This is an Abstract of Offers (Optional Form 1419) documenting five bids received for solicitation 70Z08825B0000069, a maintenance dredging project at U.S. Coast Guard Moorings Tongue Point in Astoria, Oregon. The bids were opened on February 20, 2025 at 1:00 PM PST.
The project scope includes mobilization/demobilization, dredging to -10.00 ft MLLW with 2 ft overdepth allowance for 25,000 cubic yards, and pre/post-dredge hydrographic surveys and reports. Total bids ranged from $874,500 (HME) to $2,499,685.52 (Reagent World), with other bidders including Bergerson ($1,596,660), Camenzind ($2,228,500), and Duwamish ($2,315,000). The government estimate was $1,294,429. Unit pricing varied significantly among bidders, particularly for mobilization/demobilization (ranging from $350,000 to $1,330,000) and dredging costs per cubic yard (ranging from $20.00 to $73.99).
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
7A.
ITEM
NO.
7B. DESCRIPTION OF OFFERED ITEM 7C. EST.
QUANTITY
D.
UNIT
E. UNIT PRICE F. ESTIMATED
AMOUNT
D. UNIT PRICE D. UNIT PRICE
MOBILIZATION AND DEMOBILIZATION FOR
MAINTENANCE DREDGING AT THE U.S. COAST
GUARD (USCG), STATION CAPE
DISAPPOINTMENT
1 JB $739,429.00 $732,429.00 $350,000.00 $762,500.00
DREDGING AND DISPOSAL: Required Dredging depth is -10.00 ft mean lower low water (MLLW). Two foot of Over-depth is authorized to -12.00 ft
25000 CY $20.00 $500,000.00 $20.00 $32.00
3 HYDROGRAPHIC SURVEYS (Pre & Post) 2 EA $24,000.00 $48,000.00 $7,500.00 $14,230.00
4 PRE AND POST DREDGE REPORTS 2 EA $7,000.00 $14,000.00 $4,750.00 $2,850.00
5 $0.00
6 $0.00
7 $0.00
8 $0.00
9 $0.00
10 $0.00
11 $0.00
12 $0.00
TOTAL $1,294,429.00
NOTE: APPARENT LOW RANKING SHOWN PRIOR TO
CONTRACTING OFFICER MAKING A DETERMINATION
OF RESPONSIBILITY.
AUTHORIZED FOR LOCAL REPRODUCTION
Previous edition is usable
NOTE: If more than two offers are received, continue on OF 1419A. OPTIONAL FORM 1419 (11-88) updated 10/27/16
$0.00
$874,500.00 $1,596,660.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00
$0.00 $0.00
$0.00 $0.00
$9,500.00 $5,700.00
$0.00 $0.00
$0.00 $0.00
$350,000.00 $762,500.00
$500,000.00 $800,000.00
$15,000.00 $28,460.00
NO. 1
C. AMENDMENTS ACKNOWLEDGED: C. AMENDMENTS ACKNOWLEDGED:
E. ESTIMATED
AMOUNT
E. ESTIMATED
AMOUNT
6. NUMBER OF AMENDMENTS ISSUED C. REASONABLE CONTRACT
(Including Profit)
MAINTENANCE DREDGING AT THE U.S. COAST GUARD
MOORINGS TONGUE POINT-ASTORIA, OR.-PSN 6049804
B. REASONABLE CONTRACT
(Without Profit)
B. BID SECURITY : Included B. BID SECURITY : Included
A. OFFEROR
HME
A. OFFEROR
BERGERSON
8. GOVERNMENT ESTIMATE
(Check A, B or C and complete D, E, and F)
9. OFFERS
NO. 2
A. HIRED LABOR
5. PROJECT TITLE
I CERTIFY that I have opened, read, and recorded on this abstract all offers received in response to this solicitation.
NAME AND TITLE OF CERTIFYING OFFICIAL (Type)
SIGNATURE DATE SIGNED
4. ISSUING OFFICE
Civil Engineering Unit Oakland (CN) 1301 Clay Street 7th Floor, Suite
700N Oakland, CA 94612-5203
Travis Cohen
ABSTRACT OF OFFERS - CONSTRUCTION PAGE1. SOLICITATION NUMBER
70Z08825B0000069
2. DATE ISSUED
1/17/2025
3. DATE OPENED
2/20/25 @ 1:00 PM PST
A. ITEM
NO.
B. ESTIMATED
QUANTITY
C.
UNIT
D. UNIT PRICE D. UNIT PRICE E. ESTIMATED
AMOUNT
D. UNIT PRICE E. ESTIMATED
AMOUNT
1 1 JB 1,330,000.00 1,200,000.00 $ 1,200,000.00 499,950.40 $ 499,950.40
2 25000 CY $ 35.00 $ 40.00 $ 1,000,000.00 $ 73.99 $ 1,849,750.00
3 2 EA $ 10,250.00 $ 47,500.00 $ 95,000.00 $ 37,496.28 $ 74,992.56
4 2 EA $ 1,500.00 $ 10,000.00 $ 20,000.00 $ 37,496.28 $ 74,992.56
5 0 0 $ - $ -
6 0 0 $ - $ -
7 0 0 $ - $ -
8 0 0 $ - $ -
9 0 0 $ - $ -
10 0 0 $ - $ -
11 0 0 $ - $ -
12 0 0 $ - $ -
TOTAL $ 2,315,000.00 $ 2,499,685.52
AUTHORIZED FOR LOCAL REPRODUCTION
Previous edition is usable
OPTIONAL FORM 1419A (11-88)
PAGE
INSTRUCTIONS Attach this form to OF 1419, Abstract of Offers - Construction, when more than 2 offers are received on a construction project. Each Continuation Sheet will accommodate 13 contract items to conform to the number of items which can be entered on the OF 1419. Use additional OF 1419's for contract items in excess of 13 and attach additional continuation Sheets (OF
1419A) as needed.
4. OFFERS (Continued)
NO.: 3 NO.:4 NO.:5 NO.:6
1. SOLICITATION NUMBER
70Z08825B0000069
2. PROJECT TITLE
Replace Heater and Control at MAINTENANCE DREDGING
AT THE U.S. COAST GUARD
MOORINGS TONGUE POINT-
ASTORIA, OR.-PSN 6049804
ABSTRACT OF OFFERS - CONSTRUCTION
CONTINUATION SHEET
A. OFFEROR A. OFFEROR
$ - $ 1,330,000.00
$ 875,000.00
E. ESTIMATED
AMOUNT
D. UNIT PRICE E. ESTIMATED
AMOUNT
$ 2,228,500.00
$ 20,500.00
$ 3,000.00
3. CONTRACT ITEMS C. AMENDMENTS ACKNOWLEDGED: C. AMENDMENTS ACKNOWLEDGED: C. AMENDMENTS ACKNOWLEDGED:
A. OFFEROR A. OFFEROR
B. BID SECURITY : Waived B. BID SECURITY: Waived B. BID SECURITY: Waived B. BID SECURITY: Waived
CAMENZIND DUWAMISH REAGENT WORLD
C. AMENDMENTS ACKNOWLEDGED:
| 2025-02-20T18:42:34-0800 | |
| COHEN.TRAVIS.CLARK.1282778943 |
File details come from the government source that posted it. Updated .