7N26RA003 TRGR Phase 2 Bid Schedule.xlsx
XLSX spreadsheet 282 KB Posted
- Solicitation number
- W9127N26RA003
About this file
This is a detailed Bid Schedule (Excel file) for the John Day Dam Turbine Replacement and Generator Rewind (TRGR) contract, covering extensive prototype design and installation work across multiple units and configurations. The document comprehensively breaks down potential work items into granular contract line items (CLINs) organized into categories including hydraulic turbine design, prototype design, equipment supply, and standalone rewind options, with each CLIN allowing contractors to specify detailed pricing, material composition, labor percentages, and optional variations.
The bid schedule includes multiple prototype design and supply categories for both adjustable and fixed blade runners, with options for different blade configurations (five and six blade designs), diameters ranging from 299.5 to 327 inches, and incremental modifications. Significant technical detail is provided for each line item, such as prototype design iterations, computational fluid dynamics (CFD) analyses, performance model testing, and component-level specifications for items like discharge rings, draft tube liners, head covers, wicket gates, and generator components. The document allows for substantial customization and optionality, with base requirements and numerous optional line items that enable precise, tailored pricing and technical approaches for turbine and generator rehabilitation work.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Total All CLINs
| Working Title |
| Notes: |
| The Subtotals add up the total cost (col. J) for each category with a Grand Total listed at the bottom |
| Category Subtotals | |
| 01XX Hydraulic Turbine Design | $ - 0 |
| 02XX Prototype Design | $ - 0 |
| 03XX Miscellaneous Equipment, Spare Parts, and Oil Disposal | $ - 0 |
| 04XX Unit AA Prototype Supply and Install | $ - 0 |
| 05XX Unit AB Prototype Supply and Install | $ - 0 |
| 06XX Unit FA Prototype Supply and Install | $ - 0 |
| 07XX Unit AC Prototype Supply and Install | $ - 0 |
| 08XX Unit FB Prototype Supply and Install | $ - 0 |
| 09XX Unit AD Prototype Supply and Install | $ - 0 |
| 10XX Unit FC Prototype Supply and Install | $ - 0 |
| 11XX Unit AE Prototype Supply and Install | $ - 0 |
| 12XX Unit FD Prototype Supply and Install | $ - 0 |
| 13XX Unit AF Prototype Supply and Install | $ - 0 |
| 14XX Unit FE Prototype Supply and Install | $ - 0 |
| 15XX Unit FF Prototype Supply and Install | $ - 0 |
| 16XX Unit AG Prototype Supply and Install (Optional) | $ - 0 |
| 17XX Unit FG Prototype Supply and Install (Optional) | $ - 0 |
| 18XX Unit AH Prototype Supply and Install (Optional) | $ - 0 |
| 19XX Unit FH Prototype Supply and Install (Optional) | $ - 0 |
| 20XX Unit AI Prototype Supply and Install (Optional) | $ - 0 |
| 21XX Unit FI Prototype Supply and Install (Optional) | $ - 0 |
| 22XX Unit AJ Prototype Supply and Install (Optional) | $ - 0 |
| 23XX Unit FJ Prototype Supply and Install (Optional) | $ - 0 |
| 24XX Standalone Rewind RA (Optional) | $ - 0 |
| 25XX Standalone Rewind RB (Optional) | $ - 0 |
| 26XX Standalone Rewind RC (Optional) | $ - 0 |
| 27XX Standalone Rewind RD (Optional) | $ - 0 |
| GRAND TOTAL | $ - 0 |
CLINs
| Title Line Goes Here | |||||||||||||||||||||||||||
| Notes: | |||||||||||||||||||||||||||
