This is Addendum No. 1, dated September 1, 2026, for the 2026 Hinkel Lane Kayak Launch Project issued by South Middleton Township in Cumberland County, Pennsylvania. The project encompasses construction of a concrete kayak launch with associated improvements including five parking spaces (three trailer spaces and two ADA-compliant spaces), a pull-off area, approximately 140 feet of sidewalk, railing installation, line painting, and erosion and sediment control features. In-stream work must be completed between October 1 and December 31, with paving work required when temperatures exceed 40 degrees and ground conditions are unfrozen. The contractor is required to coordinate with UGI to confirm the location of gas lines prior to excavation and must obtain a GP-2 permit from the Pennsylvania Department of Environmental Protection. The Notice to Proceed will not be issued until DEP permit approval is obtained. All materials not specified in the Construction Plans dated August 17, 2026, shall comply with PennDOT Publications 408/2020 Change No. 4 and 72M Change No. 8.
Addendum No. 1 includes revisions to the Construction Plans, specifically clarifying the gas line location on Sheet C-100, correcting scaling on the Kayak Launch Profile on Sheet C-300 and adding Station 0+15 Kayak Launch Cross Section, adding ADA parking area details on Sheet C-501, and providing additional details on Sheet C-502 for the New Kayak Ramp section, Typical Stepping Footing Detail, and Steel Railing System. No pricing information, award dates, contract terms, or funding sources are specified in this addendum document.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Addendum #1
September 1, 2026
Addendum No. 1 South Middleton Township
Cumberland County. Pennsylvania 2026 Hinkel Lane Kayak Launch Project
TO ALL HOLDERS OF THE PROJECT MANUAL:
Your attention is directed to the following interpretations of, changes in, and additions to the “2026 Hinkel Lane Kayak Launch Project”.
This Addendum is part of the Contract Documents in accordance with Specifications and Contract Documents for the 2026 Hinkel Lane Kayak Launch Project. The updated documents can be found in the FILES tab in PennBID.
Revisions/Additions include:
To the Specifications and Contract Documents for the 2026 Hinkel Lane Kayak Launch Project document:
1. General Terms and Conditions, Item 13. Project Description and Construction Specifications. Revisions to this text are shown in red.
This project includes the construction of a concrete boat launch and parking areas. Specifications can be found within the “Construction Plans” dated August 17, 2026 and amended via Addendum #1 dated September 1, 2026. All materials not specified on the Drawings shall be completed in conformance with PennDOT Publication 408/2020 Change No. 4, and Publication 72M Change No. 8. These documents are to be considered part of these Contract Documents.
Construction of the boat launch will include concrete work as well as railing installation as per the Construction Plans. Proposed parking areas (5 parking spaces with 3 trailer spaces, and 2 ADA spots) and the proposed pull-off area by the boat launch shall consist of light duty paving further described in the Construction Plans. New parking/pull-off areas will also consist of associated line painting as shown on the Construction Plans, and approximately 140’ of sidewalk is proposed by the pull-off leading to the boat launch.
E&S features such as a rock construction entrance, filter sock, final seeding and temporary cofferdam are required. All work should be completed within an appropriate timeframe with DEP and Trout Stream considerations. In-Stream work is to be completed within the timeframe of October 1 through December 31. Paving/ project should be completed when the temperature is above 40 degrees and the ground should not be frozen during paving placement.
Contractor shall coordinate with UGI to set up a site visit prior to any excavation work to confirm location of gas line and ensure that the line that runs through this area is protected.
This project requires a GP-2 permit from PA DEP. The Township has submitted the permit and is awaiting DEP approval. Project Notice to Proceed will not be sent before this permit approval is obtained.
Addendum #1
September 1, 2026
To the Construction Plans for Hinkel Lane Kayak Launch
1. Sheet C-100 (and subsequent plan view pages)
a. Showing the gas line connecting the two surveyed pipeline delineators for clarity
2. Sheet C-300
a. Corrected the scaling on the Kayak Launch Profile
b. Added Station 0+15 Kayak Launch Cross Section
3. Sheet C-501
a. Added details pertaining to the proposed ADA parking areas
4. Sheet C-502
a. The Following details/notes have been added for:
i. Section at New Kayak Ramp
ii. Typical Stepping Footing Detail
iii. Steel Railing System
Documents uploaded to the FILES tab in PennBID:
Addendum No. 1 – September 1, 2026 Receipt of Addenda Addendum #1 9-01-2026 Construction Plans for Hinkel Lane Kayak Launch
File details come from the government source that posted it. Updated .