8-Addendum 2- RFP 25-0164 Emergency Pipe Repair Materials and Services.pdf

PDF 122 KB Posted

Attached to
RFP Emergency Pipe Repair Materials and Services State and local contract opportunity
Solicitation number
25-0164
Issued by
Tarrant County, Texas

About this file

This is Addendum No. 1 to a Request for Proposal issued by the City of Fort Worth's Purchasing Division for Emergency Pipe Repair Materials and Services (RFP No. 25-0164). The original RFP was issued on August 6, 2025, with this addendum dated August 19, 2025, and the proposal closing date remains unchanged at August 28, 2025. The addendum incorporates a Questions and Answers document that addresses bidder inquiries about the scope of work, which involves emergency pipe repair services including welding and materials for various pipe types and sizes such as 24", 36", and 42" pipes made of different materials including steel.

The Q&A section clarifies that quoted prices should include materials, the City will handle excavation and digging at repair sites, and bidders should provide hourly welder rates in their primary responses. For materials and services not specifically listed in the bid table, vendors will offer a percentage discount off catalog prices, with detailed quotes to be submitted after contract award. The addendum requires bidder acknowledgment through signature and company name matching the original bid documents, with failure to return the signed addendum potentially resulting in bid rejection.

View the file

Other files for this state and local contract opportunity

Other files attached to RFP Emergency Pipe Repair Materials and Services, newest first.
File Type Posted
1-RFP-02-CIQ Form.pdf PDF
7-RFP-06-Evaluation Factors and Scope of Services.pdf PDF
2-RFP-03-Authorized Signature and Contact Details.pdf PDF
4-RFP-04-Reference Sheet.pdf PDF
6-RFP-07-Questionnaire and Requirements.docx DOCX document
3-RFP-05-Draft Services Agreement.pdf PDF
5-RFP-01-Instruction to Proposers (1).pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ADDENDUM TO REQUST FOR PROPOSAL

EMERGENCY PIPE REPAIR MATERIALS AND SERVICES

PURCHASING DIVISION

ADDENDUM NO. 1 DATE ISSUED: August 19, 2025

REQUEST FOR PROPOSAL (RFP): 25-0164

PROPOSAL CLOSING DATE: August 28, 2025 (UNCHANGED)

RFP No. 25-0164, issued August 6, 2025, is hereby amended as follows:

1. Questions and Answers documents are hereby incorporated, in full text, page 2 this addendum.

All other terms and conditions remain unchanged.

LaKita Slack-Johnson LaKita Slack-Johnson Purchasing Buyer II By the signature affixed below, Addendum No. 2 is hereby incorporated into and made part of the above referenced RFP.

COMPANY NAME:____________________________________________________

SIGNATURE:_________________________________________________________

NOTE: Company name and signature must be the same as on the original bid documents. Failure to return this form with your sealed bid may constitute grounds for rejection of your offer.

ITB 23-0057 I30 & I35 Mowing and Trash Pick-Up Services Addendum No. 1, Page 2 of 2

Questions and Answers

Q1. When quoting prices, should it include materials?

A1. Yes

Q2. Will the City be doing excavation and digging at the cites?

A2. Yes

Q3. In looking at the bid table, we are to put our hourly welder rate in the primary responses. The additional responses sheet is locked which doesn't allow us to add all the scenarios along with different ways of repairing each pipe type that is listed on the RFP. How would we price out materials for each situation that we could encounter? IE - 36" Butt strap repair on B303, 42" Closure section on L301, 24" Joint weld on Steel pipe---there are many situations that would be need differing materials. Is there also a list of sizes/materials that are in your system?

A3. Question 2.3 of the questionnaire indicates that additional items and services not listed on the bid table will be offered at a ___% discount off catalog prices. After the contract is in place the successful Vendor will submit a quote (with the discount) for all items and services not specifically listed on the bid table.

ADDENDUM TO REQUST FOR PROPOSAL
EMERGENCY PIPE REPAIR MATERIALS AND SERVICES
PURCHASING DIVISION

File details come from the government source that posted it. Updated .