8-ATTACHMENT B - CONSTRUCTION DOCUMENTS Revised 20250822.pdf
PDF 9 MB Posted
- Attached to
- Historic Restoration General Contractor Services
- Solicitation number
- RFP-076-25-CC
- Issued by
- Leon County, Florida
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 4-FORM 1 - CLIENT REFERENCES.pdf | ||
| 2-ATTACHMENT A - COST PROPOSAL.xlsx | XLSX spreadsheet | |
| 7-RFP-076-25-CC Addendum No.1.pdf | ||
| 6-FORM 8 - MWBE Forms.pdf | ||
| 3-ATTACHMENT C - GRANT AGREEMENT.pdf | ||
| 5-FORMS 2-7.pdf | ||
| 1-RFP-076-25-CC - and Draft Contract.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ADAPTIVE REUSE OF ROBINSON'S GROCERY STORE
2021 HOLTON STREET, TALLAHASSEE, FL 32310
DESIGN DEVELOPMENT
Project #: 4M-2025-04
AUGUST 25TH, 2025
© Copyright 2025 4M Design Group PA. Al l Rights Reserved. Drawings, specif icat ions and the design are and shall remain the property of 4M Design Group PA, whether the project for which they are prepared is executed or not, unless superceded by contractual agreement. The drawings and specif icat ions shall not be used by the project owner or any other party for other projects, addit ions to this project, or for the completion of this project except by agreement in writ ing.
4 M D e s i g n G r o u p P A
FLORIDA PRODUCT APPROVAL:
Contractor shall make available to the Building Inspector documentation necessary to verify that all components requiring product approval per FS
553.842 are in compliance with product approval installation Requirements.
RFP-076-25-CC Revised August 22, 2025
M
D e s ig n G ro u p P
A
A rc h it e c tu re
P re s e rv a ti o n
S u s ta in a b il it y
B e a rd S tr e e t
Ta lla h a ss e e
F L
.4
.3
.4
.3 f a x
A rc h it e c tu re R e g
A
A
Official Seal
Rev. # Description
A D
A P
TI
V E R
E U
SE
O
F R O
B
IS
O N
'S G
R O
C E R Y S
TO
R E
TA
LL
A H
A
SS
E E F L
AUGUST 25TH, 2025
CONSTRUCTION
DOCUMENTS
4M Proj. # 4M-2025-004
H
O
LT
O N
S
TR
E E T
PROJECT
INFORMATION
Drawn By: JED
C-1
R.O. ROUGH OPENING
F.P. FIRE PARTITION, FIRE PROTECTION
FOOTING
FURRING
FIRE RATED, FIRE RISER
FOOT, FEET
FRAME
GYPSUM BOARD
GRADE
GLASS, GLAZING
GALVANIZED
GAUGE
GLASS BLOCK
GYPSUM SHEATHING
GYPSUM WALLBOARD
GYPSUM
GYPSUM BOARD
GL.
GLB
GR.
G.S.
GYP.
GYP BD
G.W.B.
F.R.
FR.
FT.
FURR.
FTG.
G
GA.
GALV.
GB
GAS
EXIST. EXISTING
EXTERIOR, EXTRUDED
EXPOSED, EXPANSION
FIRE HOSE & EXTINGUISHER CABINET
FIRE HOSE CABINET
FIGURE
FINISHED FLOOR ELEVATION
FINISH FLOOR
FIRE EXTINGUISHER CABINET
FIRE EXTINGUISHER
FLOOR DRAIN
FACE OF BRICK
FINISH
FACE OF STUDS
FLUORESCENT
FOUNDATION
FLASHING
FLOOR
FIXTURE
F.H.C.
FIG.
F.H.&E.C.
FIN.
FIXT.
FLASHG.
FL., FLR.
FNDN.
F.O.S.
FLUOR.
EXP.
EXT.
FB
F.D.
F.E.
F.E.C.
F.F.
F.F.E.
DOWN
EXPANSION JOINT
EXTERIOR INSULATION FINISH SYSTEM
DRAWINGS
DRAWING
DETAIL
DOWNSPOUT
DRAWER
DOOR, DRESSING ROOM
ELEVATION
ELEVATOR
EXPOSED STRUCTURE
ELECTRIC WATER COOLER
EACH WAY
EXHAUST
EQUAL
DIMENSION
DIVISION, DIVIDED
EACHEA.
E.J.
EIFS
ELEV.
ELEV.,EL.
EQ., EQL.
E.W.
E.S.
EXH.
E.W.C.
DN.
D.S.
DRWR.
DR., D.R.
DTL.
DWG'S
DWG
DIM.
DIV.
TYPICALTYP.
UNLESS NOTED OTHERWISE
VINYL COMPOSITION TILE
WATER HEATER
WATER CLOSET
W/C
W.H.
WDW
WD.
W/ W.
WAINS.
W.C.
WHEELCHAIR
WINDOW
WOOD
WAINSCOT
WEST, WIDTH
WITH
UTIL.
VCT
V.B.
VEST.
U.N.O.
UR.
UTILITY
VINYL BASE
VESTIBULE
URINAL
STAINLESS STEEL
SOUTH, SIMILAR
REVOLUTIONS PER MINUTE
SQ.FT. SQUARE FEET
THRESH.
TOIL., T.
THRU
T
S.S.,S/S
STOR.,STO.
STRUCT.
STL.
THRESHOLD
THROUGH
TITLE
TOILET
STORAGE
STRUCTURAL
STEEL
SCHED.,SCH.
S.F.
SQ.
SHT.
SIM.
SHTHG.
R.P.M.
S
SQUARE FEET
SQUARE
SHEATHING
SIMILAR
SHEET
SCHEDULE
ABBREVIATIONS (ARCHITECTURAL)
A.F.F. ABOVE FINISH FLOOR
CONTROL JOINTC.J.
CLOSET
CEILING
COUNTER
COLUMN
CONTINUOUS
CONSTRUCTION
CONCRETE
COORDINATE
CERAMIC TILE
CUBIC
COLD WATER
COUNTER, CENTER
DEPARTMENT
DIAMETER
DRINKING FOUNTAIN
CUBIC YARD
DIAGONAL, DIAGRAM
CORRIDOR, CORRUGATED
CONCRETE MASONRY UNIT
CORR.
CTR.
CT
C.W.
CU.
DEPT.
D.F.
DIAG.
DIA.
C.Y.
CL., CLO.
CLG.
COL.
CNTR.
CONC
CONT.
CONST.
COORD.
CMU
ALUMINUM
APPROXIMATE
ACOUSTIC TILE
ARCHITECTURAL
BUILDING
BLOCK(ING)
BEARING
CABINET
BOTTOM
BRITISH THERMAL UNITS
ACCESS PANEL, ACOUSTICAL PANEL
CAST IRON PIPE
CONCRETE IN PLACE,
CUBIC FOOT PER MINUTE
CAST IN PLACE CONCRETE,
CONCRETE
BOT., BTM.
BTU
C., CAB.
BRG., BRNG
C.I.P.
CFM
C., CONC.
ALUM.
APP.,
A.P.
A.T.
ARCH.
APPROX.
BLK(G).
BLDG.
DIAMETER, ROUND
CENTER LINE
PERCENT
INCHES
AIR CONDITIONED
ACOUSTIC, ACOUSTICAL
ACCESS DOOR, AREA DRAIN
ACOUSTIC CEILING TILE
AIR CONDITIONING UNIT
PROPERTY LINE, PLATE
FEET'
w
ACOUST.
A/C
A.D.
ACT
A.C.U.
L O
C
AT
AND
LAM. LAMINATE
N.T.S. NOT TO SCALE
REFRIGERATOR
REINFORCING(ED)
REGLET, REGISTER
POLYVINYL CHLORIDE
PRESSURE TREATED
PAINT, PAINTED, POINT
PLATE, PROPERTY LINE
PVMT. PAVEMENT
REG.
REF.,RFG.
REQ'D.
REINF.
RM.
RAD.
RB
R.D.
RECP.
REQUIRED
ROOM
RECEPTION
ROOF DRAIN
RUBBER BASE
RADIUS
OPG., OPNG
P , PNL.
PT
P.T.
P.V.C.
OPP.
PANEL
OPPOSITE
OPENING
MANUFACTURER
MANUFACTURED
MOULDING, MOLDING
MISCELLANEOUS
MINIMUM, MINUTE
MASONRY OPENING
NOT IN CONTRACT
MIN.
MTL
N.
N.I.C.
NO.
MISC.
MLDG.
MOD.
M.O.
METAL
NUMBER
NORTH
MODIFIED
MAX.
MED.
MECH.
MFGR.
MFD.,MFG.
L.F.
LB., LBS.
MAT.
MAXIMUM
MEDIUM
MECHANIC(AL)
LINEAR FEET
POUNDS
MATERIAL
INSIDE DIAMETER
HEATING, VENTILATION,
HOLLOW METAL
HR. HOUR
IN.
INT., INTR.
INSUL.
JAN.
H.V.A.C.
H.W.
I.D., ID
INCH(ES)
JANITOR
INTERIOR
INSULATION
HOT WATER
H/C H'CAP.
HDW.
HORIZ.
H.M.
HDWR.,HW.,
H., HT.
HANDICAPPED
HORIZONTAL
HARDWARE
HEIGHT
INTERIOR ELEVATION MARK
NORTH ARROW
ROOM
NAME
ES
A
ROOM NAME & NUMBER
ELEVATION MARK
PARTITION TYPE
WINDOW SYMBOL
DOOR SYMBOL
ARCHITECTURAL SYMBOLS
SHEET CUT ON
DOOR & FRAME
ELEVATION REFERENCE
I N D E X O F D R A W I N G S:
X
X X
SHEET SHOWN ON
DETAIL MARK
X
X X
SHEET SHOWN ON
SHEET(S) CUT ON
DETAIL NUMBER
SHEET(S) CUT ON
ELEVATION MARK
SECTION MARK
X
X X
ELEVATION NUMBER
SHEET(S) CUT ON
SHEET SHOWN ON
SECTION NUMBER
& AIR CONDITIONING
PROXIMITY MAP
LOCATION MAP
REST ROOMR.R.
APPROVED
DESIGN DATA
CONSTRUCTION TYPE:
X
X
FLORIDA BUILDING CODE, BUILDING (FBC-B) 8th EDITION (2023) FLORIDA BUILDING CODE, MECHANICAL (FBC-M) 8th EDITION (2023) FLORIDA BUILDING CODE, FUEL & GAS (FBC-FG) 8th EDITION (2023) FLORIDA BUILDING CODE, PLUMBING (FBC-P) 8th EDITION (2023) FLORIDA BUILDING CODE, EXISTING BUILDING (FBC-EB) 8th EDITION (2023) FLORIDA BUILDING CODE, ACCESSIBILITY (FBC-A) 8th EDITION (2023) FLORIDA FIRE PREVENTION CODE, (FFPC) 8th EDITION
NATIONAL ELECTRICAL CODE (NEC) 2020 EDITION
APPLICABLE CODES
GENERAL NOTES:
(1) ALL WORK IS TO BE IN STRICT COMPLIANCE WITH STATE AND LOCAL LAWS AND CODES WHICH
APPLY TO THIS PROJECT, AND TO GENERALLY ACCEPTED CONSTRUCTION TRADE PRACTICES.
(2) ALL WORK IS TO COMPLY WITH APPLICABLE COVENANTS, RESTRICTIONS, AND REQUIRED
CONSTRUCTION PROCEDURES.
(3) ALL DIMENSIONS, SITE CONDITIONS, AND INSTALLATION SHALL BE FIELD VERIFIED WHEN
PREPARING BIDS AND PRIOR TO PROCEEDING WITH THE WORK. ANY DISCREPANCIES OR
CONFLICTS BETWEEN FIELD CONDITIONS AND THE CONTRACT SHALL BE BROUGHT TO THE
DESIGNER'S ATTENTION FOR CLARIFICATION PRIOR TO PROCEEDING WITH THE WORK.
(4) ALL WORK IS TO BE CONSISTENT WITH THE CONTRACT. ANY PROPOSED CHANGES OR
SUBSTITUTIONS TO THE LAYOUT, ASSEMBLY, OR MATERIALS MUST BE APPROVED BY THE DESIGNER
PRIOR TO PROCEEDING.
(5) THE CONTRACTOR SHALL PROVIDE CRAFTSMAN-LIKE INSTALLATION AND FINISHING OF ALL
EXPOSED CONSTRUCTION SYSTEMS.
(6) ALL DIMENSIONS ARE FROM THE FACE OF STUD, FACE OF CMU, OR CENTERLINE OF COLUMN
UNLESS SHOWN OR NOTED OTHERWISE. DO NOT SCALE THE DRAWINGS TO DETERMINE
DIMENSIONS. RELY ONLY ON WRITTEN DIMENSIONS THAT HAVE BEEN FIELD VERIFIED FOR
CONSISTENCY. IF DIMENSION STRINGS ARE NOT MATHEMATICALLY CONSISTENT, OR IF DIMENSIONS
ON ONE DRAWING DO NOT MATCH ANOTHER DRAWING; CONTACT THE DESIGNER FOR
CLARIFICATION PRIOR TO PROCEEDING WITH THE WORK.
(7) THE CONSTRUCTION DOCUMENTS (DRAWINGS & SPECIFICATIONS) ARE CONNECTED AND
COMPLIMENTARY. IF A REQUIREMENT, ASSEMBLY, ARRANGEMENT, DIMENSION, ETC IS SHOWN ON
ONE DOCUMENT BUT NOT ON THE OTHER, IT MAY STILL BE REQUIRED TO BE PART OF THE WORK. IF
THERE ARE ANY INCONSISTENCIES BETWEEN DIFFERENT DRAWINGS OR BETWEEN THE DRAWINGS &
SPECIFICATIONS, NOTIFY THE DESIGNER FOR CLARIFICATION PRIOR TO PROCEEDING WITH THE
WORK. ANY WORK THAT IS DONE WITHOUT CLEAR CONSISTENT DIRECTION FROM THE
CONSTRUCTION DOCUMENTS OR THE DESIGNER AS INTERPRETER OF THE CONSTRUCTION
DOCUMENTS IS SUBJECT TO THE CORRECTION/REVISION OF THE WORK AT THE CONTRACTOR'S
EXPENSE.
(8) THE CONTRACTOR WILL REPAIR AT HIS OR HER EXPENSE ANY MATERIALS, FINISHES, EQUIPMENT, LANDSCAPE, OR PROTECTED EXISTING VEGETATION THAT IS DAMAGED DURING THE COURSE OF THE
WORK.
(9) THE CONTRACTOR SHALL REMOVE FROM THE SITE AND DISPOSE OF ALL TRASH, DEBRIS, AND
CONSTRUCTION MATERIALS PRIOR TO THE COMPLETION OF THE WORK. TRASH AND CONSTRUCTION
MATERIALS ARE TO BE SECURED AT THE SITE, AND THE CONTRACTOR IS TO ENSURE THAT DEBRIS IS
NOT BLOWN OR SPREAD BEYOND THE SITE DURING THE PERFORMANCE OF THE WORK.
(10). CONTRACTOR SHALL VERIFY SITE PLAN DESIGN WITH FINAL SITE SURVEY TO BE FURNISHED BY THE
OWNER. GROUND FLOOR FIN. CONC. SLAB REFERENCE ELEVATION = 0'-0". REFER TO
SITE/GRADING PLAN FOR NAVD ELEVATIONS.
(11). CONTRACTOR SHALL FIELD VERIFY LOCATION OF ALL UTILITIES AND UTILITY SERVICE ACCESS
ABOVE AND BELOW GROUND, INCLUDING BUT NOT LIMITED TO ELECTRIC, WATER, SEWER,
TELECOMMUNICATIONS (VOICE, DATA, CABLE), AND GAS.
(12). LUMBER PRODUCTS CONTAINED IN ASSEMBLIES FOUND ON THIS PROJECT ARE LIKELY TO BE
EXPOSED TO WEATHERING CONDITIONS INCLUDING BUT NOT LIMITED TO : WINDBLOWN DEBRIS, PROLONGED WET WEATHER CONDITIONS INCLUDING SHADE CONDITIONS THAT PREVENT ADEQUATE
DRYING TIMES & ULTRA-VIOLET SUN EXPOSURES THAT CAUSE DETERIORATION TO UNTREATED WOOD
PRODUCTS.
ALL LUMBER PRODUCTS USED ON THIS PROJECT WHICH MAY BE SUBJECTED TO EXTERIOR EXPOSURE
DURING CONSTRUCTION OR BE USED AS A FINISHED MATERIAL SHALL BE PROTECTED PRIOR TO
INSTALLATION AND IF USED WITH IN A MANNER EXPOSED TO DIRECT WEATHERING CONDITIONS
SHALL BE PRESSURE TREATED WITH THE BEST WOOD DECAY AND INSECT PREVENTATIVE TREATMENT
CURRENTLY AVAILABLE IN THE MARKET, OR BE CERTIFIED BY THE WOOD/LUMBER PRODUCTS
MANUFACTURER TO BE SUITABLE FOR EXTERIOR EXPOSURES.
FLORIDA PRODUCT APPROVAL:
Contractor shall make available to the Building
Inspector documentation necessary to verify that all components requiring product approval per FS
553.842 are in compliance with product approval installation Requirements.
OCCCUPANCY TYPE:
N/A COVERSHEET
C-1 PROJECT INFORMATION
C-2 SITE PLAN OVER SURVEY
AD-1 DEMOLITION PLAN
AE-1 EXISTING FLOOR PLAN WITH DIMENSIONS
AE-2 EXISTING EXTERIOR ELEVATIONS
AR-1 PROPOSED FLOOR PLAN
AR-2.1 PROPOSED EXTERIOR ELEVATION
AR-2.2 PROPOSED EXTERIOR ELEVATION
AR-3 FOUNDATION PLAN
AR-4 ROOF & FRAMING PLAN
AR-5.1 PHOTO REFERENCES
AR-5.2 PHOTO REFERENCES
AR-6.1 BUILDING SECTIONS
AR-6.2 BUILDING SECTIONS
P00 PLUMBING NOTES & LEGEND
P101 PLUMBING DEMOLITION FLOOR PLAN
P102 SANITARY FLOOR PLAN
P103 PRESSURE FLOOR PLAN
P501 PLUMBING DETAILS
P502 PLUMBING DETAILS
P601 PLUMBING SCHEDULES
P901 PLUMBING RISER DIAGRAM
M001 MECHANICAL NOTES & LEGENDS
M101 HVAC FLOOR PLAN
M501 HVAC DETAILS
M502 HVAC DETAILS
M601 HVAC SCHEDULES
E001 ELECTRICAL NOTES & LEGENDS
E002 ELECTRICAL SYMBOLS
E101 ELECTRICAL SITE PLAN
E102 ELECTRICAL DEMOLITION FLOOR PLAN
E103 ELECTRICAL RENOVATION FLOOR PLAN - POWER & FA
E104 ELECTRICAL RENOVATION FLOOR PLAN - LIGHTING
E501 POWER DETAILS
E502 LIGHTING DETAILS
E503 TELECOM DETAILS
E504 FIRE ALARM DETAILS
E601 ELECTRICAL SCHEDULES
E602 ELECTRICAL SCHEDULES
E701 ELECTRICAL ONE-LINE
E702 ELECTRICAL GROUNDING
MERCHANTILE - GROUP M
SITE LOCATION
OCCCUPANCY LOAD: MERCHANTILE - 60 SF/1,840 SF = 31 PERSONS
FBC 602.3 Type III. - WOOD FRAME & CONCRETE CONSTRUCTION
M
D e s ig n G ro u p P
A
A rc h it e c tu re
P re s e rv a ti o n
S u s ta in a b il it y
B e a rd S tr e e t
Ta lla h a ss e e
F L
.4
.3
.4
.3 f a x
A rc h it e c tu re R e g
A
A
Official Seal
Rev. # Description
A D
A P
TI
V E R
E U
SE
O
F R O
B
IS
O N
'S G
R O
C E R Y S
TO
R E
TA
LL
A H
A
SS
E E F L
AUGUST 25TH, 2025
CONSTRUCTION
DOCUMENTS
4M Proj. # 4M-2025-004
H
O
LT
O N
S
TR
E E T
SITE PLAN
OVER SURVEY
Drawn By: JED
C-2
M
D e s ig n G ro u p P
A
A rc h it e c tu re
P re s e rv a ti o n
S u s ta in a b il it y
B e a rd S tr e e t
Ta lla h a ss e e
F L
.4
.3
.4
.3 f a x
A rc h it e c tu re R e g
A
A
Official Seal
Rev. # Description
A D
A P
TI
V E R
E U
SE
O
F R O
B
IS
O N
'S G
R O
C E R Y S
TO
R E
TA
LL
A H
A
SS
E E F L
AUGUST 25TH, 2025
CONSTRUCTION
DOCUMENTS
4M Proj. # 4M-2025-004
H
O
LT
O N
S
TR
E E T
DEMOLITION
FLOOR PLAN
Drawn By: JED
AD-1
01'
1" 2"
SCALE: 1/4"=1'-0"
0" 3"
1' 2' 12'3' 4' 5' 6' 8'
DEMOLITION FLOOR PLAN
SCALE: 1/4"=1'-0"
DEMOLITION NOTES
ROBINSONS GROCERY STROR REHABILITAION AND ADAPTIVE REUSE
1. INSURE THAT ALL ON-SITE UTILITIES ARE INOPERABLE: INCLUDE WATER, SANITARY
SEWERAGE, ELECTRICAL, AND GAS CONNECTIONS,
2. BLEED ALL LINE TO INSURE NO EXISTING UTILITIES ARE ACTIVE.
3. REMOVE EXISTING WELDED IRON WINDOW AND FENESTRATION SECURITY GRILLS.
4. PATCH ANY HOLES IN EXTERIOR CONCRTE MASONRY (CMU) PARTICULARLY IF
CAUSED BY REMOVAL OF SECURITY GRILLES AND PROTECTIVE GRATING, ALL
LOCATIONS OF THE BUILDING. ALSO REMOVE PAY PHONES
5. REMOVE EXISTING ROOF IN ITS ENTIRETY.
6. REMOVAL OF EXISTING ROOF TO INCLUDE WEATHERING SURFACE, FRAMING AND
EXISTING CEILING SURFACE.
7. REMOVE/DEMOLISH ALL EXISTING INTERIOR ELEMENTS INCLUDING COUNTERS,
FLOORING, GLAZED FRAMED TRANSCATION COUNTER ENCLOSURE.
8. REMOVE ALL EXISTING WINDOWS, DOORS; INTERIOR AND EXTERIOR.
9. REMOVE EXISTING WALK-IN COOLER.
10. REMOVE ALL EXISTING PLUMBING AND ELECTRICAL SERVICE, PANELS AND
FIXTURES, WIRING AND ANY SUB-PANELS.
11. REMOVE ALL EXISTING MECHANICAL SYSTEMS INCLUDING HEATING, VENTILATION,
AND COOLING SYSTEM EQUIMENT. AND ASSOCIATED DUCTWORK.
12. REMOVE ANY COOKING EQUIPMENT AND CAP ALL GAS AND PLUMBING
CONNECTIONS.
13. REMOVE ALL EXISTING PLUMBING FIXTURES, SINKS, TOLIETS, LAVATORIES, AND
EXPOSED PLUMBING PIPING.
14. DEMOLISH ALL INTERIOR FRAMED PARTITIONS.
15. DO NOT DISTURB OR DEMOLISH ANY EXTERIOR CONCRETE MASONRY WALLS
UNLESS SPECIFICALLY INDICATED.
16. DEMOLISH WOODEN FRAMED “LEAN-TO” SHED ON NORTH-SIDE OF EXISTING
STRUCTURE. RECONSTRUCT IN SAME CONFIGURATION IN CMU WALLS AND FOOTER
WITH 3000 PSI CONCRETE SLAB ON FILL.TOP OF SLAB MATCHES INTERIOR FLOOR.
17. ALL VENT STACKS AND ANY ROOF TOP EQUIPMENT TO BE DEMOLISHED AS PART OF
THE ROOF DEMOLITION. ENTIRE ROOF TO BE REFRAMED AND NEW STRUCTURAL
AND WEATHERING SURFACE, INCLUDING FLASHING AND REROOFING
ACCESSORIES IN LATER PHASE OF THIS SCOPE OF WORK.
18. LEAVE BUILDING IN CLEAN CONDITION WITH FLOORING SWEPT AND PREPARED
FOR RECONFIGURATION.
19. PATCH AND FILL ANY DAMAGE TO CMU EXTERIOR WALLS. INFILL ANY EXTERIOR
WALLS WHERE PREVIOUS DOORS OR WINDOWS WERE EXISTING.
20. DEMOLISH EXISTING LOAD BEARING WALL AND BEAM AT LOCATION OF FORMER
ROOF PARAPET.
21. EXISTING SHED WITH PARTICAL BOARD WALLS TO BE DEMOLISHED, SLAB SHALL
REMAIN IF IT MATCHES THE INTERIOR ELEVATION. CONTRACTOR TO DECIDE IS A
POUR OVER IS ACCEPTABLE TO MEET ADA. IF UNACCEPTABLE REMOVE AND
REPLACE AT THE CORRECT ELEVATION.
3 3 34 4 4
8 8
8 8
M
D e s ig n G ro u p P
A
A rc h it e c tu re
P re s e rv a ti o n
S u s ta in a b il it y
B e a rd S tr e e t
Ta lla h a ss e e
F L
.4
.3
.4
.3 f a x
A rc h it e c tu re R e g
A
A
Official Seal
Rev. # Description
A D
A P
TI
V E R
E U
SE
O
F R O
B
IS
O N
'S G
R O
C E R Y S
TO
R E
TA
LL
A H
A
SS
E E F L
AUGUST 25TH, 2025
CONSTRUCTION
DOCUMENTS
4M Proj. # 4M-2025-004
H
O
LT
O N
S
TR
E E T
EXISTING FLOOR
PLAN W/ DIMS
Drawn By: JED
AE-1
01'
1" 2"
SCALE: 1/4"=1'-0"
0" 3"
1' 2' 12'
EXISTING FLOOR PLAN WITH DIMENSIONS
SCALE: 1/4"=1'-0"
3' 4' 5' 6' 8'
M
D e s ig n G ro u p P
A
A rc h it e c tu re
P re s e rv a ti o n
S u s ta in a b il it y
B e a rd S tr e e t
Ta lla h a ss e e
F L
.4
.3
.4
.3 f a x
A rc h it e c tu re R e g
A
A
Official Seal
Rev. # Description
A D
A P
TI
V E R
E U
SE
O
F R O
B
IS
O N
'S G
R O
C E R Y S
TO
R E
TA
LL
A H
A
SS
E E F L
AUGUST 25TH, 2025
CONSTRUCTION
DOCUMENTS
4M Proj. # 4M-2025-004
H
O
LT
O N
S
TR
E E T
EXISTING EXT.
ELEVATIONS
Drawn By: JED
AE-2
01'
1" 2"
SCALE: 1/4"=1'-0"
0" 3"
1' 2' 12'
EXISTING FRONT ELEVATION
SCALE: 1/4"=1'-0"
3' 4' 5' 6' 8'
EXISTING FRONT ELEVATION
SCALE: 1/4"=1'-0"
EXISTING SOUTH ELEVATION
SCALE: 1/4"=1'-0"
EXISTING NORTH ELEVATION
M
D e s ig n G ro u p P
A
A rc h it e c tu re
P re s e rv a ti o n
S u s ta in a b il it y
B e a rd S tr e e t
Ta lla h a ss e e
F L
.4
.3
.4
.3 f a x
A rc h it e c tu re R e g
A
A
Official Seal
Rev. # Description
A D
A P
TI
V E R
E U
SE
O
F R O
B
IS
O N
'S G
R O
C E R Y S
TO
R E
TA
LL
A H
A
SS
E E F L
AUGUST 25TH, 2025
CONSTRUCTION
DOCUMENTS
4M Proj. # 4M-2025-004
H
O
LT
O N
S
TR
E E T
PROPOSED
FLOOR PLAN
Drawn By: JED
AR-1
01'
1" 2"
SCALE: 1/4"=1'-0"
0" 3"
1' 2' 12'
PROPOSED FLOOR PLAN
SCALE: 1/4"=1'-0"
3' 4' 5' 6' 8'
RECONSTRUCTION KEYNOTES -
ROBINSONS GROCERY REHABILITAION AND ADAPTIVE REUSE
1. REMOVE AND REPLACE ALL FENESTRATION- DEMOLISH ALL EXISTING WINDOWS AND DOORS
FOLLOWING DEMOLITION SCOPE.
2. RECONSTRUCT NORTHSIDE LEAN-TO ADDITION WITH CMU ON STEM WALL AND C.I.P CONCRETE
FOOTING. REFER TO DETAIL
3. TREAT SOILS AND PROVIDE MIN 8-10 MIL VAPOR BARRIER OVER 4” SAND AND GRAVEL BED.
4. REINFORCE NEW SLAB AT NORTHSIDE LEAN TO AND NEW RESTROOMS WITH 10X10 WWF.
5. REINFORCE NEW CONCRETE FOUNDATION WITH THREE (3) #5 REBAR CONTINUOUSLY AND ONE (1) #5
AT 2’-0” O.C.
6. REINFOCE ALL NEW CMU WALLS WITH GALVANIZED LADDER TYPE HORIZONTAL REINFORCING AT 16”
O.C. VERTICALLY.
7. REINFORCE ALL NEW CMU EXTERIOR WALLS WITH ONE (1) #5 REBAR AT 24” O. C.
8. INSTALL NEW KNOCK DOWN TYPE 18 GAUGE FULL-WRAP DOOR FRAMES AT ALL CMU WALL OPENINGS
INTERIOR AND EXTERIOR.
9. INTERIOR DOORS SHALL BE SOLID CORE WOOD DOORS WITH THREE (3) HINGES.
10. RESTROOMS TO HAVE PUSH PLATES AND HANDLES, OFFICE, AND STORAGE ROOM DOOR TO HAVE
LEVER TYPE DOOR HANDLES.
11. FRONT DOORS AND ALL WINDOWS ON ALL ELEVATIONS PROVIDED BY WEATHERSHIELD, LOWEN,PELLA
ECT ALUMINUM CLAD WOOD WITH IMPACT RESISTANT GLASS/SHATTER PROOF.
12. FRONT DOORS TO HAVE THREE POINT LOCKING MECHANISM AND KEYED LOCK FROM EXTERIOR.
13. EGRESS AND ACCESSIBLE DOORS TO BE 18-GAUGE HM FIRE RATED 45 MIN WITH 12X12 WIRED GLASS
PANEL WITH PANIC BAR AND KICK PLATES ON INTERIOR.
14. LEVEL THE INTERIOR FLOORS TO ACHIEVE UNIFORM AND CONSISTENT FLOOR LEVEL FOR RESURFACING
WITH LVT OR CERAMIC TILE FINISH MATERIALS.
15. NEW CEILING SHALL BE 5/8” TYPE “FC” GYPSUM BOARD FINISHED IN MEDIUM KNOCK DOWN FINISH;
PAINT WHITE ON METAL OR WOOD SUBFRAME.
16. NEW INTERIOR CMU WALLS TO BE PREFINISHED WITH BLOCK SEALER AND ELASTOMERIC PAINT.
17. PROVIDE JOINT CONCEALER ON THE INTERIOR FINISHED WALLS OF OFFICE AND NEW RESTROOMS.
18. PAINT ENTIRE EXTERIOR BUILDING- COLOR SCHEDULE TO BE PROVIDED BY ARCHITECT.
19. NEW ROOF TO BE T.P.O. SINGLE PLY MEMBRANE. FLASH AND COUNTER FLASH AND CAP WITH FORMED
ALUMINUM CAP (MILL FINISHED) AT ALL PARAPETS, OVER 3/4" PLYWOOD SHEATHING NAILED TO NEW
WOOD TRUSSES.
20. PROVIDE DEEP OVERSIZED GUTTER WITH LEAF GUARD COVERS AND OVERSIZED ROUND DOWNSPOUTS
DROP TO CONCRETE SPLASH BLOCKS OR IN-GROUND DRYWELLS ON EAST ELEVATION AT PARKING AREA.
21. RELOCATE EXISTING CHAIN-LINK FENCING PER SITE PLAN.
22. RESURFACE EXISTING PARKING AND VEHICULAR ACCESS AREAS* PER SITE PLAN.
23. PROVIDE ONE (1) HANDICAP ACCESSIBLE* PARKING SPACES AS SHOWN ON SITE PLAN.
24. RECONFIGURE PORCH *WEST ELEVATION SUPPORT COLUMNS AS SHOWN, REPAIR CANOPY TO ENSURE
WATERTIGHT CONDITION. TEMPORARY SHORE OR LEAVE EXISTING COLUMNS IN PLACE WHILE INSTALLING
NEW COLUMNS IN LOCATIONS SHOWN.
25. REPAIR CABLE STAYS ABOVE CANOPY.
26. REMOVE FLUORESCENT STRIP LIGHTING FIXTURES FROM WEST ELEVATION CANOPY CEILING
27. REMOVE STREET LIGHT FIXTURE, TELEPHONE BANK AND FORMER ELECTRICAL SIGNAGE BRACKET FROM
FRONT (WEST) ELEVATION.
