About this file

This file comprises technical specifications and an invitation for sealed bids issued by the Caln Township Municipal Authority for the King's Grant Pump Station Upgrades project (Contract CAL-01-26), a wastewater treatment facility electrical and mechanical upgrade. The project scope encompasses electrical equipment upgrades at an existing pump station, offsite rebuild of two KSB Model KRT F100-401 pumps (50HP, 3/60/460 VAC, 1800RPM, explosion-proof rated) and a Muffin Monster Model 30005-0012-DI hydraulically-driven grinder, and site restoration. The detailed technical specifications address Division 26 electrical work including basic electrical materials and methods, selective demolition, low-voltage and control-voltage conductors and cables, grounding and bonding systems, hangers and supports, conduit systems, boxes, wiring device identification, power system studies, wiring devices, enclosed controllers, surge protective devices, and interior and exterior lighting. Electronic sealed bids are due by 10:00 A.M. local time on Thursday, April 24, 2026, via PennBid, with all bids to be opened online at that time. Bid documents and solicitation details became available at no cost on March 27, 2026, through the PennBid portal.

The successful bidder must submit a bid bond or certified check equal to a minimum of ten percent of the total bid amount and is prohibited from withdrawing any bid for the period specified in the bid form following bid opening. The awarded contractor is required to furnish Performance and Payment Bonds in an amount equal to 100 percent of the contract value and a Maintenance Bond equal to fifteen percent of the contract amount on specified bond forms with a Waiver of Lien. The work is subject to the Pennsylvania Prevailing Wage Act (Act No. 442), and compensation will be provided according to applicable prevailing wage requirements. PennBid charges a fee to the awarded bidder. The Caln Township Municipal Authority reserves the right to waive any informality in bids, reject any or all bids, and accept any bid deemed most favorable under the circumstances.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CALN TOWNSHIP MUNICIPAL AUTHORITY

KINGS'S GRANT PUMP STATION UPGRADES

MARCH 2026

26 00 10 - Basic Electrical Materials and Methods

CALN TOWNSHIP MUNICIPAL AUTHORITY

KINGS'S GRANT PUMP STATION UPGRADES

MARCH 2026 26 00 10 - 1

PART 1 - GENERAL

1.01 SUMMARY DESCRIPTION

A. Section includes the following:

1. Electrical equipment coordination and installation.

2. Common electrical installation requirements.

1.02 RELATED REQUIREMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.

1.03 REFERENCE STANDARDS

A. NECA 1 - Standard for Good Workmanship in Electrical Construction; (Latest Edition).

B. NETA ATS - Standard for Acceptance Testing Specifications for Electrical Power Equipment And Systems; (Latest Edition).

1.04 DEFINITIONS

A. ATS: Acceptance Testing Specifications.

1.05 SUBMITTALS

A. Coordination Drawings: The Contractor shall provide coordination drawings for each location requiring additional detail to properly plan, execute and document the work. Coordination drawings shall be drawn to scale.

1. Examples of areas requiring additional detail include:

a. Areas in constrained spaces, where code required working space or free and clear panel door swings will be difficult to achieve.

b. Areas requiring coordination with installation work of other trades

c. Areas in congested spaces, where existing conditions require the new work to workaround the existing installed systems.

d. Control and interconnecting wiring indicated below that deviates from the Contract drawings and is not provided by the equipment vendor, the System Integrator, or the Power System Integrator.

e. Work that will be concealed at the conclusion of the project

f. Areas designated by the Owner or Engineer during construction to clarify the means and methods that the Contractor intends to employ to complete the work.

2. Coordination Drawings shall consist of the following levels of detail:

a. Location of all conduit and conduit size

MARCH 2026

26 00 10 - Basic Electrical Materials and Methods

CALN TOWNSHIP MUNICIPAL AUTHORITY

KINGS'S GRANT PUMP STATION UPGRADES

MARCH 2026 26 00 10 - 2

b. Conductor size and number of wires inside conduit

c. Location of all pull and junction boxes

d. Location of all electrical equipment installed on the project.

e. Location of existing electrical equipment to be interfaced to items installed or modified under this Contract.

f. Verification that new equipment will not interfere with working clearance around existing equipment for operations and maintenance.

1) New equipment dimensions will be based on submitted equipment.

2) Equipment plans will include door swing markout showing both the proper hinge placement and the space required for fully open door swings.

3) Location plans will include markout of required working space for the electrical equipment, the mechanical equipment and the process equipment.

4) Provide section drawings indicating below slab and overhead raceways with bending radius on elbows and working space for pull boxes and condulets.

5) Indicate housekeeping pad outside dimensions.

g. Modification details (both wiring and mechanical changes) to equipment to be modified under this project.

h. Preparation of point to point wiring diagrams showing interconnecting wiring between new and existing equipment to be installed/modified under this project.

i. Preparation of point to point wiring diagrams showing interconnecting wiring between new and existing equipment to be installed/ modified under this project.

Point to point wiring shall give a unique terminal block number for each device or conductor and its corresponding location.

3. Upon Completion of the project, a hardcopy “read-lined” sets of prints showing all work deviating from the Contract drawings or provided as part of the working drawing work shall be turned over to the ENGINEER for inspection and approval.

4. Equipment Location Plants: Working drawings shall depict all of the wiring devices, conduits, field devices, and power distribution equipment on scaled plan drawings.

Detail all proposed concealed and under slab raceways.

5. Update Existing Panel Schedules

a. Provide an updated hardcopy of the panel schedule inside the existing panel.

6. Provide working drawings of underground raceways and ductbanks. Working drawings shall include:

a. Updated duct bank section, including sections of each manhole entrance wall.

b. Updated location plans of manholes and ductbanks drawn to-scale depicting outside dimensions, coordinated with new and existing underground facilities.

Indicate all process piping and other underground facilities crossings and discovered conflicts.

MARCH 2026

26 00 10 - Basic Electrical Materials and Methods

CALN TOWNSHIP MUNICIPAL AUTHORITY

KINGS'S GRANT PUMP STATION UPGRADES

MARCH 2026 26 00 10 - 3

c. Indicate floor and manhole elevations for each manhole.

d. Indicate invert elevation and cover depth for each ductbank and underground circuit.

1.06 QUALITY ASSURANCE

A. Test Equipment Suitability and Calibration: Comply with NETA ATS, "Suitability of Test Equipment" and "Test Instrument Calibration."

