8-2-CR27029-27242490 Approved Plans.pdf
PDF 6 MB Posted
- Solicitation number
- CR27029
- Issued by
- Utah
About this file
This approved construction document package is for a new committal shelter facility at the Utah Department of Veterans and Military Affairs cemetery located at 17111 South Camp Williams Road, Camp Williams, Utah. The project involves the construction of a concrete block and steel-framed shelter structure designed to provide weather protection during graveside services. The facility will be approximately 6,000 square feet with a single story, 16 feet in height, and will include concrete flooring, a standing-seam metal roof, structural steel components, electrical systems, and minor landscaping and irrigation modifications. The construction documents were approved by the Division of Facilities Construction and Management (DFCM) on October 22, 2026, following a review for code compliance by Thomas Peterson. The project is identified as Project No. 24162 and is designed by Greene Architecture, with structural engineering by McNeil Engineering, MEP engineering by Royal Engineering, and geotechnical services by AGEC – Applied Geotechnical.
The construction cost estimate for this project is $765,000.00. The project requires compliance with applicable 2024 International Building Codes, the 2023 National Electrical Code, and ADA accessibility guidelines. The contractor must provide adequate accommodations for winter weather conditions, including concrete blankets, tenting, and heaters as necessary to ensure quality installation. Special inspections are required for concrete construction, reinforcing steel, and masonry work in accordance with ACI 318-19 and TMS 602-22 standards. The contractor must achieve substantial completion with minimal punch list items, complete all certificate of occupancy requirements, resolve any code or special inspection issues, and provide all closeout documentation. Failure to complete these items within the contract timeline may result in liquidated damages charged by the State of Utah DFCM.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LANDSCAPING
8610 SOUTH SANDY PARKWAY,SUITE 200
SANDY, UTAH 84070
Phone: 801.255.770
McNEIL ENGINEERING
STRUCTURAL ENGINEER
8610 SOUTH SANDY PARKWAY,SUITE 200
SANDY, UTAH 84070
Phone: 801.255.770
McNEIL ENGINEERING
MEP ENGINEER
1837 S E BAY BLVD,
PROVO, UTAH 84606
Phone: 801.375.2228
ROYAL ENGINEERING
ARCHITECT
8610 SOUTH SANDY PARKWAY,SUITE 200
SANDY, UTAH 84070
Phone: 801.255.770
GREENE ARCHITECTURE
GEOTHECNICAL ENGINEER
600 SOUTH SANDY PARKWAY,SUITE 200
SANDY, UTAH 84070
Phone: 801.566.6399
AGEC - APPLIED GEOTECHNICAL
REVISIONS :
UNLESS A PROFESSIONAL SEAL WITH
SIGNATURE AND DATE IS AFFIXED, THIS
DOCUMENT IS PRELIMINARY AND IS NOT
INTENDED FOR CONSTRUCTION,
RECORDING PURPOSES, OR
IMPLEMENTATION
THE DESIGNS SHOWN AND DESCRIBED
HEREIN INCLUDING ALL TECHNICAL
DRAWINGS, GRAPHIC REPRESENTATIONS &
MODELS THEREOF, ARE PROPRIETARY &
CAN NOT BE COPIED, DUPLICATED, OR
COMMERCIALLY EXPLOITED IN WHOLE OR
IN PART WITHOUT THE SOLE AND EXPRESS
WRITTEN PERMISSION FROM MCNEIL
ENGINEERING
PROJECT NO.
DRAWN BY:
CHECKED BY:
ISSUE DATE:
CLIENT PROJECT/PROPERTY NO.
GREENE.ARCHITECTURE1@GMAIL.COM
G001
V E
T E
R A
N 'S
C E
M E
T E
R Y
C O
M M
IT
T
A L
CONSTRUCTION DOCS
VETERAN'S CEMETERY COMMITTAL
CONSTRUCTION DOCS - AUGUST 2026
COVER SHEET
24162
CEG
XXXXXXXX
AUGUST 2026
MB
D
EP
A R
TM
EN
T O
F V
ET
ER
A N
S A
N D
M
IL
IT
A
R Y
A
FF
A
IR
S
S
O U
T H
C A
M P
W
IL
LI
A
M S
R O
A D
C
A M
P W
IL
LI
A M
S
U T
A H
DESIGN TEAM
DFCM APPROVAL STAMP
# DESCRIPTION DATE
1 September 2026
DIVISION OF FACILITIES
CONSTRUCTION AND
MANAGEMENT
REVIEWED FOR
CODE COMPLIANCE
THOMAS PETERSON
10/22/2026
SEE STRUCTURAL DRAWINGS FOR SPECIAL INSPECTIONS REQUIRED.
TO RECEIVE A CERTIFICATE OF SUBSTANTIAL COMPLETION ON THIS PROJECT THE
FOLLOWING REQUIREMENTS MUST BE MET:
1. THE STATUS OF THE WORK MUST TRULY BE SUBSTANTIALLY COMPLETE WITH
MINIMAL, OR NO PUNCH LIST ITEMS AS DETERMINED BY THE ARCHITECT AND
OWNER. A SUBSTANTIALLY COMPLETE PROJECT WILL INCLUDE THE FOLLOWING:
A. CONTRACTOR WILL PERFORM THEIR OWN PRE-SUBSTANTIAL QUALITY
CONTROL INSPECTION OF THE PROJECT AND PROVIDE THE ARCHITECT AND
OWNER WITH A REPORT OF ANY DEFICIENCIES FOUND AND THE PROPOSED
RESOLUTION FOR THEM.
B. THE ROOFING SYSTEM(S) MANUFACTURER WILL PERFORM A FINAL
WARRANTY INSPECTION AND THE CONTRACTOR WILL PROVIDE ARCHITECT
AND OWNER WITH MANUFACTURER’S INSPECTION REPORT AND
DOCUMENTATION OF ALL DEFICIENCIES IDENTIFIED AND/OR RESOLVED.
2. CONTRACTOR MUST HAVE ALL CERTIFICATE OF OCCUPANCY REQUIREMENTS
CLEARED ON EDMS, WHICH MAY INCLUDE, BUT IS NOT LIMITED TO: DEFERRED
SUBMITTALS, FLAGGED CODE AND SPECIAL INSPECTION ITEMS RESOLVED,
STRUCTURAL OBSERVATION ISSUES RESOLVED, CERTIFICATE OF FIRE CLEARANCE,
AND FINAL CODE REPORT UPLOADED. CONTRACTOR TO REVIEW EDMS FOR PROJECT
SPECIFIC REQUIREMENTS.
3. NO OUTSTANDING PROPOSED CHANGE ORDERS (PCO) OR CHANGE ORDERS (CO)
TO RESOLVE AND/OR PROCESS.
4. ALL CLOSEOUT DOCUMENTATION (SEE THE DFCM'S PROJECT CLOSEOUT
CHECKLIST) MUST HAVE BEEN TURNED INTO THE ARCHITECT FOR REVIEW. THE ONLY
EXCEPTION WOULD BE THE DFCM ROOFING MANUFACTURER'S WARRANTY AND THE
DFCM ROOFING INSTALLER'S WARRANTY, WHICH REQUIRE THE SUBSTANTIAL
COMPLETION DATE.
5. FAILURE TO COMPLETE THESE ITEMS WITHIN YOUR CONTRACT TIMELINE MAY
RESULT IN THE STATE PF UTAH DFCM CHARGING LIQUIDATED DAMAGES.
APPLICABLE CODES
International Building Code:
International Mechanical Code:
International Plumbing Code:
International Fire Code:
National Electrical Code:
Uniform Code for Building Conservation:
ADA Accessibility Guidelines:
A. Occupancy and Group:
Change in Use: YES NO Mixed Occupancy: YES NO Special Use and Occupancy (i.e. High Rise, Covered Mall):
B. Seismic Design Category: Design Wind Speed:
C. Type of Construction (circle one):
D. Fire Resistance Rating - Requirements for the Exterior Walls based on the fire separation distance (in hours):
North: East: South: West:
E. Mixed Occupancies: Non-separated Uses:
F. Sprinklers:
Required: Provided: Type of Sprinkler System:
G. Number of Stories: Building Height:
H. Actual Area per Floor (square feet):
J. Tabular Area:
K. Area Modifications -
a) Single Occupancy (multistory buildings):
Aa = [At + (NS x If)] x Sa If = [F/P - 0.25] W/30
b) Mixed Occupancy (multistory buildings):
Aa = [At + (NS x If)] If = [F/P - 0.25] W/30
c) Sum of the Ratio Calculation for Mixed Occupancies
Actual Area/Allowable Area ≤ 1
d) Total Allowable Area for:
1) One Story:
2) Two Story: Aa(2)
2) Three Story: Aa(3)
e) Unlimited Area Building - Yes No Code Section:
L. Fire Resistance Rating Requirements for Building Elements (hours) -
M. Design Occupant Load:
Exit Width Required:
Exit Width Provided:
N. Minimum Number of Plumbing Fixtures (see tables within code plans for calculations and counts based on Occupancy Use Classification).
FOOTNOTES:
1) In case of conflict with the U.S. Department of Justice Federal Registers Parts I through V - ADA Guidelines and specific reference to the International Building Code Accessibility Chapters, the more restrictive requirement shall govern.
2) Additional Code Information shall be provided at the discretion of the Building Official for Complex Buildings, including, but not limited to -
a. High Rise Requirements
b. Atriums
c. Performance Base Criteria
d. Means or Egress Criteria
e. Fire Assembly Locator Sheet
f. Exterior and Interior Accessibility Route
g. Fire Stopping, including tested design number
h. Fire Penetration Details
3) See Code Plan sheets for Additional information.
I
A
I
B
II
A
II
B
III
A
III
B
IV
A
IV
B
V
A
V
B
THESE DOCUMENTS MEET ALL REQUIREMENTS OF DFCM STANDARDS FOUND AT www.dfcm.utah.gov
International Energy Conservation Code:
N/A
D-1 115 MPH EXPOSURE "C"
N/A N/A N/A N/A
0 SF / 0 SF =
EXISTING
432"
1 16' - 0"
X X
X
N/A N/A N/A
N/A N/A
ELEMENT HOURS
ASSEMBLY
LISTING
Primary Structural Frame
Bearing Walls - Exterior
Bearing Walls - Interior
Nonbearing Walls/Partitions - Interior
Nonbearing Walls/Partitions - Exterior
Floor construction and associated secondary members
Roof construction and associated secondary members
Exterior Doors & Windows
Shaft Enclosures
Fire Walls
Fire Partitions
Smoke Partitions
Fire Barriers
N/A
N/A
N/A
N/A
N/A -
CONTRACTOR TO PROVIDE ALL NECESSARY ACCOMMODATIONS TO PERFORM WORK
DURING WINTER CONDITIONS. CONCRETE BLANKETS, TENTING, HEATERS, ETC. AS NEEDED
TO PERFORM A QUALITY INSTALLATION OF ALL MATERIAL.