28. INSTALL WALL PACK TYPE VANDAL RESISTANT LED LIGHTING ONE ON EACH ELEVATION EXCEPT WEST OR
HOLTON STREET ELEVATION
29. INSTALL VANDAL AND VAPOR PROOF CEILING LIGHTING IN EXPOSED GALVANIZED CONDUIT AT FRONT
(WEST) PORCH, AND SIMILAR VANDAL-PROOF SCONCE TYPE ENCLOSED FIXTURES ADJACENT TO BOTH
EXITING DOORS ON NORTH AND SOUTH ELEVATIONS.
30. RE-ROOF NORTH LEAN-TO WITH 30 YEAR 5V METAL CRIMP METAL PANELS OVER W.R. GRACE ICE AND
WATER SHIELD OR TITANIUM BRAND ROOFING UNDERLAYMENT. IF TITANIUM IS USED APPLY TWO (2)
LAYERS OF ROOFING UNDERLAYMENT FABRIC OVER ¾” PLYWOOD SHEATHING. NO O.S.B [ORIENTED
STRAND BOARD, WILL BE ACCEPTED)
'-7
6' -8
9' -0
'-0
0' -6
EXISTING STUCCO TO BE REPAIRED AND REFINISHED TO A
CLEAN AND CONTINUOUS SURFACE, A PATCHED LOOK IS
NOT PERMITTED
NEW RESTROOM
AREA TO BE
ADDED REMOVE SMALL LEAN TO
SHED INVENTORY
STORAGE SHED TO BE
REMOVED AND
RECONSTRUCTED OUT OF
CMU FOR SECURITY
NEW ROOFING MATERIALS
AND SUB FRAMING
M
D e s ig n G ro u p P
A
A rc h it e c tu re
P re s e rv a ti o n
S u s ta in a b il it y
B e a rd S tr e e t
Ta lla h a ss e e
F L
.4
.3
.4
.3 f a x
A rc h it e c tu re R e g
A
A
Official Seal
Rev. # Description
A D
A P
TI
V E R
E U
SE
O
F R O
B
IS
O N
'S G
R O
C E R Y S
TO
R E
TA
LL
A H
A
SS
E E F L
AUGUST 25TH, 2025
CONSTRUCTION
DOCUMENTS
4M Proj. # 4M-2025-004
H
O
LT
O N
S
TR
E E T
PROPOSED
ELEVATIONS
Drawn By: JED
AR-2.1
01'
1" 2"
SCALE: 3/8"=1'-0"
0" 3"
1' 2' 8'
REAR ELEVATION WITH NEW RESTROOMS AND NEW ROOF
SCALE: 3/8"=1'-0"
3' 4' 5'
FRONT ELEVATION WITH NEW DOORS AND WINDOWS
SCALE: 3/8"=1'-0"
NEW ADA EXIT
EXISTING STUCCO TO BE REPAIRED AND REFINISHED TO A
CLEAN AND CONTINUOUS SURFACE, A PATCHED LOOK IS
NOT PERMITTED
NEW RESTROOM
AEREA TO BE
ADDED
NEW ADMIN EXIT
'-7
'-0
EXISTING STUCCO TO BE REPAIRED AND REFINISHED TO A
CLEAN AND CONTINUOUS SURFACE, A PATCHED LOOK IS
NOT PERMITTED
6' -8
5'-0" 3'-0" 2'-0"
3' -0
3'
-8
3'-0"
3' -8
3'
-0
6'-4"
5' -2
1'
-6
M
D e s ig n G ro u p P
A
A rc h it e c tu re
P re s e rv a ti o n
S u s ta in a b il it y
B e a rd S tr e e t
Ta lla h a ss e e
F L
.4
.3
.4
.3 f a x
A rc h it e c tu re R e g
A
A
Official Seal
Rev. # Description
A D
A P
TI
V E R
E U
SE
O
F R O
B
IS
O N
'S G
R O
C E R Y S
TO
R E
TA
LL
A H
A
SS
E E F L
AUGUST 25TH, 2025
CONSTRUCTION
DOCUMENTS
4M Proj. # 4M-2025-004
H
O
LT
O N
S
TR
E E T
PROPOSED
ELEVATIONS
Drawn By: JED
AR-2.2
NORTH ELEVATION FACING AWAY FROM OSCEOLA STREET
SCALE: 3/8"=1'-0"
SOUTH ELEVATION FACING OSCEOLA STREET
SCALE: 3/8"=1'-0"
01'
1" 2"
SCALE: 3/8"=1'-0"
0" 3"
1' 2' 8'3' 4' 5'
M
D e s ig n G ro u p P
A
A rc h it e c tu re
P re s e rv a ti o n
S u s ta in a b il it y
B e a rd S tr e e t
Ta lla h a ss e e
F L
.4
.3
.4
.3 f a x
A rc h it e c tu re R e g
A
A
Official Seal
Rev. # Description
A D
A P
TI
V E R
E U
SE
O
F R O
B
IS
O N
'S G
R O
C E R Y S
TO
R E
TA
LL
A H
A
SS
E E F L
AUGUST 25TH, 2025
CONSTRUCTION
DOCUMENTS
4M Proj. # 4M-2025-004
H
O
LT
O N
S
TR
E E T
PROPOSED
FOUND. PLAN
Drawn By: JED
AR-3
01'
1" 2"
SCALE: 1/4"=1'-0"
0" 3"
1' 2' 12'
FOUNDATION PLAN
3' 4' 5' 6' 8'
M
D e s ig n G ro u p P
A
A rc h it e c tu re
P re s e rv a ti o n
S u s ta in a b il it y
B e a rd S tr e e t
Ta lla h a ss e e
F L
.4
.3
.4
.3 f a x
A rc h it e c tu re R e g
A
A
Official Seal
Rev. # Description
A D
A P
TI
V E R
E U
SE
O
F R O
B
IS
O N
'S G
R O
C E R Y S
TO
R E
TA
LL
A H
A
SS
E E F L
AUGUST 25TH, 2025
CONSTRUCTION
DOCUMENTS
4M Proj. # 4M-2025-004
H
O
LT
O N
S
TR
E E T
ROOF & FRAMING
PLAN
Drawn By: JED
AR-4
01'
1" 2"
SCALE: 1/4"=1'-0"
0" 3"
1' 2' 12'
ROOF FRAMING PLAN
SCALE: 1/4"=1'-0"
3' 4' 5' 6' 8'
ROOF PLAN
M
D e s ig n G ro u p P
A
A rc h it e c tu re
P re s e rv a ti o n
S u s ta in a b il it y
B e a rd S tr e e t
Ta lla h a ss e e
F L
.4
.3
.4
.3 f a x
A rc h it e c tu re R e g
A
A
Official Seal
Rev. # Description
A D
A P
TI
V E R
E U
SE
O
F R O
B
IS
O N
'S G
R O
C E R Y S
TO
R E
TA
LL
A H
A
SS
E E F L
AUGUST 25TH, 2025
CONSTRUCTION
DOCUMENTS
4M Proj. # 4M-2025-004
H
O
LT
O N
S
TR
E E T
PHOTO
REFERENCES
Drawn By: JED
AR-5.1
EXISTING SLOPE IN FLOOR TO BE
CORRECTED TO PROVIDE A LEVEL FLOOR
SURFACE THROUGH OUT THE BUILDING.
RAISE ALL ADJACENT FLOORS TO THE
CORRECT LEVEL AS NEEDED. CURRENT
ELEVATION CHANGE IS +/- 2.5"
SEEN HERE ARE ROBINSON'S GROCERY
EXISTING INTERIOR ELEMENTS. REMOVE ALL
EXISTING INTERIOR ELEMENTS AND
EQUIPMENT. ENSURE ALL EXISTING UTILITIES
ARE INOPERABLE AND CAP ALL EXISTING
UTILITY SERVICES; WATER, SANITARY SEWER,
ELECTRICAL AND NATURAL GAS.
CURRENT NORTH ELEVATION IS TO BE
RE-PAINTED. THE WOODEN SHED STYLE
ADDITION IS TO BE DEMOLISHED AND
REBUILT WITH A CONCRETE BLOCK
STRUCTURE TO MIMIC THE ORIGINAL
CONDITION FOR SECURITY PURPOSE.
SIMILAR ROOF STYLE TO BE
RECONSTRUCTED.
ORIGINAL SUPPORT COLUMN TO BE
REMOVED, REPLACED, & RELOCATED AS
NEEDED FOR THE NEW ROOF STRUCTURE
PER STRUCTURAL DRAWINGS. AFTER
DEMOLISHING THE EXISTING ROOF THE
TEMPORARY SUPPORT WALLS CAN BE
REMOVED PRIOR TO NEW STRUCTURAL
SUPPORTS AND NEW ROOF.
CURRENT SOUTH ELEVATION IS TO BE
RE-PAINTED. MURALS NOT TO BE SAVED.
PARAPET WALL TO BE EVALUATED AT THE
TOP AND BLOCKED TO BE REPLACED IF
NEEDED TO ALLOW THE EXTENTION OF THE
WALL UP TO THE SAME LEVEL AS THE FRONT
& NORTH SIDES. REMOVE ALL DAMAGED
BLOCKS BEFORE ADDING NEW BLOCKS.
THE WOODEN SHED STYLE ADDITION IS TO
BE DEMOLISHED AND REBUILT WITH A
CONCRETE BLOCK STRUCTURE TO MIMIC
THE ORIGINAL CONDITION FOR SECURITY
PURPOSE. SIMILAR ROOF STYLE TO BE
RECONSTRUCTED. WINDOW LOCATION TO
BE PRESERVED IN NEW REPLICATION WITH
SECURE MATERIALS.
EXISTING ENTRY SLAB TO BE CLEANING &
REPAIRED AS NEEDED TO REMAIN. EXISTING
CONCRETE STEPS ARE TO BE REMOVED
AND RECONSTRUCTED AS THEY WERE
HISTORICALLY. NEW COLUMN BASES TO BE
ANCHORED & DRESSED OUT. HANDRAIL TO
BE ADDED TO ONE SIDEOR CENTER OF THE
STEPS FOR ACCESSIBILITY
EXISTING ROBINSON'S GROCERY PIER
FOUNDATIONS AT NORTHSIDE WOOD
ADDITION TO BE DEMOLISHED AND
RECONSTRUCTED WITH CMU WALL AND
FOOTER UNDERGROUND. FILL AND POUR
4" CONCRETE SLAB FLOOR WITH WWM
WITHIN THE NEW PERIMETER WALL. MATCH
INTERIOR FLOOR ELEVATION.
EXISTING CANOPY TO BE RE-ENFORCED
STRUCTURALLY WITH NEW GIRDER BEAM &
NEW COLUMNS. RELOCATE COLUMNS AS
SHOWN IN PLANS. ANGLE BRACED TO BE
ELIMINATED THEY ARE NON-HISTORIC.
ORIGINAL CANOPY WAS HELD BY CABLES,
COLUMNS ARE TO BE ADDED WITH BETTER
PLACEMENTS IN A STYLE TO MATCH THE ERA.
CURRENT ROBINSON'S GROCERY LOWER
CEILING AREA IN EXISITNG SOUTH
ADDITION. REMOVE ALL CEILINGS & REPAIR
PARAPET, REFRAME ROOF STRUCTURE &
INSTALL NEW ROOFING. AFTER RE-ROOF
INSTALL NEW MECHANICAL & ELECTRICAL
SYSTEMS & THEN INSTALL NEW CEILINGS
ROBINSONS GROCERY - EXTEND STEPPED
PARAPET ON SOUTH WALL TO LEVEL ENTIRE
ROOF PARAPET WITH FRONT ELEVATION
(WEST FACING) ALL MECHANICAL
EQUIPMENT ON THE GROUND AND ON THE
ROOF TO BE REMOVED AND DISPOSED OF
IN AN APPROPRIATE MANNER.
EAST ELEVATION INFILL CELLS OF
VENTELATION BLOCKS WITH GROUT HARD
TROWEL FINISH OR REPLACE THE BLOCKS
AND THEN PAINT OVER. ALL EXISTING
DAMAGED ROOF OVERHANGS TO BE
REMOVED. NEW ROOFING PARAPET WITH
SUPPERS TO BE ADDED.
ROBINSON S GROCERY REMOVE ALL
EXISTING FLOOR TILE, AND OTHER FINISHED
FLOORING- LEVEL INTERIOR OF ENTIRE
BUILDING. REMOVE AND REPLACE
DOORWAYS AND SHAPE CONCRETE
FLOOR TO MEET ACCESSIBILITY STANDARDS
ROBINSONS GROCERY INTERIOR -REMOVE
ALL INTERIOR EQUIPMENT INCLUDING WALK
IN COOLER CASE, EXISTING HVAC AND
PLUMBING FIXTURES. ALL INTERIOR
CABINETRY, COUNTER TOPS, ACCESSORIES,
AND INTERIOR WALLS TO BE REMOVED.
ALL ELECTRICAL ELEMENTS TO BE REMOVED.
ROBINSONS GROCERY INTERIOR LEVEL
FLOORING - REMOVE AND REPLACE
DOORWAYS AND SHAPE CONCRETE
FLOOR TO MEET ACCESSIBILITY STANDARDS.
EXISTING SUMP TO BE FILLED AND LEVELED
WITH THE REST OF THE FLOOR. DOOR
THRESHOLD ELEVATIONS MAY BE ADJUSTED.
M
D e s ig n G ro u p P
A
A rc h it e c tu re
P re s e rv a ti o n
S u s ta in a b il it y
B e a rd S tr e e t
Ta lla h a ss e e
F L
.4
.3
.4
.3 f a x
A rc h it e c tu re R e g
A
A
Official Seal
Rev. # Description
A D
A P
TI
V E R
E U
SE
O
F R O
B
IS
O N
'S G
R O
C E R Y S
TO
R E
TA
LL
A H
A
SS
E E F L
AUGUST 25TH, 2025
CONSTRUCTION
DOCUMENTS
4M Proj. # 4M-2025-004
H
O
LT
O N
S
TR
E E T
PHOTO
REFERENCES
Drawn By: JED
AR-5.1
ALL INTERIOR SPACES ARE TO BE VOID OF
ALL CABINETRY, SHELVING, COUNTERTOPS,
INTERIOR WALLS, & INTERIOR FLOOR
FINISHES. REMOVE ALL MECHANICAL,
ELECTRICAL, & PLUMBING FIXTURES.
INTERIOR ELEMENTS ARE ALL TO BE
REMOVED.
EXISTING PARTICAL BOARD SHED WITH SLAB
ROOF TO BE DEMOLISHED COMPLETELY,
AND WILL NOT BE RE-CONSTRUCTED IN
PREPARATION FOR NEW ADA ACCESSIBLE
ENTRY DOOR. CONCRETE PAD CAN
REMAIN IF AT THE APPROPRIATE ELEVATION
WITH THE INTERIOR FLOOR OR POURED
OVER TO THE APPROPIATE ELEVATION.
ALL MECHANICAL & ELECTRICAL TO BE
REMOVED FROM ALL EXTERIOR PERIMETER
WALLS & GRADE SURFACES OF THE
BUILDING. ALL EXTERIOR GARBAGE &
DEBRIS TO BE REMOVED OF AND DISPOSED
OF IN AN APPROPRIATE MANNER. WALL
MOUNTED FIXTURES TO BE REMOVED AND
SURFACES TO BE REPAIRED.
DOOR AND CANOPY TO BE REMOVED &
INFILLED WITH NEW BLOCK TO CONSTRUCT
THE NEW CMU WALL OF THE ADA
RESTROOMS. INFILL IN A MANNER THAT THE
SURFACES DO NOT LOOK OUT OF PLACE
IN THE NEW WALL. LOOK AS THE DOOR
NEVER EXISTED IN THIS EXISTING WALL.
PATCH AND PAINT SURFACES.
REMOVE AND REPLACE DAMAGED GLASS
BLOCKS. PATCH AND PAINT THE EXTERIOR
WALLS. REMOVE AND CAP ANY
NON-ESSENTIAL PLUMBING PROTRUSIONS
THRU THE EXTERIOR WALLS & FILL AND
PATCH THE HOLES PRIOR TO PAINT. ISOLATE
ARE NEW SERVICE ENTRIES AND EXITS TO
ONE CENTRALIZED LOCATION.
ENLARGED IMAGE FOR CLARITY.
REMOVE GAS METER AND BUILDING
PENETRATION THROUGH THE WALL PATCH
AND REPAIR WALL. STEP PARAPET TO BE
ADDED TO AND RISE TO THE EXISTING
ELEVATION OF THE FRONT ENTRY WALL. ALL
MECHANICAL, ELECTRICAL AND PLUMBING
TO BE REMOVED UNLESS ESSENTIAL TO THE
PRECIEVED USE OF THE BUILDING. CHAIN
LINK FENCING TO BE REMOVED, REPAIRED
OR RELOCATED AS PER THE DRAWING.
REAR CORRIDOR OF THE BUILDING &
RESTROOM . REMOVE ALL PLUMBING
FIXTURES INCLUDING BUT NOT LIMITED TO
LAVATORIES, TOILETS, KITCHEN SINKS,
WATER HEATER. PIPING, & ANY WALL
ACCESSORIES ASSOCIATED WITH THE
PREVIOUS FUNCTIONS OF THIS SPACE.
M
D e s ig n G ro u p P
A
A rc h it e c tu re
P re s e rv a ti o n
S u s ta in a b il it y
B e a rd S tr e e t
Ta lla h a ss e e
F L
.4
.3
.4
.3 f a x
A rc h it e c tu re R e g
A
A
Official Seal
Rev. # Description
A D
A P
TI
V E R
E U
SE
O
F R O
B
IS
O N
'S G
R O
C E R Y S
TO
R E
TA
LL
A H
A
SS
E E F L
AUGUST 25TH, 2025
CONSTRUCTION
DOCUMENTS
4M Proj. # 4M-2025-004
H
O
LT
O N
S
TR
E E T
BUILDING
SECTIONS
Drawn By: JED
AR-6.1
FULL BUILDING SECTION THROUGH EXIISTING STRUCTURE
SCALE: 1/2"=1'-0"
M
D e s ig n G ro u p P
A
A rc h it e c tu re
P re s e rv a ti o n
S u s ta in a b il it y
B e a rd S tr e e t
Ta lla h a ss e e
F L
.4
.3
.4
.3 f a x
A rc h it e c tu re R e g
A
A
Official Seal
Rev. # Description
A D
A P
TI
V E R
E U
SE
O
F R O
B
IS
O N
'S G
R O
C E R Y S
TO
R E
TA
LL
A H
A
SS
E E F L
AUGUST 25TH, 2025
CONSTRUCTION
DOCUMENTS
4M Proj. # 4M-2025-004
H
O
LT
O N
S
TR
E E T
BUILDING
SECTIONS
Drawn By: JED
AR-6.1
BUILDING SECTION THROUGH NEW BATHROOM ADDITION
SCALE: 1/2"=1'-0"
BUILDING SECTION THROUGH NEW INVENTORY ROOM
SCALE: 1/2"=1'-0"
M
R S
UNION
ACCESS PANEL AP
MIN. INVERT ELEVATION 36" B.F.F.
MIN. I.E. =
AAV
EX ###EXISTING SYSTEM PIPING
EX ###
PLUMBING LEGEND
COLD WATER SUPPLY
SANITARY
ELBOW, TURNED DOWN
ELBOW, TURNED UP
VENT THROUGH ROOF
HB HOSE BIBB
UNO UNLESS NOTED OTHERWISE
ECO EXTERIOR CLEANOUT
SK STAINLESS STEEL SINK
DCW DOMESTIC COLD WATER
DHW DOMESTIC HOT WATER
DN DOWN
VENT THROUGH ROOF
WCO WALL CLEAN OUT
HD HUB DRAIN
CO CLEAN OUT
CWV COMBINATION WASTE AND VENT
C CONDENSATE
FD FLOOR DRAIN
FCO FLOOR CLEANOUT
WATER CLOSET
L LAVATORY
EWC ELECTRIC WATER COOLER
CONDENSATE C
ABBREVIATIONS
IRP IN-LINE RECIRCULATION PUMP
RECIRCULATION PUMP
CHECK VALVE / BACKFLOW PREVENTOR
120 HOT WATER SUPPLY
HOT WATER RETURN
HWR HOT WATER RETURN
EX EXISTING
GWH GAS WATER HEATER
PLUMBING FIXTURE
WALL HYDRANTWH
WC
VTR
PF
EWH ELECTRIC WATER HEATER
FREEZE PROOF WALL HYDRANTWHY
MS MOP SINK
SAN SANITARY WASTE
IM ICE MAKER VALVE BOX
HOSE BIBB WITH VACUUM BREAKER
WALL CLEANOUT
FLOOR CLEANOUT
FLOOR DRAIN
FLOW CONTROL VALVE
BALL VALVE
DHW
VENT PIPING
FC FLOW CONTROL VALVE
HWR
DCW
SAN
VENT
RCP-#
TO BE DEMOLISHED
LIMITS OF DEMOLITION
CONNECT TO EXISTING
DEMOLITION KEYNOTE
RENOVATION KEYNOTE
HB-#
WCO
FCO
FD
VTR
DN
UP
FLOOR SINK FS
STORM ST
WATER METER
STORM OVERFLOW OF
KITCHEN GREASE SANITARY GW
PRESSURE REGULATOR
SOLENOID SHUTOFF VALVE
WATER HAMMER ARRESTERWHA
TYP TYPICAL
TMV THERMOSTATIC MIXING VALVE
UR URINAL
SH SHOWER
AAV AIR ADMITTANCE VALVE
AFF ABOVE FINISHED FLOOR
AHAP AS HIGH AS POSSIBLE
BFP BACK FLOW PREVENTOR
BFF BELOW FINISHED FLOOR
BF BELOW FLOOR
BG BELOW GRADE
IE INVERT ELEVATION
EXPANSION TANKXT
ALL MAY NOT APPLY
ELBOW, 90°
CONNECTION, TOP
CONNECTION, BOTTEM
CONNECTION, SIDE
CAP, AIR AND WATER TIGHT
AIR ADMITTANCE VALVE (BOD: STUDOR)
BOD BASIS OF DESIGN
WASH MACHINE BOXWMB
POTABLE WATER
1.ALL POTABLE WATER PIPING SHALL BE DISINFECTED IN ACCORDANCE WITH THE
PLUMBING CODE AND VERIFIED BY WRITTEN REPORT FROM THE STATE BOARD OF
HEALTH.