1.07 FIELD CONDITIONS

A. Coordinate arrangement, mounting, and support of electrical equipment:

1. To allow maximum possible headroom unless specific mounting heights that reduce headroom are indicated.

2. To provide for ease of disconnecting the equipment with minimum interference to other installations.

3. To allow right of way for piping and conduit installed at required slope.

4. So connecting raceways, cables, wireways, cable trays, and busways will be clear of obstructions and of the working and access space of other equipment.

B. Coordinate installation of required supporting devices.

C. Coordinate electrical testing of electrical, mechanical, and architectural items, so equipment and systems that are functionally interdependent are tested to demonstrate successful interoperability.

D. Interruption of Existing Electric Service: Do not interrupt electric service to facilities occupied by Owner or others unless permitted under the following conditions and then only after arranging to provide temporary electric service according to requirements indicated:

1. Notify Engineer no fewer than five days in advance of proposed interruption of electric service.

2. Do not proceed with interruption of electric service without Engineer's written permission.

PART 2 - PRODUCTS

2.01 MANUFACTURERS

A. In other Part 2 articles where titles below introduce lists, the following requirements apply to product selection:

1. Available Manufacturers: Subject to compliance with requirements, manufacturers offering products that may be incorporated into the Work include, but are not limited to, manufacturers specified.

2. Manufacturers: Subject to compliance with requirements, provide products by one of the manufacturers specified.

MARCH 2026

26 00 10 - Basic Electrical Materials and Methods

CALN TOWNSHIP MUNICIPAL AUTHORITY

KINGS'S GRANT PUMP STATION UPGRADES

MARCH 2026 26 00 10 - 4

3. Basis-of-Design Product: Products indicated are the design basis to develop equipment specifications and requirements. Substitutions may be made subject to compliance with the requirements.

PART 3 - EXECUTION

3.01 COMMON REQUIREMENTS FOR ELECTRICAL INSTALLATION

A. Incidentals: The CONTRACTOR shall provide materials and incidentals require for a complete and operable system, even if not required explicitly by the Contract Documents.

Typical incidents are terminal lugs not furnished with vendor-supplied equipment, compression connectors for cables, splices, junction and terminal boxes, and control wiring required by vendor-furnished equipment to connect with other equipment indicated in the Contract Documents.

B. Field Control of Location and Arrangement: The Drawings diagrammatically indicate the desired location and arrangement of outlets, conduit runs, equipment, and other items, exact locations shall be determined by the CONTRACTOR in the field based on the physical size and arrangement of equipment, finished elevations, and other obstructions. Locations on the Drawings, however, shall be followed as closely as possible.

C. Conduit and equipment shall be installed in such a manner as to avoid obstructions, to preserve headroom, and keep openings and passageways clear. Lighting fixtures, switches, convenience outlets, and similar items shall be located within finished rooms as indicated.

Where the Drawings do not indicate exact locations, such locations will be determined by the ENGINEER. If equipment is installed without instruction and must be moved, it shall be adjusted slightly to avoid obstructions and to minimize shadows.

D. Wherever conduits and wiring for lighting and receptacles are not indicated, it shall be the CONTRACTORS’S responsibility to provide lighting and receptacle-related conduits and wiring as required, based on the actual installed fixture layout and the circuit designations as indicated. Wring shall be #12 AWG minimum (encased). Where circuits are combined in the same raceway, the CONTRACTOR SHALL derate conductor ampacities in accordance with NEC requirements.

E. Workmanship: Materials and equipment shall be installed in strict accordance with printed recommendations of the manufacturer. Installation shall be accomplished by workers skilled in the WORK. Installation shall be coordinated in the field with other trades to avoid interferences.

F. Protections of Equipment and Materials: The CONTRACTOR shall fully protect materials and equipment against damage from any cause. Materials and equipment, both in storage and during construction, shall be covered in such a manner that no finished surfaces will be damaged, marred, or spattered with water, foam, plaster, or paint. Moving parts shall be kept clean and dry. The CONTRACTOR shall replace or refinish damaged materials or equipment, including faceplates of panels and switchboard sections as part of the WORK.

G. Comply with NECA 1.

H. Measure indicated mounting heights to bottom of unit for suspended items and to center of unit for wall-mounting items.

MARCH 2026

26 00 10 - Basic Electrical Materials and Methods

CALN TOWNSHIP MUNICIPAL AUTHORITY

KINGS'S GRANT PUMP STATION UPGRADES

MARCH 2026 26 00 10 - 5

I. Headroom Maintenance: If mounting heights or other location criteria are not indicated, arrange and install components and equipment to provide maximum possible headroom consistent with these requirements.

J. Equipment: Install to facilitate service, maintenance, and repair or replacement of components of both electrical equipment and other nearby installations. Connect in such a way as to facilitate future disconnecting with minimum interference with other items in the vicinity.

K. Right of Way: Give to raceways and piping systems installed at a required slope.

3.02 EXAMINATION

A. Examine substrates, with Installer present, for compliance with requirements for maximum moisture content, installation tolerances, and other conditions affecting performance of the Work.

B. Examine roughing-in for other trades to verify actual locations of equipment connections before equipment installation.

C. Examine walls and floors for suitable conditions where equipment will be installed.

D. Prepare written report, endorsed by Installer, listing conditions detrimental to performance.

E. Proceed with installation only after unsatisfactory conditions have been corrected.

3.03 PROTECTION

A. Temporary Heating: Apply temporary heat to maintain temperature according to manufacturer's written instructions until equipment is ready to be energized and placed into service.

B. Replace equipment whose interiors have been exposed to a buildup of dust or debris, water or other liquids prior to Substantial Completion.

3.04 ADJUSTING

A. Adjust hardware to function smoothly, and lubricate as recommended by manufacturer.

B. Occupancy Adjustments: When requested within 12 months from date of Substantial Completion, provide on-site assistance in adjusting system to suit actual occupied conditions. Provide up to two visits to Project during other-than-normal occupancy hours for this purpose.

MARCH 2026

26 05 05 - Selective Demolition for Electrical

CALN TOWNSHIP MUNICIPAL AUTHORITY

KINGS'S GRANT PUMP STATION UPGRADES

MARCH 2026 26 05 05 - 1

PART 1 - GENERAL

1.01 SECTION DESCRIPTION

A. Electrical demolition.

1.02 RELATED SECTIONS

A. Section 26 00 10 - Basic Electrical Materials and Methods. Outage information and limitations.

B. See Section 01 30 00 - Administrative Requirements, for submittal procedures.

PART 2 - PRODUCTS

2.01 MATERIALS AND EQUIPMENT

A. Materials and equipment for patching and extending work: As specified in individual sections.

PART 3 - EXECUTION

3.01 EXAMINATION

A. Verify field measurements and circuiting arrangements are as indicated.

B. Verify that abandoned wiring and equipment serve only abandoned facilities.

C. Demolition drawings are based on casual field observation and existing record documents.

D. Report discrepancies to Engineer before disturbing existing installation.

E. Beginning of demolition means installer accepts existing conditions.

3.02 PREPARATION

A. Disconnect electrical systems in walls, floors, and ceilings to be removed.

B. Coordinate utility service outages with utility company.

C. Provide temporary wiring and connections to maintain existing systems in service during construction. When work must be performed on energized equipment or circuits, use personnel experienced in such operations.

3.03 DEMOLITION AND EXTENSION OF EXISTING ELECTRICAL WORK

A. Remove, relocate, and extend existing installations to accommodate new construction.

B. Remove abandoned wiring to source of supply.

C. Remove exposed abandoned conduit, including abandoned conduit above accessible ceiling finishes. Cut conduit flush with walls and floors, and patch surfaces.

MARCH 2026

26 05 05 - Selective Demolition for Electrical

CALN TOWNSHIP MUNICIPAL AUTHORITY

KINGS'S GRANT PUMP STATION UPGRADES

MARCH 2026 26 05 05 - 2

D. Disconnect abandoned outlets and remove devices. Remove abandoned outlets if conduit servicing them is abandoned and removed. Provide blank cover for abandoned outlets that are not removed.

E. Repair adjacent construction and finishes damaged during demolition and extension work.

F. Maintain access to existing electrical installations that remain active. Modify installation or provide access panel as appropriate.

3.04 CLEANING AND REPAIR

A. Maintain site clear of debris during and after demolition activities.

3.05 PROTECTION

A. Protect all existing equipment not scheduled to be demolished.

B. Remove and replace equipment that are physically damaged, wet or moisture damaged, or mold damaged as a result of demolition activity under this contract.

MARCH 2026

26 05 19 - Low-Voltage Electrical Power Conductors and Cables

CALN TOWNSHIP MUNICIPAL AUTHORITY

KINGS'S GRANT PUMP STATION UPGRADES

MARCH 2026 26 05 19 - 1

PART 1 - GENERAL

1.01 SECTION INCLUDES

A. Single conductor building wire.

B. Wiring connectors.

C. Electrical tape.

D. Oxide inhibiting compound.

E. Wire pulling lubricant.

F. Cable ties.

1.02 RELATED SECTIONS

A. Section 26 05 26 - Grounding and Bonding for Electrical Systems: Additional requirements for grounding conductors and grounding connectors.

B. Section 26 05 53 - Identification for Electrical Systems: Identification products and requirements.

C. See Section 01 30 00-Administrative Requirements, for submittal procedures.

1.03 REFERENCE STANDARDS

A. ASTM B3 - Standard Specification for Soft or Annealed Copper Wire; 2013 (Reapproved 2018).

B. ASTM B8 - Standard Specification for Concentric-Lay-Stranded Copper Conductors, Hard, Medium-Hard, or Soft; 2023.

C. ASTM B33 - Standard Specification for Tin-Coated Soft or Annealed Copper Wire for Electrical Purposes; 2010, with Editorial Revision (2020).

D. ASTM B787/B787M - Standard Specification for 19 Wire Combination Unilay-Stranded Copper Conductors for Subsequent Insulation; 2004 (Reapproved 2020).

E. ASTM D3005 - Standard Specification for Low-Temperature Resistant Vinyl Chloride Plastic Pressure-Sensitive Electrical Insulating Tape; 2017.

F. ASTM D4388 - Standard Specification for Nonmetallic Semi-Conducting and Electrically Insulating Rubber Tapes; 2020.

G. FS A-A-59544 - Cable and Wire, Electrical (Power, Fixed Installation); 2008a (Validated 2019).

H. NECA 1 - Standard for Good Workmanship in Electrical Construction; 2023.

I. NEMA WC 70 - Power Cables Rated 2000 Volts or Less for the Distribution of Electrical Energy; 2021.

MARCH 2026

26 05 19 - Low-Voltage Electrical Power Conductors and Cables

CALN TOWNSHIP MUNICIPAL AUTHORITY

KINGS'S GRANT PUMP STATION UPGRADES

MARCH 2026 26 05 19 - 2

J. NETA ATS - Standard for Acceptance Testing Specifications for Electrical Power Equipment And Systems; 2025.

K. NFPA 70 - National Electrical Code; Most Recent Edition Adopted by Authority Having Jurisdiction, Including All Applicable Amendments and Supplements.

L. UL 44 - Thermoset-Insulated Wires and Cables; Current Edition, Including All Revisions.

M. UL 83 - Thermoplastic-Insulated Wires and Cables; Current Edition, Including All Revisions.

N. UL 267 - Outline of Investigation for Wire-Pulling Compounds; Current Edition, Including All Revisions.

O. UL 486A-486B - Wire Connectors; Current Edition, Including All Revisions.

P. UL 486C - Splicing Wire Connectors; Current Edition, Including All Revisions.

Q. UL 486D - Sealed Wire Connector Systems; Current Edition, Including All Revisions.

R. UL 510 - Polyvinyl Chloride, Polyethylene, and Rubber Insulating Tape; Current Edition, Including All Revisions.

1.04 ADMINISTRATIVE REQUIREMENTS

A. Coordination:

1. Coordinate sizes of raceways, boxes, and equipment enclosures installed under other sections with the actual conductors to be installed, including adjustments for conductor sizes increased for voltage drop.

2. Coordinate the installation of direct burial cable with other trades to avoid conflicts with piping or other potential conflicts.

3. Coordinate with electrical equipment installed under other sections to provide terminations suitable for use with the conductors to be installed.

4. Notify Engineer of any conflicts with or deviations from Contract Documents. Obtain direction before proceeding with work.

1.05 SUBMITTALS

A. Product Data: Provide manufacturer's standard catalog pages and data sheets for conductors and cables, including detailed information on materials, construction, ratings, listings, and available sizes, configurations, and stranding.

B. Sustainable Design Documentation: Submit manufacturer's product data on conductor and cable showing compliance with specified lead content requirements.

C. Manufactured Wiring System Shop Drawings: Provide plan views indicating proposed system layout with components identified; indicate branch circuit connections.

D. Wire Pulling Lubricant: Certification of compatibility with conductors/cables.

E. Field Quality Control Test Reports.

MARCH 2026

26 05 19 - Low-Voltage Electrical Power Conductors and Cables

CALN TOWNSHIP MUNICIPAL AUTHORITY

KINGS'S GRANT PUMP STATION UPGRADES

MARCH 2026 26 05 19 - 3

F. Manufacturer's Installation Instructions: Indicate application conditions and limitations of use stipulated by product testing agency. Include instructions for storage, handling, protection, examination, preparation, and installation of product.

G. Project Record Documents: Record actual installed circuiting arrangements. Record actual routing for underground circuits.

1.06 QUALITY ASSURANCE

A. Comply with requirements of NFPA 70.

B. Maintain at the project site a copy of each referenced document that prescribes execution requirements.

C. Manufacturer Qualifications: Company specializing in manufacturing the products specified in this section with minimum three years documented experience.

D. Product Listing Organization Qualifications: An organization recognized by OSHA as a Nationally Recognized Testing Laboratory (NRTL) and acceptable to authorities having jurisdiction.

1.07 DELIVERY, STORAGE, AND HANDLING

A. Receive, inspect, handle, and store conductors and cables in accordance with manufacturer's instructions.

1.08 FIELD CONDITIONS

A. Do not install or otherwise handle thermoplastic-insulated conductors at temperatures lower than 14 ºF, unless otherwise permitted by manufacturer's instructions. When installation below this temperature is unavoidable, notify Engineer and obtain direction before proceeding with work.

PART 2 - PRODUCTS

2.01 CONDUCTOR AND CABLE APPLICATIONS

A. Do not use conductors and cables for applications other than as permitted by NFPA 70 and product listing.

B. Provide single conductor building wire installed in suitable raceway unless otherwise indicated, permitted, or required.

C. Nonmetallic-sheathed cable is not permitted.

D. Underground feeder and branch-circuit cable is not permitted.

E. Service entrance cable is not permitted.

F. Manufactured wiring systems are not permitted.

2.02 CONDUCTOR AND CABLE GENERAL REQUIREMENTS

A. Provide products that comply with requirements of NFPA 70.

MARCH 2026

26 05 19 - Low-Voltage Electrical Power Conductors and Cables

CALN TOWNSHIP MUNICIPAL AUTHORITY

KINGS'S GRANT PUMP STATION UPGRADES

MARCH 2026 26 05 19 - 4

B. Provide products listed, classified, and labeled as suitable for the purpose intended.

C. Provide new conductors and cables manufactured not more than one year prior to installation.

D. Unless specifically indicated to be excluded, provide all required conduit, boxes, wiring, connectors, etc. as required for a complete operating system.

E. Comply with NEMA WC 70.

F. Comply with FS A-A-59544 where applicable.

G. Thermoplastic-Insulated Conductors and Cables: Listed and labeled as complying with UL 83.

H. Thermoset-Insulated Conductors and Cables: Listed and labeled as complying with UL 44.

I. Conductors for Grounding and Bonding: Also comply with Section 26 05 26.

J. Conductors and Cables Installed Where Exposed to Direct Rays of Sun: Listed and labeled as sunlight resistant.

K. Conductors and Cables Installed Exposed in Spaces Used for Environmental Air (only where specifically permitted): Plenum rated, listed and labeled as suitable for use in return air plenums.

L. Conductor Material:

1. Provide copper conductors only. Aluminum conductors are not acceptable for this project. Conductor sizes indicated are based on copper.

2. Copper Conductors: Soft drawn annealed, 98 percent conductivity, uncoated copper conductors complying with ASTM B3, ASTM B8, or ASTM B787/B787M unless otherwise indicated.

3. Tinned Copper Conductors: Comply with ASTM B33.

M. Minimum Conductor Size:

1. Branch Circuits: 12 AWG.

a. Exceptions:

1) 20 A, 120 V circuits longer than 75 feet: 10 AWG, for voltage drop.

2) 20 A, 120 V circuits longer than 150 feet: 8 AWG, for voltage drop.

2. Control Circuits: 14 AWG.

N. Where conductor size is not indicated, size to comply with NFPA 70 but not less than applicable minimum size requirements specified.

O. Conductor Color Coding:

1. Color code conductors as indicated unless otherwise required by the authority having jurisdiction. Maintain consistent color coding throughout project.

MARCH 2026

26 05 19 - Low-Voltage Electrical Power Conductors and Cables

CALN TOWNSHIP MUNICIPAL AUTHORITY

KINGS'S GRANT PUMP STATION UPGRADES

MARCH 2026 26 05 19 - 5

2. Color Coding Method: Integrally colored insulation.

a. Conductors size 4 AWG and larger may have black insulation color coded using vinyl color coding electrical tape.

3. Color Code:

a. 480 V, 3 Phase, 3 Wire System:

1) Phase A: Brown.

2) Phase B: Orange.

3) Phase C: Yellow.

b. Equipment Ground, All Systems: Green.

c. Isolated Ground, All Systems: Green with yellow stripe.

d. Travelers for 3-Way and 4-Way Switching: Pink.

e. For modifications or additions to existing wiring systems, comply with existing color code when existing code complies with NFPA 70 and is approved by the authority having jurisdiction.

f. For control circuits, comply with manufacturer's recommended color code.

2.03 SINGLE CONDUCTOR BUILDING WIRE

A. Manufacturers: Subject to compliance with requirements, available manufacturers offering products that may be incorporated into the Work include, but are not limited to, the following:

1. Copper Building Wire:

a. General Cable Technologies Corporation.

b. Service Wire Co.

c. Southwire Company.

d. Approved Equal.

B. Description: Single conductor insulated wire.

C. Conductor Stranding:

1. Feeders and Branch Circuits:

a. Size 10 AWG and Smaller: Solid.

b. Size 8 AWG and Larger: Stranded.

2. Control Circuits: Stranded.

D. Insulation Voltage Rating: 600 V.

E. Insulation:

MARCH 2026

26 05 19 - Low-Voltage Electrical Power Conductors and Cables

CALN TOWNSHIP MUNICIPAL AUTHORITY

KINGS'S GRANT PUMP STATION UPGRADES

MARCH 2026 26 05 19 - 6

1. Copper Building Wire: Type THHN/THWN-2 or XHHW-2, except as indicated below.

a. Size 4 AWG and Larger: Type XHHW-2.

b. Installed Underground: Type XHHW-2.

2.04 WIRING CONNECTORS

A. Description: Wiring connectors appropriate for the application, suitable for use with the conductors to be connected, and listed as complying with UL 486A-486B or UL 486C as applicable.

B. Connectors for Grounding and Bonding: Comply with Section 26 05 26.

C. Wiring Connectors for Splices and Taps:

1. Copper Conductors Size 8 AWG and Smaller: Use twist-on insulated spring connectors.

2. Copper Conductors Size 6 AWG and Larger: Use mechanical connectors or compression connectors.

D. Wiring Connectors for Terminations:

1. Provide terminal lugs for connecting conductors to equipment furnished with terminations designed for terminal lugs.

2. Provide compression adapters for connecting conductors to equipment furnished with mechanical lugs when only compression connectors are specified.

3. Where over-sized conductors are larger than the equipment terminations can accommodate, provide connectors suitable for reducing to appropriate size, but not less than required for the rating of the overcurrent protective device.

4. Provide motor pigtail connectors for connecting motor leads in order to facilitate disconnection.

5. Copper Conductors Size 8 AWG and Larger: Use mechanical connectors or compression connectors where connectors are required.

6. Stranded Conductors Size 10 AWG and Smaller: Use crimped terminals for connections to terminal screws.

7. Conductors for Control Circuits: Use crimped terminals for all connections.

E. Do not use insulation-piercing or insulation-displacement connectors designed for use with conductors without stripping insulation.

F. Do not use push-in wire connectors as a substitute for twist-on insulated spring connectors.

G. Twist-on Insulated Spring Connectors: Rated 600 V, 105 ºC for standard applications and 105 ºC for high temperature applications; pre-filled with sealant and listed as complying with UL 486D for damp and wet locations.

MARCH 2026

26 05 19 - Low-Voltage Electrical Power Conductors and Cables

CALN TOWNSHIP MUNICIPAL AUTHORITY

KINGS'S GRANT PUMP STATION UPGRADES

MARCH 2026 26 05 19 - 7

1. Manufacturers: Subject to compliance with requirements, available manufacturers offering products that may be incorporated into the Work include, but are not limited to, the following:

a. 3M.

b. Ideal Industries, Inc.

c. NSI Industries LLC.

d. Approved Equal.

H. Mechanical Connectors: Provide bolted type or set-screw type.

1. Manufacturers: Subject to compliance with requirements, available manufacturers offering products that may be incorporated into the Work include, but are not limited to, the following:

a. Burndy LLC.

b. nVent ILSCO.

c. Thomas & Betts Corporation.

d. Approved Equal.

I. Compression Connectors: Provide circumferential type or hex type crimp configuration.

1. Manufacturers: Subject to compliance with requirements, available manufacturers offering products that may be incorporated into the Work include, but are not limited to, the following:

a. Burndy LLC.

b. nVent ILSCO.

c. Thomas & Betts Corporation.

d. Approved Equal.

J. Crimped Terminals: Nylon-insulated, with insulation grip and terminal configuration suitable for connection to be made.

1. Manufacturers: Subject to compliance with requirements, available manufacturers offering products that may be incorporated into the Work include, but are not limited to, the following:

a. Burndy LLC.

b. Ilsco.

c. Thomas & Betts Corporation.

d. Approved Equal.

MARCH 2026

26 05 19 - Low-Voltage Electrical Power Conductors and Cables

CALN TOWNSHIP MUNICIPAL AUTHORITY

KINGS'S GRANT PUMP STATION UPGRADES

MARCH 2026 26 05 19 - 8

2.05 ACCESSORIES

A. Electrical Tape:

1. Manufacturers: Subject to compliance with requirements, available manufacturers offering products that may be incorporated into the Work include, but are not limited to, the following:

a. 3M.

b. Plymouth Rubber Europa.

c. Approved Equal.

2. Vinyl Color Coding Electrical Tape: Integrally colored to match color code indicated;

listed as complying with UL 510; minimum thickness of 7 mil; resistant to abrasion, corrosion, and sunlight; suitable for continuous temperature environment up to 105 ºC.

3. Vinyl Insulating Electrical Tape: Complying with ASTM D3005 and listed as complying with UL 510; minimum thickness of 7 mil; resistant to abrasion, corrosion, and sunlight;

conformable for application down to 0 ºF and suitable for continuous temperature environment up to 105 ºC.

4. Rubber Splicing Electrical Tape: Ethylene Propylene Rubber (EPR) tape, complying with ASTM D4388; minimum thickness of 30 mil; suitable for continuous temperature environment up to 90 ºC and short-term 130 ºC overload service.

5. Electrical Filler Tape: Rubber-based insulating moldable putty, minimum thickness of 125 mil; suitable for continuous temperature environment up to 176 degrees F.

6. Varnished Cambric Electrical Tape: Cotton cambric fabric tape, with or without adhesive, oil-primed and coated with high-grade insulating varnish; minimum thickness of 7 mil; suitable for continuous temperature environment up to 221 degrees F.

7. Moisture Sealing Electrical Tape: Insulating mastic compound laminated to flexible, all-weather vinyl backing; minimum thickness of 90 mil.

B. Oxide Inhibiting Compound: Listed; suitable for use with the conductors or cables to be installed.

1. Manufacturers: Subject to compliance with requirements, available manufacturers offering products that may be incorporated into the Work include, but are not limited to, the following:

a. Burndy LLC.

b. Ideal Industries, Inc.

c. Ilsco.

d. Approved Equal.

C. Wire Pulling Lubricant:

MARCH 2026

26 05 19 - Low-Voltage Electrical Power Conductors and Cables

CALN TOWNSHIP MUNICIPAL AUTHORITY

KINGS'S GRANT PUMP STATION UPGRADES

MARCH 2026 26 05 19 - 9

1. Manufacturers: Subject to compliance with requirements, available manufacturers offering products that may be incorporated into the Work include, but are not limited to, the following:

a. 3M.

b. American Polywater Corporation.

c. Ideal Industries, Inc.

d. Approved Equal.

2. Listed and labeled as complying with UL 267.

3. Suitable for use with conductors/cables and associated insulation/jackets to be installed.

4. Suitable for use at installation temperature.

D. Cable Ties: Material and tensile strength rating suitable for application.

1. Manufacturers: Subject to compliance with requirements, available manufacturers offering products that may be incorporated into the Work include, but are not limited to, the following:

a. Burndy LLC.

b. Ideal Industries.

c. Approved Equal.

PART 3 - EXECUTION

3.01 EXAMINATION

A. Verify that interior of building has been protected from weather.

B. Verify that work likely to damage wire and cable has been completed.

C. Verify that raceways, boxes, and equipment enclosures are installed and are properly sized to accommodate conductors and cables in accordance with NFPA 70.

D. Verify that field measurements are as indicated.

E. Verify that conditions are satisfactory for installation prior to starting work.

3.02 PREPARATION

A. Clean raceways thoroughly to remove foreign materials before installing conductors and cables.

3.03 INSTALLATION

A. Circuiting Requirements:

MARCH 2026

26 05 19 - Low-Voltage Electrical Power Conductors and Cables

CALN TOWNSHIP MUNICIPAL AUTHORITY

KINGS'S GRANT PUMP STATION UPGRADES

MARCH 2026 26 05 19 - 10

1. Unless dimensioned, circuit routing indicated is diagrammatic.

2. When circuit destination is indicated without specific routing, determine exact routing required.

3. Arrange circuiting to minimize splices.

4. Include circuit lengths required to install connected devices within 10 feet of location indicated.

5. Maintain separation of Class 1, Class 2, and Class 3 remote-control, signaling, and power-limited circuits in accordance with NFPA 70.

6. Maintain separation of wiring for emergency systems in accordance with NFPA 70.

7. Circuiting Adjustments: Unless otherwise indicated or required by code, when branch circuits are indicated as separate, combining them together in a single raceway is permitted, under the following conditions:

a. Provide no more than six current-carrying conductors in a single raceway.

Dedicated neutral conductors are considered current-carrying conductors.

b. Increase size of conductors as required to account for ampacity derating.

c. Size raceways, boxes, etc. to accommodate conductors.

8. Common Neutrals: Unless otherwise indicated, sharing of neutral/grounded conductors among up to three single phase branch circuits of different phases installed in the same raceway is not permitted. Provide dedicated neutral/grounded conductor for each individual branch circuit.

B. Install products in accordance with manufacturer's instructions.

C. Perform work in accordance with NECA 1 (general workmanship).

D. Installation in Raceway:

1. Tape ends of conductors and cables to prevent infiltration of moisture and other contaminants.

2. Pull all conductors and cables together into raceway at same time.

3. Do not damage conductors and cables or exceed manufacturer's recommended maximum pulling tension and sidewall pressure.

4. Use suitable wire pulling lubricant where necessary, except when lubricant is not recommended by the manufacturer.

E. Direct Burial Cable Installation:

1. Provide trenching and backfilling in accordance with Drawing details.

2. Install cable with minimum cover of 24 inches unless otherwise indicated or required.

3. Protect cables from damage in accordance with NFPA 70.

MARCH 2026

26 05 19 - Low-Voltage Electrical Power Conductors and Cables

CALN TOWNSHIP MUNICIPAL AUTHORITY

KINGS'S GRANT PUMP STATION UPGRADES

MARCH 2026 26 05 19 - 11

4. Provide underground warning tape in accordance with Section 26 05 53 along entire cable length.

F. Paralleled Conductors: Install conductors of the same length and terminate in the same manner.

G. Secure and support conductors and cables in accordance with NFPA 70 using suitable supports and methods approved by the authority having jurisdiction. Provide independent support from building structure. Do not provide support from raceways, piping, ductwork, or other systems.

1. Installation Above Suspended Ceilings: Do not provide support from ceiling support system. Do not provide support from ceiling grid or allow conductors and cables to lay on ceiling tiles.

2. Installation in Vertical Raceways: Provide supports where vertical rise exceeds permissible limits.

H. Terminate cables using suitable fittings.

I. Install conductors with a minimum of 12 inches of slack at each outlet.

J. Where conductors are installed in enclosures for future termination by others, provide a minimum of 5 feet of slack.

K. Neatly train and bundle conductors inside boxes, wireways, panelboards and other equipment enclosures.

L. Group or otherwise identify neutral/grounded conductors with associated ungrounded conductors inside enclosures in accordance with NFPA 70.

M. Make wiring connections using specified wiring connectors.

1. Make splices and taps only in accessible boxes. Do not pull splices into raceways or make splices in conduit bodies or wiring gutters.

2. Remove appropriate amount of conductor insulation for making connections without cutting, nicking or damaging conductors.

3. Do not remove conductor strands to facilitate insertion into connector.

4. Clean contact surfaces on conductors and connectors to suitable remove corrosion, oxides, and other contaminates. Do not use wire brush on plated connector surfaces.

5. Mechanical Connectors: Secure connections according to manufacturer's recommended torque settings.

6. Compression Connectors: Secure connections using manufacturer's recommended tools and dies.

7. Split-bolt compression splices are not permitted.

MARCH 2026

26 05 19 - Low-Voltage Electrical Power Conductors and Cables

CALN TOWNSHIP MUNICIPAL AUTHORITY

KINGS'S GRANT PUMP STATION UPGRADES

MARCH 2026 26 05 19 - 12

N. Insulate splices and taps that are made with uninsulated connectors using methods suitable for the application, with insulation and mechanical strength at least equivalent to unspliced conductors.

1. Dry Locations: Use insulating covers specifically designed for the connectors, electrical tape, or heat shrink tubing.

a. For taped connections, first apply adequate amount of rubber splicing electrical tape or electrical filler tape, followed by outer covering of vinyl insulating electrical tape.

b. For taped connections likely to require re-entering, including motor leads, first apply varnished cambric electrical tape, followed by adequate amount of rubber splicing electrical tape, followed by outer covering of vinyl insulating electrical tape.

2. Damp Locations: Use insulating covers specifically designed for the connectors, electrical tape, or heat shrink tubing.

a. For connections with insulating covers, apply outer covering of moisture sealing electrical tape.

b. For taped connections, follow same procedure as for dry locations but apply outer covering of moisture sealing electrical tape.

3. Wet Locations: Use heat shrink tubing.

O. Insulate ends of spare conductors using vinyl insulating electrical tape.

P. Field-Applied Color Coding: Where vinyl color coding electrical tape is used in lieu of integrally colored insulation as permitted in Part 2 under "Color Coding", apply half overlapping turns of tape at each termination and at each location conductors are accessible.

Q. Identify conductors and cables in accordance with Section 26 05 53.

R. Install firestopping to preserve fire resistance rating of partitions and other elements, using materials and methods specified in Section 07 84 00.

S. Unless specifically indicated to be excluded, provide final connections to all equipment and devices, including those furnished by others, as required for a complete operating system.

3.04 FIELD QUALITY CONTROL

A. See Section 01 40 00 - Quality Requirements, for additional requirements.

B. Inspect and test in accordance with NETA ATS, except Section 4.

C. Perform inspections and tests listed in NETA ATS, Section 7.3.2.

D. Correct deficiencies and replace damaged or defective conductors and cables.

MARCH 2026

26 05 23 - Control-Voltage Electrical Power Cables

CALN TOWNSHIP MUNICIPAL AUTHORITY

KINGS'S GRANT PUMP STATION UPGRADES

MARCH 2026 26 05 23 - 1

PART 1 - GENERAL

1.01 REFERENCE STANDARDS

A. BICSI TDMM - Telecommunications Distribution Methods Manual, 15th Edition; 2024.

B. NECA 1 - Standard for Good Workmanship in Electrical Construction; 2023.

C. NFPA 70 - National Electrical Code; Most Recent Edition Adopted by Authority Having Jurisdiction, Including All Applicable Amendments and Supplements.

D. TIA-569 - Telecommunications Pathways and Spaces; 2019e, with Addendum (2022).

E. UL 44 - Thermoset-Insulated Wires and Cables; Current Edition, Including All Revisions.

F. UL 83 - Thermoplastic-Insulated Wires and Cables; Current Edition, Including All Revisions.

G. UL 969 - Marking and Labeling Systems; Current Edition, Including All Revisions.

H. UL 1277 - Electrical Power and Control Tray Cables with Optional Optical-Fiber Members;

Current Edition, Including All Revisions.

I. UL 1569 - Metal-Clad Cables; Current Edition, Including All Revisions.

J. UL 1581 - Reference Standard for Electrical Wires, Cables, and Flexible Cords; Current Edition, Including All Revisions.

1.02 SECTION DESCRIPTION

A. Section Includes:

1. Category 6 balanced twisted pair cable.

2. Balanced twisted pair cabling hardware.

3. Low-voltage control cabling.

4. Control-circuit conductors.

5. Identification products.

1.03 RELATED SECTIONS:

A. Section 409533 “Process Control Networks”.

B. Section 409443 “Programmable Logic Process Controllers”.

1.04 DEFINITIONS

A. EMI: Electromagnetic interference.

B. Low Voltage: As defined in NFPA 70 for circuits and equipment operating at less than 50 V or for remote-control and signaling power-limited circuits.

MARCH 2026

26 05 23 - Control-Voltage Electrical Power Cables

CALN TOWNSHIP MUNICIPAL AUTHORITY

KINGS'S GRANT PUMP STATION UPGRADES

MARCH 2026 26 05 23 - 2

C. Plenum: A space forming part of the air distribution system to which one or more air ducts are connected. An air duct is a passageway, other than a plenum, for transporting air to or from heating, ventilating, or air-conditioning equipment.

1.05 ACTION SUBMITTALS

A. Product Data: For each type of product.

1.06 INFORMATIONAL SUBMITTALS

A. Source quality-control reports.

B. Field quality-control reports.

PART 2 - PRODUCTS

2.01 PERFORMANCE REQUIREMENTS

A. Electrical Components, Devices, and Accessories: Listed and labeled as defined in NFPA 70, by a qualified testing agency, and marked for intended location and application.

B. Flame Travel and Smoke Density in Plenums: As determined by testing identical products according to NFPA 262, by a qualified testing agency. Identify products for installation in plenums with appropriate markings of applicable testing agency.

1. Flame Travel Distance: 60 inches or less.

2. Peak Optical Smoke Density: 0.5 or less.

3. Average Optical Smoke Density: 0.15 or less.

C. Flame Travel and Smoke Density for Riser Cables in Non-Plenum Building Spaces: As determined by testing identical products according to UL 1666.

D. Flame Travel and Smoke Density for Cables in Non-Riser Applications and Non-Plenum Building Spaces: As determined by testing identical products according to UL 1685.

E. RoHS compliant.

2.02 CATEGORY 6 BALANCED TWISTED PAIR CABLE

A. Description: Four-pair, balanced-twisted pair cable, certified to meet transmission characteristics of Category 6 cable at frequencies up to 250MHz.

B. Manufacturers: Subject to compliance with requirements, available manufacturers offering products that may be incorporated into the Work include, but are not limited to, the following:

1. Belden Inc.

2. General Cable; Prysmian Group North America.

3. Monoprice, Inc.

4. Approved Equal.

MARCH 2026

26 05 23 - Control-Voltage Electrical Power Cables

CALN TOWNSHIP MUNICIPAL AUTHORITY

KINGS'S GRANT PUMP STATION UPGRADES

MARCH 2026 26 05 23 - 3

C. Standard: Comply with NEMA WC 66/ICEA S-116-732 and TIA-568-C.2 for Category 6 cables.

D. Conductors: 100-ohm, 23 AWG solid copper.

E. Shielding/Screening: Shielded twisted pairs (FTP).

F. Cable Rating: Riser.

G. Jacket: White thermoplastic.

2.03 BALANCED TWISTED PAIR CABLE HARDWARE

A. Description: Hardware designed to connect, splice, and terminate balanced twisted pair copper communications cable.

B. Manufacturers: Subject to compliance with requirements, available manufacturers offering products that may be incorporated into the Work include, but are not limited to the following:

1. AMP NETCONNECT; a TE Connectivity Ltd. company.

2. Belden CDT Networking Division/NORDX.

3. Molex Premise Networks.

4. Approved Equal.

C. General Requirements for Balanced Twisted Pair Cable Hardware:

1. Comply with the performance requirements of Category 6.

2. Comply with TIA-568-C.2, IDC type, with modules designed for punch-down caps or tools.

3. Cables shall be terminated with connecting hardware of same category or higher.

D. Source Limitations: Obtain balanced twisted pair cable hardware from single source from single manufacturer.

E. Patch Cords: Factory-made, four-pair cables in lengths as required; terminated with an eight-position modular plug at each end.

1. Patch cords shall have bend-relief-compliant boots and color-coded icons to ensure performance. Patch cords shall have latch guards to protect against snagging.

2. Patch cords shall have color-coded boots for circuit identification.

2.04 CONTROL-CIRCUIT CONDUCTORS

A. Manufacturers: Subject to compliance with requirements, available manufacturers offering products that may be incorporated into the Work include, but are not limited to the following:

1. General Cable; Prysmian Group North America.

2. Service Wire Co.

MARCH 2026

26 05 23 - Control-Voltage Electrical Power Cables

CALN TOWNSHIP MUNICIPAL AUTHORITY

KINGS'S GRANT PUMP STATION UPGRADES

MARCH 2026 26 05 23 - 4

3. Southwire Company.

4. Approved Equal.

B. Class 1 Control Circuits: Stranded copper, Type THHN/THWN-2, complying with UL 83 in raceway.

C. Class 2 Control Circuits: Stranded copper, Type THHN/THWN-2, complying with UL 83 in raceway.

D. Class 3 Remote-Control and Signal Circuits: Stranded copper, Type THHN/THWN-2, complying with UL 83 in raceway.

E. Class 2 Control Circuits and Class 3 Remote-Control and Signal Circuits That Supply Critical Circuits: Circuit Integrity (CI) cable.

1. Smoke control signaling and control circuits.

2.05 SOURCE QUALITY CONTROL

A. Factory test twisted pair cables according to TIA-568-C.2.

B. Cable will be considered defective if it does not pass tests and inspections.

C. Prepare test and inspection reports.

PART 3 - EXECUTION

3.01 EXAMINATION

A. Test cables on receipt at Project site.

1. Test each pair of twisted pair cable for open and short circuits.

2. Reject failed cables.

B. Comply with requirements in Section 26 05 33.16 Boxes for Electrical Systems for installation requirements for boxes and conduits as supplemented or modified in this Section.

1. Outlet boxes shall be no smaller than 2 inches wide, 3 inches high, and 2-1/2 inches deep.

2. Outlet boxes for cables shall be no smaller than 4 inches square by 1-1/2 inches deep with extension ring sized to bring edge of ring to within 1/8 inch of the finished wall surface.

3. Flexible metal conduit shall not be used.

C. Comply with TIA-569-D for pull-box sizing and length of conduit and number of bends between pull points.

D. Install manufactured conduit sweeps and long-radius elbows if possible.

3.02 INSTALLATION OF CONDUCTORS AND CABLES

MARCH 2026

26 05 23 - Control-Voltage Electrical Power Cables

CALN TOWNSHIP MUNICIPAL AUTHORITY

KINGS'S GRANT PUMP STATION UPGRADES

MARCH 2026 26 05 23 - 5

A. Comply with NECA 1.

B. General Requirements for Cabling:

1. Comply with BICSI ITSIMM, Ch. 5, "Copper Structured Cabling Systems."

2. Terminate all conductors; no cable shall contain unterminated elements.

3. Cables may not be spliced and shall be continuous from terminal to terminal. Do not splice cable between termination, tap, or junction points.

4. Cables serving a common system may be grouped in a common raceway. Install network cabling and control wiring and cable in separate raceway from power wiring.

Do not group conductors from different systems or different voltages.

5. Furnish a separate raceway system for shielded signal cable. Do not run in the same conduit with power cable.

6. Secure and support cables at intervals not exceeding 30 inches and not more than 6 inches from cabinets, boxes, fittings, outlets, racks, frames, and terminals.

7. Install exposed cables parallel and perpendicular to surfaces or exposed structural members and follow surface contours where possible.

8. Do not install bruised, kinked, scored, deformed, or abraded cable. Remove and discard cable if damaged during installation and replace it with new cable.

9. Cold-Weather Installation: Bring cable to room temperature before dereeling. Do not use heat lamps for heating.

10. Support cables at intervals not exceeding 30 inches and not more than 6 inches from cabinets, boxes, fittings, outlets, racks, frames, and terminals. Do not allow cables to lie on removable ceiling tiles.

11. Secure: Fasten securely in place with hardware specifically designed and installed so as to not damage cables.

12. Provide strain relief.

13. Keep runs short. Allow extra length for connecting to terminals. Do not bend cables in a radius less than 10 times the cable OD. Use sleeves or grommets to protect cables from vibration at points where they pass around sharp corners and through penetrations.

14. Ground wire shall be copper, and grounding methods shall comply with IEEE C2.

Demonstrate ground resistance.

C. Balanced Twisted Pair Cable Installation:

1. Comply with TIA-568-C.2.

2. Install FTP cables using techniques, practices, and methods that are consistent with the Category rating of components and that ensure required Category performance of completed and linked signal paths, end to end.

MARCH 2026

26 05 23 - Control-Voltage Electrical Power Cables

CALN TOWNSHIP MUNICIPAL AUTHORITY

KINGS'S GRANT PUMP STATION UPGRADES

MARCH 2026 26 05 23 - 6

3. Do not untwist balanced twisted pair cables more than 1/2 inch at the point of termination to maintain cable geometry.

4. All terminators required to interface the new cables to the various devices shall be furnished, installed, connected and tested as part of this contract.

D. Installation of Control-Circuit Conductors:

1. Install wiring in raceways.

2. Use insulated spade lugs for wire and cable connection to screw terminals.

3. Comply with requirements specified in Section 260533 "Raceways and Boxes for Electrical Systems."

4. Control wiring may be pulled in the power conduits and wireways providing the highest voltage of the adjacent wires is not more than 120 volts.

5. All terminators required to interface the new cables to the various devices shall be furnished, installed, connected and tested as part of this contract.

E. Open-Cable Installation:

1. Install cabling with horizontal and vertical cable guides in telecommunications spaces with terminating hardware and interconnection equipment.

2. Suspend copper cable not in a wireway or pathway a minimum of 8 inches above ceilings by cable supports not more than 30 inches apart.

3. Cable shall not be run through or on structural members or in contact with pipes, ducts, or other potentially damaging items.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .