8-Part II Sherwood Forest Park Landscaping Site Plan 2026.pdf

PDF 6 MB Posted

Attached to
SHRWOOD FOREST PARK LANDSCAPING PROJECT DSS #1 VENDORS ONLY
Solicitation number
548131
Issued by
Wayne County, Detroit City, Michigan

About this file

Sherwood Forest Park Landscaping Site Plan Summary

This document is a landscaping site plan prepared by the City of Detroit General Services Department (GSD) for the Sherwood Forest Park Landscaping Project located at 19701 Canterbury Road, Detroit, Michigan. The project scope includes removal of existing planting materials (three shrubs, three lilac multi-stem shrubs, and one small eight-inch caliper tree), site preparation, installation of perennial plantings including Hydrangea varieties, Baptisia, Forsythia, Agastache, and Allium species across approximately 710 square feet of planting beds, and installation of a standard city park sign on a concrete pad. The site encompasses 0.765 acres of fair, flat terrain that is currently all grass with mature trees. The project is bounded by Canterbury Road, Warrington Drive (50 feet wide), and St. Martin Avenue in Detroit. The drawings dated April 22, 2026, and revised May 11, 2026, include comprehensive details for soil erosion and sedimentation control (SESC), existing conditions, demolition plans, planting specifications, sign installation, and an optional irrigation system alternate.

The project requires compliance with Michigan's soil erosion and sedimentation control laws (P.A. 451, Parts 41 and 91) and Wayne County Ordinance No. 2001-759. The contractor must retain an EGLE-certified storm water operator (CSWO) to provide weekly and storm event reports and maintain all SESC measures throughout the project duration. The contractor bears responsibility for site visits, demolition debris removal, topsoil stripping and stockpiling, daily maintenance of erosion controls, catch basin cleaning, and dust control. Violations must be corrected within 24 hours of notification, with fines up to $25,000 per day assessed for noncompliance. The contractor must contact Miss Dig 72 hours prior to any excavation. Alternate #1 includes irrigation installation for the planting beds, requiring the contractor to design the irrigation system, arrange water taps through Detroit Water and Sewerage Department (DWSD) standards, and obtain necessary city permits. The RFQ is limited to pre-approved DDS #1 Ground Maintenance Suppliers and requires a two-year maintenance term following installation.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VICINITY MAP

Sherwood Forest

ST. AUBIN

HAMTRAMCK

M O

U N

D

SCHOOLCRAFT

FENKELL

TE

LE

G R

AP

H

LA

H

SE

R

FWY.

LODGE FWY.

GRAND RIVER

FI

SH

ER

FORT

JEFFRIES FWY.

WARREN

PLYMOUTH

JOY

SO

U

TH

FI

EL

D

F W

Y.

EV

ER

G R

EE

N

G R

EE

N

FI

EL

D

US-10

SC

H

AE

FE

R W

YO

M

IN

G

W

. GR.

DIX

I-75

MICHIGAN

D E T R O I T

BLVD.

HIGHLAND

PARK

TW

ELFTH

McNICHOLS

SEVEN MILE RD.

EIGHT MILE RD.

LI

VE

R N

O

IS

W

OODW

ARD

LODGE FW

Y.

CHRYSLER

R

YA

N

R I V E R

SEVEN MILE

WARREN

GRAT

IO

T

I-94

E. G

R. BLVD.

EIGHT MILE

VA

N

D

YK

E

O U

TE

R

D R

CONNER

JEFFERSON

MACK

VERNOR

FORD FWY.

SC

H

O

EN

H

ER

R

ALTER

DRAWING INDEX

WAYNE COUNTY (2024-2025 MILEAGE) SHERWOOD

FOREST PARK LANDSCAPING PROJECT

CITY OF DETROIT

MARY SHEFFIELD, MAYOR

GENERAL SERVICES DEPARTMENT

CRYSTAL PERKINS, DIRECTOR

TIM KARL, CHIEF OF LANDSCAPE ARCHITECTURE

JEFF KLEIN, DEPUTY CHIEF OF LANDSCAPE ARCHITECTURE

PROJECT MANAGER

BARRY BURTON & FARHAT CHAUDHRY

19701 Canterbury Rd, Detroit, Michigan

Property No: 171 Date: 5 / 11 / 2026

Dwg. No. SHEET NO. SHEET TITLE S1.01 1 Soil Erosion and Sedimentation (SESC) Plan S1.02 2 Soil Map and Legal Description L1.01 3 Existing Conditions and Demolition Plan L1.02 4 Planting Site Plan L1.03 5 Site Plan for Sign L1.04 6 Enlarge Planting Bed Plan L1.05 7 Alternate # 1 (Irrigation)

GENERAL SERVICES DEPARTMENT

PARKS & RECREATION

DIVISION

SITE LOCATION MAP

LIVER

N

O

IS

C A

N

TER

B U

R Y R

D

PEMBROKE AVE

ST.MARTIN AVE

AutoCAD SHX Text North

CB FOR FILE

PROJ #:

PROP #:

DIST #:

CHECKED:

SHEET TITLE:

APPROVED:DRAWN:

GENERAL SERVICES DEPARTMENT

LANDSCAPE DESIGN UNIT

115 ERSKINE ST, DETROIT MI 48201

PH: (313) 628-0900 FAX:(313) 628-0927

SHEET

DATE

PROJECT NAME:

ISSUED FOR

SCALE:

SHERWOOD FOREST

PARK LANDSCAPING

4 / 22 / 2026

SOIL EROSION AND

SEDIMENTATION

CONTROL PLAN

S1.01

FC

JK

TK

1:10

NOT TO SCALE

TREE PROTECTION UNDER DRIP LINE2

L1.01

4'

LEGEND:

EROSION CONTROLS:

SEDIMENT CONTROLS:

2' MIN.