| Eligible Design Quantity Adjustments | Eligible Inflation Adjustments | Weight of... | Area of… | % of CLIN Price That Is…. | |||||||||||||||||||||||
| Category | Item/CLIN | Base/Opt | Description | Qty | Unit of Measure | Unit Price | Total | Basis | Material Weight | Surface Area Labor | Material EPA | Onsite Labor | Offsite Labor | Stainless Steel in Lbs | Carbon Steel in Lbs | Concrete and/or Grout in Lbs | All Wetted Surfaces in SQFT | Stainless-Steel | Carbon Steel | Electromagnetic Steel | Concrete and/or Grout | Carbon Steel Weld Material | Stainless-Steel Weld Material | Copper | Offsite Labor | Onsite Labor | Total cols. S-AA (Must Be < 100%) |
> 90% - Orange > 100% - Red
| 01XX Hydraulic Turbine Design | 0101 | Base | Pre-Iteration Coordination, Design, Analysis, and Performance Model Construction | 1 | JOB | $ - 0 | N/A | a | a | a | a | a | a | a | a | a | a | a | a | a | a |
| 01XX Hydraulic Turbine Design | 0102 | Base | Adjustable Blade Iteration 1A Base Design Work | 1 | JOB | $ - 0 | N/A | a | a | a | a | a | a | a | a | a | a | a | a | a | a |
| 01XX Hydraulic Turbine Design | 0103 | Opt | Adjustable Blade Iteration 1A - Preliminary Design Five Blade, 299.5-inch Diameter CFD | 1 | JOB | $ - 0 | N/A | a | a | a | a | a | a | a | a | a | a | a | a | a | a |
| 01XX Hydraulic Turbine Design | 0104 | Opt | Adjustable Blade Iteration 1A - Preliminary Design Five Blade, 317-inch Diameter CFD | 1 | JOB | $ - 0 | N/A | a | a | a | a | a | a | a | a | a | a | a | a | a | a |
| 01XX Hydraulic Turbine Design | 0105 | Opt | Adjustable Blade Iteration 1A - Preliminary Design Performance Model Testing (Diameter TBD) | 1 | JOB | $ - 0 | N/A | a | a | a | a | a | a | a | a | a | a | a | a | a | a |
| 01XX Hydraulic Turbine Design | 0106 | Base | Adjustable Blade Iteration 2A Base Design Work | 1 | JOB | $ - 0 | N/A | a | a | a | a | a | a | a | a | a | a | a | a | a | a |
| 01XX Hydraulic Turbine Design | 0107 | Opt | Adjustable Blade Iteration 2A - Preliminary Design Six Blade, TBD-inch Diameter CFD | 1 | JOB | $ - 0 | N/A | a | a | a | a | a | a | a | a | a | a | a | a | a | a |
| 01XX Hydraulic Turbine Design | 0108 | Opt | Adjustable Blade Iteration 2A - Preliminary Design Performance Model Testing (Diameter TBD) | 1 | JOB | $ - 0 | N/A | a | a | a | a | a | a | a | a | a | a | a | a | a | a |
| 01XX Hydraulic Turbine Design | 0109 | Base | Adjustable Blade Iteration 3A Base Design Work | 1 | JOB | $ - 0 | N/A | a | a | a | a | a | a | a | a | a | a | a | a | a | a |
| 01XX Hydraulic Turbine Design | 0110 | Opt | Adjustable Blade Iteration 3A - Preliminary Design CFD With Draft Tube Modification 1 | 1 | JOB | $ - 0 | N/A | a | a | a | a | a | a | a | a | a | a | a | a | a | a |
| 01XX Hydraulic Turbine Design | 0111 | Opt | Adjustable Blade Iteration 3A - Preliminary Design CFD With Draft Tube Modification 2 | 1 | JOB | $ - 0 | N/A | a | a | a | a | a | a | a | a | a | a | a | a | a | a |
| 01XX Hydraulic Turbine Design | 0112 | Opt | Adjustable Blade Iteration 3A - Preliminary Design Performance Model Testing With Draft Tube Modification | 1 | JOB | $ - 0 | N/A | a | a | a | a | a | a | a | a | a | a | a | a | a | a |
| 01XX Hydraulic Turbine Design | 0113 | Opt | Adjustable Blade Iteration 4A Design Work | 1 | JOB | $ - 0 | N/A | a | a | a | a | a | a | a | a | a | a | a | a | a | a |
| 01XX Hydraulic Turbine Design | 0114 | Opt | Adjustable Blade Iteration 4A - ERDC Observational Model Testing Coordination | 1 | JOB | $ - 0 | N/A | a | a | a | a | a | a | a | a | a | a | a | a | a | a |
| 01XX Hydraulic Turbine Design | 0115 | Opt | Adjustable Blade Iteration 5A Design Work | 1 | JOB | $ - 0 | N/A | a | a | a | a | a | a | a | a | a | a | a | a | a | a |
| 01XX Hydraulic Turbine Design | 0116 | Opt | Adjustable Blade Iteration 5A - ERDC Observational Model Testing Coordination | 1 | JOB | $ - 0 | N/A | a | a | a | a | a | a | a | a | a | a | a | a | a | a |
| 01XX Hydraulic Turbine Design | 0117 | Base | Adjustable Blade Final Design Performance Model Testing | 1 | JOB | $ - 0 | N/A | a | a | a | a | a | a | a | a | a | a | a | a | a | a |
| 01XX Hydraulic Turbine Design | 0118 | Base | Fixed Blade Iteration 1F Base Design Work | 1 | JOB | $ - 0 | N/A | a | a | a | a | a | a | a | a | a | a | a | a | a | a |
| 01XX Hydraulic Turbine Design | 0119 | Opt | Fixed Blade Iteration 1F - Preliminary Design Five Blade, 319-inch Diameter CFD | 1 | JOB | $ - 0 | N/A | a | a | a | a | a | a | a | a | a | a | a | a | a | a |
| 01XX Hydraulic Turbine Design | 0120 | Opt | Fixed Blade Iteration 1F - Preliminary Design Five Blade, 327-inch Diameter CFD | 1 | JOB | $ - 0 | N/A | a | a | a | a | a | a | a | a | a | a | a | a | a | a |
| 01XX Hydraulic Turbine Design | 0121 | Opt | Fixed Blade Iteration 1F - Preliminary Design Performance Model Testing (Diameter TBD) | 1 | JOB | $ - 0 | N/A | a | a | a | a | a | a | a | a | a | a | a | a | a | a |
| 01XX Hydraulic Turbine Design | 0122 | Base | Fixed Blade Iteration 2F Base Design Work | 1 | JOB | $ - 0 | N/A | a | a | a | a | a | a | a | a | a | a | a | a | a | a |
| 01XX Hydraulic Turbine Design | 0123 | Opt | Fixed Blade Iteration 2F - Preliminary Design Six Blade, TBD-inch Diameter CFD | 1 | JOB | $ - 0 | N/A | a | a | a | a | a | a | a | a | a | a | a | a | a | a |
| 01XX Hydraulic Turbine Design | 0124 | Opt | Fixed Blade Iteration 2F - Preliminary Design Performance Model Testing (Diameter TBD) | 1 | JOB | $ - 0 | N/A | a | a | a | a | a | a | a | a | a | a | a | a | a | a |
| 01XX Hydraulic Turbine Design | 0125 | Base | Fixed Blade Iteration 3F Base Design Work | 1 | JOB | $ - 0 | N/A | a | a | a | a | a | a | a | a | a | a | a | a | a | a |
| 01XX Hydraulic Turbine Design | 0126 | Opt | Fixed Blade Iteration 3F - Preliminary Design CFD With Modified Distributor | 1 | JOB | $ - 0 | N/A | a | a | a | a | a | a | a | a | a | a | a | a | a | a |
| 01XX Hydraulic Turbine Design | 0127 | Opt | Fixed Blade Iteration 3F - Preliminary Design CFD With Draft Tube Modification 1 | 1 | JOB | $ - 0 | N/A | a | a | a | a | a | a | a | a | a | a | a | a | a | a |
| 01XX Hydraulic Turbine Design | 0128 | Opt | Fixed Blade Iteration 3F - Preliminary Design CFD With Draft Tube Modification 2 | 1 | JOB | $ - 0 | N/A | a | a | a | a | a | a | a | a | a | a | a | a | a | a |
| 01XX Hydraulic Turbine Design | 0129 | Opt | Fixed Blade Iteration 3F - Preliminary Design Performance Model Testing With Draft Tube Modification | 1 | JOB | $ - 0 | N/A | a | a | a | a | a | a | a | a | a | a | a | a | a | a |
| 01XX Hydraulic Turbine Design | 0130 | Opt | Fixed Blade Iteration 4F Design Work | 1 | JOB | $ - 0 | N/A | a | a | a | a | a | a | a | a | a | a | a | a | a | a |
| 01XX Hydraulic Turbine Design | 0131 | Opt | Fixed Blade Iteration 4F - ERDC Observational Model Testing Coordination | 1 | JOB | $ - 0 | N/A | a | a | a | a | a | a | a | a | a | a | a | a | a | a |
