8-Specification Requirements Airport Sprinkler FDC and Pump Testing AS UPD 05.22.2026.docx
DOCX document 16 KB Posted
- Attached to
- Sprinkler, FDC, and pump testing and related maintenance at Milwaukee Mitchell International Airport
- Solicitation number
- ITB-2026-Sprinkler, FDC, and pump testing and related maintenance at Milwaukee Mitchell International Airport
- Issued by
- Milwaukee County, Mattoon Village, Wisconsin
About this file
This specification requirements document pertains to sprinkler, FDC (Fire Department Connection), and pump testing and related maintenance services at Milwaukee Mitchell International Airport, located at 5300 S. Howell Ave., Milwaukee, Wisconsin 53207, under the jurisdiction of Milwaukee County. The contract requires comprehensive testing and maintenance performed according to established weekly, annual, 3-year, and 5-year schedules. A mandatory pre-bid meeting is scheduled for Monday, June 8th, 2026, at 9:00 AM Central Time at the Milwaukee County Milwaukee Mitchell International Airport Fire Department (5800 S. Howell Ave., Milwaukee, WI 53207), which is mandatory for all bidders unless they have completed the required pre-bid attendance within the last 18 months. The document establishes the technical specifications and requirements that contractors must meet to provide these critical fire safety testing and maintenance services at the airport facility.
The specification document outlines the detailed technical requirements, testing protocols, and maintenance standards that bidding contractors must comply with to perform sprinkler system, FDC, and pump testing services. The document serves as the baseline for evaluating contractor qualifications, ensuring all work meets applicable fire safety codes and regulatory standards necessary for airport operations. No pricing information, set-asides, funding amounts, or contract award dates are specified within this requirements document, as it functions as the technical specification guide rather than a pricing or award notice.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 3-NFP Regulations.pdf | ||
| 7-Pre-Bid Sign-In Registration ITB-2026-Sprinkler FDC and pump testing and related maintenance AS UPD.xlsx | XLSX spreadsheet | |
| 2-Bid Sheet Required Tests and Proposed Fees (Revised 3-17-2026).xlsx | XLSX spreadsheet | |
| 5-Map and Directions On Site Visit.JPG | JPG image | |
| 6-Map Milwaukee Mitchell International Airport Fire Department.jpg | JPG image | |
| 1-Bid Prerequisite Requirements Sprinker testing.docx | DOCX document | |
| 4-Arrival Directions for On-Site Visit Monday 8 June 9 AM Central - Copy.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Specification Requirements Name: Airport Sprinkler, FDC, and Pump Testing Scope:
· Perform sprinkler, FDC, and pump testing and related maintenance at Milwaukee Mitchell International Airport according to attached weekly, annual, 3 year and 5 year schedule
· Contractor shall provide a minimum four hour response time (between call and arriving on site) for emergencies, 24 hours a day/7 days a week.
· Rates for scheduled maintenance and testing are fixed rates inclusive of all expenses including but not limited to personnel, travel, equipment, and badging; no truck charges may be added
· All work shall be done per NFPA25 specifications and performed by certified fire protection personnel
· All work must be scheduled in coordination with MCFD Chief or designee
· All sprinkler and standpipe testing must be completed by September to ensure appropriate conditions
· Contractor's personnel working on site are required to be badged by the Airport. Time and expense for badging is the responsibility of the Contractor.
· On an annual basis, Contractor shall provide to MCFD Chief or designee a binder of record detailing inspections and work performed for the year. All costs for the binder of record are included in the proposed fees.
· All testing and other charges will be invoiced monthly
· To be eligible for consideration for this bid, Contractor may not have documented adverse history with Milwaukee County contracts including poor performance, termination, default, breach or litigation within the last 10 years
· To be eligible for consideration for this bid, Contractor must either attend the pre-bid On-Site Visit on June 8 or have completed a site visit within the last 18 months.
Notes Bid Evaluation (matches calculation in excel workbook): Total 5 Year Price equal to the sum of below:
· [Annual Total] X [5] (5 years)
· [3 Year Total] X [5/3] (5 years divided by 3)
· [5 Year Total]
· [Weekly Total] X [52] X [5] (52 weeks x 5 years)
· [Weekly (Nov-Mar) Total] X [16] X [5] (16 weeks x 5 years)
· [Fall Drain/Winterization Total] X [5] (5 years)
Term: 1 Year + 4 annual optional extensions