NAME BRAND ONLY-MILLER PARKER ACTUATORS Federal contract opportunity
Solicitation number
80AFRC19Q0013
Issued by
National Aeronautics and Space Administration Armstrong Flight Research Center

About this file

Actuator SOW

View the file

Other files for this federal contract opportunity

Other files attached to NAME BRAND ONLY-MILLER PARKER ACTUATORS, newest first.
File Type Posted
80AFRC19Q0013P001_SF30.pdf PDF
Actuator_SOWv1.pdf PDF
Actuator__List.pdf PDF
Acuators.pdf PDF
PR_4200704367_Brand_Name.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

Acquisition of Actuators for Loads Calibration Testing

Flight Loads Laboratory Aerostructures Branch, Code 560

Base Version

National Aeronautics and Space Administration Armstrong Flight Research Center Edwards, California

Table of Contents

1.0 Background

2.0 Objectives

3.0 Requirements

4.0 Deliverables

5.0 Period of Performance

6.0 Travel

7.0 Other Special Requirements and Considerations

1.0 Background

The Armstrong Flight Research Center (AFRC) Flight Loads Laboratory (FLL) is conducting a loads calibration of a Navy F/A-18E Super Hornet aircraft for the Naval Air Systems Command (NAVAIR) headquartered at the Naval Air Station Patuxent River, Md. The loads calibration is being conducted as part of the Navy’s F/A-18E life extension program and thus represents a program of critical national importance affecting the readiness of the Navy’s air forces.

As part of this project, the FLL must procure parts for testing including hydraulic actuators. The actuators are critical components of the testing and must meet stringent performance requirements. Acquisition of the proper components on-time and within budget are required to ensure that the testing is performed in compliance with the Navy’s requirements.

2.0 Objectives

The objective of this procurement is to acquire actuators that meet the requirements specified in Section

3.0 that follows. As stated above, these components will be used in the load calibrations test of the Navy’s F/A-18E Super Hornet aircraft.

3.0 Requirements

The contractor shall provide the Miller-Parker manufactured actuators as enumerated in Table 1 and in the individual manufacturer’s configuration sheets provided. If the contractor finds any discrepancy between the actuators in Table 1 and the configuration sheets, the contractor shall notify the government prior to fabricating any actuator. The contractor shall provide the government with dimensional engineering drawings as well as CAD models of each actuator prior to fabricating any actuator. The government will then review the drawings and provide the contractor with approval to fabricate.

The contractor also shall perform hydraulic testing on each deliverable actuator to one and one-half (1.5) times the rated actuator pressure to verify that there are no leaks and the actuators meet structural requirements. The test pressures shall be traceable to National Institute of Standards and Technology (NIST) standards.

The government will also have the option to purchase up to the number of actuators at the same price and delivery terms as the original purchase within 180 days of the initial order.

4.0 Deliverables

The contractor shall provide the actuators as enumerated in Table 1. Prior to fabrication of the actuators, the contractor shall provide the government with dimensional engineering drawings for review. At final delivery of the actuators the contractor shall provide the government with certified test reports showing that the actuators have successfully passed the pressure testing requirements and that the test pressures are traceable to NIST standards.

All parts and test reports must be delivered to the government at AFRC located on Edwards AFB, Edwards, CA.

5.0 Period of Performance

The actuator dimensional drawings shall be available no later than 10 working days after the contract award and the actuators shall be delivered no later than 30 days after drawing approval by the government. Period of performance will be for one calendar year after contract award.

6.0 Travel

There are no travel requirements as part of this work.

7.0 Other Special Requirements and Considerations

Actuators shall be individually identified by a unique manufacturer’s serial number. There are no other special requirements or considerations with this contract.

REVISIONS

Revision Number Date Brief Summary of Changes

Base 9 July 2019 Initial Release

Table 1. Actuator parts list

MODEL CODE

Piston Rod Diameter (inches)

Port Size Head

Port Location

Head

Port Size Cap

Port Location

Cap

LRT

Connector

Position

Piston Rod End A

Dimension (inches)

Piston Rod End

Extension Length (inches)

Male Piston Rod

Thread

Gross Stroke

(inches)

Net Stroke (inches)

Quantity

2.00BBHVXKNFT8S23A9.250 - NNNFFRN 1.37 #8 SAE 4 #8 SAE 4 3 1.625 1 1-14 UNS 9.250 8.000 2 2.00BBHVXKNFT8S23A17.250 - NNNFFRN 1.37 #8 SAE 4 #8 SAE 4 3 1.625 1 1-14 UNS 17.250 16.000 4 2.50BBHVXKNFT8S33A11.250 - NNNFFRN 1.37 #8 SAE 4 #8 SAE 4 3 1.625 1.625 1-14 UNS 11.250 10.000 4 2.50BBHVXKNFT8S33A15.250 - NNNFFRN 1.37 #8 SAE 4 #8 SAE 4 3 1.625 1.625 1-14 UNS 15.250 14.000 2 2.50BBHVXKNFT8S23A25.250 - NNNFFRN 1.75 #8 SAE 4 #8 SAE 4 3 2.000 1.875 1-14 UNS 25.250 24.000 2 2.50BBHVXKNFT8S23A27.250 - NNNFFRN 1.75 #8 SAE 4 #8 SAE 4 3 2.000 1.875 1-14 UNS 27.250 26.000 2 3.25BBHVXKNFT8S33A9.250 - NNNFFRN 1.75 #8 SAE 4 #8 SAE 4 3 2.000 1.875 1.5-12 UNF 9.250 8.000 8 3.25BBHVXKNFT8S33A23.250 - NNNFFRN 1.75 #8 SAE 4 #8 SAE 4 3 2.000 1.875 1.5-12 UNF 23.250 22.000 6 3.25BBHVXKNFT8S33A25.250 - NNNFFRN 1.75 #8 SAE 4 #8 SAE 4 3 2.000 1.875 1-14 UNS 25.250 24.000 2 4.00BBHVXKNFT8S33A8.000 - NNNFFRN 2 #8 SAE 4 #8 SAE 4 3 2.250 2 1.5-12 UNF 8.000 8.000 2 5608-8-10S Aeroquip female 68 5608-8-10S Aeroquip male 68 6403-8 Tompkins SAE O-ring 68 Total

All cylinders:

1) Standard 2 Wrench Flats

2) Non Cushioned

3) No Stop Tube

4) HVX with LRT Internal Feedback (NNNFFRN)

5) Note: For cylinders < 4" bore, the gross "Stroke" entered above is reduced by 1.25" due to the LRT spacer on the cap end. See "Net Stroke" for actual stroke values.

File details come from the government source that posted it.