SECTION A - A'

A A'

NOT TO SCALE

INLET FABRIC DROP1

L1.01

PLAN

0 40 80

PROJECT SIGN:

CONTRACTOR IS REQUIRED TO PROVIDE A TEMPORARY PROJECT

SIGN (4' x 8' x 34") IN COLOR ON CORRUGATED CHLOROPLAST PRIOR TO

CONSTRUCTION; INSTALLED SIGN SHALL BE 42" ABOVE GRADE.

INSTALLATION TO BE PERFORMED ACCORDING TO MANUFACTURERS

AND STANDARD GSD SPECS.

L1.01

2 TREE

PROTECTION

L1.01

L1.01

1 INLET FABRIC

DROP

L1.01

TREE

PROTECTION

AutoCAD SHX Text

CANTERBURY ROAD

AutoCAD SHX Text

WARRINGTON DRIVE (50' WIDE)

AutoCAD SHX Text

ST.MARTIN AVE

AutoCAD SHX Text

NOTES: DROP FABRIC AT INLETS WHERE APPLICABLE AND WITHIN LIMITS OF WORK

AutoCAD SHX Text TREE PROTECTION FENCE: (NOT APPLICABLE) HIGH DENSITY POLYETHYLENE FENCING WITH 3.5" X 1.5" OPENINGS; COLOR ORANGE. STEEL POSTS INSTALLED AT 8' O.C.

AutoCAD SHX Text NOTES: NO PRUNING SHALL BE PERFORMED EXCEPT BY APPROVED CITY REP. NO EQUIPMENT SHALL OPERATE INSIDE THE PROTECTION FENCE INCLUDING DURING FENCE INSTALLATION AND REMOVAL. FENCE SHALL REMAIN UNTIL PARK IMPROVEMENTS ARE COMPLETE

AutoCAD SHX Text

2" X 6" STEEL POSTS OR APPROVED EQUIVALENCE

AutoCAD SHX Text MAINTAIN EXISTING GRADE WITH THE FENCE PROTECTION FENCE UNLESS OTHERWISE INDICATED ON THE PLANS

AutoCAD SHX Text Inlet Protection Fabric

AutoCAD SHX Text S58

AutoCAD SHX Text Dust Control

AutoCAD SHX Text E5

AutoCAD SHX Text

TF

AutoCAD SHX Text Drop

AutoCAD SHX Text

6" MIN. OVERLAP AT END OF SILT FENCE

AutoCAD SHX Text GEOTEXTILE BLANKET INSTALLED BETWEEN COVER AND FRAME OF DRAINAGE STRUCTURE CASTING

AutoCAD SHX Text

DRAIN INLET /COVER

AutoCAD SHX Text

DRAIN INLET/COVER

AutoCAD SHX Text GEOTEXTILE BLANKET INSTALLED BETWEEN COVER AND FRAME OF DRAINAGE STRUCTURE CASTING

AutoCAD SHX Text

SILT FENCE

AutoCAD SHX Text S58

AutoCAD SHX Text E5

AutoCAD SHX Text E5

AutoCAD SHX Text E5

E5

FOR FILE

PROJ #:

PROP #:

DIST #:

CHECKED:

SHEET TITLE:

APPROVED:DRAWN:

GENERAL SERVICES DEPARTMENT

LANDSCAPE DESIGN UNIT

115 ERSKINE ST, DETROIT MI 48201

PH: (313) 628-0900 FAX:(313) 628-0927

SHEET

DATE

PROJECT NAME:

ISSUED FOR

SCALE:

SHERWOOD FOREST

PARK LANDSCAPING

4 / 22 / 2026

SOIL EROSION AND

SEDIMENTATION

CONTROL PLAN

S1.02

FC

JK

TK

N.T.S

LEGEND:

EROSION CONTROLS:

SEDIMENT CONTROLS:

0 40 80

PROJECT

AREA

PARK PROPERTY

BOUNDARY

AutoCAD SHX Text Inlet Protection Fabric

AutoCAD SHX Text S58

AutoCAD SHX Text Dust Control

AutoCAD SHX Text E5

AutoCAD SHX Text

TF

AutoCAD SHX Text Drop

AutoCAD SHX Text

SITE LEGAL DESCRIPTION:

AutoCAD SHX Text

PROXIMITY TO LAKES AND STREAMS:

AutoCAD SHX Text APPROXIMATELY 1.36 MILES FROM DETROIT RIVER TO THE EAST AND APPROXIMATELY 6.73 MILES TO ROUGE RIVER TO THE WEST

AutoCAD SHX Text

COUNTOUR/SLOPES:

AutoCAD SHX Text

THE SITE IS FAILR FLAT IN ELEVATION THROUGHOUT THE ENTIRE PARK.

AutoCAD SHX Text

DRAINAGE AND DEWATERING FACILITIES:

AutoCAD SHX Text

THE SITE IS ALL GRASS WITH MATURE TREES AND DRAINS INTO THE GROUND

AutoCAD SHX Text

SHERWOOD FOREST PARK - SOIL MAP:

AutoCAD SHX Text

SOIL EROSION AND SEDIMENTATION CONTROL NOTES:

AutoCAD SHX Text A. THE GENERAL SERVICES DEPARTMENT (GSD) IS AN AUTHORIZED THE GENERAL SERVICES DEPARTMENT (GSD) IS AN AUTHORIZED PUBLIC AGENCY (APA) ENTITY AND HAS BEEN GRANTED BY THE STATE OF MICHIGAN THE PRIVILEGE TO UNDERTAKE EARTH CHANGE ACTIVITIES WITHOUT HAVING TO OBTAIN A SOIL EROSION AND SEDIMENTATION CONTROL (SESC) PERMIT. THE CONTRACTOR SHALL COMPLY WITH THE PROVISIONS OF THE STATE OF MICHIGAN'S SESC LAW AND REQUIREMENTS; COMPLYING WITH ALL CONTRACT DOCUMENTS, APPROVED S.E.S.C. PLANS, PERMIT CONDITIONS THAT ENFORCES P.A. 451, PARTS 41 AND 91 SOIL EROSION AND SEDIMENTATION CONTROL OF THE NATURAL RESOURCES AND ENVIRONMENTAL PROTECTION ACT AND WAYNE COUNTY SOIL SEDIMENTATION CONTROL ORDINANCE NO. 2001-759. B. PRIOR TO BEGINNING ANY EARTH CHANGE, THE CONTRACTOR MUST PRIOR TO BEGINNING ANY EARTH CHANGE, THE CONTRACTOR MUST RETAIN A E.G.L.E. CERTIFIED STORM WATER OPERATOR (C.S.W.O.) TO PROVIDE THE REQUIRED S.E.S.C. REPORTS (WHICH INCLUDE THE WEEKLY AND STORM EVENT REPORTS AS WELL AS ALL FOLLOW UP REPORTS FOR BOTH VIOLATIONS AND STORM EVENT CORRECTIONS) ON THE STANDARD E.G.L.E. FORM. THE CONTRACTOR SHALL PROVIDE THE E.G.L.E. FORM. THE CONTRACTOR SHALL PROVIDE THE FORM. THE CONTRACTOR SHALL PROVIDE THE REPORTS TO THE OWNER ON A WEEKLY BASIS, AND RETAIN THOSE REPORTS FOR THREE YEARS. C. PRIOR TO BEGINNING ANY EARTH CHANGE, THE CONTRACTOR MUST PRIOR TO BEGINNING ANY EARTH CHANGE, THE CONTRACTOR MUST INSTALL AND MAINTAIN ALL S.E.S.C. MEASURES AS SHOWN ON THE CONTRACT DOCUMENTS AND AS DIRECTED BY THE OWNER, C.S.W.O., M.E.A./C.E.A. OR E.G.L.E. AT ANYTIME DURING THE LIFE OF THE E.G.L.E. AT ANYTIME DURING THE LIFE OF THE AT ANYTIME DURING THE LIFE OF THE CONTRACT OR UNTIL THE CITY OF DETROIT OFFICIALLY TAKES OVER RESPONSIBILITY FOR THE SITE. IMMEDIATELY PRIOR TO THE CITY OF DETROIT TAKING RESPONSIBILITY FOR THE SITE, THE CONTRACTOR WILL BE REQUIRED TO CLEAN ALL CATCH BASINS AFFECTED BY THE CONSTRUCTION, BOTH WITHIN THE CONTRACT LIMITS AND ALL SURROUNDING ROADS AND LAWN AREAS WHERE SOIL MAY HAVE SPREAD AS THE RESULT OF CONSTRUCTION ACTIVITIES. D. THE CONTRACTOR SHALL CONDUCT ALL EXCAVATION, FILLING, THE CONTRACTOR SHALL CONDUCT ALL EXCAVATION, FILLING, GRADING, AND CLEANUP OPERATIONS IN A MANNER SUCH THAT SEDIMENT, GENERATED BY WIND OR WATER, IS NOT DISCHARGED INTO ANY STORM SEWER, DRAINAGE DITCH, RIVER, LAKE, AIR, OR UNDERGROUND UTILITY SYSTEM. STAGE WORK IS NECESSARY TO MINIMIZE THE AREA OF EXPOSED SOIL, THEREBY REDUCING THE OPPORTUNITY FOR SOIL EROSION. E. CONTRACTOR RESPONSIBLE FOR WATER FROM TRENCHES AND OTHER CONTRACTOR RESPONSIBLE FOR WATER FROM TRENCHES AND OTHER EXCAVATION SHALL BE PUMPED INTO A FILTRATION BAG TO REMOVE SEDIMENTS FROM THE WATER F. IF SEDIMENT EXTENDS BEYOND THE PROJECT LIMITS, THE CONTRACTOR IF SEDIMENT EXTENDS BEYOND THE PROJECT LIMITS, THE CONTRACTOR SHALL BE RESPONSIBLE FOR CLEANUP AND RESTORATION OF ALL SURFACES AND UTILITY SYSTEMS TO THE CONDITION THAT EXISTED PRIOR TO THE CONTRACT AWARD. G. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO MAINTAIN ALL IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO MAINTAIN ALL S.E.S.C. MEASURES ON A DAILY BASIS. H. ACCESS ROADS AND ADJACENT CONCRETE PATHWAYS SHALL BE ACCESS ROADS AND ADJACENT CONCRETE PATHWAYS SHALL BE MAINTAINED BROOM CLEAN AT ALL TIMES, AT THE END OF EACH CONSTRUCTION DAY BY CONTRACTOR. I. SHOULD VIOLATIONS BE IDENTIFIED BY THE CITY, C.S.W.O., SHOULD VIOLATIONS BE IDENTIFIED BY THE CITY, C.S.W.O., M.E.A./C.E.A. OR E.G.L.E., THEY SHALL BE CORRECTED WITHIN 24 E.G.L.E., THEY SHALL BE CORRECTED WITHIN 24 , THEY SHALL BE CORRECTED WITHIN 24 HOURS OF NOTIFICATION. THE CORRECTION(S) MUST BE APPROVED BY THE CITY, C.S.W.O., M.E.A./C.E.A. OR E.G.L.E. ALL SUBSEQUENT E.G.L.E. ALL SUBSEQUENT ALL SUBSEQUENT INSPECTIONS PERFORMED BY THE OWNER, C.S.W.O., M.E.A./C.E.A. OR E.G.L.E. AS A RESULT OF THE VIOLATION (AND ANY OTHER . AS A RESULT OF THE VIOLATION (AND ANY OTHER ASSOCIATED COSTS) WILL BE PAID BY THE CONTRACTOR. IF IDENTIFIED VIOLATIONS ARE NOT CORRECTED WITHIN 24 HOURS OF WRITTEN NOTICE, THE CITY WILL MAKE THE REQUIRED REPAIRS WITHOUT FURTHER NOTIFICATION, AT THE CONTRACTOR'S EXPENSE. J. FINES ASSESSED AS A RESULT OF THE VIOLATION FOR FINES ASSESSED AS A RESULT OF THE VIOLATION FOR NONCOMPLIANCE OF THE S.E.S.C. PROVISIONS WILL BE PAID BY THE CONTRACTOR. SHOULD A "STOP WORK" ORDER FOR NONCOMPLIANCE BE ISSUED, A TIME EXTENSION REQUEST FOR THAT TIME PERIOD WILL NOT BE GRANTED (FINES COULD BE ASSESSED UP TO AND INCLUDING $25,000 PER DAY FOR EACH VIOLATION). K. STRIP ALL TOPSOIL WITHIN THE LIMITS OF WORK AS INDICATED ON STRIP ALL TOPSOIL WITHIN THE LIMITS OF WORK AS INDICATED ON DEMOLITION PLAN. STOCKPILE ALL STRIPPED TOPSOIL TO LOCATION BE DETERMINED BY CITY REPRESENTATIVE PRIOR TO STRIPPING. L. DIRT OR MUD TRACKED ONTO PAVED AREAS SHALL BE PROMPTLY DIRT OR MUD TRACKED ONTO PAVED AREAS SHALL BE PROMPTLY REMOVED AND CLEANED DAILY. M. THERE ARE NO WETLANDS ON THE PROJECT SITE OR IMMEDIATELY THERE ARE NO WETLANDS ON THE PROJECT SITE OR IMMEDIATELY ADJACENT TO THE PROJECT SITE. N. STORM WATER FROM SUBJECT SITE WILL NOT ADVERSELY IMPACT STORM WATER FROM SUBJECT SITE WILL NOT ADVERSELY IMPACT ADJACENT PROPERTIES. O. ALL DISTURBED AREAS SHALL RECEIVE PERMANENT EROSION CONTROL ALL DISTURBED AREAS SHALL RECEIVE PERMANENT EROSION CONTROL WITHIN 5 DAYS OF FINAL GRADING. P. SOIL TYPE WITHIN SITE BOUNDARIES IS "URBANIZED SOILS." SOIL TYPE WITHIN SITE BOUNDARIES IS "URBANIZED SOILS." Q. TOTAL ACRES OF THE PROJECT = 0.765 ACRESTOTAL ACRES OF THE PROJECT = 0.765 ACRES

W CANTERBURY PARK GREENACRES SUB L39 P13 PLATS, W C R 2/149 177.99 IRREG

CB

EX. DECIDUOUS

TREES

EX. EVERGREEN

TREES

SEWER LINE

EXISTING

TRASH BIN

TO REMAIN

FOR FILE

PROJ #:

PROP #:

DIST #:

CHECKED:

SHEET TITLE:

APPROVED:DRAWN:

GENERAL SERVICES DEPARTMENT

LANDSCAPE DESIGN UNIT

115 ERSKINE ST, DETROIT MI 48201

PH: (313) 628-0900 FAX:(313) 628-0927

SHEET

DATE

PROJECT NAME:

ISSUED FOR

SCALE:

SHERWOOD FOREST

PARK LANDSCAPING

4 / 22 / 2026

EX. CONDITIONS &

DEMOLITION PLAN

L1.01

FC

JK

TK

1:10

LEGEND:

00 30 60

EXISTING

ROAD CURB

EXISTING

TREES TO

REMAIN

PARK PROPERTY

BOUNDARY

PROJECT

BOUNDARY

OAD CURB

REMOVE

(3) SHRUBS

REMOVE

(3) LILAC MULTI- STEM

SHRUBS

REMOVE

(1) SMALL (8" )

CALIPER TREE REMOVE

LANDSCAPE BED

ALONG WITH SHRUBS

REMOVE

SHRUBS

REMOVE

(3) LILAC MULTI- STEM

SHRUBS

AutoCAD SHX Text

CANTERBURY ROAD

AutoCAD SHX Text

WARRINGTON DRIVE (50' WIDE)

AutoCAD SHX Text

ST.MARTIN AVE

AutoCAD SHX Text

GENERAL NOTES

A. THE CONTRACTOR IS RESPONSIBLE FOR VISITING THE SITE TO DETERMINE THE THE CONTRACTOR IS RESPONSIBLE FOR VISITING THE SITE TO DETERMINE THE EXTENT OF THE WORK DEMOLITION AND CONSTRUCTION (WHETHER SHOWN ON THE DRAWINGS OR NOT). B. EXISTING MATERIALS/ITEMS TO BE SALVAGE BY CONTRACTOR SHALL BE STOCKPILED EXISTING MATERIALS/ITEMS TO BE SALVAGE BY CONTRACTOR SHALL BE STOCKPILED OR STORED IN APPROVED LOCATIONS BY CITY REPRESENTATIVE AND RELOCATED. CONTRACTOR TO PROTECT ALL MATERIALS DESIGNATED TO REMAIN AND SOLELY RESPONSIBLE FOR REPLACEMENT OF ANY MATERIALS THAT BECOME DAMAGED DURING CONSTRUCTION. THE EXTENT OF REPLACEMENT/REPAIR OF DAMAGED MATERIALS/ITEMS SHALL BE DETERMINED BY CITY REPRESENTATIVE. C. THE CONTRACTOR SHALL REMOVE AND CLEAR DEBRIS FROM OFFSITE IN A LEGAL THE CONTRACTOR SHALL REMOVE AND CLEAR DEBRIS FROM OFFSITE IN A LEGAL MANNER. D. CONTACT MISS DIG 72 HOURS PRIOR TO ANY DEMOLITION.CONTACT MISS DIG 72 HOURS PRIOR TO ANY DEMOLITION.

196.8'

58.0'

18.6'

R 20.5'

AM

AR

AM

AM

AM

AM

AM

AM

AM

AR

B

AM

AM

AM

AM AM

AM

AM

HA

HA

HA

HL

HL

HL

HL

HL

HL

HL

HA

HA

HA

HA

HA

HA

HA

HA

HA

HV

BB

BB

B

B B B B B B

B B B

B

BB

BBBBB

B

B

B B B B BB B

B

B

BB

AB

AB

AB

AB

AB

AB

AB

AB

AB

AB

AB

AB

F F

F

AR

AR

AR

AR AR

AR

AR

AR

ARAR

AR

AM

AM

AM

AM

AM

AM

AM

F F

AB

AB

AM

AM

AM

AM

AM AM

AM

AM

AM

AM

AM

AM

AM

AM

AR

AM

AM AM

AM

AM

AM AM

AB

AB

AB

AB

AB

AB

AB

AB

AB

AB

AB

AB

F F

FAM

AM

AM

AM

AM

AM

AM

F F

AB

AB

AM

AM

AM

AM

AM

AM

AM

AM

AM

AM

AM

AM

AM

AM

AM

AM

AM

AM

AM AM

AM

AM

AB

AB

AB

AB

AB

AB

AB

AB

AB

AB

AB

AB

F F

F

AR

AR

AR AR

AR

AM

AM

AM

AM

AM

AM

AM

F F

AB

AB

AM

AM

AM

AM

AM AM

AR

AR

AR

AR

ARAR

ARAM

AM

AM

AM

AM

AM

AM

AM

AM AM

AM

AM

AM AM

AB

AB

AB

AB

AB

AB

AB

AB

AB

AB

AB

AB

F F

FAM

AM

AM

AM

AM

AM

AM

AR

F F

AB

AB

AM

AM

AM

AM

AM

AM

AM

AM

AM

AM

AM

AM

AR AR

ARARAR

AR AR

AR AR AR

ARARAR

ARAR

AR

ARAR

AR

AR

ARAR

AR

ARARAR

AR AR AR

PS

PS

PS

PS

PS

PS

PS

PS

PS

PS

PS

PS

PS

PS

PS

PS

PS

PS

PS

PSPS

PS PS

PS

PS

PS

PS

HV

HV

HV

HV

HV

HV

HV

HV

AM

AR

AM

AM

AM

AM

AM

AM

AM

AR

B

AM

AM

AM

AM AM

AM

AM

HA

HA

HA

HL

HL

HL

HL

HL

HL

HL

HA

HA

HA

HA

HA

HA

HA

HA

HA

HV

BBBB

B

B

B B B B BB B

B

B

BB

BBBBB

B

B

B B B B BB B

B

B

BB

AB

AB

AB

AB

AB

AB

AB

AB

AB

AB

AB

AB

F F

F

AR

AR

AR

AR AR

AR

AR

AR

ARAR

AR

AM

AM

AM

AM

AM

AM

AM

F F

AB

AB

AM

AM

AM

AM

AM AM

AM

AM

AM

AM

AM

AM

AM

AM

AR

AM

AM AM

AM

AM

AM AM

AB

AB

AB

AB

AB

AB

AB

AB

AB

AB

AB

AB

F F

FAM

AM

AM

AM

AM

AM

AM

F F

AB

AB

AM

AM

AM

AM

AM

AM

AM

AM

AM

AM

AM

AM

AM

AM

AM

AM

AM

AM

AM AM

AM

AM

AB

AB

AB

AB

AB

AB

AB

AB

AB

AB

AB

AB

F F

F

AR

AR

AR AR

AR

AM

AM

AM

AM

AM

AM

AM

F F

AB

AB

AM

AM

AM

AM

AM AM

AR

AR

AR

AR

ARAR

ARAM

AM

AM

AM

AM

AM

AM

AM

AM AM

AM

AM

AM AM

AB

AB

AB

AB

AB

AB

AB

AB

AB

AB

AB

AB

F F

FAM

AM

AM

AM

AM

AM

AM

AR

F F

AB

AB

AM

AM

AM

AM

AM

AM

AM

AM

AM

AM

AM

AM

AR AR

ARARAR

AR AR

AR AR AR

ARARAR

ARAR

AR

ARAR

AR

AR

ARAR

AR

ARARAR

AR AR AR

PS

PS

PS

PS

PS

PS

PS

PS

PS

PS

PS

PS

PS

PS

PS

PS

PS

PS

PS

PSPS

PS PS

PS

PS

PS

PS

HV

HV

HV

HV

HV

HV

HV

HV

FOR FILE

PROJ #:

PROP #:

DIST #:

CHECKED:

SHEET TITLE:

APPROVED:DRAWN:

GENERAL SERVICES DEPARTMENT

LANDSCAPE DESIGN UNIT

115 ERSKINE ST, DETROIT MI 48201

PH: (313) 628-0900 FAX:(313) 628-0927

SHEET

DATE

PROJECT NAME:

ISSUED FOR

SCALE:

SHERWOOD FOREST

PARK LANDSCAPING

4 / 22 / 2026

PLANTING

SITE PLAN

L1.02

FC

JK

TK

1: 10

LEGEND:

EX. DECIDUOUS

TREES

EX. EVERGREEN

TREES

CONCRETE

STORM SEWER

00 30 60

NOTES:

· PLEASE SEE BID FORM FOR LANDSCAPING PLANTS- PLANTS TO BE INSTALLED PER CITY OF DETROIT

SPECIFICATIONS AND DETAILS. FOLLOW THE INSTRUCTION FOR WARRANTY AND MAINTENANCE.

· CONTRACTOR TO STAKE LOCATION OF PLANTS TO BE INSTALLED. REVIEW WITH CITY REPRESENTATIVE

PRIOR TO ANY EXCAVATION.

· CONTACT MISS DIG 72 HOURS PRIOR TO ANY EXCAVATION FOR PRE-MARKING.

1 SHRUB PLANTING

NOT TO SCALEL1.02

REMOVE TOP 1/3 OF BURLAP

FROM SHRUB BALL

FORM SAUCER WITH 3"

CONTINUOUS RIM

SPECIFIED PLANTING MIX. WATER &

TAMP TO REMOVE AIR POCKETS

GEO TEXTILE FABRIC

4" MULCH KEEP MULCH

FROM PLANT TRUNK

PERENNIAL BED

NOT TO SCALE

15" +/- 2/3"

10"

EDGE

MULCH AS SPECIFIED

SOIL MIX AS SPECIFIED

PLANT BED EDGE

15" +/-

UNDISTURBED SUBGRADE

L2.02

2 NATURAL PLANTING BED EDGE

NOT TO SCALE

NOTE: PLANT MIX = 80% EXISTING

SOIL & 20% COMPOST SEE SPECS

EXISTING SOIL

FINISH GRADE FOR LAWN

HAND DIG 4 INCH WIDE BY 4 INCH

DEEP TRENCH AT EDGE OF

PLANTING BED MULCH 2" - 4"

DEPTH AS

SPECIFIED

PLANT MIX

L3.02

PLANT BED SCALE 1:5

AutoCAD SHX Text

CANTERBURY ROAD

AutoCAD SHX Text

WARRINGTON DRIVE (50' WIDE)

AutoCAD SHX Text

ST.MARTIN AVE

AutoCAD SHX Text

PLANTING BED

AutoCAD SHX Text

PLANTING BED

AutoCAD SHX Text

PROPOSED PARK SIGN

AutoCAD SHX Text

PROPOSED (AGASTACHE 'ROSIE POSIE'-AR 56)

AutoCAD SHX Text

PROPOSED (ALLIUM LAVENDER-AM 84)

AutoCAD SHX Text

PROPOSED (FORSYTHIA-F 20)

AutoCAD SHX Text

PROPOSED (AGASTACHE 'BLUE FORTUNE'-AB 30)

AutoCAD SHX Text

PROPOSED (BAPTISIA-B 27)

AutoCAD SHX Text

PROPOSED (HYDRANGEA 'INCREDIBALL'-HA 12)

AutoCAD SHX Text

PROPOSED (HYDRANGEA 'LIMELIGHT'-HL 7)

PROPOSED (HYDRANGEA 'VANILLA STRAWBERRY'-HV 18)

AM

AR

AM

AM

AM

AM

AM

AM

AM

AR

B

AM

AM

AM

AM AM

AM

AM

HA

HA

HA

HL

HL

HL

HL

HL

HL

HL

HA

HA

HA

HA

HA

HA

HA

HA

HA

HV

BBBB

B

B

B B B B BB B

B

B

BB

BBB

BB

B

B B B B B

BB

B B

B

BB

AB

AB

AB

AB

AB

AB

AB

AB

AB

AB

AB

AB

F F

F

AR

AR

AR

AR AR

AR

AR

AR

ARAR

AR

AM

AM

AM

AM

AM

AM

AM

F F

AB

AB

AM

AM

AM

AM

AM AM

AM

AM

AM

AM

AM

AM

AM

AM

AR

AM

AM AM

AMAM

AM AM

AB

AB

AB

AB

AB

AB

AB

AB

AB

AB

AB

AB

F F

FAM

AM

AM

AM

AM

AM

AM

F F

AB

AB

AM

AM

AM

AM

AMAM

AM

AM

AM

AM

AM

AM

AM

AM

AM

AM

AMAM

AM AM

AMAM

AB

AB

AB

AB

AB

AB

AB

AB

AB

AB

AB

AB

F F

F

AR

AR

AR AR

AR

AM

AM

AM

AM

AM

AM

AM

F F

AB

AB

AM

AM

AM

AM

AM AM

AR

AR

AR

AR

ARAR

ARAM

AM

AM

AM

AM

AM

AM

AM

AM AM

AM

AM

AM AM

AB

AB

AB

AB

AB

AB

AB

AB

AB

AB

AB

AB

F F

FAM

AM

AM

AM

AM

AM

AM

AR

F F

AB

AB

AM

AM

AM

AM

AM

AM

AM

AM

AM

AM

AM

AM

AR AR

ARARAR

AR AR

AR AR AR

ARARAR

ARAR

AR

ARAR

AR

AR

ARAR

AR

ARARAR

AR AR AR

PS

PS

PS

PS

PS

PS

PS

PS

PS

PS

PS

PS

PS

PS

PS

PS

PS

PS

PS

PSPS

PS PS

PS

PS

PS

PS

HV

HV

HV

HV

HV

HV

HV

HV

FOR FILE

PROJ #:

PROP #:

DIST #:

CHECKED:

SHEET TITLE:

APPROVED:DRAWN:

GENERAL SERVICES DEPARTMENT

LANDSCAPE DESIGN UNIT

115 ERSKINE ST, DETROIT MI 48201

PH: (313) 628-0900 FAX:(313) 628-0927

SHEET

DATE

PROJECT NAME:

ISSUED FOR

SCALE:

SHERWOOD FOREST

PARK LANDSCAPING

4 / 22 / 2026

SITE PLAN

FOR SIGN

L1.03

FC

JK

TK

1: 10

LEGEND:

EX. DECIDUOUS

TREES

EX. EVERGREEN

TREES

GRASS

STORM SEWER

NOTES:

00 30 60

NOTES:

PLEASE SEE ATTACHED SITE PLAN APPENDIX "A" FOR LANDSCAPING PLAN- SIGN TO BE INSTALLED PER GSD DETAILS. SIGN GRAPHICS TO BE PROVIDED BY CITY REPRESENTATIVE AT INSTALLATION TIME.

NOT TO SCALE

4' PARK SIGN INSTALLATION

L5.21

48"4"

20"

4" X 4" X 18" STEEL TUBE POST

4" X 4" X 18" STEEL CAP WELDED

TO TUBE

48" X 20" GRAPHIC PANEL

4"

6" 48" X 8" WAYNE COUNTY RIDER

12" X 12" X 12" STEEL MOUNTING PLATE

WELDED TO TUBE

STAINLESS STEEL ANCHOR BOLTS

4' W X 8' L CONCRETE SLAB

6" SAND COURSE

SLAB FLUSH WITH

SURROUNDING TURF

NOTES:

SIGN SHALL BE 12" THICK SINGLE-SIDED OR

DOUBLE-SIDED PHENOLIC-FUSED PANEL

ALL STEEL POWDER COATED BLACK

60"

8"

48"

20" 14"

16" DIA. HOLES DRILLED

TO ACCEPT 38" TORX HEAD

SECURITY SCREWS

SIGN GRAPHIC PROVIDED BY

GSD AT TIME OF FABRICATION

FRONT OF SIGN PANEL DETAIL

12"

12"

12" x 12" x 12" STEEL PLATE

16" DIA. HOLES DRILLED 1" FROM EDGE

4" X 4" X 18" STEEL SQUARE TUBE

TUBE AND PLATE WELDED TOGETHER

POWER COATED BLACK

TOP VIEW - MOUNTING BRACKET

1 12"

2" X 2"X 18" STEEL ANGLE

WELDED TO TUBE

MOUNTING PLATE DETAIL

AutoCAD SHX Text

CANTERBURY ROAD

AutoCAD SHX Text

WARRINGTON DRIVE (50' WIDE)

AutoCAD SHX Text

ST.MARTIN AVE

AutoCAD SHX Text

PLANTING BED

AutoCAD SHX Text

PROPOSED STANDARD CITY PARK SIGN ON CONCRETE PAD PER GSD DETAILS

PROPOSED FLOWER BEDS PER (SHEET L1.02)

AR

AM

AM

AM

AM

AM

AM

AM

AR

B

AM

AM

AM

AM AM

AM

AM

HA

HA

HA

HL

HL

HL

HL

HL

HL

HL

HA

HA

HA

HA

HA

HA

HA

HA

HA

HV

BBBB

B

B

B B B B BB B

B

B

BB

BBB

BB

B

B B B B B

BB

B B

B

BB

AB

AB

AB

AB

AB

AB

AB

AB

AB

AB

AB

AB

F F

F

AR

AR

AR

AR AR

AR

AR

AR

ARAR

AR

AM

AM

AM

AM

AM

AM

AM

F F

AB

AB

AM

AM

AM

AM

AM AM

AM

AM

AM

AM

AM

AM

AM

AM

AR

AM

AM AM

AMAM

AM AM

AB

AB

AB

AB

AB

AB

AB

AB

AB

AB

AB

AB

F F

FAM

AM

AM

AM

AM

AM

AM

F F

AB

AB

AM

AM

AM

AM

AMAM

AM

AM

AM

AM

AM

AM

AM

AM

AM

AM

AMAM

AM AM

AMAM

AB

AB

AB

AB

AB

AB

AB

AB

AB

AB

AB

AB

F F

F

AR

AR

AR AR

AR

AM

AM

AM

AM

AM

AM

AM

F F

AB

AB

AM

AM

AM

AM

AM AM

AR

AR

AR

AR

ARAR

ARAM

AM

AM

AM

AM

AM

AM

AM

AM AM

AM

AM

AM AM

AB

AB

AB

AB

AB

AB

AB

AB

AB

AB

AB

AB

F F

FAM

AM

AM

AM

AM

AM

AM

AR

F F

AB

AB

AM

AM

AM

AM

AM

AM

AM

AM

AM

AM

AM

AM

AR AR

ARARAR

AR AR

AR AR AR

ARARAR

ARAR

AR

ARAR

AR

AR

ARAR

AR

ARARAR

AR AR AR

PS

PS

PS

PS

PS

PS

PS

PS

PS

PS

PS

PS

PS

PS

PS

PS

PS

PS

PS

PSPS

PS PS

PS

PS

PS

PS

HV

HV

HV

HV

HV

HV

HV

HV

FOR FILE

PROJ #:

PROP #:

DIST #:

CHECKED:

SHEET TITLE:

APPROVED:DRAWN:

GENERAL SERVICES DEPARTMENT

LANDSCAPE DESIGN UNIT

115 ERSKINE ST, DETROIT MI 48201

PH: (313) 628-0900 FAX:(313) 628-0927

SHEET

DATE

PROJECT NAME:

ISSUED FOR

SCALE:

SHERWOOD FOREST

PARK LANDSCAPING

4 / 22 / 2026

ENLARGE

PLANTING BED

L1.04

FC

JK

TK

N.T.S

LEGEND:

00 30 60

PLANT BEDS ENLARGE N.T.S

AutoCAD SHX Text

PROPOSED (AGASTACHE 'ROSIE POSIE'-AR 56)

AutoCAD SHX Text

PROPOSED (ALLIUM LAVENDER-AM 84)

AutoCAD SHX Text

PROPOSED (FORSYTHIA-F 20)

AutoCAD SHX Text

PROPOSED (AGASTACHE 'BLUE FORTUNE'-AB 30)

AutoCAD SHX Text

PROPOSED (BAPTISIA-B 27)

AutoCAD SHX Text

PROPOSED (HYDRANGEA 'INCREDIBALL'-HA 12)

AutoCAD SHX Text

PROPOSED (HYDRANGEA 'LIMELIGHT'-HL 7)

PROPOSED (HYDRANGEA 'VANILLA STRAWBERRY'-HV 18)

CB

AR

AM

AM

AM

AM

AM

AM

AM

AR

B

AM

AM

AM

AM AM

AM

AM

HA

HA

HA

HL

HL

HL

HL

HL

HL

HL

HA

HA

HA

HA

HA

HA

HA

HA

HA

HV

BBBB

B

B B B B B B

B B B

B

BB

BBB

BB

B

B B B B B

B B B

B

B

BB

AB

AB

AB

AB

AB

AB

AB

AB

AB

AB

AB

AB

F F

F

AR

AR

AR

AR AR

AR

AR

AR

ARAR

AR

AM

AM

AM

AM

AM

AM

AM

F F

AB

AB

AM

AM

AM

AM

AM AM

AM

AM

AM

AM

AM

AM

AM

AM

AR

AM

AM AM

AMAM

AM AM

AB

AB

AB

AB

AB

AB

AB

AB

AB

AB

AB

AB

F F

FAM

AM

AM

AM

AM

AM

AM

F F

AB

AB

AM

AM

AM

AM

AMAM

AM

AM

AM

AM

AM

AM

AM

AM

AM

AM

AMAM

AM AM

AMAM

AB

AB

AB

AB

AB

AB

AB

AB

AB

AB

AB

AB

F F

F

AR

AR

AR AR

AR

AM

AM

AM

AM

AM

AM

AM

F F

AB

AB

AM

AM

AM

AM

AM AM

AR

AR

AR

AR

ARAR

ARAM

AM

AM

AM

AM

AM

AM

AM

AM AM

AM

AM

AM AM

AB

AB

AB

AB

AB

AB

AB

AB

AB

AB

AB

AB

F F

FAM

AM

AM

AM

AM

AM

AM

AR

F F

AB

AB

AM

AM

AM

AM

AM

AM

AM

AM

AM

AM

AM

AM

AR AR

ARARAR

AR AR

AR AR AR

ARARAR

ARAR

AR

ARAR

AR

AR

ARAR

AR

ARARAR

AR AR AR

PS

PS

PS

PS

PS

PS

PS

PS

PS

PS

PS

PS

PS

PS

PS

PS

PS

PS

PS

PSPS

PS PS

PS

PS

PS

PS

HV

HV

HV

HV

HV

HV

HV

HV

FOR FILE

PROJ #:

PROP #:

DIST #:

CHECKED:

SHEET TITLE:

APPROVED:DRAWN:

GENERAL SERVICES DEPARTMENT

LANDSCAPE DESIGN UNIT

115 ERSKINE ST, DETROIT MI 48201

PH: (313) 628-0900 FAX:(313) 628-0927

SHEET

DATE

PROJECT NAME:

ISSUED FOR

SCALE:

SHERWOOD FOREST

PARK LANDSCAPING

4 / 22 / 2026

ALTERNATE # 1 &

EX UTILITY MAP

L1.05

FC

JK

TK

N.T.S

LEGEND:

00 30 60

EX. DECIDUOUS

TREES

EX. EVERGREEN

TREES

SEWER LINE

PROPOSED

PLANTING BED

(APPROXIMATELY

710 SF)AREA

AutoCAD SHX Text

CANTERBURY ROAD

AutoCAD SHX Text

WARRINGTON DRIVE (50' WIDE)

AutoCAD SHX Text

ST.MARTIN AVE

AutoCAD SHX Text

PLANTING BED

AutoCAD SHX Text

IRRIGANTION SCOPE OF WORK:

AutoCAD SHX Text A. INSTALL IRRIGATION TO COVER THE PLANTING BED APPROXIMATELY (710 SF)AREA. INSTALL IRRIGATION TO COVER THE PLANTING BED APPROXIMATELY (710 SF)AREA. B. CONTRACTOR IS RESPONSIBLE FOR IRRIGATION LAYOUT SYSTEM. WATER TAP TO BE PERFORMED CONTRACTOR IS RESPONSIBLE FOR IRRIGATION LAYOUT SYSTEM. WATER TAP TO BE PERFORMED PER STANDARD DWSD WATER TAP DETAIL TO INCLUDE PIT FOR METER AND BACKFLOW VALVES TO TAP IRRIGATION. C. WATER SIZE TAP TO BE DETERMINED BY THE CONTRACTOR AND SUBMIT FOR APPROVAL PRIOR TO WATER SIZE TAP TO BE DETERMINED BY THE CONTRACTOR AND SUBMIT FOR APPROVAL PRIOR TO INSTALL. D. CONTRACTOR IS RESPONSIBLE TO SECURE SUBMIT PERMITTING APPLICATION TO DWSD AND ROW CONTRACTOR IS RESPONSIBLE TO SECURE SUBMIT PERMITTING APPLICATION TO DWSD AND ROW PERMITTING APPLICATION TO DPW. E. CONTACT MISS DIG 72 HOURS PRIOR TO ANY DEMOLITION. CONTACT MISS DIG 72 HOURS PRIOR TO ANY DEMOLITION. F. PERMIT APPLICATION FEES MAY BE WAIVED PERMIT APPLICATION FEES MAY BE WAIVED G. CONSTRUCTION AND INSTALLATION IS TO BE PERFORMED ACCORDING TO GSD CONSTRUCTION CONSTRUCTION AND INSTALLATION IS TO BE PERFORMED ACCORDING TO GSD CONSTRUCTION STANDARDS, SPECIFICATIONS AND DETAILS AND PER MANUFACTURER'S INSTALLATION INSTRUCTIONS. LOCATIONS TO BE DETERMINED FROM THE DRAWING AND VERIFIED IN FIELD WITH CITY REPRESENTATIVE PRIOR TO INSTALLATION ON SITE..

AutoCAD SHX Text

EXISTING UTILITY MAP SHOWING WATERLINES

PROPOSED PLANTING PLAN

1-Sherwood Forest_Site Plan 2026-Cover Page- 2025 WC
Sheets and Views
Cover Page- 2025 WC
2- Sherwood Forest_Site Plan 2026-L1.01 SESC 2025 -WC 1
Sheets and Views
L1.01 SESC 2025 -WC 1
3-Sherwood Forest_Site Plan 2026-L1.01 SESC 2025 -WC 2
Sheets and Views
L1.01 SESC 2025 -WC 2
4- Sherwood Forest_Site Plan 2026-L1.02 EX 2025-WC
Sheets and Views
L1.02 EX 2025-WC (2)
5- Sherwood Forest_Site Plan 2026-L1.02 PLANTING PLAN 2026-WC
Sheets and Views
L1.02 PLANTING PLAN 2026-WC
6- Sherwood Forest_Site Plan 2026-L1.03 SITE PLAN SIGN 2026-WC
Sheets and Views
L1.03 SITE PLAN SIGN 2026-WC
7- Sherwood Forest_Site Plan 2026-L1.02 PLANTING BED Color
7- Sherwood Forest_Site Plan 2026-L1.02 PLANTING BED
Sheets and Views
L1.02 PLANTING BED
8- Sherwood Forest_Site Plan 2026-L1.05 ALTERNATE
Sheets and Views
L1.05 ALTERNATE

File details come from the government source that posted it. Updated .