2.ALL PLUMBING PIPING SHALL BE CONCEALED IN FLOORS, WALLS, OR ABOVE CEILINGS AS
APPLICABLE EXCEPT AT IMMEDIATE FIXTURE.
3.PROVIDE HANGERS FOR SUPPLY PIPING AT A MAXIMUM SPACING OF 3 FEET.
4.PROVIDE WATER HAMMER ARRESTORS AT EACH FIXTURE, QUICK CLOSING VALVE, OR
BATTERY OF FIXTURES WHERE REQUIRED AND PER FBC-P 604.9. ARRESTORS SHALL BE
FACTORY FABRICATED. SIZED PER PLUMBING AND DRAINAGE INSTITUTE STANDARD P.D.I
WH-201. AIR CHAMBERS SHALL NOT BE CONSIDERED AN EQUAL TO WATER HAMMER
ARRESTORS AS SPECIFIED.
5.BALL VALVES 1/4" THRU 2" SHALL BE TWO PIECE - 600 WOG, TEFLON SEATS, ANSI 316
STAINLESS STEEL BALL AND STEM (EXTENSION STEM ON INSULATED HOT WATER AND
TEMPERED HOT WATER), BRONZE BODY WITH THREADED OR SOLDER ENDS.
6.DURING CONSTRUCTION ALL PRESSURE PIPING SYSTEMS SHALL RECEIVE A
HYDROSTATIC TEST OF 1-1/2 TIMES THE OPERATING PRESSURE FOR A PERIOD OF NOT
LESS THAN EIGHT (8) HOURS. NO LEAKAGE EVIDENT DURING THE TEST PERIOD IS
ALLOWED. NOTIFY THE ARCHITECT AND ENGINEER OF RECORD 24 HOURS IN ADVANCE OF
ANY TESTING SO THAT THEY MAY OBSERVE IF THE NEED IS CALLED FOR. PIPING SYSTEMS,
EQUIPMENT, SPECIALTIES, PUMPS, TRAPS, VALVES, STRAINERS, ETC. SHALL BE INSPECTED
AND TESTED FOR PROPER FUNCTIONALITY AT THE CONCLUSION OF CONSTRUCTION AND
ANY LEAKAGE OR MALFUNCTIONS SHALL BE REPAIRED.
7.PROVIDE ISOLATION AND ASSE1024 DUAL CHECK BACKFLOW PREVENTION BEFORE AND
BEVERAGE CONNECTION, CARBONATED DEVICE(ASSE1022), STERILIZATION EQUIPMENT,
AND ICE MACHINE SUPPLY, PER FBC-P608.3 AND 608.17.
8.MOUNT HOSE BIBBS 24" ABOVE FINISHED GRADE, UNLESS OTHERWISE NOTED.
9.ALL PRESSURE PIPING SHALL BE INSTALLED ABOVE CEILING AND IN WALLS UNLESS
NOTED OTHERWISE.
10.BELOW GRADE
10.1.PIPING SHALL BE COATED WITH HEAVY TROWEL GRADE LION OIL CO. NOKORODE
SEALKOTE OR APPROVED EQUAL.
10.2.UNDERGROUND SERVICE PIPING SHALL BE COPPER TUBING.
11.PIPING SPECIFICATIONS
11.1.ABOVE GRADE DOMESTIC COLD WATER SUPPLY PIPING SHALL BE HIGH IMPACT
CPVC WITH SOLVENT WELD FITTINGS.
11.1.1.PROVIDE TRANSITION FITTINGS AS REQUIRED TO INSTALL VALVES, FIXTURE
STOPS, EQUIPMENT AND OTHER COMPONENTS.
11.1.2.ALL PIPES AND FITTINGS SHALL CONFORM TO ASTM 1784.
11.2.PIPING LOCATED IN RETURN AIR PLENUMS SHALL BE TYPE L HARD COPPER TUBE
OR CPVC WITH 1" THICK FIRE WRAP INSULATION SEALED TO PROVIDE FS/SD=25/50.
11.3.EXPOSED PIPING SHALL BE TYPE L HARD COPPER TUBE PAINTED TO MATCH
ADJACENT ARCHITECTURAL SURFACE.
12.INSULATION SPECIFICATIONS
12.1.INSULATE COLD WATER SUPPLY PIPING IN EXTERIOR WALLS AND ATTIC AS WELL AS
ALL HOT WATER WITH 1" IMCOLOCK PRE-SLIT, PRE-GLUED INSULATION. INSULATE
FITTINGS WITH MITERED CUT PIECES OF IMCOLOCK, 1" INSULATION.
12.2.THERE SHALL BE NO EXPOSED HOT WATER SUPPLY PIPING EXCEPT WITHIN
MECHANICAL OR EQUIPMENT ROOMS.
12.3.PIPING UNDER HANDICAPPED LAVATORIES SHALL BE INSULATED PER AMERICANS
WITH DISABILITIES ACT WITH FACTORY FABRICATED SEAMLESS MICROBIAL PVC
RESIN INSULATION.
13.EXPOSED PIPING
13.1.ALL EXPOSED PIPING SHALL BE COORDINATED WITH OTHER ABOVE-CEILING
SYSTEMS SAND ROUTED TO AVOID CONFLICTS EVEN IF ITS ROUTING IS DIFFERENT
THAN THAT WHICH IS SHOWN ON THESE PLANS.
13.2.ALL EXPOSED PIPING SHALL BE INSTALLED NEAT AND ORDERLY. PAINT TO MATCH
ADJACENT ARCHITECTURAL SURFACE OR AS DIRECTED BY ARCHITECT.
SUBMITTAL REQUIREMENTS
1. USE OF AN APPROVAL STAMP ON SUBMITTAL DOCUMENTS CERTIFIES THAT THE
CONTRACTOR HAS COMPLIED WITH THE CONTRACT DOCUMENT REQUIREMENTS.
2. THE CONTRACTOR SHALL NOT BE RELIEVED OF RESPONSIBILITY FOR DEVIATIONS FROM
REQUIREMENTS OF THE CONTRACT DOCUMENTS BY THE ARCHITECT/ENGINEER'S
APPROVAL OF SHOP DRAWINGS, PRODUCT DATA, SAMPLES, OR SIMILAR SUBMITTAL ITEMS
UNLESS THE CONTRACTOR HAS SPECIFICALLY INFORMED THE ARCHITECT/ENGINEER IN
WRITING OF SUCH DEVIATION AT THE TIME OF SUBMITTAL AND THE ARCHITECT/ENGINEER
HAS GIVEN WRITTEN APPROVAL TO THE SPECIFIC DEVIATION. THE CONTRACTOR SHALL
NOT BE RELIEVED OF RESPONSIBILITY FOR ERRORS OR OMISSIONS IN SHOP DRAWINGS,
PRODUCT DATA, SAMPLES, OR SIMILAR SUBMITTAL ITEMS BY THE ARCHITECT/ENGINEER'S
APPROVAL THEREOF.
3. CONTRACTOR SHALL SUPPLY TO THE ARCHITECT SUBMITTALS ON THE FOLLOWING
WHERE APPLICABLE (ALL MAY NOT APPLY):
A. PLUMBING FIXTURES
B. PIPE AND FITTINGS
C. INSULATION MATERIALS
D. PLUMBING ACCESSORIES AND SPECIALITIES
E. VALVES
F. HOT WATER HEATER
ENERGY SYSTEMS - WATER HEATING
1. SERVICE WATER HEATING EQUIPMENT SHALL ALLOW LAVATORY OUTLET
TEMPERATURES IN PUBLIC FACILITY RESTROOMS SHALL BE LIMITED TO 110°F. CONTROL
BY TMV.
2. WATER-HEATING EQUIPMENT AND HOT WATER STORAGE TANKS SHALL MEET THE
REQUIREMENTS OUTLINED IN FBC CHAPTER 4, TABLE C404.2 AND THE EFFICIENCY SHALL
BE VERIFIED THROUGH DATA FURNISHED BY THE MANUFACTURER THROUGH
CERTIFICATION UNDER AN APPROVED CERTIFICATION PROGRAM.
3. ALL HOT WATER SUPPLY AND RECIRCULATION PIPING IN THE HOT WATER SYSTEM SHALL
BE INSULATED WITH MINIMUM 1IN OF INSULATION HAVING A CONDUCTIVITY OF 0.27 (BTU /
IN / H X FT^2 X °F).
4. CIRCULATING HOT WATER SYSTEM PUMPS OR HEAT TRACE SHALL BE ARRANGED TO BE
TURNED OFF EITHER AUTOMATICALLY OR MANUALLY WHEN THERE IS LIMITED HOT WATER
DEMAND. READY ACCESS SHALL BE PROVIDED TO THE OPERATING CONTROLS.
5. FOR NON-CIRCULATING STORAGE WATER TANKS HEAT TRAPS MUST BE INSTALLED ON
THE SUPPLY AND DISCHARGE PIPING ASSOCIATED WITH THE EQUIPMENT.
6. CONDENSER HEAT RECOVERY SHALL BE INSTALLED FOR HEATING OR REHEATING OF
SERVICE HOT WATER, PROVIDED THE FACILITY OPERATES 24 HOURS A DAY, THE TOTAL
HEAT CAPACITY OF WATER-COOLED SYSTEMS EXCEEDS 6,000,000 BTU/HR OF HEAT
REJECTION, AND THE DESIGN SERVICE WATER HEATING LOAD EXCEEDS 1,000,000 BTU/HR.
THE HEAT RECOVERY SHALL PROVIDE THE SMALLER OF EITHER: 60% OF THE PEAK HEAT
REJECTION LOAD AT DESIGN CONDITIONS, OR PROVIDE THE PREHEATING REQUIRED TO
RAISE THE PEAK SERVICE HOT WATER DRAW TO 85°F.
EXTERIOR CLEANOUT SCHEDULE
TYPE JR SMITH M#
ONE WAY(CAST IRON 4223L
BODY, BRONZE PLUG,
CAST IRON TOP
TAPER THREAD)
TWO WAY (CAST IRON 4223L
BODY, BRONZE PLUG,
CAST IRON TOP
TAPER THREAD)
INTERIOR CLEANOUT SCHEDULE
LOCATION TYPE JR SMITH M#
FLOOR (FCO) 4028C
(CAST IRON BODY, BRONZE
PLUG, NICKEL BRONZE TOP)
WALL (WCO) 4532S
(CAST IRON BODY, BRONZE
PLUG STAINLESS STEEL COVER)
EXPOSED (TCO) HORIZONTAL 4400C
(CAST IRON BODY, BRONZE VERTICAL 4512S
PLUG, THREADED CAP)
WATER HAMMER ARRESTOR SCHEDULE
FIXTURE UNIT 1-11 12-32 33-60 61-113 114-154 155-330
JR SMITH M# 5005 5010 5020 5030 5040 5050
CODE REFERENCE (ALL MAY NOT APPLY)
THE LATEST EDITIONS OF THE ESTABLISHED STANDARDS OF THE FOLLOWING
ORGANIZATIONS, AND INDIVIDUAL STANDARDS NAMED SHALL BE FOLLOWED THE SAME AS
IF THEY WERE FULLY WRITTEN HEREIN AND CONSTITUTE A PART OF THE SPECIFICATION
REQUIREMENTS EXCEPT WHERE OTHERWISE SPECIFIED:
FBC, BUILDING FLORIDA BUILDING CODE 8TH EDITION
FBC, MECHANICAL FLORIDA BUILDING CODE 8TH EDITION
FBC, EXISTING BUILDINGFLORIDA BUILDING CODE 8TH EDITION
FBC, FUEL GAS FLORIDA BUILDING CODE 8TH EDITION
FBC, ENERGY CONSERVATION FLORIDA BUILDING CODE 8TH EDITION
FFPC FLORIDA FIRE PREVENTION CODE, 2023 8TH EDITION
NFPA 54 NATIONAL FUEL GAS CODE
NFPA 101 LIFE SAFETY CODE
NFPA 101A GUIDE ON ALTERNATIVE APPROACHES TO LIFE SAFETY
NFPA 101B CODE FOR MEANS OF EGRESS FOR BUILDINGS AND
STRUCTURES
NFPA 900 BUILDING ENERGY CODE
ASTM AMERICAN SOCIETY FOR TESTING AND MATERIALS
ANSI AMERICAN NATIONAL STANDARDS INSTITUTE
ASME AMERICAN SOCIETY OF MECHANICAL ENGINEERS
ADA AMERICAN WITH DISABILITIES ACT
UL UNDERWRITERS LABORATORIES
THESE CODE AND STANDARDS SHALL BE CONSIDERED A MINIMUM REQUIREMENT. THE
CONTRACTOR SHALL NOT RELIEVED FROM PROVIDING HIGHER GRADE MATERIALS,
PRODUCTS AND WORKMANSHIP WHICH MAY BE SPECIFIED WITHIN THESE DOCUMENTS.
PLUMBING GENERAL NOTES
1. LOCATIONS OF ANY WASTE AND SUPPLY PIPING SHOWN ARE ONLY APPROXIMATE. THE
PLUMBING CONTRACTOR SHALL VERIFY THESE LOCATIONS BEFORE PROCEEDING WITH
WORK.
2. ALL PLUMBING PIPE SHALL BE RUN STRAIGHT, SQUARE, AND LEVEL. NO SAGGING OF
PLUMBING PIPING SHALL BE ACCEPTED.
3. ALL DRAINAGE PIPING 3" AND LARGER SHALL HAVE A MINIMUM SLOPE OF 1/8" PER FOOT, PIPING 2-1/2" AND SMALLER SHALL HAVE A MINIMUM SLOPE OF 1/4" PER FOOT UNLESS
OTHERWISE NOTED.
4. VENT PIPING SHOWN ON FLOOR PLAN IS ONLY INDICATIVE EXCEPT FOR VTR LOCATIONS.
5. CONTRACTOR SHALL INSTALL DIELECTRIC UNIONS AT CONNECTIONS OF DISSIMILAR
METALS.
6. VALVES AND FITTINGS SHALL BE OF THE SAME SIZE AS THE LINE IN WHICH THEY ARE
INSTALLED.
7. ALL WATER SANITARY WASTE, VENT AND SUPPLY PIPING SHALL BE INSTALLED AS CLOSE
TO PLANS AS POSSIBLE WITH NO CHANGE IN SIZING.
8. SEE ARCHITECTURAL DRAWINGS FOR EXACT PLUMBING FIXTURE LOCATIONS, MOUNTING
HEIGHTS, DIMENSIONS AND ADDITIONAL REQUIREMENTS NOT COVERED ON THESE
DRAWINGS.
9. PIPING SHALL NOT BE RUN ABOVE ELECTRICAL OR SERVER EQUIPMENT, COORDINATE
WITH FIELD CONDITIONS.
10. DO NOT PENETRATE WALL FOOTINGS AS REQUIRED TO CLEAR PLUMBING SERVICES.
WHERE ABSOLUTELY NECESSARY, ALL PIPES PENETRATING BEARING WALL OR FOOTING
MUST BE SLEEVED AND IN A LOCATION APPROVED BY THE STRUCTURAL ENGINEER.
11. CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ALL NECESSARY SUPPORTING
DEVICES OR ALL FIXTURES INCLUDED IN THESE CONTRACT DOCUMENTS.
12. WALL BRACKETS, HANGERS, SUPPORTS, ETC. SHALL BE PROVIDED WHERE REQUIRED
IN ACCORDANCE WITH THE BEST STANDARD PRACTICE OF THE TRADE AND AS PER CODE.
ADDITIONAL SUPPORTS SHALL BE PROVIDED TO TRANSMIT LOADS TO THE MAIN
STRUCTURE WHERE REQUIRED. CPVC PIPING SUPPORTS SHALL BE 3'-0" ON CENTER FOR
1/2" THRU 1" AND 4'-0" ON CENTER FOR 1-1/2" AND LARGER. ALL EXPOSED SUPPORTS SHALL
BE HOT DIPPED GALVANIZED OR FIBERGLASS REINFORCED "UNISTRUT" TYPE INCLUDING
HARDWARE.
13. POWER WIRING, PANELS, TRANSFORMERS, AND DISCONNECT SWITCHES FOR
PLUMBING EQUIPMENT SHALL BE PROVIDED AND INSTALLED BY THE ELECTRICAL
CONTRACTOR. ALL CONTROL WIRING, RELAYS, AND PANELS SHALL BE PROVIDED AND
INSTALLED BY THE PLUMBING CONTRACTOR. ALL MOTOR STARTERS REQUIRED FOR ANY
PLUMBING EQUIPMENT SHALL BE FURNISHED BY THE PLUMBING CONTRACTOR AND
INSTALLED BY THE ELECTRICAL CONTRACTOR.
14. INSTALL ACCESS PANELS (MINIMUM 18x18) WHERE EQUIPMENT REQUIRING ACCESS
RESIDES ABOVE AN INACCESSIBLE CEILING TYPE.
15. ALL CONCEALED VALVES, WATER HAMMER ARRESTORS, CLEANOUTS, ETC.,
CONCEALED IN WALLS SHALL BE PROVIDED WITH AN ACCESS PANEL, ZURN MODEL ZN-1460
OR APPROVED EQUAL.
16. ALL CONCEALED PIPING IN CHASE AREAS SHALL BE SUPPORTED WITH A PIPING
SUPPORT SYSTEM, SUMNER POSIFIX, STAKFIX AND CHANNEL OR APPROVED EQUAL.
17. PURGE, CLEAN, DISINFECT & TEST WATER PIPING SYSTEMS. SUBMIT REPORT & WATER
SAMPLES TO A.H.J. USE PROCEDURE PRESCRIBED BY A.H.J., OR IF METHOD NOT
PRESCRIBED USE AWWA C651 OR AWWA C652.
18. CONTRACTOR SHALL INSTALL WATER HAMMER ARRESTORS AT ALL QUICK CLOSING
VALVES. REFER TO FPC 604.9.
CONDENSATE, SANITARY WASTE AND VENT
1.GRAVITY FLOW SYSTEMS HAVE SPACE PRIORITY FOR SLOPING PIPES.
2.SLOPING PIPES SHALL BE STARTED AT THE HIGHEST POINT POSSIBLE.
3.ALL SOIL, WASTE, AND VENT PIPING SHALL BE TESTED IN ACCORDANCE WITH THE
FLORIDA BUILDING CODE AND LOCAL PERMITTING AUTHORITIES REQUIREMENTS.
4.THE GENERAL CONTRACTOR SHALL VERIFY ALL FLOOR DRAIN AND WATER SUPPLY
LOCATIONS BEFORE POURING SLABS.
5.CONDENSATE, SANITARY AND VENT PIPING SHALL BE COLLECTED AND TERMINATED AT A
POINT SHOWN ON THE DRAWINGS.
5.1.PLUMBING CONTRACTOR SHALL BE RESPONSIBLE FOR CONDENSATE PIPES AFTER
AIR UNIT TRAP, MECHANICAL CONTRACTOR RESPONSIBLE FOR FIRST 12" OF
CONDENSATE AND TRAP.
6.INVERT SHOWN ON PLANS IS AN ESTIMATE OF MINIMUM INVERT CALCULATED USING
ENGINEERING ESTIMATES OF SLOPE, FITTING DIMENSIONS AND OTHER FACTORS THAT
MAY NOT MATCH THE EXACT FIELD CONDITIONS. DUE DILIGENCE HAS BEEN PUT FORTH TO
COORDINATE THIS WITH THE SITE CONNECTIONS BUT IT IS THE RESPONSIBILITY OF THE
CONTRACTOR TO VERIFY ACTUAL SITE CONNECTION INVERT AND ITS CONNECTION TO THE
BUILDING SERVICE PIPING. ANY ISSUES SHALL BE BROUGHT TO THE ATTENTION OF THE
EOR PRIOR TO COMMENCING WITH INSTALLATION OF UNDERGROUND PIPING.
7.WHEN REQUIRED BY CODE PLUMBING CONTRACTOR SHALL PROVIDE AND INSTALL AN AIR
GAP SERVING INDIVIDUAL FIXTURES, DEVICES, OR APPLIANCES.
8.ALL SANITARY WASTE LINES SHALL BE INSTALLED UNDER THE FLOOR SLAB, UNLESS
OTHERWISE NOTED. VENT PIPING SHALL BE INSTALLED ABOVE CEILING AND IN WALLS
UNLESS NOTED OTHERWISE.
9.FLOOR DRAIN TRAPS SHALL BE DEEP SEAL (MIN. 4"). FURNISH AND INSTALL TRAP
PRIMERS, WHERE INDICATED, OR IF LOCAL CODES REQUIRE THEM. VERIFY AND INCLUDE IN
BID. PER FBC-P 1002.4 ANY TRAPPED FIXTURE SUBJECT TO EVAPORATION SHALL BE
FURNISHED WITH 1/2" TRAP PRIMER CONNECTION TO NEAREST DCW WATER SUPPLY LINE,
WITH VALVE CONFORMING TO ASSE1018. USE SELF SEAL RUBBER TYPE THAT CONFORM TO
ASSE1044 FOR REMOTE DRAINS THAT ARE OVER 20' FROM THE WATER SUPPLY.
10.SIZE AND LOCATION OF CLEANOUTS SHALL BE IN ACCORDANCE WITH FLORIDA
PLUMBING CODE AND ALL JURISDICTIONAL REGULATIONS.
11.PIPING SPECIFICATIONS
11.1.CONDENSATE, DOMESTIC WASTE, AND VENT PIPING SHALL BE SCHEDULE 40
PVC/DWV PIPE WITH SOLVENT WELD DRAINAGE FITTINGS CONFORMING TO ASTM
D-2665.
11.2.VENT PIPING SHALL BE MINIMUM OF 2", UNLESS NOTED OTHERWISE.
11.3.PIPING INSTALLED WITHIN A RETURN AIR PLENUM SHALL BE CAST IRON WITH HUB
AND SPIGOT FITTINGS OR PVC PIPING WITH 1/2" THICK FIRE WRAP INSULATION
SEALED TO PROVIDE FS/SD=25/50.
11.4.UNLESS NOTED OTHERWISE, ASSUME ALL COMBINED DISCHARGE CONNECTIONS
ARE WYE TYPE.
12.EXPOSED PIPING
12.1.ALL EXPOSED PIPING SHALL BE COORDINATED WITH OTHER ABOVE-CEILING
SYSTEMS AND ROUTED TO AVOID CONFLICTS EVEN IF ITS ROUTING IS DIFFERENT
THAN WHAT IS SHOWN ON THESE PLANS.
12.2.ALL EXPOSED PIPING SHALL BE INSTALLED NEAT AND ORDERLY. PAINT TO MATCH
ADJACENT ARCHITECTURAL SURFACE OR AS DIRECTED BY ARCHITECT.
GENERAL NOTES
1. THE ENGINEER SHALL NOT BE HELD RESPONSIBLE FOR ANY MISUSE AND/OR
MISREPRESENTATION OF THIS SET OF DOCUMENTS.
2. THE SUB CONTRACTOR ASSUMES RESPONSIBILITY FOR THE USE OF THE CONTRACT
DOCUMENTS. THE CONTRACTOR SHALL MAKE THEMSELVES AWARE OF PROJECT
CONDITIONS AND OWNER REQUIREMENTS PRIOR TO PROCUREMENT OF EQUIPMENT AND
SERVICES. CHANGES IN PROJECT COST WILL NOT BE GRANTED DUE TO FIELD CONFLICTS
AND OR PROJECT CONDITIONS.
3. THIS SET OF DRAWINGS AND SPECIFICATIONS SHALL NOT BE CONSIDERED A SET OF
CONSTRUCTION DOCUMENTS UNLESS A SIGNATURE AND DATE ARE AFFIXED TO THE
DRAWINGS AND SPECIFICATIONS BY THE ENGINEER OF RESPONSIBLE CHARGE OF THE
GIVEN DISCIPLINE. PRINTED COPIES OF THIS DOCUMENT ARE NOT CONSIDERED SIGNED
AND SEALED UNLESS EMBOSSED AND THE SHA AUTHENTICATION CODE MUST BE VERIFIED
ON ELECTRONIC COPIES.
4. CONFLICTS BETWEEN THIS SET OF DRAWINGS AND THE CONTRACT SPECIFICATIONS
SHALL BE RESOLVED BY THE ENGINEER OF RECORD. THE SUB CONTRACTOR DOES NOT
HAVE THE AUTHORITY TO INTERPRET CONFLICTS AND RESOLVE ISSUES WITHOUT WRITTEN
DIRECTION FROM THE ENGINEER OF RECORD.
5. ANY CONFLICTS IN THE FIELD OR WITHIN THESE DOCUMENTS SHALL BE RECORDED AND
PROVIDED TO THE ENGINEER OF RECORD ON THE SUB CONTRACTOR'S STANDARD
LETTERHEAD. WRITTEN DIRECTION RESOLVING CONFLICT WILL BE ISSUED BY THE
ENGINEER OF RECORD.
6. PRIOR TO INSTALLATION, COORDINATE AND ADJUST THE FINAL LOCATION OF ALL WALL
MOUNTED DEVICES AND EQUIPMENT WITH ALL CASEWORK, SHELVING OR OTHER WALL
MOUNTED FURNISHINGS.
7. PLANS ARE DIAGRAMMATIC IN NATURE AND INTENDED TO SHOW THE GENERAL SCOPE
OF THE WORK TO BE PERFORMED. REFER TO ARCHITECTURAL AND STRUCTURAL
DRAWINGS FOR ALL DIMENSIONS.
8. DUE TO THE SMALL SCALE OF THE DRAWINGS, AND TO UNFORESEEN JOB CONDITIONS,
ALL REQUIRED OFFSETS, TRANSITIONS AND FITTINGS MAY NOT BE SHOWN BUT SHALL BE
PROVIDED AT NO ADDITIONAL COST.
9. THE SUB CONTRACTOR SHALL COORDINATE WITH OTHER TRADES AND EXISTING
EQUIPMENT TO ENSURE THE EQUIPMENT SPECIFIED WILL WORK FOR THE SPACES
PROVIDED. FINAL DIMENSIONS OF SYSTEMS SHOWN ON THESE PLANS SHALL BE
COORDINATED IN THE FIELD. THE CONTRACTOR SHALL ASSUME RESPONSIBILITY FOR
PROVIDING OFFSETS AND TRANSITIONS TO FIT IN SPACES PROVIDED AND AT NO COST TO
THE OWNER.
10. THE SUB CONTRACTOR IS RESPONSIBLE FOR ANY SPECIAL REQUIREMENTS INVOLVED
IN INSTALLING EQUIPMENT IN THE BUILDING. DISMANTLING AND REASSEMBLING OF ANY
EQUIPMENT SHALL BE DONE AS REQUIRED TO BRING INTO THE BUILDING AND EQUIPMENT
ROOMS.
11. ALL WORK PERFORMED AS PART OF THIS PROJECT SHALL BE PERFORMED BY
EXPERIENCED TRADESMEN, TRAINED, EXPERIENCED, AND SKILLED IN THE TASKS
INCIDENTAL TO THE PROJECT.
12. ALL WORK SHALL COMPLY WITH APPLICABLE OSHA AND EPS REGULATIONS AND
GUIDELINES.
13. THE SUB CONTRACTOR PERFORMING WORK ON THIS PROJECT WILL BE RESPONSIBLE
FOR REGULARLY CLEANING THE WORK AREA OF ANY DEBRIS ASSOCIATED WITH THE WORK
BEING PERFORMED. THE SITE SHALL BE CLEAN OF ALL CONSTRUCTION DEBRIS AT THE
COMPLETION OF THE JOB, BEFORE FINAL PAYMENT IS MADE.
14. REASONABLE PRECAUTIONS SHALL BE MADE FOR SAFETY AND HEALTH INCLUDING BUT
NOT LIMITED TO WARNING SIGNS, SAFETY PRECAUTIONS AND BARRICADES FOR
PEDESTRIANS.
15. COORDINATE ALL DEMOLITION, CLEANING AND CONSTRUCTION WORK. SUB
CONTRACTOR SHALL PROVIDE GENERAL CONTRACTOR A FULL CONSTRUCTION SCHEDULE.
16. SUB CONTRACTOR SHALL BE HELD TO PROVIDED SCHEDULE. THEY SHALL BE
RESPONSIBLE FOR PROVIDING SUFFICIENT MANPOWER AND EQUIPMENT TO COMPLETE
THE WORK IN THE TIME INDICATED.
17. THE SUB CONTRACTOR IS RESPONSIBLE FOR THE PROTECTION AND SECURITY OF ALL
EQUIPMENT AND MATERIALS. THE LOCATION OF STORAGE SHALL BE RESTRICTED
SPECIFICALLY TO THE AREA ALLOTTED BY THE OWNER.
18. ALL ITEMS INSTALLED UNDER THE SCOPE OF THIS PROJECT SHALL BE NEW, CLEAN, AND
FREE OF DEFECTS.
19. IF DRAWING CHANGES ARE NEEDED FOR INSPECTION DUE TO FIELD CHANGES MADE BY
THE CONTRACTOR WITHOUT PRIOR APPROVAL OF THE ENGINEER AND AGREED UPON
TERMS, THEN THE SUB CONTRACTOR SHALL PAY HOURLY RATES TO THE ENGINEER OF
RECORD FOR MAKING NECESSARY CHANGES.
20. SUPPORTS, HANGERS, WIRING AND PIPING SHALL BE INSTALLED IN A NEAT FASHION
AND IN AN ORDERLY APPEARANCE.
21. FOR LOCAL WIND LOADS, REFER TO MECHANICAL DESIGN CRITERIA
22. PROTECT THE ROOF FROM DAMAGE WHENEVER ANY WORK ON THE ROOF IS REQUIRED.
23. SUB CONTRACTOR SHALL MAINTAIN THE INTEGRITY OF ALL PARTITIONS LABELED WITH A
SPECIAL LISTING ON THE ARCHITECTURAL PLANS. THIS INCLUDES FIRE, SMOKE
ACOUSTICAL AND OTHER UL WALL OR CEILING ASSEMBLIES.
24. STRUCTURAL PENETRATIONS INCLUDING BUT NOT LIMITED TO WALL, FLOOR OR BEAM
SHALL BE APPROVED BY THE STRUCTURAL ENGINEER. ALL BEAM SLEEVES AND
REINFORCING APPROVED BY STRUCTURAL ENGINEER SHALL BE FURNISHED AND
INSTALLED BY THE SUB CONTRACTOR.
25. SUB CONTRACTOR SHALL GUARANTEE THE WORK AND MATERIALS FOR PERIOD OF ONE
YEAR FROM THE DATE OF FINAL ACCEPTANCE. THIS GUARANTEE SHALL BE IN ADDITION TO
THE WARRANTIES PROVIDED BY THE MATERIAL SUPPLIES AND MANUFACTURERS.
26. VALUE ENGINEERING OR CHANGES TO PLANS MUST BE APPROVED BY THE ENGINEER
OF RECORD AND RESUBMITTED THROUGH THE BUILDING DEPARTMENT PRIOR TO BEING
INSTALLED.
27. FLOOR CLEANOUTS SHALL BE LOCATED NO MORE THAN 100 FEET APART IN
HORIZONTAL DRAINAGE PIPES. CLEANOUTS SHALL BE LOCATED AT EACH CHANGE OF
DIRECTION GREATER THAN 45 DEGREES.
28. CLEANOUTS SHALL BE LOCATED AT THE BASE OF EACH WASTE STACK. INSTALL
CLEANOUTS IN CONCEALED LOCATIONS.
29. WALL CLEANOUTS ARE REQUIRED IN THE BOTTOM COURSE OF MASONRY FOR EACH
GROUT POUR THAT IS MORE THAN 64" TALL. SEAL CLEANOUTS BEFORE AND AFTER GROUT.
30. WALL CLEANOUTS SHALL BE INSTALLED IN CONCEALED LOCATIONS WITH OPENINGS IN
A FINISHED WALL WITHIN 1.5" OF THE FINISHED WALL SURFACE.
PLUMBING SHEET INDEX
SHEET NUMBER SHEET NAME
P001 PLUMBING NOTES & LEGEND
P101 PLUMBING DEMOLITION FLOOR PLAN
P102 SANITARY FLOOR PLAN
P103 PRESSURE FLOOR PLAN
P501 PLUMBING DETAILS
P502 PLUMBING DETAILS
P601 PLUMBING SCHEDULES
P901 PLUMBING RISER DIAGRAM
Brandon Klenck, PE FL 100085
C Co py rig ht
4M D es ign
G ro up P
A.
A ll R igh ts re se rv ed . D ra wi ng s, s pe cif ica tio ns a nd th e de sig n ar e an d sh all re m ain p ro pe rty o f 4
M D es ig n G ro up
P A, w he th er th e pr oj ec t f or w hic h th ey a re p re pa re d is ex ec ut ed o r n ot , u nle ss su pe rs ed ed b y co nt ra ct ua l a gr ee m en t, Th e dr aw ing s an d sp ec ific at ion s sh all n ot b e us ed b y th e pr oj ec t o wn er o r a ny o th er p ar ty fo r o th er p ro je ct s, a dd itio ns to th is pr oj ec t, or fo r t he c om ple tio n of th is pr oj ec t e xc ep t b y ag re em en t i n wr…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .