About this file

This is a Cost Proposal exhibit for a runway pavement replacement project at Dallas Love Field, a component of the City of Dallas Airport System's broader 60-month Indefinite Delivery/Indefinite Quantity service agreement for airport pavement repair and maintenance services. The project requires the removal and replacement of fifty-four (54) concrete runway panels—forty-eight (48) located in a single area and sixteen (16) in three additional sections—along Runway 13L. The scope of work includes existing concrete removal and disposal, site preparation with compacting and grading, forming and reinforcement installation, light can replacement or reuse with associated electrical work, concrete placement to specifications (17-inch slab, 3,000 PSI mix), compression joint sealing, edge dirt work, and finishing to match existing grooving. Four centerline lights within panel cans are to be replaced among the fifty-four total panels. All work must comply with FAA requirements as outlined in Exhibit B - Airside Pavement Repair Standards and meet applicable City, State, and Federal regulations. The bidder must complete all work within a maximum of forty-five (45) days during a planned runway closure.

The cost proposal must include all project expenses with a detailed breakdown referencing applicable line items from Exhibit C per the specifications provided. Bidders are instructed to subtotal individual Exhibit C line items, calculate total cost per day, and provide a total project cost. Only line items applicable to this specific project should be included in the proposal. The pavement repair specifications serve as the priority documents in the event of any conflict with the cost proposal scope of work.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Exhibit E - Cost Proposal Bid #2 – Runway 13L

1. Project Overview

• Dallas Love Field has fifty-four (54) runway panels, fourty-eight (48) in a single area and sixteen (16) additional panels that need removal and replacement. The bidder is asked to provide the proposed cost to complete the work in no more than forty five (45) days during a planned runway closure.

2. Scope of Work

• Remove and Replace fifty-four (54) runway panels, forty-eight (48) in a single area and sixteen (16) additional panels in three sections. The Runway 13L panel replacement work requirements are disclosed in Exhibit B – Airside Pavement Repair Standards, as required for compliance with the FAA. For this proposal, four (4) centerline light in panel cans will be replaced within the fifty four (54) total panels.

• Work Performed should include:

o Existing concrete removal and disposal.

o Site preparation, compacting and grading.

o Forming and Reinforcement of the area.

o Light Can Reuse or Replace, including electrical work o Concrete specifications 17-inch slab, 3,000 PSI mix.

o Compression Joint Sealing and Edge Dirt Work o Finishing: Match existing Groving. No Paint Required o Any other Work not noted as required to complete this project.

o Compliance with all additional City, State, Federal requirements.

o The Pavement Repair Specifications will serve as the Priority Documents if there is any conflict with this cost proposal scope of work.

3. Cost Breakdown

• The cost proposal should include all expenses for this project, referring to all applicable prices provided in Exhibit C per the Specifications. Note: All line items on the Exhibit C Bid Form may not apply to this project, the cost proposal should only refer to applicable Bid Form Line Items.

• Proposal Cost Breakdown should include:

o Individual (Exhibit C) Line items shall be Subtotaled.

o Total Cost Per Day o Total Cost Per Project.