approaches, providing technical editing, graphics, and document administration, and refining workflows to improve proposal quality and competitiveness. The Contractor will assist in creating a dashboard tool that offers a comprehensive overview of all competitive proposals, including actual and expected announcements of opportunity (AOs), details on current, open, and closed AOs such as status, organization leads, principal investigators, funding levels, and expected award announcements. Additionally, the Contractor will deliver database solutions and proposal development support focused on partnership development and technology transfer, ensuring proposal data is organized, searchable, and useful for strategic planning. The Contractor will prepare documentation for Ames-managed solicitations, support compliance reviews, administrative preparation, and contribute to the peer review process by creating science and technical summary packages with relevant background, rationale, qualifications, experience, results, and references.

4.1.7.1 Thermal Systems Design and Analysis

The Contractor shall perform the work by providing expertise in all areas of thermal systems design and analysis. The contractor shall apply this expertise when developing thermal system architectures through use of passive and active thermal control techniques. The work requires the application of various Government provided thermal analysis programs, Finite Element Modeling and Analysis using MSC/PATRAN, MSC/NASTRAN, Creo Simulate and Thermal Desktop, and the application of experimental methods and closed-form solutions. Thermal design and analysis include the assessment of the exchange of thermal energy between physical systems, and the evaluation of structures and systems for heat transfer, including contributions from conduction, convection and thermal radiation. Application includes the study and analysis of heat transfer through various materials comprising spacecraft, aircraft and ground systems. This includes various mechanical structural designs supporting Thermal Protection Systems (TPS), including ablative TPS systems, for spacecraft.

4.1.7.2 Fluid Mechanics Systems Design and Analysis

The Contractor shall perform the work by providing expertise in all areas of fluid mechanics systems design and analysis. The contractor shall apply this expertise when developing fluid mechanics systems for experimental devices installed on aircraft external surfaces or in wind tunnel airstreams. Tasks may include design and analysis of systems, components and instrumentation for internal fluid flow through pipes, ducts, channels, and conduits, to determine precise flow parameters. The work requires a fundamental understanding of aerodynamics and fluid dynamic analysis (e.g., lift, drag, and determination of boundary layer thickness) and computational fluid dynamic (CFD) modeling. The contractor may be required to use Government-provided modeling software. The Contractor shall also provide microfluidics fluid mechanics expertise to meet requirements for design, development, assembly, integration, prototyping and testing of microfluidics systems used within spacecraft or payloads systems.

This can include micro-fluidics cards, manifold, pumps, valves, media storage and waste bags. Microfluidics systems development will focus on support for long duration missions in microgravity and other extreme environments. The primary application area for microfluidics will be biology or astrobiology experiments in microgravity, so biocompatibility will also be a significant factor in the engineering of these systems.

4.1.7.3 Cryogenic Systems Design and Analysis

The Contractor shall perform the work by providing expertise in all areas of cryogenic systems design and analysis. The contractor shall apply this expertise when developing, designing and modeling cryogenic systems – including multi-phase cryogenic fluid modeling, procuring and/or fabricating system equipment, planning and implementing system testing, acquiring and reporting test results, and the evaluation and maintenance of cryogenic systems. Tasks include the operation and maintenance of cryogenics laboratory facilities at Ames, including instrument calibration and maintenance, vacuum system maintenance, experiment troubleshooting, hazardous materials control, and safety assurance.

4.1.7.4 Electrical/Electronics

The Contractor shall perform the work by providing engineering and technician expertise in all areas of electrical/electronic engineering, including the ability to design and develop instrumentation, analog and digital sensors, embedded systems, small and large (facility) power systems, security systems, data acquisition systems, and communication systems.

The Contractor shall minimize power consumption and physical size of electrical systems, unless otherwise specified in work package requirements. The Contractor shall use Government-provided Altium, Orcad/Cadence and LabView for electrical schematic/PCB design simulation and user interface. The Contractor shall meet NASA’s requirements (NASA-HDBK-8739.21) for electrostatic discharge control. Applications include avionics in support of small spacecraft and rockets for secondary payloads.

These systems utilize a combination of COTS and custom-designed hardware/software/firmware.

4.1.7.5 Sensors and Instrumentation Development

The Contractor shall perform the work by providing all necessary expertise for sensors and instrumentation development. The contractor shall apply this expertise when developing designs for sensor and instrumentation systems including airborne and spaceborne atmospheric chemistry, atmospheric physics, remote sensing, and astronomy instruments; cryogenics systems and sensors; biomedical, chemical, and bio-telemetry sensors; and laser and optics development. The Contractor shall conduct trade studies and industry searches as specified in work package requirements. The Contractor shall develop custom analog and digital circuitry emphasizing modularity and high margin-of-safety as specified in work package requirements.

4.1.7.5.1 Embedded Computational Systems Development

The Contractor shall perform the work by providing all necessary expertise for embedded computational systems development. The contractor shall apply this expertise when developing designs for embedded systems include custom software and firmware development, custom hardware, data compression and storage development, electronics packaging, cable design and researching new applicable technologies.

Embedded systems are used to control instrumentation, payloads, and/or hardware, and collect research data. Embedded systems can also include Command/Data Handling (C&DH) for an aircraft or spacecraft and its payloads.

4.1.7.5.2 Power Systems Design and Development

The Contractor shall perform the work by providing all necessary expertise for power systems design and development. The contractor shall apply this expertise when developing designs for power systems that include power distribution, generation (e.g., solar panels) and management systems and custom hardware/software/firmware development, commercial power supply selection for a given system, and system designs with minimal conducted and/or radiated Electromagnetic Interference (EMI). This includes the development of battery packs and miniaturized batteries. Power System design and development support also applies to ARC Electrical Distribution Systems, Protective Relay System, and ARC Power Monitoring System. This includes designing, providing configuration management of electrical system database, files and drawings, updating existing Electrical Distribution Systems, and implementing electrical protective relay system upgrades for the NASA Ames Electrical Distribution System. The work requires knowledge and use of the Government-provided SKM software and managing the SKM system model and database. The government will furnish specialized relay testing equipment, dedicated software and all other items necessary to conduct required tests and make all required relay setting adjustments. Some tasks may require engineering field support.

4.1.7.5.3 Control Systems Design and Development

The Contractor shall perform the work by providing all necessary expertise for control systems design and development. The contractor shall apply this expertise when designing or developing control systems that are utilized by NASA in aircraft and spacecraft Guidance, Navigation, and Control (GN&C), science payloads, instruments (ground, airborne, and space), arc jet facility, wind tunnels systems, model supports, motion simulators, centrifuges, autonomous robotic controls systems, environmental control systems, ARC facility electrical power and fire alarm systems, the ARC Facility

Management Control System (FMCS), the Ames Power Monitoring System (APMS), and process control systems. The Contractor shall meet NASA’s requirements for electrical safety and electrostatic discharge control as defined in NASA Procedural Requirements (NPRs), Ames Management System (AMS) directives, NASA-HDBK-8739.21, and shall be proficient in using the Government-provided MATLAB and LabView. For facility control system support, the contractor shall develop piping and instrumentation diagrams (P&IDs). Examples of applications for required control system support are described below.

4.1.7.5.4 High-Performance Servo Systems Applications

The Contractor shall perform the work by providing the necessary expertise for high-performance servo system design and development. Aircraft and Spacecraft control systems are generally high-performance servo systems, such as 1) gimbaled axes positioning control system which must address relatively high stiffness, pressure disturbances, and vibration; 2) gyro-inertial tracking systems with accuracy in arc-seconds; and 3) precision temperature control systems. Servo systems can be elements of C&DH subsystems, Attitude Determination and Control Systems (ADCS), and GN&C.

The Contractor shall meet requirements for applicable standards and certification processes for flight-quality hardware as specified in the customer tasks, subtasks, and work packages. System design and testing will require servo analysis and computer simulation. The Contractor shall provide pre-flight ground support and in-flight validation of control system performance.

4.1.7.5.5 Wind Tunnels Applications

The Contractor shall perform the work by providing the necessary expertise for wind tunnel control system design and development. Wind tunnel control systems are used to set flow conditions (dynamic pressure (“Q”), Mach and Reynolds numbers) via pressure, drive RPM, nozzle/flexwall, and temperature control systems, and to control the attitude and position of the test model. System components include large high-power electric motors, blowers, pumps, large valves, and compressors. Contractor tasks may include the design and development of distributed control systems that use programmable logic controllers for control and operation for these applications.

4.1.7.5.6 Motion Simulators and Centrifuges Applications

The Contractor shall perform the work by providing the necessary expertise for motion simulator and centrifuge control system design and development. Motion simulator and centrifuge systems are motion-based power-driven control systems. The Contractor shall ensure smoothness of operation, high reliability and man-rating, for long or short-term operation. The Contractor shall address issues such as cross-coupling and structural resonance of large-payload, multiple-degrees-of- freedom motion systems. These control systems involve velocity and acceleration controls of motor drives and high pressure pneumatic/hydraulic actuators.

4.1.7.5.7 Autonomous Robotic Systems Applications

The Contractor shall perform the work by providing the necessary expertise for autonomous robotic control systems design and development to explore new concepts utilizing new technology, customized prototype design, subminiature control hardware, and microprocessor-based control systems and embedded controllers. Most systems utilize embedded software.

4.1.7.5.8 Environmental Control Systems Applications

The contractor shall perform the work by providing the necessary expertise for environmental control systems design and development to maintain control parameters for stable environmental conditions, such as temperature and humidity for airborne instruments, wind tunnels, facility heating, ventilation & air conditioning (HVAC) systems, and life science experiments flying aboard spacecraft.

4.1.7.5.9 Micro-Propulsion Systems Applications

The Contractor shall perform the work by providing the necessary expertise for micro-propulsion control systems design and development. This work includes developing a micro-propulsion system suitable for attitude control of small-scale satellite systems.

Support activities include design, development and testing of prototype thrusters and power supplies.

4.1.7.5.10 Ames Power Monitoring System (APMS) Applications

The Contractor shall perform the work by providing the engineering expertise to support the continuous design improvements that are necessary to ensure the Ames Power Monitoring System (APMS) will have as high of a system availability as possible. The APMS is a network of power meters located throughout the Center, connected to a centrally located server, where system health status and power consumption is measured 24/7. ARC benefits from this system by monitoring trends, verifying power consumption, managing and scheduling power usage, and assisting cost control with the utility provider. Task will include monitoring operations and maintenance for troubleshooting and correcting software and hardware issues, to facilitate system upgrades, ensuring Center Local Area Network (LAN) upgrade compatibility with APMS, and meter additions and programming.

4.1.7.5.11 Data Acquisition Systems Design and Development

The Contractor shall perform the work by providing all necessary expertise for data acquisition systems design and development. The contractor shall apply this expertise when designing or developing data acquisition systems, which can include selecting commercial sensors and data acquisition equipment, developing needed custom software and hardware, and performing data collection for analysis. Data acquisition systems are used to collect large amounts of data from research facilities, models or experiments.

4.1.7.5.12 Communication Systems Design and Development

The Contractor shall perform the work by providing all necessary expertise for communication systems design and development. The contractor shall apply this expertise when designing or developing communication systems, which can include transmitters and receivers, serial communications, satellite communications, spacecraft communications, information systems, Ethernet communications, radio communications, Internet interfaces (including wireless), and custom hardware/software development.

Support also includes any required licensing for the communication systems.

4.1.7.5.13 Software and Firmware Systems Design and Development

The Contractor shall perform the work by providing all necessary expertise for software and firmware systems design and development. The contractor shall apply this expertise when designing or developing system software and firmware, test software and firmware, Internet products, custom or off-the-shelf databases, data analysis, design tools, project related IT structure, upgrades to existing software/firmware and developing research models for conceptual designs. For aircraft and spacecraft, the work includes supporting the development of firmware for flight dynamics systems including C&DH systems, Attitude Determination and Control Systems (ADCS), GN&C, and communication systems. Development tools require the use of standard programming languages along with Simulink, Matlab, ATK and other programming instruction sets, as defined in work packages, compatible with government provided software and firmware.

4.1.7.6 Chemical, Biological, Biomedical and Radioactive Systems

The Contractor shall perform the work by providing all required expertise in the areas of chemical, biological, biomedical, and radioactive systems. This includes the ability to design, fabricate, test and inspect systems and subsystem components that contain, transport, manipulate, process, and investigate, potentially hazardous chemical, biological, biomedical, and/or radioactive materials in support of NASA space and life science research. Example projects include the development of chemistry protocols for the isolation of RNA from blood, plant, or mammalian cells for ISS experiments, and evaluation of yeast as a radiation dosimeter in small spacecraft applications. The contractor shall ensure work is compliant with all applicable safety and environmental regulatory requirements governing the use of these materials and operations of these systems.

4.1.8 Assembly, Integration, and Test (AI&T)

The Contractor shall lead or support project efforts in the areas of Assembly, Integration, and Test (AI&T). AI&T activities will be in support of a variety of project types including both spaceflight systems and ground systems. Contractor AI&T tasks may include support for prototypes and engineering development units, qualification units, and/or flight units. The work encompasses touch labor for assembly and integration and technicians for instrumenting hardware, conducting tests, and data reduction. Integration and test activities culminate in Verification and Validation testing of systems in readiness for operations review gates.

4.1.9 Operations, Sustainment, and Closeout

The Contractor shall lead or support project efforts in the areas of operations, sustainment, and closeout. Operations include the task to conduct the prime mission of the project or system. This includes concept of operations development, operations planning, operations requirements specification, and execution of the operations phase of small satellites flights, spaceflight payloads, or research facilities using either in-house mission operations centers, partner’s operations centers, or contract operations facilities.

Operations support can also include providing launch support services. Sustainment tasks include maintenance of the system with appropriate data logs, data reduction and analysis, evaluation reports, and preparation for deactivation or decommissioning.

Closeout tasks include the disposition the system or facility as required, documenting lessons learned, and archiving all documents and data in the closeout phase.

4.1.10 Project Technical Review and Compliance

ARC’s Facilities Engineering Branch (Code JCE) conducts ARC Architectural and Engineering support for Building and R&D Facilities Design and Construction Projects.

The Contractor shall perform engineering reviews and inspections related to Code Compliance for designs developed, for building construction projects. This may also include safety, environmental, and performance compliance inspections for research facility systems involving complex high- energy electrical, mechanical, pressure, thermal and/or chemical components.

4.1.11 Engineering Support and Support for Technology Development Responsibilities

The Contractor shall support laboratory and prototype hardware development and demonstration efforts from concept through operations. This includes assisting with the design, maturation, and operational readiness of hardware throughout all phases of development and supporting activities required to bring hardware concepts into functional systems. In addition, the Contractor shall support development of full system design and architecture in accordance with NASA NPR 7123, ensuring that system‑level products and architectural frameworks comply with agency standards.

The Contractor shall support system and hardware assembly and test activities, contributing to integration, verification, and validation processes. This includes working with engineering teams to assemble components, conduct system‑level testing, and document results in support of program…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .