8.CAM3of6_Landslide_GSER IRSC.pdf
PDF 797 KB Posted
- Solicitation number
- 12363N23Q4001
- Issued by
-
Department of Agriculture Forest Service
About this file
This document provides details for a federal contract opportunity for emergency fuels management services within Giant Sequoia groves on National Forest lands in California. The solicitation seeks contractors to perform urgent treatments including hand cutting and piling of small trees, mechanical cutting and removal of trees, mastication of brush, and prescribed burn preparation. Included forest products from mixed conifer stands must be removed from three specified groves. The period of performance is through December 2023. The contract will be a firm-fixed price commercial services agreement awarded using best value procedures. Interested parties must register in the System for Award Management to be considered for the work. The primary point of contact is listed for any questions.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A
A
A
A A
A
A
A
A
A
A
A
A
A A
A
A
A
A
A
A A
A A
A
A
A
A
A
A
A
A
A
A
A
A A
A A
A A
A
A A
A
A
A
A
A
A
AA
A
AA
AAA
A
A A
AA
A A
A
A
A
A
A
A
AAAAA
AAA
A
A A
A
AA
A
AA
A
A A
A
T1 3 S
R
E T1
3 S R
E
!(627
!(61
!(62
!(63
!(612
!(64
!(67
!(615
13S33
13S33
13S33
13S33
14S02C
14S 02C
14S02C
14S02C
14S 02C
S2
6F
13S26F
13S33B
S3
3A
S3
3A
13S33D
13S33D
14S02
14S
14S02
Contract Area Map 3 of 6 - Landslide Grove Giant Sequoia Emergency Response IRSC
Sierra and Sequoia National Forests 0 0.20.1
Miles
1:2,640 1 inch = 220 feetWhen printed at 24" x 36":
Legend Contract Area Boundary, B1.1 StreamsToSMZcorrect50ftBuff Riparian Conservation Area
! ! ! ! ! ! ! ! ! Rx Burn Control Hand Lines, Item 6b Existing Transportation System, C6.22#
A Public Use Restriction, C5.12# Cutting Unit, Mechanical Treatment, B1.1, Item 3a and 3c Cutting Unit, Mechanical Treatment, B1.1, Item 3b
Cutting Unit, Hand Treatment, B1.1, Item 6a
Visalia
Piedra
Fresno
Clovis
Porterville
Sierra National Forest
Inyo National Forest
Inyo National Forest
Sequoia National Forest
Sequoia National Forest
Tule River Indian
Reservation
UV65
UV63
UV201
UV137
UV216
UV43
UV198UV63
UV245
UV180
UV168
UV198
UV145
UV41
UV41
UV190
UV136
UV190
UV99
UV99
£¤395
Kings Canyon National Park
Sequoia National
Park
E. Vakili 11/10/2022
Cutting Unit Requirements 64, 615, 627 POS1, DxP, DF, TRAC, SUSP, ENDL, MH, TS, Whole, Min, Fell, SEPM
61, 62, 63, 67, 612 POS1, DF, TS
Mechanized Fuels Treatment Item 3a, 3b, and 3c
Hand Fuels Treatment Item 6a
DF Directional Felling, B6.41, C6.41# DxDam Designation by Damage Class, B2.34, C2.35#, C2.353# DxP Designation by Prescription, B2.34, C2.35#, C2.355# ENDL Ground Based Skidding, Endlining, B6.42, C6.42# Fell Fell damaged residual trees, C6.7# Mach Slash treatment, Machine Pile at Landings B6.7, C6.7# MH Ground Based Skidding, Mechanical Harvest, B6.42, C6.42# Min Minimum Stump Height 6", B6.41, C6.41# POS1 Project Operation Schedule, Limited Operating Period December 1 - June 30, C6.315# POS2 Project Operation Schedule, Limited Operating Period July 1 - August 15, C6.315#
Requirements Legend POS3 Project Operation Schedule, Limited Operating Period August 16 - September 15, C6.315# POS4 Project Operation Schedule, Limited Operating Period October 1 - November 30, C6.315# POS5 Project Operation Schedule, Campground Limited Operating Period, C6.315# SCAT 18" Slash treatment, scattering of slash B6.7, C6.7# SEPM Special Erosion Prevention Measures, Not to exceed 10% of awarded acres, C6.6# SUSP Ground Based Skidding, One End Suspension, B6.42, C6.42# TRAC Ground Based Skidding, Skid Trail Layout, B6.42, C6.42# TS Treatment of stumps, C6.41# Whole Whole Tree Skidding, B6.41, C6.41#
Requirements Legend, Continued
File details come from the government source that posted it. Updated .