REVISIONS :
UNLESS A PROFESSIONAL SEAL WITH
SIGNATURE AND DATE IS AFFIXED, THIS
DOCUMENT IS PRELIMINARY AND IS NOT
INTENDED FOR CONSTRUCTION,
RECORDING PURPOSES, OR
IMPLEMENTATION
THE DESIGNS SHOWN AND DESCRIBED
HEREIN INCLUDING ALL TECHNICAL
DRAWINGS, GRAPHIC REPRESENTATIONS &
MODELS THEREOF, ARE PROPRIETARY &
CAN NOT BE COPIED, DUPLICATED, OR
COMMERCIALLY EXPLOITED IN WHOLE OR
IN PART WITHOUT THE SOLE AND EXPRESS
WRITTEN PERMISSION FROM MCNEIL
ENGINEERING
D
C
B
A
1 2 3 4 5
PROJECT NO.
DRAWN BY:
CHECKED BY:
ISSUE DATE:
CLIENT PROJECT/PROPERTY NO.
GREENE.ARCHITECTURE1@GMAIL.COM
2 3 4 5
G002
V E
T E
R A
N 'S
C E
M E
T E
R Y
C O
M M
IT
T
A L
CONSTRUCTION DOCS
GENERAL
INFO.
24162
CEG
XXXXXXXX
AUGUST 2026
CFM
D
EP
A R
TM
EN
T O
F V
ET
ER
A N
S A
N D
M
IL
IT
A
R Y
A
FF
A
IR
S
S
O U
T H
C A
M P
W
IL
LI
A
M S
R O
A D
C
A M
P W
IL
LI
A M
S
U T
A H
ABBR Definition
& AND
@ AT
Ø DIAMETER
(E), EXIST. EXISTING
(N) NEW
d PENNY
# POUND OR NUMBER
A
A.F.F. ABOVE FINISHED FLOOR
AC. ACOUSTIC
ADD. ADDENDUM
A/C. AIR CONDITIONING
ALT. ALTERNATE
AL/ALUM. ALUMINUM
A.B. ANCHOR BOLT
ARCH ARCHITECT(URAL)
ASP. ASPHALT
B
BSMT. BASEMENT
B.M. BENCHMARK
BLKG. BLOCKING
BD. BOARD
B.O. BOTTOM OF
BLDG. BUILDING
C
CAB'T. CABINET
C.I.P. CAST IN PLACE
C.B. CATCH BASIN
CLG. CEILING
CL. CENTER LINE
C.T. CERAMIC TILE
CH. CHANNEL
C.O. CLEAN OUT
CLR. CLEAR
CL. CLOSET
COL. COLUMN
CONC. CONCRETE
CMU CONCRETE MASONRY UNIT
COND. CONDITION
CONN. CONNECTION
CONST. CONSTRUCTION
CONT CONTINUOUS
CJ CONTROL JOINT
D
D.P. DAMP PROOFING
D.B. DECK BEARING
DIAG. DIAGONAL
DIA. DIAMETER
DIM. DIMENSION
DISP. DISPENSER
DWL. DOWEL
DN. DOWN
D.S. DOWN SPOUT
D.W.V. DRAINAGE WASTE VENT
ABBR Definition
JST. JOIST
L
LAM. LAMINATED
LDG. LANDING
LAV. LAVATORY
LT. LIGHT
L.W.C. LIGHT WEIGHT CONCRETE
LVR. LOUVER
L.S. LOW SLOPE
M
M.B. MACHINE BOLT
MH. MANHOLE
MFR. MANUFACTURER
M.O. MASONRY OPENING
MAT'L MATERIAL
MAX. MAXIMUM
MECH. MECHANICAL
MTL. METAL
MIN. MINIMUM
MLDG. MOLDING
MULL. MULLION
N
N.G. NATURAL GRADE
NOM. NOMINAL
N/A NOT APPLICABLE
N.I.C. NOT IN CONTRACT
N.T.S. NOT TO SCALE
N.O. NUMBER
O
O.C. ON CENTER
O.D. OUTSIDE DIAMETER
O.R.D. OVERFLOW ROOF DRAIN
O.F.S. OVERFLOW SCUPPER
O.H. OVERHANG
O.F.C.I. OWNER FURNISHED, CONTRACTOR
INSTALLED
O.F.O.I. OWNER FURNISHED, OWNER INSTALLED
P
PT. PAINT
PTD. PAINTED
PR. PAIR
PNL. PANEL
P. PENNY
P.L. PLASTIC LAMINATE
PL. PLATE
PLBG. PLUMBING
P.S.I. POUND PER SQUARE INCH
P.S.F. POUNDS PER SQUARE FOOT
R
RAD. RADIUS
REC. RECOMMENDATION
RE./REF. REFERENCE
RCP. REFLECTED CEILING PLAN
REG. REGISTER
REQ'D REQUIRED
SITE
NORTH
ABBR Definition
DWG. DRAWING
E
EA. EACH
E.W.C. ELEC. WATER COOLER
EL./ELEC. ELECTRIC
ELEV. ELEVATION
EQ. EQUAL
EQUIP. EQUIPMENT
EXH. EXHAUST
EXIST. EXISTING
E.J. EXPANSION JOINT
EXT. EXTERIOR
F
FT. FEET
FV/F.V. FIELD VERIFY
FIN. FINISH(ED)
F.E. FIRE EXTINGUISHER
F.E.C. FIRE EXTINGUISHER CABINET
FIXT. FIXTURE
FL. FLASHING
FD FLOOR DRAIN
FURN. FURNACE
G
GPF GALLONS PER FLUSH
GALV. GALVANIZED
GA. GAUGE
G.C. GENERAL CONTRACTOR
G.S.N. GENERAL STRUCTURAL NOTES
GL. GLASS
GD. GRADE
GRL. GRILLE
GRD. GROUND
GYP. GYPSUM
H
H.C. HANDI-CAP
HDW. HARDWARE
HDWD. HARDWOOD
HTR. HEATER
HT. HEIGHT
H.P. HIGH POINT
H.S. HIGH SLOPE
H.M. HOLLOW METAL
HORIZ. HORIZONTAL
H.B. HOSE BIB
H.W. HOT WATER
HR. HOUR
I
IN. INCH
I.D. INSIDE DIAMETER
INSUL. INSULATION
INT. INTERIOR
INV. INVERT
J
JAN. JANITOR
JT. JOINT
ABBR Definition
R.A. RETURN AIR
REV. REVISION
R.D. ROOF DRAIN
RFG. ROOFING
RM. ROOM
RGH. ROUGH
RND. ROUND
S
SCR. SCREW
SEC./SECT. SECTION
SEL. SELECT
SHT. SHEET
SIM. SIMILAR
SLDG. SLIDING
SM. SMOOTH
SPEC. SPECIFICATION
SPL. SPLASH
SQ. SQUARE
S.S. STAINLESS STEEL
STD. STANDARD
STRUC. STRUCTURE
S.A. SUPPLY AIR
SUSP. SUSPENDED
SW.BD. SWITCHBOARD
T
TELCO TELEPHONE COMPANY
T.G. TEMPERED GLASS
T&G TONGUE & GROOVE
T&B TOP & BOTTOM
T.O. TOP OF
T.O.C. TOP OF CURB
T.O.D. TOP OF DECK
T.O.P. TOP OF PARAPET
TYP. TYPICAL
U
U.N.O. UNLESS NOTED OTHERWISE
V
V. VENT
V.T.R. VENT THROUGH ROOF
VERT. VERTICAL
V.G. VERTICAL GRAIN
VEST. VESTIBULE
V.C.T. VINYL COMPOSITION TILE
V.C.P. VITREOUS CLAY PIPE
W
W.C. WATER CLOSET
W.H. WATER HEATER
W.R. WATER RESISTANT
W.P. WATERPROOF
WT. WEIGHT
W.W.F. WELDED WIRE FABRIC
W.F. WIDE FLANGE
WDW. WINDOW
W/ WITH
W/O WITHOUT
WD. WOOD
VICINITY MAP
ABBREVIATIONS GENERAL NOTES
1. STRUCTURAL, MECHANICAL, AND ELECTRICAL DRAWINGS (IF PRESENT) ARE
SUPPLEMENTAL TO THE ARCHITECTURAL DRAWINGS. IT SHALL BE THE
RESPONSIBILITY OF THE GENERAL CONTRACTOR TO CHECK WITH THE
ARCHITECTURAL DRAWINGS BEFORE THE INSTALLATION OF MECHANICAL OR
ELECTRICAL CONSTRUCTION. ANY DISCREPANCIES BETWEEN THE ARCHITECTURAL
AND CONSULTING ENGINEERS' DRAWINGS SHALL BE BROUGHT TO THE ARCHITECT'S
ATTENTION FOR CLARIFICATION. ANY CONSTRUCTION INSTALLED IN CONFLICT WITH
THE ARCHITECTURAL DRAWINGS SHALL BE CORRECTED BY THE GENERAL
CONTRACTOR AT HIS/HER OWN EXPENSE AND AT NO EXPENSE TO THE OWNER OR
ARCHITECT.
2. ALL WORK SHALL COMPLY WITH THE CURRENT ADA ACCESSIBILITY GUIDELINES
(AMERICANS WITH DISABILITIES ACT).
3. REFER TO THE CODE COMPLIANCE PLAN FOR APPLICABLE CODES GOVERNING THIS
WORK. CODE REQUIREMENTS AND REGULATIONS SHALL BE CONSIDERED AS
MINIMUM. WHERE THE CONTRACT DOCUMENTS EXCEED (WITHOUT VIOLATING) CODE
AND REGULATION REQUIREMENTS, CONTRACT DOCUMENTS SHALL TAKE
PRECEDENCE. IF CONFLICT EXIST, THE MORE STRINGENT SHALL APPLY. COMPLY
WITH REQUIREMENTS OF THE ADOPTED EDITIONS OF THE INTERNATIONAL CODE
COUNCIL CODES, THE CODES AND STANDARDS REFERENCED WITHIN THE ICC CODES
AND THE AMERICANS WITH DISABILITIES ACT.
4. THE CONTRACTOR SHALL PROVIDE ADEQUATE BARRICADES AND PROTECTIVE
DEVICES SEPARATING CONSTRUCTION AREAS. TEMPORARY PASSAGES SHALL BE
PROVIDED AS REQUIRED. PRIOR TO DELIVERY OF MATERIALS TO CONSTRUCTION
ZONE AND REMOVAL OF WASTE FROM SITE, THE CONTRACTOR SHALL CHECK WITH
THE OWNER FOR AN ACCEPTABLE ROUTE AND TIME.
5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE PROPER LOCATION AND SIZE OF
OPENINGS FOR ALL TRADES AND SHALL COORDINATE ALL CONSTRUCTION AS
INDICATED BY THE CONTRACT DOCUMENTS, INCLUDING SHOP DRAWINGS REVIEWED
BY THE ARCHITECT.
6. THE CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS AND NOTIFY THE
ARCHITECT OF ANY DISCREPANCIES PRIOR TO COMMENCEMENT OF WORK.
7. FOR ALL REMODEL WORK AS OCCURS, THE CONTRACTOR SHALL COORDINATE WITH
THE OWNER ALL MEASURES TO ACCOMPLISH THE WORK WITH THE MINIMUM OF
INTERRUPTION TO NORMAL BUILDING PROCEDURES. SYSTEM SHUTDOWNS OF HVAC,
PLUMBING, ELECTRICAL, AND NOISY CONSTRUCTION INCLUDING ROTO HAMMER, SAW
CUTTING, CONCRETE ANCHORS, ETC. SHALL BE COORDINATED WITH THE OWNER AT
LEAST 72 HOURS PRIOR TO COMMENCEMENT.
8. ALL DIMENSIONS ARE SHOWN TO FACE OF GYPSUM BOARD OF NEW CONSTRUCTION
OR STRUCTURAL WALL, UNLESS NOTED OTHERWISE.
9. ALL DRAWINGS, THOUGH NOTED TO SCALE ARE FOR ILLUSTRATION ONLY. THE
CONTRACTOR SHALL NOT SCALE DRAWINGS.
10. WHEN A DETAIL IS IDENTIFIED AS TYPICAL, THE CONTRACTOR IS TO APPLY THIS
DETAIL IN ESTIMATING AND CONSTRUCTION TO EVERY LIKE CONDITION WHETHER OR
NOT THE REFERENCE IS REPEATED IN EVERY INSTANCE.
11. DRAWINGS HAVE BEEN DETAILED IN COMPLIANCE WITH U.L. LISTING REQUIREMENTS
AND ICBO REPORTS FOR THE MATERIALS SPECIFIED. IF AN ALTERNATE OR
SUBSTITUTED MATERIAL IS ACCEPTED AS AN EQUAL BY THE GENERAL CONTRACTOR,
HE/SHE WILL ASSUME THE RESPONSIBILITY FOR WHATEVER CONSTRUCTION
MODIFICATION AND/OR ADDITIONAL COSTS ARE REQUIRED.
12. ALL TRASH SHALL BE REMOVED DAILY. BUILDING MATERIALS MAY NOT BE STORED IN
THE CORRIDORS AT ANY TIME. BLOCKAGE OF ANY REQUIRED EXIT IS PROHIBITED.
13. CONTRACTOR TO COMPLY WITH DFCM HOT WORKS REQUIREMENTS AND ARE TO BE
FULLY QUALIFIED UNDER THE DFCM HOT WORKS PROGRAM PRIOR TO COMMENCING
ANY OPERATIONS THAT WOULD QUALIFY UNDER THIS REGULATION.
14. ABBREVIATIONS THROUGHOUT THE PLAN ARE THOSE IN COMMON USE. THE
ARCHITECT SHALL DEFINE THE INTENT OF ANY IN QUESTION.
15. THE CONTRACTOR SHALL VERIFY SIZES AND LOCATIONS OF WATER AND DRAIN
INSTALLATIONS AND OTHER REQUIRED SERVICES WITH EQUIPMENT
MANUFACTURERS.
16. MAINTAIN ALL EXISTING SPRAY-APPLIED FIRE PROOFING ON STEEL STRUCTURAL
MEMBERS. WHERE EXISTING FIRE PROOFING IS REMOVED FOR INSTALLATION OF NEW
BEAMS, UNISTRUTS, ETC. THE CONTRACTOR SHALL PATCH AGAIN WITH EQUIVALENT
FIRE PROOFING MATERIAL TO MATCH ADJACENT EXISTING MATERIAL.
17. ALL WOOD CANTS, NAILERS, CURBS, ETC. THROUGHOUT JOB SHALL BE FIRE
RETARDANT PRESSURE-TREATED, AS PER I.B.C. CURRENT VERSION. SEE RELEVANT
DETAILS.
18. CONTRACTOR SHALL REFER TO THE PROJECT MANUAL FOR A COMPLETE LIST OF
GENERAL CONDITIONS, SPECIAL CONDITIONS AND OTHER NOTES.
19. GENERAL CONTRACTOR SHALL FIELD VERIFY ALL CONDITIONS AND SHALL REPORT TO
THE ARCHITECT ANY UNKNOWN CONDITIONS, ERRORS, OR CONFLICTS IN THE
DRAWINGS BEFORE BEGINNING WORK.
20. ALL NEW METAL WILL BE GALVANIZED OR PRE-FINISHED. CAULKING WILL BE SAME
COLOR AS METAL.
21. BEFORE FABRICATION OF ANY SHEET METAL WORK, SUBMIT SHOP DRAWINGS TO
CONSULTANT FOR REVIEW AND APPROVAL. ALL WORK TO CONFORM TO NRCA OR
SMACNA DETAILS AND REQUIREMENTS WHERE NOT SPECIFICALLY DETAILED
OTHERWISE.
22. RAIN GUTTERS & DOWNSPOUTS HEADS: RIVETS & SCREWS TO BE PAINTED SAME
COLOR (NO SPRAY PAINT), USE POP RIVETS AT ALL CONNECTIONS FROM GUTTERS TO
DOWNSPOUT, DOWNSPOUTS TO CONNECT TO EXISTING SUB-GRADE DRAINAGE
SYSTEM, WHERE THERE IS EXISTING DRAINAGE SYSTEM, PROVIDE NEW CONNECTION
FITTING, DOWNSPOUTS NOT CONNECTED TO DRAINAGE SYTEM WILL EMPTY ONTO A
NEW 12"x30" PRE-CAST SPLASH BLOCK, AND ALL JOINTS TO BE SEALED WATER TIGHT.
23. AT THE END OF CONSTRUCTION, CONTRACTOR IS TO CLEAN OUT AND FLUSH ALL RAIN
GUTTERS & DOWNSPOUTS TO MAKE SURE THEY ARE NOT PLUGGED AND ARE IN
WORKING CONDITION.
24. ALL SAFETY STANDARDS AND REQUIREMENTS ARE THE RESPONSIBILITY OF THE
CONTRACTOR. THE CONTRACTOR SHALL PROVIDE ADEQUATE BARRICADES AND
PROTECTIVE DEVICES SEPARATING CONSTRUCTION AREAS. TEMPORARY PASSAGES
SHALL BE PROVIDED AS REQUIRED. PRIOR TO DELIVERY OF MATERIALS TO
CONSTRUCTION ZONE AND REMOVAL OF WASTE FROM SITE, THE CONTRACTOR SHALL
CHECK WITH THE OWNER FOR AN ACCEPTABLE ROUTE AND TIME.
25. CONTRACTOR TO SUPPLY AN ON SITE PORTABLE RESTROOM. FACILITY RESTROOMS
ARE NOT TO BE USED BY CONTRACTOR OR CONTRACTOR'S EMPLOYEES. LOCATION
OF PORTABLE RESTROOM TO BE DETERMINED DURING PRE-CONSTRUCTION MEETING.
26. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE PROPER LOCATION AND SIZE OF
OPENINGS FOR ALL TRADES AND SHALL COORDINATE ALL CONSTRUCTION AS
INDICATED BY THE CONTRACT DOCUMENTS, INCLUDING SHOP DRAWINGS REVIEWED
BY THE ARCHITECT.
27. WHEN A DETAIL IS IDENTIFIED AS TYPICAL, THE CONTRACTOR IS TO APPLY THIS
DETAIL IN ESTIMATING AND CONSTRUCTION TO EVERY LIKE CONDITION WHETHER OR
NOT THE REFERENCE IS REPEATED IN EVERY INSTANCE.
28. ABBREVIATIONS THROUGHOUT THE PLAN ARE THOSE IN COMMON USE. THE
ARCHITECT SHALL DEFINE THE INTENT OF ANY IN QUESTION.
29. THE CONTRACTOR SHALL VERIFY SIZES AND LOCATIONS OF WATER AND DRAIN
INSTALLATIONS AND OTHER REQUIRED SERVICES WITH EQUIPMENT
MANUFACTURERS.
30. CONTRACTOR SHALL REFER TO THE PROJECT MANUAL FOR A COMPLETE LIST OF
GENERAL CONDITIONS, SPECIAL CONDITIONS AND OTHER NOTES.
31. GENERAL CONTRACTOR SHALL FIELD VERIFY ALL CONDITIONS AND SHALL REPORT TO
THE ARCHITECT ANY UNKNOWN CONDITIONS, ERRORS, OR CONFLICTS IN THE
DRAWINGS BEFORE BEGINNING WORK.
32. ALL NEW METAL WILL BE GALVANIZED OR PRE-FINISHED. CAULKING WILL BE SAME
COLOR AS METAL.
33. BEFORE FABRICATION OF ANY SHEET METAL WORK, SUBMIT SHOP DRAWINGS TO
CONSULTANT FOR REVIEW AND APPROVAL. ALL WORK TO CONFORM TO NRCA OR
SMACNA DETAILS AND REQUIREMENTS WHERE NOT SPECIFICALLY DETAILED
OTHERWISE.
CODE ANALYSIS
GENERAL
G001 COVER SHEET
G002 GENERAL INFO.
CIVIL
C2.01 DEMO PLAN AND HCP
C2.02 GRADING AND DETAILS
LANDSCAPING
L1.01 LANDSCAPE DEMOLITION PLAN
L2.01 LANDSCAPE PLANTING PLAN
L3.01 LANDSCAPE IRRIGATION PLAN
L5.01 LANDSCAPE DETAILS
L5.02 LANDSCAPE IRRIGATION DETAILS
ARCHITECTURAL
A101 FOOTING & FOUNDATION, FLOOR PLAN
A102 ROOF PLAN
A201 EXTERIOR ELEVATIONS
A210 WALL AND BUILDING SECTIONS
A211 MILITARY SEAL COLUMNS
A401 DOOR SCHEDULE
A402 BEAM CUTOUTS
A501 DETAILS
STRUCTURAL
S0.00 GENERAL NOTES
S1.00 STRUCTURAL NOTES AND FOOTING AND FOUNDATION
S1.01 ROOF FRAMING PLAN
S5.00 STRUCTURAL DETAILS
ELECTRICAL
E001 ELECTRICAL COVER SHEET
E002 MAIN FLOOR ELECTRICAL PLAN
E101 MAIN FLOOR ELECTRICAL PLAN
E501 ELECTRICAL DETAILS
E601 ELECTRICAL SCHEDULES
E701 ELECTRICAL SPECIFICATIONS
MECHANICAL
M001 MECHANICAL NOTES & LEGENDS
M101 MECHANICAL PLAN
M501 MECHANICAL DETAIL
M701 MECHANICAL SPECIFICATIONS
M702 MECHANICAL SPECIFICATIONS
DRAWING INDEX
N/A
DFCM APPROVAL STAMP
SPECIAL INSPECTIONS
SUBSTANTIAL COMPLETION INSTRUCTIONS
WINTER CONDITIONS
# DESCRIPTION DATE
1 September 2026
DIVISION OF FACILITIES
CONSTRUCTION AND
MANAGEMENT
REVIEWED FOR
CODE COMPLIANCE
LINE TO GUN SALUTE
COLUMN OFFSET TO OPEN VISUAL TO GUN SALUTE,
ALSO SYMBOLIC OF MISSING MAN FORMATION
COLORED, STEEL TROWEL
POLISHED CONC. FLOOR
INSIDE COMMITTAL
GUTTER & CURB FLUSH
WITH PAVING SEE C1.01
NAVY
ARMY
AIR
FORCE
MARINESCOAST
GUARD
SPACE
FORCE
F A
M
IL
Y
D
B
A
C
ADD DARKER CONC.
COLOR TO THIS SQUARE
40' - 4"
11' - 4" 14' - 0" 14' - 0" 1' - 0"
2' - 0"12' - 0"2' - 0"12' - 0"2' - 0"10' - 4"
5' - 0"
8"
3' - 4 1/2"
1' - 3 3/4"
24' - 0"
5' - 8"
12' - 8"
5' - 8"
8"
3' - 4"
23' - 8" 7' - 0"
6' - 0"2' - 0"6' - 0"2' - 0"12' - 0"2' - 0"5' - 4"
CONTROL JOINT, TYP
24' - 0"
1' - 0"
11' - 0"
11' - 0"
1' - 0"2' - 0"
6' - 6 1/2"
7' - 0"
6' - 5 1/2"
2' - 0"
5' - 3 3/4" 8' - 0" 8' - 0" 8' - 0" 4' - 0" 2' - 0"
4' - 8"
4' - 0"
4' - 0"
4' - 0"
4' - 8"
5' - 0"
2' - 8"
DB
A
C
SLOPE TOP OF WALL
STEP DN FND. 6" MIN. AT
DOOR OPENING, TYP
STEP FND.
COL. PER ENGR., TYP
STEP FND.
6" CONC. SLAB w/ #3 BARS @18" o.c. EA. WAY
40' - 4"
11' - 4" 14' - 0" 14' - 0" 1' - 0"
10' - 4" 2' - 0" 12' - 0" 2' - 0" 12' - 0" 2' - 0"
24' - 0"
5' - 8"
12' - 8"
5' - 8"
4' - 4"
8"
3' - 4"
5' - 0" 8" 3' - 4" 1' - 4"
24' - 0"
1' - 0"
11' - 0"
11' - 0"
1' - 0"
2' - 0"
20' - 0"
2' - 0"
40' - 4"
9' - 8" 23' - 8" 7' - 0"
5' - 0" 4' - 8" 8" 2' - 0" 12' - 0" 2' - 0" 6' - 0" 2' - 0" 6' - 0"
8" 3' - 4" 8"
5' - 0"
2' - 8"
5' - 0"
100' - 4"
100' - 4"
101' - 8"
103' - 0"
102' - 6"
103' - 3 1/2" 101' - 8"
100' - 4"
100' - 4" 100' - 4"
100' - 4"100' - 4"
6"
6"8"
8"
8"
8"
8"
1' - 4"
SLOPE TOP OF WALL
A501
A501
A501
DBA
C
LINE TO GUN SALUTE
NAVY
ARMY
AIR
FORCE
MARINESCOAST
GUARD
SPACE
FORCE
F A
M
IL
Y
RAISED AREA FOR CASKET
REVISIONS :
UNLESS A PROFESSIONAL SEAL WITH
SIGNATURE AND DATE IS AFFIXED, THIS
DOCUMENT IS PRELIMINARY AND IS NOT
INTENDED FOR CONSTRUCTION,
RECORDING PURPOSES, OR
IMPLEMENTATION
THE DESIGNS SHOWN AND DESCRIBED
HEREIN INCLUDING ALL TECHNICAL
DRAWINGS, GRAPHIC REPRESENTATIONS &
MODELS THEREOF, ARE PROPRIETARY &
CAN NOT BE COPIED, DUPLICATED, OR
COMMERCIALLY EXPLOITED IN WHOLE OR
IN PART WITHOUT THE SOLE AND EXPRESS
WRITTEN PERMISSION FROM MCNEIL
ENGINEERING
D
C
B
A
1 2 3 4 5
PROJECT NO.
DRAWN BY:
CHECKED BY:
ISSUE DATE:
CLIENT PROJECT/PROPERTY NO.
GREENE.ARCHITECTURE1@GMAIL.COM
2 3 4 5
A101
V E
T E
R A
N 'S
C E
M E
T E
R Y
C O
M M
IT
T
A L
CONSTRUCTION DOCS
FOOTING &
FOUNDATION,
FLOOR PLAN
24162
CEG
XXXXXXXX
AUGUST 2026
CEG
D
EP
A R
TM
EN
T O
F V
ET
ER
A N
S A
N D
M
IL
IT
A
R Y
A
FF
A
IR
S
S
O U
T H
C A
M P
W
IL
LI
A
M S
R O
A D
C
A M
P W
IL
LI
A M
S
U T
A H
SCALE: 1/4" = 1'-0"
FLOOR PLAN
SCALE: 1/4" = 1'-0"
FOUNDATION AND FOOTINGS
KEYED NOTE
DFCM APPROVAL STAMP
ARCH 100' - 0" + SITE 57.30"
SCALE: 1/4" = 1'-0"
FURNITURE PLAN
# DESCRIPTION DATE
1 September 2026
DIVISION OF FACILITIES
CONSTRUCTION AND
MANAGEMENT
REVIEWED FOR
CODE COMPLIANCE
A501
DBA
C
8' - 11" 36' - 6" 8' - 11"
54' - 4"
07.01
07.02
07.02
07.02
07.02
A501
A501
A501
7' - 0"7' - 0"7' - 0"7' - 0"7' - 0"
A501
D
B
A
C
1' -
1' -
05.01
05.01
05.01
05.01
08.01 08.01
05.01
O C
F F
G F C I
G F C I/ W P
GFCI/WP GFCI/WP GFCI/WP
GFCI/WP GFCI/WP GFCI/WP
2' - 0"
1' - 8 3/4"
07.02
07.02
07.02
07.02
REVISIONS :
UNLESS A PROFESSIONAL SEAL WITH
SIGNATURE AND DATE IS AFFIXED, THIS
DOCUMENT IS PRELIMINARY AND IS NOT
INTENDED FOR CONSTRUCTION,
RECORDING PURPOSES, OR
IMPLEMENTATION
THE DESIGNS SHOWN AND DESCRIBED
HEREIN INCLUDING ALL TECHNICAL
DRAWINGS, GRAPHIC REPRESENTATIONS &
MODELS THEREOF, ARE PROPRIETARY &
CAN NOT BE COPIED, DUPLICATED, OR
COMMERCIALLY EXPLOITED IN WHOLE OR
IN PART WITHOUT THE SOLE AND EXPRESS
WRITTEN PERMISSION FROM MCNEIL
ENGINEERING
D
C
B
A
1 2 3 4 5
PROJECT NO.
DRAWN BY:
CHECKED BY:
ISSUE DATE:
CLIENT PROJECT/PROPERTY NO.
GREENE.ARCHITECTURE1@GMAIL.COM
2 3 4 5
A102
V E
T E
R A
N 'S
C E
M E
T E
R Y
C O
M M
IT
T
A L
CONSTRUCTION DOCS
ROOF PLAN
24162
CEG
XXXXXXXX
AUGUST 2026
CEG
D
EP
A R
TM
EN
T O
F V
ET
ER
A N
S A
N D
M
IL
IT
A
R Y
A
FF
A
IR
S
S
O U
T H
C A
M P
W
IL
LI
A
M S
R O
A D
C
A M
P W
IL
LI
A M
S
U T
A H
SCALE: 1/4" = 1'-0"
ROOF PLAN
SCALE: 1/4" = 1'-0"
REFLECTED CEILING PLAN
KEYED NOTE
05.01 PAINTED STRUCTURAL STEEL TUBE BEAM PER ENGR.
07.01 PRE-FINISHED, 24 GA. STANDING-SEAM METAL ROOF. MATCH COLOR & SEAM
SPACING OF EXISTING ROOFS ON SITE
07.02 PRE-FINISHED METAL FASCIA & DRIP EDGE. SEE DETAIL 1&6/A501
08.01 EXPOSED STRUCTURAL METAL B DECK. PAINT.
DFCM APPROVAL STAMP
# DESCRIPTION DATE
1 September 2026
DIVISION OF FACILITIES
CONSTRUCTION AND
MANAGEMENT
REVIEWED FOR
CODE COMPLIANCE
T.O. MASONRY
108' - 4"
MAIN LEVEL
100' - 0"
D B A
07.01 07.02
05.05
04.01
03.01
04.0104.01
03.08
08.05
T.O. MASONRY
108' - 4"
MAIN LEVEL
100' - 0"
DBA C
NAVY
07.01
07.02
05.01
05.01
04.01
08.02
03.01
04.0104.0105.05 04.01
03.08
08.05
T.O. MASONRY
108' - 4"
MAIN LEVEL
100' - 0"
1 2 3
6"
12" 07.01
07.02
04.0104.01
04.02
04.01
03.08
05.01
03.08
T.O. MASONRY
108' - 4"
MAIN LEVEL
100' - 0"
FAMILY
6"
12" 07.01
07.02
04.01
08.02
04.01
04.02 03.08
05.01
03.08
REVISIONS :
UNLESS A PROFESSIONAL SEAL WITH
SIGNATURE AND DATE IS AFFIXED, THIS
DOCUMENT IS PRELIMINARY AND IS NOT
INTENDED FOR CONSTRUCTION,
RECORDING PURPOSES, OR
IMPLEMENTATION
THE DESIGNS SHOWN AND DESCRIBED
HEREIN INCLUDING ALL TECHNICAL
DRAWINGS, GRAPHIC REPRESENTATIONS &
MODELS THEREOF, ARE PROPRIETARY &
CAN NOT BE COPIED, DUPLICATED, OR
COMMERCIALLY EXPLOITED IN WHOLE OR
IN PART WITHOUT THE SOLE AND EXPRESS
WRITTEN PERMISSION FROM MCNEIL
ENGINEERING
D
C
B
A
1 2 3 4 5
PROJECT NO.
DRAWN BY:
CHECKED BY:
ISSUE DATE:
CLIENT PROJECT/PROPERTY NO.
GREENE.ARCHITECTURE1@GMAIL.COM
2 3 4 5
A201
V E
T E
R A
N 'S
C E
M E
T E
R Y
C O
M M
IT
T
A L
CONSTRUCTION DOCS
EXTERIOR
ELEVATIONS
24162
CEG
XXXXXXXX
AUGUST 2026
CFM
D
EP
A R
TM
EN
T O
F V
ET
ER
A N
S A
N D
M
IL
IT
A
R Y
A
FF
A
IR
S
S
O U
T H
C A
M P
W
IL
LI
A
M S
R O
A D
C
A M
P W
IL
LI
A M
S
U T
A H
SCALE: 1/4" = 1'-0"3
NORTH ELEVATION
SCALE: 1/4" = 1'-0"1
SOUTH ELEVATION
SCALE: 1/4" = 1'-0"2
WEST ELEVATION
SCALE: 1/4" = 1'-0"4
EAST ELEVATION
03.01 5" CONC. SLAB W/ #3 BAR @ 18" o.c. EACH WAY. COLOR, POLISH & SEAL
03.08 PRECAST CONCRETE CAP
04.01 8x8x16 ATLAS BLOCK. MATCH EXISTING BUILDINGS ON SITE REINFORCE & GROUT
PER ENGINEER
04.02 4x8x16 ATLAS BLOCK. MATCH EXISTING BUILDINGS ON SITE & OFFSET 1/2" FROM
BLOCK BELOW REINFORCE & GROUT PER ENGINEER
05.01 PAINTED STRUCTURAL STEEL TUBE BEAM PER ENGR.
05.05 STRUCTURAL STEEL TUBE HEADER
07.01 PRE-FINISHED, 24 GA. STANDING-SEAM METAL ROOF. MATCH COLOR & SEAM
SPACING OF EXISTING ROOFS ON SITE
07.02 PRE-FINISHED METAL FASCIA & DRIP EDGE. SEE DETAIL 1&6/A501
08.02 CAST BRONZE MILITARY BRANCH SEALS
08.05 FOLDING PANEL WINDOW.
KEYED NOTE
DFCM APPROVAL STAMP
# DESCRIPTION DATE
1 September 2026
DIVISION OF FACILITIES
CONSTRUCTION AND
MANAGEMENT
REVIEWED FOR
CODE COMPLIANCE
05.06
04.01
4"
4"
8' - 0"
07.01
08.01
05.01
03.08
04.01
08.02
03.01
A401
A401
A401
T.O. MASONRY
108' - 4"
MAIN LEVEL
100' - 0"
A501
A501
B
8' - 0"
4"
04.01
07.01
08.01
05.01
05.01
03.08
05.06
05.06
T.O. MASONRY
108' - 4"
MAIN LEVEL
100' - 0"
BOT FOOTING
97' - 6"
DBA
COAST
GUARD
MARINES NAVY
07.01
08.01 05.0105.0105.01
03.08
08.02
04.01
03.01
04.01
04.02
05.05
PAINT, MATCH TO EXISTING
BEAMS ON SITE
PAINT, MATCH TO EXISTING
BEAMS ON SITE
PAINT FRAME
A501
08.05
A501
T.O. MASONRY
108' - 4"
MAIN LEVEL
100' - 0"
BOT FOOTING
97' - 6"
D B AC
ARMY
AIR
FORCE
SPACE
FORCE
07.01
08.01
05.0105.0105.01
05.05
04.01
03.08
08.02
04.01
03.01
04.02
PAINT, MATCH TO EXISTING
BEAMS ON SITE
PAINT FRAME
PAINT, MATCH TO EXISTING
BEAMS ON SITE
A501
08.05
A501
T.O. MASONRY
108' - 4"
MAIN LEVEL
100' - 0"
BOT FOOTING
97' - 6"
A501
07.02
08.02
03.08
04.02
04.01
6"
12"
PAINT, MATCH TO EXISTING
BEAMS ON SITE
FAMILY
A501
A501
A501
A501
REVISIONS :
UNLESS A PROFESSIONAL SEAL WITH
SIGNATURE AND DATE IS AFFIXED, THIS
DOCUMENT IS PRELIMINARY AND IS NOT
INTENDED FOR CONSTRUCTION,
RECORDING PURPOSES, OR
IMPLEMENTATION
THE DESIGNS SHOWN AND DESCRIBED
HEREIN INCLUDING ALL TECHNICAL
DRAWINGS, GRAPHIC REPRESENTATIONS &
MODELS THEREOF, ARE PROPRIETARY &
CAN NOT BE COPIED, DUPLICATED, OR
COMMERCIALLY EXPLOITED IN WHOLE OR
IN PART WITHOUT THE SOLE AND EXPRESS
WRITTEN PERMISSION FROM MCNEIL
ENGINEERING
D
C
B
A
1 2 3 4 5
PROJECT NO.
DRAWN BY:
CHECKED BY:
ISSUE DATE:
CLIENT PROJECT/PROPERTY NO.
GREENE.ARCHITECTURE1@GMAIL.COM
2 3 4 5
A210
V E
T E
R A
N 'S
C E
M E
T E
R Y
C O
M M
IT
T
A L
CONSTRUCTION DOCS
WALL AND
BUILDING
SECTIONS
24162
CEG
XXXXXXXX
AUGUST 2026
CFM
D
EP
A R
TM
EN
T O
F V
ET
ER
A N
S A
N D
M
IL
IT
A
R Y
A
FF
A
IR
S
S
O U
T H
C A
M P
W
IL
LI
A
M S
R O
A D
C
A M
P W
IL
LI
A M
S
U T
A H
03.01 5" CONC. SLAB W/ #3 BAR @ 18" o.c. EACH WAY. COLOR, POLISH & SEAL
03.08 PRECAST CONCRETE CAP
04.01 8x8x16 ATLAS BLOCK. MATCH EXISTING BUILDINGS ON SITE REINFORCE & GROUT
PER ENGINEER
04.02 4x8x16 ATLAS BLOCK. MATCH EXISTING BUILDINGS ON SITE & OFFSET 1/2" FROM
BLOCK BELOW REINFORCE & GROUT PER ENGINEER
05.01 PAINTED STRUCTURAL STEEL TUBE BEAM PER ENGR.
05.05 STRUCTURAL STEEL TUBE HEADER
05.06 REINFORCING BARS PER ENGR.
07.01 PRE-FINISHED, 24 GA. STANDING-SEAM METAL ROOF. MATCH COLOR & SEAM
SPACING OF EXISTING ROOFS ON SITE
07.02 PRE-FINISHED METAL FASCIA & DRIP EDGE. SEE DETAIL 1&6/A501
08.01 EXPOSED STRUCTURAL METAL B DECK. PAINT.
08.02 CAST BRONZE MILITARY BRANCH SEALS
08.05 FOLDING PANEL WINDOW.
KEYED NOTE
SCALE: 3/4" = 1'-0"5
STORAGE ROOM WALL
SCALE: 3/4" = 1'-0"6
FOLDING DOOR SECTION
SCALE: 3/4" = 1'-0"4
COLUMN SECTION
SCALE: 1/4" = 1'-0"1
SECTION VEIW - NORTH
SCALE: 1/4" = 1'-0"2
SECTION VEIW - SOUTH
SCALE: 1/4" = 1'-0"3
SECTION VEIW - WEST
DFCM APPROVAL STAMP
# DESCRIPTION DATE
1 September 2026
DIVISION OF FACILITIES
CONSTRUCTION AND
MANAGEMENT
REVIEWED FOR
CODE COMPLIANCE
2 B C
REVISIONS :
UNLESS A PROFESSIONAL SEAL WITH
SIGNATURE AND DATE IS AFFIXED, THIS
DOCUMENT IS PRELIMINARY AND IS NOT
INTENDED FOR CONSTRUCTION,
RECORDING PURPOSES, OR
IMPLEMENTATION
THE DESIGNS SHOWN AND DESCRIBED
HEREIN INCLUDING ALL TECHNICAL
DRAWINGS, GRAPHIC REPRESENTATIONS &
MODELS THEREOF, ARE PROPRIETARY &
CAN NOT BE COPIED, DUPLICATED, OR
COMMERCIALLY EXPLOITED IN WHOLE OR
IN PART WITHOUT THE SOLE AND EXPRESS
WRITTEN PERMISSION FROM MCNEIL
ENGINEERING
D
C
B
A
1 2 3 4 5
PROJECT NO.
DRAWN BY:
CHECKED BY:
ISSUE DATE:
CLIENT PROJECT/PROPERTY NO.
GREENE.ARCHITECTURE1@GMAIL.COM
2 3 4 5
A211
V E
T E
R A
N 'S
C E
M E
T E
R Y
C O
M M
IT
T
A L
CONSTRUCTION DOCS
MILITARY
SEAL
COLUMNS
24162
CEG
XXXXXXXX
AUGUST 2026
CFM
D
EP
A R
TM
EN
T O
F V
ET
ER
A N
S A
N D
M
IL
IT
A
R Y
A
FF
A
IR
S
S
O U
T H
C A
M P
W
IL
LI
A
M S
R O
A D
C
A M
P W
IL
LI
A M
S
U T
A H
DFCM APPROVAL STAMP
SCALE: 1" = 1'-0"1
FAMILY
SCALE: 1" = 1'-0"2
SPACE FORCE
SCALE: 1" = 1'-0"3
COAST GUARD
SCALE: 1" = 1'-0"4
AIR FORCE
SCALE: 1" = 1'-0"5
MARINES
SCALE: 1" = 1'-0"6
NAVY
SCALE: 1" = 1'-0"7
ARMY
# DESCRIPTION DATE
1 September 2026
DIVISION OF FACILITIES
CONSTRUCTION AND
MANAGEMENT
REVIEWED FOR
CODE COMPLIANCE
1. STRUCTURAL CMU WALL.
2. CONTINUOUS SEALANT AT BUILDING EXTERIOR SIDE
USE CAULKING WITH BACKER ROD. VERIFY CAULKING
COLOR WITH ARCHITECT.
3. DOOR. SEE DOOR SCHEDULE FOR DOOR TYPE.
4. HOLLOW METAL DOOR FRAME (OR WINDOW FRAME
WHERE OCCURS). ATTACH FRAME TO WALL WITH
MASONRY ANCHORS (3 PER JAMB MINIMUM
5. AS RECOMMENDED BY FRAME MANUFACTURER. FILL
FRAME WITH GROUT. PAINT FRAME.
6. FRAME ANCHOR. PER MFR.
KEYED NOTES
1. STRUCTURAL CMU WALL.
2. CONTINUOUS SEALANT ON BOTH SIDES OF FRAME. AT
BUILDING EXTERIOR SIDE USE CAULKING WITH BACKER
ROD. VERIFY CAULKING COLOR WITH ARCHITECT.
3. DOOR. SEE DOOR SCHEDULE FOR DOOR TYPE.
4. HOLLOW METAL DOOR FRAME (OR WINDOW FRAME
WHERE OCCURS). ATTACH FRAME TO WALL WITH
MASONRY ANCHORS (3 PER JAMB MINIMUM) AS
RECOMMENDED BY FRAME MANUFACTURER. FILL
FRAME WITH GROUT. PAINT FRAME.
5. FRAME ANCHOR.
KEYED NOTES
4 5
TYPE - A
7' - 0"
SEE DOOR
3' - 0"
FINISH FLOOR
7' - 1"
1 1/2"
6' - 10"
1 1/2"
1 1/2"
TYPE - B
11' - 8"
EQ EQ EQ EQ
(TYP)
1 1/2" 1 1/2"
FRAME - 1
2" 3' - 0" 2"
4"
7' - 0"
FINISH FLOOR
FRAME - 2
7' - 4"
1"
7' - 1"
2"
12' - 0"
2" 11' - 8" 2"1. ALUMINUM DOOR FRAME. SEE DOOR
SCHEDULE.
2. ALUMINUM THRESHOLD. MOUNT
THRESHOLD TO SLAB WITH APPROPRIATE
CONCRETE FASTENERS AND EPOXY TYPE
ADHESIVES. MAINTAIN 1" MINIMUM
DIMENSION BETWEEN THE THRESHOLD EDGE
AND THE COLD JOINT BETWEEN THE
CONCRETE FLOOR AND THE SIDEWALK SLAB.
PROVIDE CONTINUOUS CLEAR SEALANT
ALONG ALL EXPOSED EDGES OF THE
THRESHOLD.
3. CONCRETE SLAB ON GRADE. SEE FLOOR PLAN
AND SITE PLAN.
BUILDING
INTERIOR SIDE
BUILDING
EXTERIOR SIDE
KEYED NOTES
1. SEALANT, CONTINUOUS ON BOTH
SIDES.
2. STEEL FRAME PER MFR.
3. STEEL SASH PER MFR.
4. DOUBLE PANE LOW E COATING
TEMPERED GLAZING
5. SET FRAME OVER SEALING GASKET
6. ATTACH FRAME TO MASONARY PER
MFR
7. WEATHER SEALING PER MFR
KEYED NOTES
1. BEAM PER ENGINEER
2. INFILL STEEL TUBE MATCH WIDTH
OF BEAM
3. STEEL FRAME PER MFR. ATTACH TO
STEEL TUBE PER MFR.
4. STEEL SASH PER MFR.
5. DOUBLE PANE, TEMPERED GLAZING
KEYED NOTES
1. DOUBLE PANE TEMPERED GLAZING
2. STEEL SASH PER MFR
3. SECURE STEEL FRAME TO CONCRETE FOUNDATION PER
WINDOW MFR
4. COVER EXPOSED CONCRETE WITH BENT STEEL TO
MATCH FRAME
LAP DOWN FOUNDATION 1/2" MINIMUN
5. STEEL FRAME PER MFR
6. SET FRAME ON SEALING GASKET
7. SEALANT ON BOTH SIDES
KEYED NOTES1
Door Schedule
DOOR #
DOOR FRAME DETAIL
HARDWARE
GROUPS# OF PANELS
SIZE
MATERIAL TYPE (1/A601) TYPE (2/A601) MATERIAL JAMB HEAD SILLW1 HEIGHT THICKNESS
1 1 3' - 0" 7' - 0" 1 3/4" STL A 1 HM 3/A601 2/A601 5/A601 1
2 1 3' - 0" 7' - 0" 1 3/4" STL A 1 HM 3/A601 2/A601 5/A601 1
4 12' - 0" 7' - 4" 3" TEMP GLASS B 2 HM 4/A401 PER MFR
5 12' - 0" 7' - 4" 3" TEMP GLASS B 2 HM 4/A401 PER MFR
REVISIONS :
UNLESS A PROFESSIONAL SEAL WITH
SIGNATURE AND DATE IS AFFIXED, THIS
DOCUMENT IS PRELIMINARY AND IS NOT
INTENDED FOR CONSTRUCTION,
RECORDING PURPOSES, OR
IMPLEMENTATION
THE DESIGNS SHOWN AND DESCRIBED
HEREIN INCLUDING ALL TECHNICAL
DRAWINGS, GRAPHIC REPRESENTATIONS &
MODELS THEREOF, ARE PROPRIETARY &
CAN NOT BE COPIED, DUPLICATED, OR
COMMERCIALLY EXPLOITED IN WHOLE OR
IN PART WITHOUT THE SOLE AND EXPRESS
WRITTEN PERMISSION FROM MCNEIL
ENGINEERING
D
C
B
A
1 2 3 4 5
PROJECT NO.
DRAWN BY:
CHECKED BY:
ISSUE DATE:
CLIENT PROJECT/PROPERTY NO.
GREENE.ARCHITECTURE1@GMAIL.COM
2 3 4 5
A401
V E
T E
R A
N 'S
C E
M E
T E
R Y
C O
M M
IT
T
A L
CONSTRUCTION DOCS
DOOR
SCHEDULE
24162
CEG
XXXXXXXX
AUGUST 2026
CFM
D
EP
A R
TM
EN
T O
F V
ET
ER
A N
S A
N D
M
IL
IT
A
R Y
A
FF
A
IR
S
S
O U
T H
C A
M P
W
IL
LI
A
M S
R O
A D
C
A M
P W
IL
LI
A M
S
U T
A H
SCALE: 3" = 1'-0"2
DOOR FRAME HEAD DETAIL
SCALE: 3" = 1'-0"3
DOOR JAMB DETAIL
SCALE: 1/4" = 1'-0"
DOOR TYPES
SCALE: 1/4" = 1'-0"
FRAME TYPES
• 1.5 PR. BUTT HINGE
• 1 EA. FLOOR STOP
• 1 EA. CLOSER
• STANDARD BOLT W/ KEY LOCK
• 1 EA. PULL HANDLE
SCALE: 3" = 1'-0"5
ALUMINUM THRESHOLD DETAIL
SCALE: 3" = 1'-0"6
FOLDING DOOR JAMB
SCALE: 3" = 1'-0"1
FOLDING DOOR HEAD
SCALE: 3" = 1'-0"4
FOLDING DOOR SILL
6/A601 1/A601
6/A601 1/A601
HM
HM
HARDWARE GROUPS
DFCM APPROVAL STAMP
# DESCRIPTION DATE
1 September 2026
DIVISION OF FACILITIES
CONSTRUCTION AND
MANAGEMENT
REVIEWED FOR
CODE COMPLIANCE
A
A4022 A4023
A210
A210
A210
A210
REVISIONS :
UNLESS A PROFESSIONAL SEAL WITH
SIGNATURE AND DATE IS AFFIXED, THIS
DOCUMENT IS PRELIMINARY AND IS NOT
INTENDED FOR CONSTRUCTION,
RECORDING PURPOSES, OR
IMPLEMENTATION
THE DESIGNS SHOWN AND DESCRIBED
HEREIN INCLUDING ALL TECHNICAL
DRAWINGS, GRAPHIC REPRESENTATIONS &
MODELS THEREOF, ARE PROPRIETARY &
CAN NOT BE COPIED, DUPLICATED, OR
COMMERCIALLY EXPLOITED IN WHOLE OR
IN PART WITHOUT THE SOLE AND EXPRESS
WRITTEN PERMISSION FROM MCNEIL
ENGINEERING
D
C
B
A
1 2 3 4 5
PROJECT NO.
DRAWN BY:
CHECKED BY:
ISSUE DATE:
CLIENT PROJECT/PROPERTY NO.
GREENE.ARCHITECTURE1@GMAIL.COM
2 3 4 5
A402
V E
T E
R A
N 'S
C E
M E
T E
R Y
C O
M M
IT
T
A L
CONSTRUCTION DOCS
BEAM
CUTOUTS
24162
CEG
XXXXXXXX
AUGUST 2026
CFM
D
EP
A R
TM
EN
T O
F V
ET
ER
A N
S A
N D
M
IL
IT
A
R Y
A
FF
A
IR
S
S
O U
T H
C A
M P
W
IL
LI
A
M S
R O
A D
C
A M
P W
IL
LI
A M
S
U T
A H
SCALE: 3/4" = 1'-0"1
ENLARGED REFLECTED CEILING PLAN
SCALE: 1 1/2" = 1'-0"2
STORAGE ROOM BEAMS
SCALE: 1 1/2" = 1'-0"3
CENTRAL BEAM
MASON TO CUT BLOCK AROUND
STL. TUBE FRM'G AS REQ.
REINFORCEMENT
PER ENGR.
MASON TO CUT BLOCK AROUND
STL. TUBE FRM'G AS REQ.
SOLID GROUT ALL MASONRY
FROM THIS POINT UP
DFCM APPROVAL STAMP
# DESCRIPTION DATE
1 September 2026
DIVISION OF FACILITIES
CONSTRUCTION AND
MANAGEMENT
REVIEWED FOR
CODE COMPLIANCE
B
SLOPE
4"
1 1/2" MIN.
2"
8"
V A
R
IE
S
1/2"
EXT. INT.
(M
IN
6"
EXT. INT.
6"
8"
8"
REVISIONS :
UNLESS A PROFESSIONAL SEAL WITH
SIGNATURE AND DATE IS AFFIXED, THIS
DOCUMENT IS PRELIMINARY AND IS NOT
INTENDED FOR CONSTRUCTION,
RECORDING PURPOSES, OR
IMPLEMENTATION
THE DESIGNS SHOWN AND DESCRIBED
HEREIN INCLUDING ALL TECHNICAL
DRAWINGS, GRAPHIC REPRESENTATIONS &
MODELS THEREOF, ARE PROPRIETARY &
CAN NOT BE COPIED, DUPLICATED, OR
COMMERCIALLY EXPLOITED IN WHOLE OR
IN PART WITHOUT THE SOLE AND EXPRESS
WRITTEN PERMISSION FROM MCNEIL
ENGINEERING
D
C
B
A
1 2 3 4 5
PROJECT NO.
DRAWN BY:
CHECKED BY:
ISSUE DATE:
CLIENT PROJECT/PROPERTY NO.
GREENE.ARCHITECTURE1@GMAIL.COM
2 3 4 5
A501
V E
T E
R A
N 'S
C E
M E
T E
R Y
C O
M M
IT
T
A L
CONSTRUCTION DOCS
DETAILS
24162
CEG
XXXXXXXX
AUGUST 2026
CFM
D
EP
A R
TM
EN
T O
F V
ET
ER
A N
S A
N D
M
IL
IT
A
R Y
A
FF
A
IR
S
S
O U
T H
C A
M P
W
IL
LI
A
M S
R O
A D
C
A M
P W
IL
LI
A M
S
U T
A H
SCALE: 1 1/2" = 1'-0"6
COLUMN BASE CONNECTION
SCALE: 1 1/2" = 1'-0"7
COLUMN CAPITOL SECTION
SCALE: 3" = 1'-0"5
ROOF EAVE @ RAKE
SCALE: 3/4" = 1'-0"8
RETAINING WALL
4X8X16 ATLAS BLOCKS
SOLID GROUT TOP
CLIP PREFINISHED
METAL FRIEZE OVER
CLIPS @ 8" o.c.
ATTACHED TO
MASONRY WALLS
INSTALL FULL
DEPTH RIGID FOAM
BLOCKS BETWEEN
BOT OF DECK & TOP
OF WALL. COVER
ALL GAPS
SET TOP OF FRIEZE
FLSUH W/ BOT DECK
CUT BLOCK TO
WITHIN 1/2" +/- OF BOT
OF DECK
TAPER BACK FROM
EDGE OF WALL
FILL GAPS BETWEEN
TOP OF WALL & BOT
OF DECK SOLID W/
EXPANDING FOAM.
CUT OFF EXCESS
FOAM & CLEAN ALL
SURFACES NOT
REQUIRING FOAM
COVER w/ PAINTED
BOARD
STRUCT. STEEL TUBE
FRM'G PER ENGR.
PREFINISHED, 24GA.
CAP PER MFR.
20GA. GALV. 2 CLIP
PER MFR.
HEM BOT EDGE
OF SSMR
22 GA.
PREFINISHED MTL.
FASCIA W/ 2" HEM.
SET OVER 12"
STRIP OF HIGH
TEMP. SECONDARY
UNDERLAYMENT
START B DECK
FROM BOT OF
ROOF FRAMING AS
SHOWN
STRUCT. STEEL TUBE
FRM'G PER ENGR.
STRUCT. B DECK
PER ENGR.
5/8" OSB DECKING
HIGH TEMP. SECONDARY
UNDERLAYMENT
CONT. 20GA. GALV.
CLIP - SNAP HEMMED
EDGE OF SSMR OVER
CLIP
SCALE: 3" = 1'-0"10
WALL OFFSET
4X8X16 ATLAS BLOCK
8X8X16 ATLAS BLOCK
MASONRY PIN
SOLID GROUT TOP
8x8x16 ATLAS BLOCK
REINFORCEMENT
BAR PER ENGR.
REINFORCEMENT
BARS PER ENGR.
SCALE: 3/4" = 1'-0"9
FND. WALL BELOW WDW.
SCALE: 3" = 1'-0"4
TOP STORAGE WALL
SCALE: 3" = 1'-0"3
STORAGE WALL TO BOT DECK
SCALE: 3" = 1'-0"2
ROOF RIDGE
SCALE: 3" = 1'-0"1
ROOF EAVE, TYP.
DFCM APPROVAL STAMP
FOLDING PARTITION WDW.
FLOOR SLAB
CONC. FND. WALL &
REINF. PER ENGR.
FIN. GRADE
FLOOR SLAB
CONC. FT'G. &
REINF. PER ENGR.
STRUCT. STL. TUBE
BM PER ENGR.
PRECAST CONC.
CAP w/ DRIP EDGE
STL. COLUMN PER ENGR.
8x8x16 ATLAS BLOCK
REINF. & GROUT
PER ENGR.
WEEP HOLE
@ EA. JNT.
CONC. PIER FND.
REINF. PER ENGR.
STANDING SEAM
METAL ROOF (SSMR)
HIGH TEMP.
UNERLAYMENT PER MFR.
5/8" OSB DECKING
PRE-FINISHED 22 GA.
MTL. FASCIA
MTL. DECK PER
ENGR.
COL. BASE PLATE &
ANCHOR BOLTS
PER ENGR.
PAINTED BOARD
REINFORCEMENT
BARS PER ENGR.
SSMR
METAL DECK
PER ENGR.
SCALE: 3" = 1'-0"11
CONC. UNDER DOOR
SCALE: 3" = 1'-0"12
CONTROL JOINT
SCALE: 1 1/2" = 1'-0"13
FAMILY COLUMN TOP
CONC. FLOOR SLAB
AGGREGATE FILL (6" MIN.)
COMP. SUB-GRADE
FND. WALL
4x4x16 ATLAS BLOCK
8x8x16 ATLAS BLOCK
PRECAST CONC.
CAP w/ DRIP EDGE
# DESCRIPTION DATE
BITUMENOUS
DAMPPROOFING - RUN
OVER TOP OF FT'G AND
DOWN FACE OF FOOTING.
3" DIA., PERF. PVC PIPE.
SURROUND w/ WASHED
1-1/2" GRAVEL. WRAP
GRAVEL IN PERMEABLE
GEOTEXTILE FILTER FABRIC
1/2" DIA. WEEP
HOLE @ 8'-0" o.c.
(2) MIN.
1 September 2026
DIVISION OF FACILITIES
CONSTRUCTION AND
MANAGEMENT
REVIEWED FOR
CODE COMPLIANCE
CONCRETE CONSTRUCTION ITEMS (TABLE 1705.3, IBC 2024; ACI 318-19):
Reinforcing steel, including prestressing tendons Continuous Periodic
Verify prior to placing concrete that reinforcing is of specified type, grade and size;
that it is free of oil, dirt and rust; that it is located and spaced properly; that hooks, bends, ties, stirrups and supplemental reinforcement are placed correctly; that lap lengths, stagger and offsets are provided; and that all mechanical connections are installed per the manufacturer's instructions and evaluation report. ACI 318: Ch. 20, 25.2, 25.3, 26.6.1-26.6.3.
Reinforcement complying with ASTM
A615 in special moment frames, special structural walls and coupling beams
Continuous Periodic
Verify by means of certified mill test reports that ASTM A615 reinforcing steel in these areas complies with the supplementary requirements of ACI 318: 20.2.2.5. If this reinforcing steel is to be welded, weldability shall be verified in accordance with ACI
318: 26.6.4 and AWS D1.4.
Reinforcing bar welding: verify weldability of bars other than ASTM A706 Continuous Periodic Verify weldability in accordance with AWS D 1.4 and ACI 318: 26.13.1.4.
Reinforcing bar welding : welds in special moment frames, boundary elements of special structural walls, and coupling beams
Continuous Periodic Inspect welding in accordance with AWS D1.4 and ACI 318: 26.13.3.
Reinforcing bar welding: single-pass fillet welds, maximum 5/16" Continuous Periodic Inspect welding in accordance with AWS D1.4 and ACI 318: 26.13.3.
Reinforcing bar welding: all other welds Continuous Periodic Inspect welding in accordance with AWS D1.4 and ACI 318: 26.13.3.
Cast-in bolts & embeds Continuous Periodic Inspect anchors or embeds cast in concrete in accordance with ACI 318: 26.13.3.3.
Post-installed adhesive anchors installed horizontally or upwardly inclined to resist sustained tension loads
Continuous Periodic
Inspect in accordance with ACI 318: 26.13.3.2 and the research report for the anchor issued by an approved source (e.g., ICC-ES ESR). Installers shall be certified where required by ACI 318.
Post-installed mechanicla anchors and adhesive anchors not listed above Continuous Periodic
Inspect in accordance with ACI 318: 26.13.3 and the research report for the anchor issued by an approved source. Where specific requirements are not provided, special inspection requirements shall be specified by the registiered design professional and approved by the building official.
Use of required mix design Continuous Periodic Verify that all mixes used comply with the approved construction documents; ACI 318:
Ch. 19, 26.4.3, 26.4.4.
Concrete sampling for strength tests, slump, air content, and temperature Continuous Periodic
At the time fresh concrete is sampled, fabricate specimens for strength tests and perform slump, air content and temperature tests; ACI 318: 26.5, 26.12; ASTM C172, ASTM C31.
Concrete & shotcrete placement Continuous Periodic Inspect concrete and shotcrete placement for proper application techniques; ACI 318:
26.5.
Curing temperature and techniques Continuous Periodic
Verify that the concrete and shotcrete, other than high-early-strength, are maintained at a temperature of at least 50°F and in a moist condition for at least the first 7 days after placement. High-early-strength concrete shall be so maintained for at least the first 3 days. Accelerated curing may be used where permitted (ACI 318: 26.5.3). In cold wether, all concrete materials, reinforcements, forms, fillers, and ground shall be free of frost (ACI 318: 26.5.4). In hot wetather, ensure that appropriate measures are taken to avoid plastic shrinkage cracking and that the specified water/cementitious materials ratio is not exceeded (ACI 318: 26.5.5).
Pre-stressed concrete: application of prestressing forces and grouting of bonded tendons
Continuous Periodic Inspect in accordance with ACI 318: 26.10.
Erection of precast concrete Continuous Periodic Verify that all precast elements are lifted, assembled and braced in accordance with the approved construction documents; ACI 318: 26.9.
Precast diaphragm connections and reinforcement at joints classified as MDE or HDE (SDC C, D, E or F)
Continuous Periodic
Inspect installation of embedded parts, completion of continuity of reinforcement across joints, and completion of connections in the field; ACI 318: 26.13.1.3; ACI
550.5.
Installation tolerances of precast concrete diaphragm connections Continuous Periodic Verify compliance with ACI 550.5; ACI 318: 26.13.1.3.
Strength verification Continuous Periodic
Verify in-place concrete strength prior to stressing of tendons in post-tensioned concrete and prior to removal of shores and forms from beams and structural slabs;
ACI 318: 26.11.2.
Formwork Continuous Periodic
Verify that the forms are placed plumb and conform to the shapes, lines, location and dimensions of the members as required by the approved construction documents;
ACI 318: 26.11.1.2(b).
CONCRETE CONSTRUCTION (IBC 1705.3 & 1705.12.1)
Inspections per IBC 2024 Table 1705.3 and ACI 318-19. Where applicable, see also IBC Section 1705.13, special inspections for seismic resistance.
Item Detailed Instructions and Frequencies
Verify materials below shallow foundations are adequate to achieve the design bearing capacity
Continuous Periodic Prior to placement of concrete. Verify against the approved geotechnical report and construction documents.
Verify excavations are extended to proper depth and have reached proper material
Continuous Periodic Prior to placement of compacted fill or concrete.
Prior to placement of compacted fill, inspect subgrade and verify that site has been prepared properly
Continuous Periodic Prior to placement of compacted fill.
Perform classification and testing of compacted fill materials Continuous Periodic
All materials shall be checked at each lift for proper classifications and gradations not less than once for each 10,000 ft 2 of surface area.
Verify use of proper materials, densities and lift thicknesses during placement and compaction of compacted fill.
Continuous Periodic Verify compliance with the approved geotechnical report. Where the report is silent, comply with IBC Section 1804.6.
MINIMUM VERIFICATION (ARTICLES 1.5 & 1.6, TMS 602-22):
Review materials certificates, mix designs, test results and construction procedures
Continuous Periodic
Verify that submittals comply with the approved construction documents per Article
1.5. Mortar mix designs shall conform to ASTM C270 and grout to ASTM C476.
Material certificates shall be provided for: reinforcement, anchors, tiles, fasteners, and metal accessories (Article 2.4); masonry units; mortar and grout materials.
Construction procedures for cold-weather and hot-weather construction (Articles 1.8 C and 1.8 D) shall be reviewed.
Verification of f'm and f'AAC Continuous Periodic
Determine the compressive strength for each wythe by the "unit strength method" or by the "prism test method" as specified in Article 1.4 B prior to construction, except where specifically exempted. For Risk Category IV buildings this shall also be verified at every 5,000ft2 of construction.
Verification of Slump Flow and Visual
Stability Index (VSI) for self-consolidating grout
Continuous Periodic Verify slump flow and VSI as delivered to the project in accordance with ASTM
C1611. Slump flow shall be 24 to 30 inches and VSI shall be 1 or less.
Verification of proportions of materials in premixed or pre-blended mortar, grout and prestressing grout
Continuous Periodic Verify as delivered that proportions for mortar meet ASTM C270 and proportions for grout meet ASTM C 476. Applies to Risk Category IV buildings only.
AS CONSTRUCTION BEGINS (TABLE 3 & 4, TMS 602-22):
Proportions of site-prepared mortar Continuous Periodic Verify that mortar is of the type and color specified on the construction documents, that it conforms to ASTM C270, and that it is mixed in accordance with Article 2.6 A
Grade, type, and size of reinforcement, connectors, anchor bolts, prestressing tendons and anchorages
Continuous Periodic
Verify compliance with the approved construction documents and Article 2.4. Verify that prestressing tendons comply with Article 2.4 B and that anchorages, couplers, and end blocks comply with Article 2.4 H.
Prestressing technique Continuous Periodic Verify that prestressing technique complies with Article 3.6 B
Properties of thin-bed mortar for AAC masonry Continuous Periodic
Verify that mortar complies with Article 2.1 C. Continuous inspection is required for the first 5,000 ft 2 of AAC masonry; periodic thereafter. Contiuous inspection is required for Risk Category IV buildings.
Sample panel construction (where required Continuous Periodic
Verify that sample panels are constructed in accordance with the construction documents and Article 1.6 D. Continuous inspection is required for Risk Category IV buildings.
PRIOR TO GROUTING (TABLES 3 & 4, TMS 602-22):
Grout space Continuous Periodic
Verify that grout space is free of mortar droppings, debris, loose aggregate, and other deleterious materials and that cleanouts are provided per Article 3.2 D and 3.2 F.
Continuous inspection is required for Risk Category IV buildings.
Placement of reinforcement, connectors, prestressing tendons, and anchorages Continuous Periodic
Verify that reinforcement, joint reinforcement, wall ties, anchor bolts and veneer anchors are installed in accordance with the approved construction documents, Articles 3.2 E, 3.4, and 3.6 A, and Chapter 6 of TMS 402-22. Continuous inspection is required for Risk Category IV buildings.
Proportions of site-prepared grout and prestressing grout for bonded tendons Continuous Periodic
Verify that grout is proportioned per ASTM C476 and has a slump between 8 and 11 inches (Article 2.6 B). Self-consolidating grout shall comply with Article 2.6 B.
Prestressing grout shall comply with Article 2.4 G.1.b. Continuous inspection is required for Risk Category IV buildings.
Construction of mortar joints Continuous Periodic Verify that mortar joints are placed in accordance with Article 3.3 B.
DURING CONSTRUCTION (TABLES 3 & 4, TMS602-22):
Size and location of structural elements Continuous Periodic Verify the locations of structural elements with respect to the approved plans and confirm that tolerances meet the requirements of Article 3.3 F.
Type, size, and location of anchors, including other details of anchorage of masonry to structural members, frames, or other construction.
Continuous Periodic Verify that correct anchorages and connections are provided per the approved plans and TMS 402-22. Continuous inspection is required for Risk Category IV buildings.
Welding of reinforcement Continuous Periodic Verify that welding of reinforcement complies with AWS D1.4 and the approved construction documents.
Preparation, construction, and protection of masonry during cold weather (<40°F) or hot weather.
Continuous Periodic
Verify that cold-weather construction is performed in accordance with Article 1.8 C and hot weather construction (ambient temperature ˃100°F, or ˃90°F with wind velocity ˃8 mph) is performed in accordance with Article 1.8 D.
Application and measurement of prestressing force Continuous Periodic
Verify that application and measurement of prestressing force complies with Article
3.6 B.
Placement of grout and prestressing grout for bonded tendons Continuous Periodic
Verify that grout placement complies with Article 3.5 and prestressing grout placement complies with Article 3.6 C.
Placement of AAC masonry units and construction of thin-bed mortar joints Continuous Periodic
Verify that units are placed and thin-bed mortar joints are constructed in accordance with Article 3.3 B. Continuous inspection is required for the first 5,000 ft2 of AAC masonry; periodic thereafter.Continuous inspection is required for Risk Category IV buildings.
Observation of preparation of grout specimens, mortar specimens, and/or prisms
Continuous Periodic Confirm that specimens/prisms are prepared as required by Articles1.4 B and 1.6.
Continuous inspection is required for Risk Category IV buildings.
High-load diaphragms (IBC 1705.5.1) Continuous Periodic
Verify that the grade and thickness of sheathing, the nominal size of framing members at adjoining panel edges, the nail or staple diameter and length, the number of fastener lines, and the spacing between fasteners in each line and at edge margins agree with the approved construction documents. Performed by code inspection firm.
Metal-plate-connected wood trussses spanning 60 feet or greater (IBC
1705.5.2)
Continuous Periodic
Verify that temporary installation restraint/bracing and permanent individual truss member restraint/bracing are installed in accordance with the approved truss submittal package. Performed by code inspection firm.
Structural wood: main wind-force-resisting system and seismic force-resisting system (IBC 1705.12.2 &
1705.13.2)
Continuous Periodic
Verify nailing, bolting, anchoring and other fastening of elements of the main wind-force-resisting system and seismic force-resisting system, including wood shear walls, wood diaphragms, drag struts, braces, shear panels and hold-downs. Not required where the specified fastener spacing of the sheathing is more than 4" o.c.
Performed by code inspection firm.
MASS TIMBER CONSTRUCTION (TABLE 1705.5.3, IBC 2024: WHERE APPLICABALE):
Anchorage and connections of mass timber to foundations; erection of mass timber elements
Continuous Periodic
Inspect anchorage and connections of mass timber construction to timber deep foundation systems and to foundations, and inspect erection of mass timber elements per the approved construction documents.
Connections; threaded fasteners Continuous Periodic
Verify use of proper installation equipment and use of pre-drilled holes…