This is a detailed Bid Schedule (Excel file) for the John Day Dam Turbine Replacement and Generator Rewind (TRGR) contract, covering extensive prototype design and installation work across multiple units and configurations. The document comprehensively breaks down potential work items into granular contract line items (CLINs) organized into categories including hydraulic turbine design, prototype design, equipment supply, and standalone rewind options, with each CLIN allowing contractors to specify detailed pricing, material composition, labor percentages, and optional variations.

The bid schedule includes multiple prototype design and supply categories for both adjustable and fixed blade runners, with options for different blade configurations (five and six blade designs), diameters ranging from 299.5 to 327 inches, and incremental modifications. Significant technical detail is provided for each line item, such as prototype design iterations, computational fluid dynamics (CFD) analyses, performance model testing, and component-level specifications for items like discharge rings, draft tube liners, head covers, wicket gates, and generator components. The document allows for substantial customization and optionality, with base requirements and numerous optional line items that enable precise, tailored pricing and technical approaches for turbine and generator rehabilitation work.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Total All CLINs

Working Title
Notes:
The Subtotals add up the total cost (col. J) for each category with a Grand Total listed at the bottom
Category Subtotals
01XX Hydraulic Turbine Design$ - 0
02XX Prototype Design$ - 0
03XX Miscellaneous Equipment, Spare Parts, and Oil Disposal$ - 0
04XX Unit AA Prototype Supply and Install$ - 0
05XX Unit AB Prototype Supply and Install$ - 0
06XX Unit FA Prototype Supply and Install$ - 0
07XX Unit AC Prototype Supply and Install$ - 0
08XX Unit FB Prototype Supply and Install$ - 0
09XX Unit AD Prototype Supply and Install$ - 0
10XX Unit FC Prototype Supply and Install$ - 0
11XX Unit AE Prototype Supply and Install$ - 0
12XX Unit FD Prototype Supply and Install$ - 0
13XX Unit AF Prototype Supply and Install$ - 0
14XX Unit FE Prototype Supply and Install$ - 0
15XX Unit FF Prototype Supply and Install$ - 0
16XX Unit AG Prototype Supply and Install (Optional)$ - 0
17XX Unit FG Prototype Supply and Install (Optional)$ - 0
18XX Unit AH Prototype Supply and Install (Optional)$ - 0
19XX Unit FH Prototype Supply and Install (Optional)$ - 0
20XX Unit AI Prototype Supply and Install (Optional)$ - 0
21XX Unit FI Prototype Supply and Install (Optional)$ - 0
22XX Unit AJ Prototype Supply and Install (Optional)$ - 0
23XX Unit FJ Prototype Supply and Install (Optional)$ - 0
24XX Standalone Rewind RA (Optional)$ - 0
25XX Standalone Rewind RB (Optional)$ - 0
26XX Standalone Rewind RC (Optional)$ - 0
27XX Standalone Rewind RD (Optional)$ - 0
GRAND TOTAL$ - 0

CLINs

Title Line Goes Here
Notes:
Eligible Design Quantity AdjustmentsEligible Inflation AdjustmentsWeight of...Area of…% of CLIN Price That Is….
CategoryItem/CLINBase/OptDescriptionQtyUnit of MeasureUnit PriceTotalBasisMaterial WeightSurface Area LaborMaterial EPAOnsite LaborOffsite LaborStainless Steel in LbsCarbon Steel in LbsConcrete and/or Grout in LbsAll Wetted Surfaces in SQFTStainless-SteelCarbon SteelElectromagnetic SteelConcrete and/or GroutCarbon Steel Weld MaterialStainless-Steel Weld MaterialCopperOffsite LaborOnsite LaborTotal cols. S-AA (Must Be < 100%)

> 90% - Orange > 100% - Red

01XX Hydraulic Turbine Design0101BasePre-Iteration Coordination, Design, Analysis, and Performance Model Construction1JOB$ - 0N/Aaaaaaaaaaaaaaa
01XX Hydraulic Turbine Design0102BaseAdjustable Blade Iteration 1A Base Design Work1JOB$ - 0N/Aaaaaaaaaaaaaaa
01XX Hydraulic Turbine Design0103OptAdjustable Blade Iteration 1A - Preliminary Design Five Blade, 299.5-inch Diameter CFD1JOB$ - 0N/Aaaaaaaaaaaaaaa
01XX Hydraulic Turbine Design0104OptAdjustable Blade Iteration 1A - Preliminary Design Five Blade, 317-inch Diameter CFD1JOB$ - 0N/Aaaaaaaaaaaaaaa
01XX Hydraulic Turbine Design0105OptAdjustable Blade Iteration 1A - Preliminary Design Performance Model Testing (Diameter TBD)1JOB$ - 0N/Aaaaaaaaaaaaaaa
01XX Hydraulic Turbine Design0106BaseAdjustable Blade Iteration 2A Base Design Work1JOB$ - 0N/Aaaaaaaaaaaaaaa
01XX Hydraulic Turbine Design0107OptAdjustable Blade Iteration 2A - Preliminary Design Six Blade, TBD-inch Diameter CFD1JOB$ - 0N/Aaaaaaaaaaaaaaa
01XX Hydraulic Turbine Design0108OptAdjustable Blade Iteration 2A - Preliminary Design Performance Model Testing (Diameter TBD)1JOB$ - 0N/Aaaaaaaaaaaaaaa
01XX Hydraulic Turbine Design0109BaseAdjustable Blade Iteration 3A Base Design Work1JOB$ - 0N/Aaaaaaaaaaaaaaa
01XX Hydraulic Turbine Design0110OptAdjustable Blade Iteration 3A - Preliminary Design CFD With Draft Tube Modification 11JOB$ - 0N/Aaaaaaaaaaaaaaa
01XX Hydraulic Turbine Design0111OptAdjustable Blade Iteration 3A - Preliminary Design CFD With Draft Tube Modification 21JOB$ - 0N/Aaaaaaaaaaaaaaa
01XX Hydraulic Turbine Design0112OptAdjustable Blade Iteration 3A - Preliminary Design Performance Model Testing With Draft Tube Modification1JOB$ - 0N/Aaaaaaaaaaaaaaa
01XX Hydraulic Turbine Design0113OptAdjustable Blade Iteration 4A Design Work1JOB$ - 0N/Aaaaaaaaaaaaaaa
01XX Hydraulic Turbine Design0114OptAdjustable Blade Iteration 4A - ERDC Observational Model Testing Coordination1JOB$ - 0N/Aaaaaaaaaaaaaaa
01XX Hydraulic Turbine Design0115OptAdjustable Blade Iteration 5A Design Work1JOB$ - 0N/Aaaaaaaaaaaaaaa
01XX Hydraulic Turbine Design0116OptAdjustable Blade Iteration 5A - ERDC Observational Model Testing Coordination1JOB$ - 0N/Aaaaaaaaaaaaaaa
01XX Hydraulic Turbine Design0117BaseAdjustable Blade Final Design Performance Model Testing1JOB$ - 0N/Aaaaaaaaaaaaaaa
01XX Hydraulic Turbine Design0118BaseFixed Blade Iteration 1F Base Design Work1JOB$ - 0N/Aaaaaaaaaaaaaaa
01XX Hydraulic Turbine Design0119OptFixed Blade Iteration 1F - Preliminary Design Five Blade, 319-inch Diameter CFD1JOB$ - 0N/Aaaaaaaaaaaaaaa
01XX Hydraulic Turbine Design0120OptFixed Blade Iteration 1F - Preliminary Design Five Blade, 327-inch Diameter CFD1JOB$ - 0N/Aaaaaaaaaaaaaaa
01XX Hydraulic Turbine Design0121OptFixed Blade Iteration 1F - Preliminary Design Performance Model Testing (Diameter TBD)1JOB$ - 0N/Aaaaaaaaaaaaaaa
01XX Hydraulic Turbine Design0122BaseFixed Blade Iteration 2F Base Design Work1JOB$ - 0N/Aaaaaaaaaaaaaaa
01XX Hydraulic Turbine Design0123OptFixed Blade Iteration 2F - Preliminary Design Six Blade, TBD-inch Diameter CFD1JOB$ - 0N/Aaaaaaaaaaaaaaa
01XX Hydraulic Turbine Design0124OptFixed Blade Iteration 2F - Preliminary Design Performance Model Testing (Diameter TBD)1JOB$ - 0N/Aaaaaaaaaaaaaaa
01XX Hydraulic Turbine Design0125BaseFixed Blade Iteration 3F Base Design Work1JOB$ - 0N/Aaaaaaaaaaaaaaa
01XX Hydraulic Turbine Design0126OptFixed Blade Iteration 3F - Preliminary Design CFD With Modified Distributor1JOB$ - 0N/Aaaaaaaaaaaaaaa
01XX Hydraulic Turbine Design0127OptFixed Blade Iteration 3F - Preliminary Design CFD With Draft Tube Modification 11JOB$ - 0N/Aaaaaaaaaaaaaaa
01XX Hydraulic Turbine Design0128OptFixed Blade Iteration 3F - Preliminary Design CFD With Draft Tube Modification 21JOB$ - 0N/Aaaaaaaaaaaaaaa
01XX Hydraulic Turbine Design0129OptFixed Blade Iteration 3F - Preliminary Design Performance Model Testing With Draft Tube Modification1JOB$ - 0N/Aaaaaaaaaaaaaaa
01XX Hydraulic Turbine Design0130OptFixed Blade Iteration 4F Design Work1JOB$ - 0N/Aaaaaaaaaaaaaaa
01XX Hydraulic Turbine Design0131OptFixed Blade Iteration 4F - ERDC Observational Model Testing Coordination1JOB$ - 0N/Aaaaaaaaaaaaaaa
01XX Hydraulic Turbine Design0132BaseFixed Blade Final Design Performance Model Testing1JOB$ - 0N/Aaaaaaaaaaaaaaa
01XX Hydraulic Turbine Design0133OptSupply Set of Model Wicket Gates2SET$ - 0N/Aaaaaaaaaaaaaaa
02XX Prototype Design0201BaseDischarge Ring Diameter Preliminary Analyses1JOB$ - 0N/Aaaaaaaaaaaaaaa
02XX Prototype Design0202BaseAdjustable Blade Runner Prototype Design1JOB$ - 0N/Aaaaaaaaaaaaaaa
02XX Prototype Design0203BaseAdjustable Blade Discharge Ring and Draft Tube Liner Transition Prototype Design1JOB$ - 0N/Aaaaaaaaaaaaaaa
02XX Prototype Design0204BaseAdjustable Blade Stay Vane Modifications Prototype Design1JOB$ - 0N/Aaaaaaaaaaaaaaa
02XX Prototype Design0205BaseAdjustable Blade Wicket Gate Prototype Design1JOB$ - 0N/Aaaaaaaaaaaaaaa
02XX Prototype Design0206BaseAdjustable Blade Lower Turbine Shaft and Blade Servomotor Shaft Prototype Design1JOB$ - 0N/Aaaaaaaaaaaaaaa
02XX Prototype Design0207OptAdjustable Blade Replacement Inner Head Cover Prototype Design1JOB$ - 0N/Aaaaaaaaaaaaaaa
02XX Prototype Design0208BaseFixed Blade Runner Prototype Design1JOB$ - 0N/Aaaaaaaaaaaaaaa
02XX Prototype Design0209BaseFixed Blade Discharge Ring and Draft Tube Liner Transition Prototype Design1JOB$ - 0N/Aaaaaaaaaaaaaaa
02XX Prototype Design0210OptFixed Blade Stay Vane Modifications Prototype Design1JOB$ - 0N/Aaaaaaaaaaaaaaa
02XX Prototype Design0211OptFixed Blade Wicket Gate Prototype Design1JOB$ - 0N/Aaaaaaaaaaaaaaa
02XX Prototype Design0212OptFixed Blade Replacement Inner Head Cover Prototype Design1JOB$ - 0N/Aaaaaaaaaaaaaaa
02XX Prototype Design0213OptModified Outer Head Cover Prototype Design1JOB$ - 0N/Aaaaaaaaaaaaaaa
02XX Prototype Design0214OptReplacement Outer Head Cover Prototype Design1JOB$ - 0N/Aaaaaaaaaaaaaaa
02XX Prototype Design0215OptModified Adjustable Blade Intermediate Head Cover Prototype Design1JOB$ - 0N/Aaaaaaaaaaaaaaa
02XX Prototype Design0216OptModified Fixed Blade Intermediate Head Cover Prototype Design1JOB$ - 0N/Aaaaaaaaaaaaaaa
02XX Prototype Design0217BasePrototype Stator Bar Design, Manufacture, and Test1JOB$ - 0N/Aaaaaaaaaaaaaaa
02XX Prototype Design0218OptThrust Bearing Structural Analysis1JOB$ - 0N/Aaaaaaaaaaaaaaa
02XX Prototype Design0219OptAdjustable Blade Draft Tube Modification Design1JOB$ - 0N/Aaaaaaaaaaaaaaa
02XX Prototype Design0220OptFixed Blade Draft Tube Modification Design1JOB$ - 0N/Aaaaaaaaaaaaaaa
02XX Prototype Design0221BaseSurface Air Coolers Design1JOB$ - 0N/Aaaaaaaaaaaaaaa
03XX Miscellaneous Equipment, Spare Parts, and Oil Disposal0301BaseDesign and Supply One Stator Core Including Materials, Accessories, and Factory Testing1JOB$ - 0Percent of the total CLIN price that is:

Electromagnetic Steel: ___%

Offsite Labor: ___%XXaaaaaaaaaaa0%
03XX Miscellaneous Equipment, Spare Parts, and Oil Disposal0302BaseMobilization and Demobilization1JOB$ - 0Percent of the total CLIN price that is:

Offsite Labor: ___%

Site Labor: ___%XXaaaaaaaaaaa0%
03XX Miscellaneous Equipment, Spare Parts, and Oil Disposal0303BaseSupply Spare Wicket Gates1JOB$ - 0Existing wicket gate size and shape:

______ pounds of stainless-steel _______ square feet of all wetted surfaces

Percent of the total CLIN price that is:

Stainless Steel: ___%

Offsite Labor: ___%XXXXaaaaaaaaa0%
03XX Miscellaneous Equipment, Spare Parts, and Oil Disposal0304BaseSupply Generator Spare Parts1JOB$ - 0Percent of the total CLIN price that is:

Copper: ___%

Offsite Labor: ___%XXaaaaaaaaaaa0%
03XX Miscellaneous Equipment, Spare Parts, and Oil Disposal0305BaseSupply Spare Surface Air Cooler Assemblies1JOB$ - 0Percent of the total CLIN price that is:

Stainless Steel: ___% Carbon Steel: ___% Copper: ___%

Offsite Labor: ___%XXaaaaaaaaa0%
03XX Miscellaneous Equipment, Spare Parts, and Oil Disposal0306BaseSupply Other Required Spare Parts1JOB$ - 0Percent of the total CLIN price that is:

Stainless Steel: ___% Carbon Steel: ___% Copper: ___%

Offsite Labor: ___%XXaaaaaaaaa0%
03XX Miscellaneous Equipment, Spare Parts, and Oil Disposal0307BaseSupply Runner and Shaft Support1JOB$ - 0Percent of the total CLIN price that is:

Carbon Steel: ___%

Offsite Labor: ___%XXaaaaaaaaaaa0%
03XX Miscellaneous Equipment, Spare Parts, and Oil Disposal0308OptOil Disposal - 4,000 Gallons1JOB$ - 0Percent of the total CLIN price that is:

Offsite Labor: ___%

Site Labor: ___%XXaaaaaaaaaaa0%
03XX Miscellaneous Equipment, Spare Parts, and Oil Disposal0309OptOil Disposal - 4,000 Gallons1JOB$ - 0Percent of the total CLIN price that is:

Offsite Labor: ___%

Site Labor: ___%XXaaaaaaaaaaa0%
03XX Miscellaneous Equipment, Spare Parts, and Oil Disposal0310OptOil Disposal - 4,000 Gallons1JOB$ - 0Percent of the total CLIN price that is:

Offsite Labor: ___%

Site Labor: ___%XXaaaaaaaaaaa0%
03XX Miscellaneous Equipment, Spare Parts, and Oil Disposal0311OptOil Disposal - 4,000 Gallons1JOB$ - 0Percent of the total CLIN price that is:

Offsite Labor: ___%

Site Labor: ___%XXaaaaaaaaaaa0%
03XX Miscellaneous Equipment, Spare Parts, and Oil Disposal0312OptOil Disposal - 4,000 Gallons1JOB$ - 0Percent of the total CLIN price that is:

Offsite Labor: ___%

Site Labor: ___%XXaaaaaaaaaaa0%
03XX Miscellaneous Equipment, Spare Parts, and Oil Disposal0313OptOil Disposal - 4,000 Gallons1JOB$ - 0Percent of the total CLIN price that is:

Offsite Labor: ___%

Site Labor: ___%XXaaaaaaaaaaa0%
03XX Miscellaneous Equipment, Spare Parts, and Oil Disposal0314OptOil Disposal - 4,000 Gallons1JOB$ - 0Percent of the total CLIN price that is:

Offsite Labor: ___%

Site Labor: ___%XXaaaaaaaaaaa0%
03XX Miscellaneous Equipment, Spare Parts, and Oil Disposal0315OptOil Disposal - 4,000 Gallons1JOB$ - 0Percent of the total CLIN price that is:

Offsite Labor: ___%

Site Labor: ___%XXaaaaaaaaaaa0%
03XX Miscellaneous Equipment, Spare Parts, and Oil Disposal0316OptOil Disposal - 4,000 Gallons1JOB$ - 0Percent of the total CLIN price that is:

Offsite Labor: ___%

Site Labor: ___%XXaaaaaaaaaaa0%
03XX Miscellaneous Equipment, Spare Parts, and Oil Disposal0317OptOil Disposal - 4,000 Gallons1JOB$ - 0Percent of the total CLIN price that is:

Offsite Labor: ___%

Site Labor: ___%XXaaaaaaaaaaa0%
03XX Miscellaneous Equipment, Spare Parts, and Oil Disposal0318OptOil Disposal - 4,000 Gallons1JOB$ - 0Percent of the total CLIN price that is:

Offsite Labor: ___%

Site Labor: ___%XXaaaaaaaaaaa0%
03XX Miscellaneous Equipment, Spare Parts, and Oil Disposal0319OptOil Disposal - 4,000 Gallons1JOB$ - 0Percent of the total CLIN price that is:

Offsite Labor: ___%

Site Labor: ___%XXaaaaaaaaaaa0%
03XX Miscellaneous Equipment, Spare Parts, and Oil Disposal0320OptOil Disposal - 500 Gallons1JOB$ - 0Percent of the total CLIN price that is:

Offsite Labor: ___%

Site Labor: ___%XXaaaaaaaaaaa0%
03XX Miscellaneous Equipment, Spare Parts, and Oil Disposal0321OptOil Disposal - 500 Gallons1JOB$ - 0Percent of the total CLIN price that is:

Offsite Labor: ___%

Site Labor: ___%XXaaaaaaaaaaa0%
03XX Miscellaneous Equipment, Spare Parts, and Oil Disposal0322OptOil Disposal - 500 Gallons1JOB$ - 0Percent of the total CLIN price that is:

Offsite Labor: ___%

Site Labor: ___%XXaaaaaaaaaaa0%
03XX Miscellaneous Equipment, Spare Parts, and Oil Disposal0323OptOil Disposal - 500 Gallons1JOB$ - 0Percent of the total CLIN price that is:

Offsite Labor: ___%

Site Labor: ___%XXaaaaaaaaaaa0%
03XX Miscellaneous Equipment, Spare Parts, and Oil Disposal0324OptOil Disposal - 500 Gallons1JOB$ - 0Percent of the total CLIN price that is:

Offsite Labor: ___%

Site Labor: ___%XXaaaaaaaaaaa0%
04XX Unit AA Prototype Supply and Install0401AABaseSupply Adjustable Five Blade Runner (Base Requirement)1JOB$ - 0Fully spherical hub, 309-inch blade tip diameter. Runner construction method as shown on proposal drawings.

______ pounds of stainless-steel ______ pounds of carbon steel _______ square feet of all wetted surfaces of the hub and blades

Percent of total CLIN price that is:

Stainless Steel: ___% Carbon Steel: ___%

Offsite Labor: ___%XXXXaaaaaaa0%
04XX Unit AA Prototype Supply and Install0401ABOptSupply Adjustable Six Blade Runner - Incremental Difference Relative to CLIN AA1JOB$ - 0Fully spherical hub, 309-inch blade tip diameter. Runner construction method as shown on proposal drawings.

______ pounds of stainless-steel ______ pounds of carbon steel _______ square feet of all wetted surfaces of the hub and blades

Percent of the sum of CLIN AA and AB prices that is:

Stainless Steel: ___% Carbon Steel: ___%

Offsite Labor: ___%XXXXaaaaaaa0%
04XX Unit AA Prototype Supply and Install0402AABaseSupply Permanent Discharge Ring Section and Insert for Adjustable Blade Runner1JOB$ - 0Spherical outer blade profile, 309-inch blade tip diameter

______ pounds of stainless-steel ______ pounds of carbon steel _______ square feet of all wetted surfaces

Percent of total CLIN price that is stainless-steel material: ___% carbon steel material: ___%

labor: ___%XXXXaaaaaaa0%
04XX Unit AA Prototype Supply and Install0402ABOptSupply Embedded Discharge Ring Section and Insert for Adjustable Blade Runner - Incremental Difference Relative to CLIN AA1JOB$ - 0Spherical outer blade profile, 317-inch blade tip diameter

______ pounds of stainless-steel ______ pounds of carbon steel _______ square feet of all wetted surfaces

Percent of the sum of CLIN AA and AB prices that is:

Stainless Steel: ___% Carbon Steel: ___%

Offsite Labor: ___%XXXXaaaaaaa0%
04XX Unit AA Prototype Supply and Install0403AABaseModify Existing Discharge Ring Without Demolition and Install Permanent Discharge Ring Section for Adjustable Blade Runner1JOB$ - 0309-inch blade tip diameter.

______ pounds of concrete and grout

Percent of total CLIN price that is:

Concrete and Grout: ___% Offsite Labor: ___%

Site Labor: ___%XXXXaaaaaaaaa0%
04XX Unit AA Prototype Supply and Install0403ABOptInstall Embedded Discharge Ring Section (Excluding Demolition) for Adjustable Blade Runner - Incremental Difference Relative to CLIN AA1JOB$ - 0317-inch blade tip diameter.

______ pounds of concrete and grout

Percent of the sum of CLINs AA and AB prices that is:

Concrete and Grout: ___% Offsite Labor: ___%

Site Labor: ___%XXXXaaaaaaaaa0%
04XX Unit AA Prototype Supply and Install0404AABaseSupply Permanent Draft Tube Liner Transition Section for Adjustable Blade Runner1JOB$ - 0309-inch blade tip diameter.

______ pounds of stainless-steel ______ pounds of carbon steel _______ square feet of all wetted surfaces

Percent of total CLIN price that is:

Stainless Steel: ___% Carbon Steel: ___%

Offsite Labor: ___%XXXXaaaaaaa0%
04XX Unit AA Prototype Supply and Install0404ABOptSupply Embedded Draft Tube Liner Transition Section for Adjustable Blade Runner - Incremental Difference Relative to CLIN AA1JOB$ - 0317-inch blade tip diameter.

______ pounds of stainless-steel ______ pounds of carbon steel _______ square feet of all wetted surfaces

Percent of the sum of CLINs AA and AB prices that is:

Stainless Steel: ___% Carbon Steel: ___%

Offsite Labor: ___%XXXXaaaaaaa0%
04XX Unit AA Prototype Supply and Install0405AABaseModify Existing Draft Tube Liner Without Demolition and Install Permanent Draft Tube Liner Transition Section for Adjustable Blade Runner1JOB$ - 0309-inch blade tip diameter.

______ pounds of concrete and grout

Percent of total CLIN price that is:

Concrete and grout material : ___% Offsite Labor: ___%

Site Labor: ___%XXXXaaaaaaaaa0%
04XX Unit AA Prototype Supply and Install0405ABOptInstall Embedded Draft Tube Liner Transition Section (Excluding Demolition) for Adjustable Blade Runner - Incremental Difference Relative to CLIN AA1JOB$ - 0317-inch blade tip diameter.

______ pounds of concrete and grout

Percent of the sum of CLINs AA and AB prices that is:

Concrete and Grout: ___% Offsite Labor: ___%

Site Labor: ___%XXXXaaaaaaaaa0%
04XX Unit AA Prototype Supply and Install0406OptDemolition of Discharge Ring and Draft Tube Liner Transition – Cubic Yard300Cubic Yard$ - 0Percent of the total CLIN price that is:

Offsite Labor: ___%

Site Labor: ___%XXaaaaaaaaaaa0%
04XX Unit AA Prototype Supply and Install0407AABaseRefurbish Existing Outer Head Cover1JOB$ - 0Percent of the total CLIN price that is:

Offsite Labor: ___%

Site Labor: ___%XXaaaaaaaaaaa0%
04XX Unit AA Prototype Supply and Install0407ABOptRefurbish and Modify Existing Outer Head Cover - Incremental Difference Relative to CLIN AA1JOB$ - 0309-inch blade tip diameter.

Percent of the total CLIN price that is:

Offsite Labor: ___%

Site Labor: ___%XXaaaaaaaaaaa0%
04XX Unit AA Prototype Supply and Install0407ACOptSupply Replacement Outer Head Cover - Incremental Difference Relative to CLIN AA1JOB$ - 0317-inch blade tip diameter.

______ pounds of carbon steel _______ square feet of all wetted surfaces

Percent of the sum of CLINs AA and AC prices that is:

Carbon Steel: ___%

Offsite Labor: ___%XXXXaaaaaaaaa0%
04XX Unit AA Prototype Supply and Install0408AABaseRefurbish Existing Intermediate Head Cover1JOB$ - 0Percent of the total CLIN price that is:

Offsite Labor: ___%

Site Labor: ___%XXaaaaaaaaaaa0%
04XX Unit AA Prototype Supply and Install0408ABOptRefurbish and Modify Existing Intermediate Head Cover - Incremental Difference Relative to CLIN AA1JOB$ - 0317-inch blade tip diameter.

Percent of the total CLIN price that is:

Offsite Labor: ___%

Site Labor: ___%XXaaaaaaaaaaa0%
04XX Unit AA Prototype Supply and Install0409AABaseRefurbish Existing Inner Head Cover1JOB$ - 0Percent of the total CLIN price that is:

Offsite Labor: ___%

Site Labor: ___%XXaaaaaaaaaaa0%
04XX Unit AA Prototype Supply and Install0409ABOptSupply Replacement Inner Head Cover - Incremental Difference Relative to CLIN AA1JOB$ - 0Existing inner headcover size and shape.

______ pounds of carbon steel _______ square feet of all wetted surfaces

Percent of the sum of CLINs AA and AB prices that is:

Carbon Steel: ___%

Offsite Labor: ___%XXXXaaaaaaaaa0%
04XX Unit AA Prototype Supply and Install0410BaseSupply Stay Vane Modification Components1JOB$ - 0Leading and trailing edge extensions or alternate method as shown on proposal drawings

______ pounds of carbon steel _______ square feet of all wetted surfaces

Percent of the total CLIN price that is:

Carbon Steel: ___%

Offsite Labor: ___%XXXXaaaaaaaaa0%
04XX Unit AA Prototype Supply and Install0411BaseRefurbish Stay Vanes/Ring Including Installation of Stay Vane Modification Components1JOB$ - 0Percent of the total CLIN price that is:

Offsite Labor: ___%

Site Labor: ___%XXaaaaaaaaaaa0%
04XX Unit AA Prototype Supply and Install0412BaseSupply Wicket Gates1JOB$ - 0Existing wicket gate size and shape.

______ pounds of stainless-steel _______ square feet of all wetted surfaces

Percent of the total CLIN price that is:

Stainless Steel: ___%

Offsite Labor: ___%XXXXaaaaaaaaa0%
04XX Unit AA Prototype Supply and Install0413BaseSupply Wicket Gate Operating Mechanism Bushings and Bearing Plate1JOB$ - 0Percent of the total CLIN price that is:

Stainless Steel: ___%

Offsite Labor: ___%XXaaaaaaaaaaa0%
04XX Unit AA Prototype Supply and Install0414BaseSupply Head Cover and Bottom Ring Facing Plates1JOB$ - 0309-inch blade tip diameter.

______ pounds of austenitic stainless-steel _______ square feet of all wetted surfaces

Percent of the total CLIN price that is:

Stainless Steel: ___%

Offsite Labor: ___%XXXXaaaaaaaaa0%
04XX Unit AA Prototype Supply and Install0415BaseSupply Blade Servomotor Shaft and Appurtenances1JOB$ - 0Percent of the total CLIN price that is:

Carbon Steel: ___%

Offsite Labor: ___%XXaAaaaaaaaaa0%
04XX Unit AA Prototype Supply and Install0416BaseSupply Lower Turbine Shaft and Appurtenances1JOB$ - 0Percent of the total CLIN price that is:

Stainless Steel: ___% Carbon Steel: ___%

Offsite Labor: ___%XXAAaaaaaaaa0%
04XX Unit AA Prototype Supply and Install0417BaseSupply Oil and Water Basin at the Blade Servomotor1JOB$ - 0Percent of the total CLIN price that is:

Carbon Steel: ___%

Offsite Labor: ___%XXaAaaaaaaaaa0%
04XX Unit AA Prototype Supply and Install0418BaseSupply Turbine Shaft Packing Box1JOB$ - 0Percent of the total CLIN price that is:

Carbon Steel: ___%

Offsite Labor: ___%XXaAaaaaaaaaa0%
04XX Unit AA Prototype Supply and Install0419BaseSupply Turbine Guide Bearing Oil Sump1JOB$ - 0Percent of the total CLIN price that is:

Carbon Steel: ___%

Offsite Labor: ___%XXaAaaaaaaaaa0%
04XX Unit AA Prototype Supply and Install0420BaseSupply Complete Set of Stator Bars, Including Supplies and Accessories for a Complete New Winding Including Factory Testing1JOB$ - 0Percent of the total CLIN price that is:

Copper: ____%

Offsite Labor: ____%XXaaaaaaaaaaa0%
04XX Unit AA Prototype Supply and Install0421BaseRemove Existing Stator Winding and Install and Test New Stator Winding1JOB$ - 0Percent of the total CLIN price that is:

Offsite Labor: ___%

Site Labor: ___%XXaaaaaaaaaaa0%
04XX Unit AA Prototype Supply and Install0422BaseSupply Surface Air Coolers1JOB$ - 0Percent of the total CLIN price that is:

Stainless Steel: ___% Carbon Steel: ___% Copper: ___%

Offsite Labor: ___%XXaaaaaaaaa0%
04XX Unit AA Prototype Supply and Install0423BaseInstall Surface Air Coolers1JOB$ - 0Percent of the total CLIN price that is:

Offsite Labor: ___%

Site Labor: ___%XXaaaaaaaaaaa0%
04XX Unit AA Prototype Supply and Install0424BasePre-Disassembly Watered Operational Testing1JOB$ - 0Percent of the total CLIN price that is:

Offsite Labor: ___%

Site Labor: ___%XXaaaaaaaaaaa0%
04XX Unit AA Prototype Supply and Install0425BaseGenerating Unit Disassembly1JOB$ - 0Percent of the total CLIN price that is:

Offsite Labor: ___%

Site Labor: ___%XXaaaaaaaaaaa0%
04XX Unit AA Prototype Supply and Install0426BaseRefurbish Existing Turbine Shaft to Become Intermediate Shaft1JOB$ - 0Percent of the total CLIN price that is:

Offsite Labor: ___%

Site Labor: ___%XXaaaaaaaaaaa0%
04XX Unit AA Prototype Supply and Install0427BaseNot UsedN/AN/A$ - 0N/Aaaaaaaaaaaaaa0%
04XX Unit AA Prototype Supply and Install0428BaseNot UsedN/AN/A$ - 0N/Aaaaaaaaaaaaaa0%
04XX Unit AA Prototype Supply and Install0429BaseMachine Stay Ring Head Cover Mounting Flange1JOB$ - 0Percent of the total CLIN price that is:

Offsite Labor: ___%

Site Labor: ___%XXaaaaaaaaaaa0%
04XX Unit AA Prototype Supply and Install0430BaseRefurbish Bottom Ring1JOB$ - 0Percent of the total CLIN price that is:

Offsite Labor: ___%

Site Labor: ___%XXaaaaaaaaaaa0%
04XX Unit AA Prototype Supply and Install0431BaseRefurbish Miscellaneous Wicket Gate Operating Mechanism Components1JOB$ - 0Percent of the total CLIN price that is:

Offsite Labor: ___%

Site Labor: ___%XXaaaaaaaaaaa0%
04XX Unit AA Prototype Supply and Install0432BaseLine Boring and Installation of Wicket Gate Stem Bushings1JOB$ - 0Percent of the total CLIN price that is:

Offsite Labor: ___%

Site Labor: ___%XXaaaaaaaaaaa0%
04XX Unit AA Prototype Supply and Install0433BaseReplace Automatic Air Valves, Gate Valves, Scroll Case Drain Valves and Floor Grating, and Draft Tube Drain Valves1JOB$ - 0Percent of the total CLIN price that is:

Stainless Steel: ___% Carbon Steel: ___% Offsite Labor: ___%

Site Labor: ___%XXaaaaaaaaa0%
04XX Unit AA Prototype Supply and Install0434BaseRefurbish Wicket Gate Operating Ring1JOB$ - 0Percent of the total CLIN price that is:

Offsite Labor: ___%

Site Labor: ___%XXaaaaaaaaaaa0%
04XX Unit AA Prototype Supply and Install0435BaseRefurbish Wicket Gate Servomotors1JOB$ - 0Percent of the total CLIN price that is:

Offsite Labor: ___%

Site Labor: ___%XXaaaaaaaaaaa0%
04XX Unit AA Prototype Supply and Install0436OptBore and Hone Wicket Gate Servomotors1JOB$ - 0Percent of the total CLIN price that is:

Offsite Labor: ___%

Site Labor: ___%XXaaaaaaaaaaa0%
04XX Unit AA Prototype Supply and Install0437OptProvide Wicket Gate Servomotor Piston Rings1JOB$ - 0Percent of the total CLIN price that is:

Offsite Labor: ___%

Site Labor: ___%XXaaaaaaaaaaa0%
04XX Unit AA Prototype Supply and Install0438BaseProvide Water and Oil Piping Systems and Components1JOB$ - 0Percent of the total CLIN price that is:

Offsite Labor: ___%

Site Labor: ___%XXaaaaaaaaaaa0%
04XX Unit AA Prototype Supply and Install0439BaseProvide Electrical Devices, Temperature Indicating Devices, and Wiring/Cable1JOB$ - 0Percent of the total CLIN price that is:

Offsite Labor: ___%

Site Labor: ___%XXaaaaaaaaaaa0%
04XX Unit AA Prototype Supply and Install0440BaseProvide High Pressure Oil Injection System Components1JOB$ - 0Percent of the total CLIN price that is:

Offsite Labor: ___%

Site Labor: ___%XXaaaaaaaaaaa0%
04XX Unit AA Prototype Supply and Install0441BaseThrust Bearing Phase 1 Inspections1JOB$ - 0Percent of the total CLIN price that is:

Offsite Labor: ___%

Site Labor: ___%XXaaaaaaaaaaa0%
04XX Unit AA Prototype Supply and Install0442OptThrust Bearing Phase 2 Inspections1JOB$ - 0Percent of the total CLIN price that is:

Offsite Labor: ___%

Site Labor: ___%XXaaaaaaaaaaa0%
04XX Unit AA Prototype Supply and Install0443OptRefurbish Thrust Bearing Shoes1JOB$ - 0Percent of the total CLIN price that is:

Offsite Labor: ___%

Site Labor: ___%XXaaaaaaaaaaa0%
04XX Unit AA Prototype Supply and Install0444OptRefurbish Thrust Bearing Runner and Collar1JOB$ - 0Percent of the total CLIN price that is:

Offsite Labor: ___%

Site Labor: ___%XXaaaaaaaaaaa0%
04XX Unit AA Prototype Supply and Install0445OptUpper Generator Guide Bearing NDT1JOB$ - 0Percent of the total CLIN price that is:

Offsite Labor: ___%

Site Labor: ___%XXaaaaaaaaaaa0%
04XX Unit AA Prototype Supply and Install0446OptRefurbish Upper Generator Guide Bearing Shoes1JOB$ - 0Percent of the total CLIN price that is:

Offsite Labor: ___%

Site Labor: ___%XXaaaaaaaaaaa0%
04XX Unit AA Prototype Supply and Install0447OptLower Generator Guide Bearing NDT1JOB$ - 0Percent of the total CLIN price that is:

Offsite Labor: ___%

Site Labor: ___%XXaaaaaaaaaaa0%
04XX Unit AA Prototype Supply and Install0448OptRefurbish Lower Generator Guide Bearing Shoes1JOB$ - 0Percent of the total CLIN price that is:

Offsite Labor: ___%

Site Labor: ___%XXaaaaaaaaaaa0%
04XX Unit AA Prototype Supply and Install0449OptTurbine Guide Bearing NDT1JOB$ - 0Percent of the total CLIN price that is:

Offsite Labor: ___%

Site Labor: ___%XXaaaaaaaaaaa0%
04XX Unit AA Prototype Supply and Install0450OptRefurbish Turbine Guide Bearing1JOB$ - 0Percent of the total CLIN price that is:

Offsite Labor: ___%

Site Labor: ___%XXaaaaaaaaaaa0%
04XX Unit AA Prototype Supply and Install0451BaseRefurbish Oil Head1JOB$ - 0Percent of the total CLIN price that is:

Offsite Labor: ___%

Site Labor: ___%XXaaaaaaaaaaa0%
04XX Unit AA Prototype Supply and Install0452BaseNot UsedN/AN/A$ - 0N/Aaaaaaaaaaaaaa0%
04XX Unit AA Prototype Supply and Install0453BaseRefurbish and Modify Blade Servomotor Oil Pipes1JOB$ - 0Percent of the total CLIN price that is:

Offsite Labor: ___%

Site Labor: ___%XXaaaaaaaaaaa0%
04XX Unit AA Prototype Supply and Install0454BaseNot UsedN/AN/A$ - 0N/Aaaaaaaaaaaaaa0%
04XX Unit AA Prototype Supply and Install0455BaseProvide Thrust Bearing Oil Coolers1JOB$ - 0Percent of the total CLIN price that is

Stainless Steel: ___% Carbon Steel: ___% Copper: ___% Offsite Labor: ___%

Site Labor: ___%XXXaaaaaaaa0%
04XX Unit AA Prototype Supply and Install0456BaseRefurbish Draft Tube Personnel Entry Door1JOB$ - 0Percent of the total CLIN price that is:

Offsite Labor: ___%

Site Labor: ___%XXaaaaaaaaaaa0%
04XX Unit AA Prototype Supply and Install0457BasePaint with Lead Removal and Disposal1JOB$ - 0Percent of the total CLIN price that is:

Offsite Labor: ___%

Site Labor: ___%XXaaaaaaaaaaa0%
04XX Unit AA Prototype Supply and Install0458BasePainting1JOB$ - 0Percent of the total CLIN price that is:

Offsite Labor: ___%

Site Labor: ___%XXaaaaaaaaaaa0%
04XX Unit AA Prototype Supply and Install0459AAOptDraft Tube Floor Fill Modification1JOB$ - 0Based on drawings S-001 and S-002.

______ pounds of concrete

Percent of total CLIN price that is:

Concrete Material: ___% Offsite Labor: ___%

Site Labor: ___%XXXXaaaaaaaaa0%
04XX Unit AA Prototype Supply and Install0459ABOptDraft Tube Roof Fill Modification – Incremental Difference Relative to CLIN AA1JOB$ - 0Based on drawings S-003 and S-004.

______ pounds of concrete

Percent of the sum of CLINs AA and AB prices that is:

Concrete Material: ___% Offsite Labor: ___%

Site Labor: ___%XXXXaaaaaaaaa0%
04XX Unit AA Prototype Supply and Install0460BaseInspect, Clean, and Test Stator Core1JOB$ - 0Percent of the total CLIN price that is:

Offsite Labor: ___%

Site Labor: ___%XXaaaaaaaaaaa0%
04XX Unit AA Prototype Supply and Install0461OptPerform Additional Interlaminar Insulation Testing1JOB$ - 0Percent of the total CLIN price that is:

Offsite Labor: ___%

Site Labor: ___%XXaaaaaaaaaaa0%
04XX Unit AA Prototype Supply and Install0462OptRemove Existing Stator Core and Install and Test New Stator Core1JOB$ - 0Percent of the total CLIN price that is:

Offsite Labor: ___%

Site Labor: ___%XXaaaaaaaaaaa0%
04XX Unit AA Prototype Supply and Install0463OptSupply Stator Core Including Materials, Accessories, and Factory Testing1JOB$ - 0Percent of the total CLIN price that is:

Electromagnetic Steel: ___%

Offsite Labor: ___%XXaaaaaaaaaaa0%
04XX Unit AA Prototype Supply and Install0464BaseClean and Inspect Rotor, Reinsulate Rotor Field Leads, and Test Rotor Field Windings1JOB$ - 0Percent of the total CLIN price that is:

Offsite Labor: ___%

Site Labor: ___%XXaaaaaaaaaaa0%
04XX Unit AA Prototype Supply and Install0465OptRefurbish Rotor Field Pole3EA$ - 0Percent of the total CLIN price that is:

Offsite Labor: ___%

Site Labor: ___%XXaaaaaaaaaaa0%
04XX Unit AA Prototype Supply and Install0466BaseFurnish, Install, and Test Surge Arrestors and Refurbish Collector Rings1JOB$ - 0Percent of the total CLIN price that is:

Offsite Labor: ___%

Site Labor: ___%XXaaaaaaaaaaa0%
04XX Unit AA Prototype Supply and Install0467BaseProvide Machine Condition Monitoring System Sensors1JOB$ - 0Percent of the total CLIN price that is:

Offsite Labor: ___%

Site Labor: ___%XXaaaaaaaaaaa0%
04XX Unit AA Prototype Supply and Install0468OptDestructively Remove Turbine Shaft-to-Runner Fastener30EA$ - 0Percent of the total CLIN price that is:

Offsite Labor: ___%

Site Labor: ___%XXaaaaaaaaaaa0%
04XX Unit AA Prototype Supply and Install0469OptRotor Balancing1JOB$ - 0Percent of the total CLIN price that is:

Offsite Labor: ___%

Site Labor: ___%XXaaaaaaaaaaa0%
04XX Unit AA Prototype Supply and Install0470BaseGenerating Unit Reassembly1JOB$ - 0Percent of the total CLIN price that is:

Offsite Labor: ___%

Site Labor: ___%XXaaaaaaaaaaa0%
04XX Unit AA Prototype Supply and Install0471BaseGenerating Unit Commissioning1JOB$ - 0Percent of the total CLIN price that is:

Offsite Labor: ___%

Site Labor: ___%XXaaaaaaaaaaa0%
04XX Unit AA Prototype Supply and Install0472BasePerform Generator Special Field Test (UNIT AA ONLY)1JOB$ - 0Percent of the total CLIN price that is:

Offsite Labor: ___%

Site Labor: ___%XXaaaaaaaaaaa0%
04XX Unit AA Prototype Supply and Install0473OptPerform Model Validation Testing on Generator1JOB$ - 0Percent of the total CLIN price that is:

Offsite Labor: ___%

Site Labor: ___%XXaaaaaaaaaaa0%
04XX Unit AA Prototype Supply and Install0474OptBrake Ring Refurbishment1JOB$ - 0Percent of the total CLIN price that is:

Offsite Labor: ___%

Site Labor: ___%XXaaaaaaaaaaa0%
05XX Unit AB Prototype Supply and Install0501AABaseSupply Adjustable Five Blade Runner (Base Requirement)1JOB$ - 0Fully spherical hub, 309-inch blade tip diameter. Runner construction method as shown on proposal drawings.

______ pounds of stainless-steel ______ pounds of carbon steel _______ square feet of all wetted surfaces of the hub and blades

Percent of total CLIN price that is:

Stainless Steel: ___% Carbon Steel: ___%

Offsite Labor: ___%XXXXaaaaaaa0%
05XX Unit AB Prototype Supply and Install0501ABOptSupply Adjustable Six Blade Runner - Incremental Difference Relative to CLIN AA1JOB$ - 0Fully spherical hub, 309-inch blade tip diameter. Runner construction method as shown on proposal drawings.

______ pounds of stainless-steel ______ pounds of carbon steel _______ square feet of all wetted surfaces of the hub and blades

Percent of the sum of CLIN AA and AB prices that is:

Stainless Steel: ___% Carbon Steel: ___%

Offsite Labor: ___%XXXXaaaaaaa0%
05XX Unit AB Prototype Supply and Install0502AABaseSupply Permanent Discharge Ring Section and Insert for Adjustable Blade Runner1JOB$ - 0Spherical outer blade profile, 309-inch blade tip diameter

______ pounds of stainless-steel ______ pounds of carbon steel _______ square feet of all wetted surfaces

Percent of total CLIN price that is stainless-steel material: ___% carbon steel material: ___%

labor: ___%XXXXaaaaaaa0%
05XX Unit AB Prototype Supply and Install0502ABOptSupply Embedded Discharge Ring Section and Insert for Adjustable Blade Runner - Incremental Difference Relative to CLIN AA1JOB$ - 0Spherical outer blade profile, 317-inch blade tip diameter

______ pounds of stainless-steel ______ pounds of carbon steel _______ square feet of all wetted surfaces

Percent of the sum of CLIN AA and AB prices that is:

Stainless Steel: ___% Carbon Steel: ___%

Offsite Labor: ___%XXXXaaaaaaa0%
05XX Unit AB Prototype Supply and Install0503AABaseModify Existing Discharge Ring Without Demolition and Install Permanent Discharge Ring Section for Adjustable Blade Runner1JOB$ - 0309-inch blade tip diameter.

______ pounds of concrete and grout

Percent of total CLIN price that is:

Concrete and Grout: ___% Offsite Labor: ___%

Site Labor: ___%XXXXaaaaaaaaa0%
05XX Unit AB Prototype Supply and Install0503ABOptInstall Embedded Discharge Ring Section (Excluding Demolition) for Adjustable Blade Runner - Incremental Difference Relative to CLIN AA1JOB$ - 0317-inch blade tip diameter.

______ pounds of concrete and grout

Percent of the sum of CLINs AA and AB prices that is:

Concrete and Grout: ___% Offsite Labor: ___%

Site Labor: ___%XXXXaaaaaaaaa0%
05XX Unit AB Prototype Supply and Install0504AABaseSupply Permanent Draft Tube Liner Transition Section for Adjustable Blade Runner1JOB$ - 0309-inch blade tip diameter.

______ pounds of stainless-steel ______ pounds of carbon steel _______ square feet of all wetted surfaces

Percent of total CLIN price that is:

Stainless Steel: ___% Carbon Steel: ___%

Offsite Labor: ___%XXXXaaaaaaa0%
05XX Unit AB Prototype Supply and Install0504ABOptSupply Embedded Draft Tube Liner Transition Section for Adjustable Blade Runner - Incremental Difference Relative to CLIN AA1JOB$ - 0317-inch blade tip diameter.

______ pounds of stainless-steel ______ pounds of carbon steel _______ square feet of all wetted surfaces

Percent of the sum of CLINs AA and AB prices that is:

Stainless Steel: ___% Carbon Steel: ___%

Offsite Labor: ___%XXXXaaaaaaa0%
05XX Unit AB Prototype Supply and Install0505AABaseModify Existing Draft Tube Liner Without Demolition and Install Permanent Draft Tube Liner Transition Section for Adjustable Blade Runner1JOB$ - 0309-inch blade tip diameter.

______ pounds of concrete and grout

Percent of total CLIN price that is:

Concrete and grout material : ___% Offsite Labor: ___%

Site Labor: ___%XXXXaaaaaaaaa0%
05XX Unit AB Prototype Supply and Install0505ABOptInstall Embedded Draft Tube Liner Transition Section (Excluding Demolition) for Adjustable Blade Runner - Incremental Difference Relative to CLIN AA1JOB$ - 0317-inch blade tip diameter.

______ pounds of concrete and grout

Percent of the sum of CLINs AA and AB prices that is:

Concrete and Grout: ___% Offsite Labor: ___%

Site Labor: ___%XXXXaaaaaaaaa0%
05XX Unit AB Prototype Supply and Install0506OptDemolition of Discharge Ring and Draft Tube Liner Transition – Cubic Yard300Cubic Yard$ - 0Percent of the total CLIN price that is:

Offsite Labor: ___%

Site Labor: ___%XXaaaaaaaaaaa0%
05XX Unit AB Prototype Supply and Install0507AABaseRefurbish Existing Outer Head Cover1JOB$ - 0Percent of the total CLIN price that is:

Offsite Labor: ___%

Site Labor: ___%XXaaaaaaaaaaa0%
05XX Unit AB Prototype Supply and Install0507ABOptRefurbish and Modify Existing Outer Head Cover - Incremental Difference Relative to CLIN AA1JOB$ - 0309-inch blade tip diameter.

Percent of the total CLIN price that is:

Offsite Labor: ___%

Site Labor: ___%XXaaaaaaaaaaa0%
05XX Unit AB Prototype Supply and Install0507ACOptSupply Replacement Outer Head Cover - Incremental Difference Relative to CLIN AA1JOB$ - 0317-inch blade tip diameter.

______ pounds of carbon steel _______ square feet of all wetted surfaces

Percent of the sum of CLINs AA and AC prices that is:

Carbon Steel: ___%

Offsite Labor: ___%XXXXaaaaaaaaa0%
05XX Unit AB Prototype Supply and Install0508AABaseRefurbish Existing Intermediate Head Cover1JOB$ - 0Percent of the total CLIN price that is:

Offsite Labor: ___%

Site Labor: ___%XXaaaaaaaaaaa0%
05XX Unit AB Prototype Supply and Install0508ABOptRefurbish and Modify Existing Intermediate Head Cover - Incremental Difference Relative to CLIN AA1JOB$ - 0317-inch blade tip diameter.

Percent of the total CLIN price that is:

Offsite Labor: ___%

Site Labor: ___%XXaaaaaaaaaaa0%
05XX Unit AB Prototype Supply and Install0509AABaseRefurbish Existing Inner Head Cover1JOB$ - 0Percent of the total CLIN price that is:

Offsite Labor: ___%

Site Labor: ___%XXaaaaaaaaaaa0%
05XX Unit AB Prototype Supply and Install0509ABOptSupply Replacement Inner Head Cover - Incremental Difference Relative to CLIN AA1JOB$ - 0Existing inner headcover size and shape.

______ pounds of carbon steel _______ square feet of all wetted surfaces

Percent of the sum of CLINs AA and AB prices that is:

Carbon Steel: ___%

Offsite Labor: ___%XXXXaaaaaaaaa0%
05XX Unit AB Prototype Supply and Install0510BaseSupply Stay Vane Modification Components1JOB$ - 0Leading and trailing edge extensions or alternate method as shown on proposal drawings

______ pounds of carbon steel _______ square feet of all wetted surfaces

Percent of the total CLIN price that is:

Carbon Steel: ___%

Offsite Labor: ___%XXXXaaaaaaaaa0%
05XX Unit AB Prototype Supply and Install0511BaseRefurbish Stay Vanes/Ring Including Installation of Stay Vane Modification Components1JOB$ - 0Percent of the total CLIN price that is:

Offsite Labor: ___%

Site Labor: ___%XXaaaaaaaaaaa0%
05XX Unit AB Prototype Supply and Install0512BaseSupply Wicket Gates1JOB$ - 0Existing wicket gate size and shape.

______ pounds of stainless-steel _______ square feet of all wetted surfaces

Percent of the total CLIN price that is:

Stainless Steel: ___%

Offsite Labor: ___%XXXXaaaaaaaaa0%
05XX Unit AB Prototype Supply and Install0513BaseSupply Wicket Gate Operating Mechanism Bushings and Bearing Plate1JOB$ - 0Percent of the total CLIN price that is:

Stainless Steel: ___%

Offsite Labor: ___%XXaaaaaaaaaaa0%
05XX Unit AB Prototype Supply and Install0514BaseSupply Head Cover and Bottom Ring Facing Plates1JOB$ - 0309-inch blade tip diameter.

______ pounds of austenitic stainless-steel _______ square feet of all wetted surfaces

Percent of the total CLIN price that is:

Stainless Steel: ___%

Offsite Labor: ___%XXXXaaaaaaaaa0%
05XX Unit AB Prototype Supply and Install0515BaseSupply Blade Servomotor Shaft and Appurtenances1JOB$ - 0Percent of the total CLIN price that is:

Carbon Steel: ___%

Offsite Labor: ___%XXaAaaaaaaaaa0%
05XX Unit AB Prototype Supply and Install0516BaseSupply Lower Turbine Shaft and Appurtenances1JOB$ - 0Percent of the total CLIN price that is:

Stainless Steel: ___% Carbon Steel: ___%

Offsite Labor: ___%XXAAaaaaaaaa0%
05XX Unit AB Prototype Supply and Install0517BaseSupply Oil and Water Basin at the Blade Servomotor1JOB$ - 0Percent of the total CLIN price that is:

Carbon Steel: ___%

Offsite Labor: ___%XXaAaaaaaaaaa0%
05XX Unit AB Prototype Supply and Install0518BaseSupply Turbine Shaft Packing Box1JOB$ - 0Percent of the total CLIN price that is:

Carbon Steel: ___%

Offsite Labor: ___%XXaAaaaaaaaaa0%
05XX Unit AB Prototype Supply and Install0519BaseSupply Turbine Guide Bearing Oil Sump1JOB$ - 0Percent of the total CLIN price that is:

Carbon Steel: ___%

Offsite Labor: ___%XXaAaaaaaaaaa0%
05XX Unit AB Prototype Supply and Install0520BaseSupply Complete Set of Stator Bars, Including Supplies and Accessories for a Complete New Winding Including Factory Testing1JOB$ - 0Percent of the total CLIN price that is:

Copper: ____%

Offsite Labor: ____%XXaaaaaaaaaaa0%
05XX Unit AB Prototype Supply and Install0521BaseRemove Existing Stator Winding and Install and Test New Stator Winding1JOB$ - 0Percent of the total CLIN price that is:

Offsite Labor: ___%

Site Labor: ___%XXaaaaaaaaaaa0%
05XX Unit AB Prototype Supply and Install0522BaseSupply Surface Air Coolers1JOB$ - 0Percent of the total CLIN price that is:

Stainless Steel: ___% Carbon Steel: ___% Copper: ___%

Offsite Labor: ___%XXaaaaaaaaa0%
05XX Unit AB Prototype Supply and Install0523BaseInstall Surface Air Coolers1JOB$ - 0Percent of the total CLIN price that is:

Offsite Labor: ___%

Site Labor: ___%XXaaaaaaaaaaa0%
05XX Unit AB Prototype Supply and Install0524BasePre-Disassembly Watered Operational Testing1JOB$ - 0Percent of the total CLIN price that is:

Offsite Labor: ___%

Site Labor: ___%XXaaaaaaaaaaa0%
05XX Unit AB Prototype Supply and Install0525BaseGenerating Unit Disassembly1JOB$ - 0Percent of the total CLIN price that is:

Offsite Labor: ___%

Site Labor: ___%XXaaaaaaaaaaa0%
05XX Unit AB Prototype Supply and Install0526BaseRefurbish Existing Turbine Shaft to Become Intermediate Shaft1JOB$ - 0Percent of the total CLIN price that is:

Offsite Labor: ___%

Site Labor: ___%XXaaaaaaaaaaa0%
05XX Unit AB Prototype Supply and Install0527BaseNot UsedN/AN/A$ - 0N/Aaaaaaaaaaaaaa0%
05XX Unit AB Prototype Supply and Install0528BaseNot UsedN/AN/A$ - 0N/Aaaaaaaaaaaaaa0%
05XX Unit AB Prototype Supply and Install0529BaseMachine Stay Ring Head Cover Mounting Flange1JOB$ - 0Percent of the total CLIN price that is:

Offsite Labor: ___%

Site Labor: ___%XXaaaaaaaaaaa0%
05XX Unit AB Prototype Supply and Install0530BaseRefurbish Bottom Ring1JOB$ - 0Percent of the total CLIN price that is:

Offsite Labor: ___%

Site Labor: ___%XXaaaaaaaaaaa0%
05XX Unit AB Prototype Supply and Install0531BaseRefurbish Miscellaneous Wicket Gate Operating Mechanism Components1JOB$ - 0Percent of the total CLIN price that is:

Offsite Labor: ___%

Site Labor: ___%XXaaaaaaaaaaa0%

This is the start of the file's text. The full file is on GovTribe.