| 01XX Hydraulic Turbine Design | 0132 | Base | Fixed Blade Final Design Performance Model Testing | 1 | JOB | $ - 0 | N/A | a | a | a | a | a | a | a | a | a | a | a | a | a | a |
| 01XX Hydraulic Turbine Design | 0133 | Opt | Supply Set of Model Wicket Gates | 2 | SET | $ - 0 | N/A | a | a | a | a | a | a | a | a | a | a | a | a | a | a |
| 02XX Prototype Design | 0201 | Base | Discharge Ring Diameter Preliminary Analyses | 1 | JOB | $ - 0 | N/A | a | a | a | a | a | a | a | a | a | a | a | a | a | a |
| 02XX Prototype Design | 0202 | Base | Adjustable Blade Runner Prototype Design | 1 | JOB | $ - 0 | N/A | a | a | a | a | a | a | a | a | a | a | a | a | a | a |
| 02XX Prototype Design | 0203 | Base | Adjustable Blade Discharge Ring and Draft Tube Liner Transition Prototype Design | 1 | JOB | $ - 0 | N/A | a | a | a | a | a | a | a | a | a | a | a | a | a | a |
| 02XX Prototype Design | 0204 | Base | Adjustable Blade Stay Vane Modifications Prototype Design | 1 | JOB | $ - 0 | N/A | a | a | a | a | a | a | a | a | a | a | a | a | a | a |
| 02XX Prototype Design | 0205 | Base | Adjustable Blade Wicket Gate Prototype Design | 1 | JOB | $ - 0 | N/A | a | a | a | a | a | a | a | a | a | a | a | a | a | a |
| 02XX Prototype Design | 0206 | Base | Adjustable Blade Lower Turbine Shaft and Blade Servomotor Shaft Prototype Design | 1 | JOB | $ - 0 | N/A | a | a | a | a | a | a | a | a | a | a | a | a | a | a |
| 02XX Prototype Design | 0207 | Opt | Adjustable Blade Replacement Inner Head Cover Prototype Design | 1 | JOB | $ - 0 | N/A | a | a | a | a | a | a | a | a | a | a | a | a | a | a |
| 02XX Prototype Design | 0208 | Base | Fixed Blade Runner Prototype Design | 1 | JOB | $ - 0 | N/A | a | a | a | a | a | a | a | a | a | a | a | a | a | a |
| 02XX Prototype Design | 0209 | Base | Fixed Blade Discharge Ring and Draft Tube Liner Transition Prototype Design | 1 | JOB | $ - 0 | N/A | a | a | a | a | a | a | a | a | a | a | a | a | a | a |
| 02XX Prototype Design | 0210 | Opt | Fixed Blade Stay Vane Modifications Prototype Design | 1 | JOB | $ - 0 | N/A | a | a | a | a | a | a | a | a | a | a | a | a | a | a |
| 02XX Prototype Design | 0211 | Opt | Fixed Blade Wicket Gate Prototype Design | 1 | JOB | $ - 0 | N/A | a | a | a | a | a | a | a | a | a | a | a | a | a | a |
| 02XX Prototype Design | 0212 | Opt | Fixed Blade Replacement Inner Head Cover Prototype Design | 1 | JOB | $ - 0 | N/A | a | a | a | a | a | a | a | a | a | a | a | a | a | a |
| 02XX Prototype Design | 0213 | Opt | Modified Outer Head Cover Prototype Design | 1 | JOB | $ - 0 | N/A | a | a | a | a | a | a | a | a | a | a | a | a | a | a |
| 02XX Prototype Design | 0214 | Opt | Replacement Outer Head Cover Prototype Design | 1 | JOB | $ - 0 | N/A | a | a | a | a | a | a | a | a | a | a | a | a | a | a |
| 02XX Prototype Design | 0215 | Opt | Modified Adjustable Blade Intermediate Head Cover Prototype Design | 1 | JOB | $ - 0 | N/A | a | a | a | a | a | a | a | a | a | a | a | a | a | a |
| 02XX Prototype Design | 0216 | Opt | Modified Fixed Blade Intermediate Head Cover Prototype Design | 1 | JOB | $ - 0 | N/A | a | a | a | a | a | a | a | a | a | a | a | a | a | a |
| 02XX Prototype Design | 0217 | Base | Prototype Stator Bar Design, Manufacture, and Test | 1 | JOB | $ - 0 | N/A | a | a | a | a | a | a | a | a | a | a | a | a | a | a |
| 02XX Prototype Design | 0218 | Opt | Thrust Bearing Structural Analysis | 1 | JOB | $ - 0 | N/A | a | a | a | a | a | a | a | a | a | a | a | a | a | a |
| 02XX Prototype Design | 0219 | Opt | Adjustable Blade Draft Tube Modification Design | 1 | JOB | $ - 0 | N/A | a | a | a | a | a | a | a | a | a | a | a | a | a | a |
| 02XX Prototype Design | 0220 | Opt | Fixed Blade Draft Tube Modification Design | 1 | JOB | $ - 0 | N/A | a | a | a | a | a | a | a | a | a | a | a | a | a | a |
| 02XX Prototype Design | 0221 | Base | Surface Air Coolers Design | 1 | JOB | $ - 0 | N/A | a | a | a | a | a | a | a | a | a | a | a | a | a | a |
| 03XX Miscellaneous Equipment, Spare Parts, and Oil Disposal | 0301 | Base | Design and Supply One Stator Core Including Materials, Accessories, and Factory Testing | 1 | JOB | $ - 0 | Percent of the total CLIN price that is: |
Electromagnetic Steel: ___%
| Offsite Labor: ___% | X | X | a | a | a | a | a | a | a | a | a | a | a | 0% | |||
| 03XX Miscellaneous Equipment, Spare Parts, and Oil Disposal | 0302 | Base | Mobilization and Demobilization | 1 | JOB | $ - 0 | Percent of the total CLIN price that is: |
Offsite Labor: ___%
| Site Labor: ___% | X | X | a | a | a | a | a | a | a | a | a | a | a | 0% | |||
| 03XX Miscellaneous Equipment, Spare Parts, and Oil Disposal | 0303 | Base | Supply Spare Wicket Gates | 1 | JOB | $ - 0 | Existing wicket gate size and shape: |
______ pounds of stainless-steel _______ square feet of all wetted surfaces
Percent of the total CLIN price that is:
Stainless Steel: ___%
| Offsite Labor: ___% | X | X | X | X | a | a | a | a | a | a | a | a | a | 0% | |||
| 03XX Miscellaneous Equipment, Spare Parts, and Oil Disposal | 0304 | Base | Supply Generator Spare Parts | 1 | JOB | $ - 0 | Percent of the total CLIN price that is: |
Copper: ___%
| Offsite Labor: ___% | X | X | a | a | a | a | a | a | a | a | a | a | a | 0% | |||
| 03XX Miscellaneous Equipment, Spare Parts, and Oil Disposal | 0305 | Base | Supply Spare Surface Air Cooler Assemblies | 1 | JOB | $ - 0 | Percent of the total CLIN price that is: |
Stainless Steel: ___% Carbon Steel: ___% Copper: ___%
| Offsite Labor: ___% | X | X | a | a | a | a | a | a | a | a | a | 0% | |||
| 03XX Miscellaneous Equipment, Spare Parts, and Oil Disposal | 0306 | Base | Supply Other Required Spare Parts | 1 | JOB | $ - 0 | Percent of the total CLIN price that is: |
Stainless Steel: ___% Carbon Steel: ___% Copper: ___%
| Offsite Labor: ___% | X | X | a | a | a | a | a | a | a | a | a | 0% | |||
| 03XX Miscellaneous Equipment, Spare Parts, and Oil Disposal | 0307 | Base | Supply Runner and Shaft Support | 1 | JOB | $ - 0 | Percent of the total CLIN price that is: |
Carbon Steel: ___%
| Offsite Labor: ___% | X | X | a | a | a | a | a | a | a | a | a | a | a | 0% | |||
| 03XX Miscellaneous Equipment, Spare Parts, and Oil Disposal | 0308 | Opt | Oil Disposal - 4,000 Gallons | 1 | JOB | $ - 0 | Percent of the total CLIN price that is: |
Offsite Labor: ___%
| Site Labor: ___% | X | X | a | a | a | a | a | a | a | a | a | a | a | 0% | |||
| 03XX Miscellaneous Equipment, Spare Parts, and Oil Disposal | 0309 | Opt | Oil Disposal - 4,000 Gallons | 1 | JOB | $ - 0 | Percent of the total CLIN price that is: |
Offsite Labor: ___%
| Site Labor: ___% | X | X | a | a | a | a | a | a | a | a | a | a | a | 0% | |||
| 03XX Miscellaneous Equipment, Spare Parts, and Oil Disposal | 0310 | Opt | Oil Disposal - 4,000 Gallons | 1 | JOB | $ - 0 | Percent of the total CLIN price that is: |
Offsite Labor: ___%
| Site Labor: ___% | X | X | a | a | a | a | a | a | a | a | a | a | a | 0% | |||
| 03XX Miscellaneous Equipment, Spare Parts, and Oil Disposal | 0311 | Opt | Oil Disposal - 4,000 Gallons | 1 | JOB | $ - 0 | Percent of the total CLIN price that is: |
Offsite Labor: ___%
| Site Labor: ___% | X | X | a | a | a | a | a | a | a | a | a | a | a | 0% | |||
| 03XX Miscellaneous Equipment, Spare Parts, and Oil Disposal | 0312 | Opt | Oil Disposal - 4,000 Gallons | 1 | JOB | $ - 0 | Percent of the total CLIN price that is: |
Offsite Labor: ___%
| Site Labor: ___% | X | X | a | a | a | a | a | a | a | a | a | a | a | 0% | |||
| 03XX Miscellaneous Equipment, Spare Parts, and Oil Disposal | 0313 | Opt | Oil Disposal - 4,000 Gallons | 1 | JOB | $ - 0 | Percent of the total CLIN price that is: |
Offsite Labor: ___%
| Site Labor: ___% | X | X | a | a | a | a | a | a | a | a | a | a | a | 0% | |||
| 03XX Miscellaneous Equipment, Spare Parts, and Oil Disposal | 0314 | Opt | Oil Disposal - 4,000 Gallons | 1 | JOB | $ - 0 | Percent of the total CLIN price that is: |
Offsite Labor: ___%
| Site Labor: ___% | X | X | a | a | a | a | a | a | a | a | a | a | a | 0% | |||
| 03XX Miscellaneous Equipment, Spare Parts, and Oil Disposal | 0315 | Opt | Oil Disposal - 4,000 Gallons | 1 | JOB | $ - 0 | Percent of the total CLIN price that is: |
Offsite Labor: ___%
| Site Labor: ___% | X | X | a | a | a | a | a | a | a | a | a | a | a | 0% | |||
| 03XX Miscellaneous Equipment, Spare Parts, and Oil Disposal | 0316 | Opt | Oil Disposal - 4,000 Gallons | 1 | JOB | $ - 0 | Percent of the total CLIN price that is: |
Offsite Labor: ___%
| Site Labor: ___% | X | X | a | a | a | a | a | a | a | a | a | a | a | 0% | |||
| 03XX Miscellaneous Equipment, Spare Parts, and Oil Disposal | 0317 | Opt | Oil Disposal - 4,000 Gallons | 1 | JOB | $ - 0 | Percent of the total CLIN price that is: |
Offsite Labor: ___%
| Site Labor: ___% | X | X | a | a | a | a | a | a | a | a | a | a | a | 0% | |||
| 03XX Miscellaneous Equipment, Spare Parts, and Oil Disposal | 0318 | Opt | Oil Disposal - 4,000 Gallons | 1 | JOB | $ - 0 | Percent of the total CLIN price that is: |
Offsite Labor: ___%
| Site Labor: ___% | X | X | a | a | a | a | a | a | a | a | a | a | a | 0% | |||
| 03XX Miscellaneous Equipment, Spare Parts, and Oil Disposal | 0319 | Opt | Oil Disposal - 4,000 Gallons | 1 | JOB | $ - 0 | Percent of the total CLIN price that is: |
Offsite Labor: ___%
| Site Labor: ___% | X | X | a | a | a | a | a | a | a | a | a | a | a | 0% | |||
| 03XX Miscellaneous Equipment, Spare Parts, and Oil Disposal | 0320 | Opt | Oil Disposal - 500 Gallons | 1 | JOB | $ - 0 | Percent of the total CLIN price that is: |
Offsite Labor: ___%
| Site Labor: ___% | X | X | a | a | a | a | a | a | a | a | a | a | a | 0% | |||
| 03XX Miscellaneous Equipment, Spare Parts, and Oil Disposal | 0321 | Opt | Oil Disposal - 500 Gallons | 1 | JOB | $ - 0 | Percent of the total CLIN price that is: |
Offsite Labor: ___%
| Site Labor: ___% | X | X | a | a | a | a | a | a | a | a | a | a | a | 0% | |||
| 03XX Miscellaneous Equipment, Spare Parts, and Oil Disposal | 0322 | Opt | Oil Disposal - 500 Gallons | 1 | JOB | $ - 0 | Percent of the total CLIN price that is: |
Offsite Labor: ___%
| Site Labor: ___% | X | X | a | a | a | a | a | a | a | a | a | a | a | 0% | |||
| 03XX Miscellaneous Equipment, Spare Parts, and Oil Disposal | 0323 | Opt | Oil Disposal - 500 Gallons | 1 | JOB | $ - 0 | Percent of the total CLIN price that is: |
Offsite Labor: ___%
| Site Labor: ___% | X | X | a | a | a | a | a | a | a | a | a | a | a | 0% | |||
| 03XX Miscellaneous Equipment, Spare Parts, and Oil Disposal | 0324 | Opt | Oil Disposal - 500 Gallons | 1 | JOB | $ - 0 | Percent of the total CLIN price that is: |
Offsite Labor: ___%
| Site Labor: ___% | X | X | a | a | a | a | a | a | a | a | a | a | a | 0% | |||
| 04XX Unit AA Prototype Supply and Install | 0401AA | Base | Supply Adjustable Five Blade Runner (Base Requirement) | 1 | JOB | $ - 0 | Fully spherical hub, 309-inch blade tip diameter. Runner construction method as shown on proposal drawings. |
______ pounds of stainless-steel ______ pounds of carbon steel _______ square feet of all wetted surfaces of the hub and blades
Percent of total CLIN price that is:
Stainless Steel: ___% Carbon Steel: ___%
| Offsite Labor: ___% | X | X | X | X | a | a | a | a | a | a | a | 0% | |||
| 04XX Unit AA Prototype Supply and Install | 0401AB | Opt | Supply Adjustable Six Blade Runner - Incremental Difference Relative to CLIN AA | 1 | JOB | $ - 0 | Fully spherical hub, 309-inch blade tip diameter. Runner construction method as shown on proposal drawings. |
______ pounds of stainless-steel ______ pounds of carbon steel _______ square feet of all wetted surfaces of the hub and blades
Percent of the sum of CLIN AA and AB prices that is:
Stainless Steel: ___% Carbon Steel: ___%
| Offsite Labor: ___% | X | X | X | X | a | a | a | a | a | a | a | 0% | |||
| 04XX Unit AA Prototype Supply and Install | 0402AA | Base | Supply Permanent Discharge Ring Section and Insert for Adjustable Blade Runner | 1 | JOB | $ - 0 | Spherical outer blade profile, 309-inch blade tip diameter |
______ pounds of stainless-steel ______ pounds of carbon steel _______ square feet of all wetted surfaces
Percent of total CLIN price that is stainless-steel material: ___% carbon steel material: ___%
| labor: ___% | X | X | X | X | a | a | a | a | a | a | a | 0% | |||
| 04XX Unit AA Prototype Supply and Install | 0402AB | Opt | Supply Embedded Discharge Ring Section and Insert for Adjustable Blade Runner - Incremental Difference Relative to CLIN AA | 1 | JOB | $ - 0 | Spherical outer blade profile, 317-inch blade tip diameter |
______ pounds of stainless-steel ______ pounds of carbon steel _______ square feet of all wetted surfaces
Percent of the sum of CLIN AA and AB prices that is:
Stainless Steel: ___% Carbon Steel: ___%
| Offsite Labor: ___% | X | X | X | X | a | a | a | a | a | a | a | 0% | |||
| 04XX Unit AA Prototype Supply and Install | 0403AA | Base | Modify Existing Discharge Ring Without Demolition and Install Permanent Discharge Ring Section for Adjustable Blade Runner | 1 | JOB | $ - 0 | 309-inch blade tip diameter. |
______ pounds of concrete and grout
Percent of total CLIN price that is:
Concrete and Grout: ___% Offsite Labor: ___%
| Site Labor: ___% | X | X | X | X | a | a | a | a | a | a | a | a | a | 0% | ||
| 04XX Unit AA Prototype Supply and Install | 0403AB | Opt | Install Embedded Discharge Ring Section (Excluding Demolition) for Adjustable Blade Runner - Incremental Difference Relative to CLIN AA | 1 | JOB | $ - 0 | 317-inch blade tip diameter. |
______ pounds of concrete and grout
Percent of the sum of CLINs AA and AB prices that is:
Concrete and Grout: ___% Offsite Labor: ___%
| Site Labor: ___% | X | X | X | X | a | a | a | a | a | a | a | a | a | 0% | ||
| 04XX Unit AA Prototype Supply and Install | 0404AA | Base | Supply Permanent Draft Tube Liner Transition Section for Adjustable Blade Runner | 1 | JOB | $ - 0 | 309-inch blade tip diameter. |
______ pounds of stainless-steel ______ pounds of carbon steel _______ square feet of all wetted surfaces
Percent of total CLIN price that is:
Stainless Steel: ___% Carbon Steel: ___%
| Offsite Labor: ___% | X | X | X | X | a | a | a | a | a | a | a | 0% | |||
| 04XX Unit AA Prototype Supply and Install | 0404AB | Opt | Supply Embedded Draft Tube Liner Transition Section for Adjustable Blade Runner - Incremental Difference Relative to CLIN AA | 1 | JOB | $ - 0 | 317-inch blade tip diameter. |
______ pounds of stainless-steel ______ pounds of carbon steel _______ square feet of all wetted surfaces
Percent of the sum of CLINs AA and AB prices that is:
Stainless Steel: ___% Carbon Steel: ___%
| Offsite Labor: ___% | X | X | X | X | a | a | a | a | a | a | a | 0% | |||
| 04XX Unit AA Prototype Supply and Install | 0405AA | Base | Modify Existing Draft Tube Liner Without Demolition and Install Permanent Draft Tube Liner Transition Section for Adjustable Blade Runner | 1 | JOB | $ - 0 | 309-inch blade tip diameter. |
______ pounds of concrete and grout
Percent of total CLIN price that is:
Concrete and grout material : ___% Offsite Labor: ___%
| Site Labor: ___% | X | X | X | X | a | a | a | a | a | a | a | a | a | 0% | ||
| 04XX Unit AA Prototype Supply and Install | 0405AB | Opt | Install Embedded Draft Tube Liner Transition Section (Excluding Demolition) for Adjustable Blade Runner - Incremental Difference Relative to CLIN AA | 1 | JOB | $ - 0 | 317-inch blade tip diameter. |
______ pounds of concrete and grout
Percent of the sum of CLINs AA and AB prices that is:
Concrete and Grout: ___% Offsite Labor: ___%
| Site Labor: ___% | X | X | X | X | a | a | a | a | a | a | a | a | a | 0% | ||
| 04XX Unit AA Prototype Supply and Install | 0406 | Opt | Demolition of Discharge Ring and Draft Tube Liner Transition – Cubic Yard | 300 | Cubic Yard | $ - 0 | Percent of the total CLIN price that is: |
Offsite Labor: ___%
| Site Labor: ___% | X | X | a | a | a | a | a | a | a | a | a | a | a | 0% | |||
| 04XX Unit AA Prototype Supply and Install | 0407AA | Base | Refurbish Existing Outer Head Cover | 1 | JOB | $ - 0 | Percent of the total CLIN price that is: |
Offsite Labor: ___%
| Site Labor: ___% | X | X | a | a | a | a | a | a | a | a | a | a | a | 0% | |||
| 04XX Unit AA Prototype Supply and Install | 0407AB | Opt | Refurbish and Modify Existing Outer Head Cover - Incremental Difference Relative to CLIN AA | 1 | JOB | $ - 0 | 309-inch blade tip diameter. |
Percent of the total CLIN price that is:
Offsite Labor: ___%
| Site Labor: ___% | X | X | a | a | a | a | a | a | a | a | a | a | a | 0% | |||
| 04XX Unit AA Prototype Supply and Install | 0407AC | Opt | Supply Replacement Outer Head Cover - Incremental Difference Relative to CLIN AA | 1 | JOB | $ - 0 | 317-inch blade tip diameter. |
______ pounds of carbon steel _______ square feet of all wetted surfaces
Percent of the sum of CLINs AA and AC prices that is:
Carbon Steel: ___%
| Offsite Labor: ___% | X | X | X | X | a | a | a | a | a | a | a | a | a | 0% | ||
| 04XX Unit AA Prototype Supply and Install | 0408AA | Base | Refurbish Existing Intermediate Head Cover | 1 | JOB | $ - 0 | Percent of the total CLIN price that is: |
Offsite Labor: ___%
| Site Labor: ___% | X | X | a | a | a | a | a | a | a | a | a | a | a | 0% | |||
| 04XX Unit AA Prototype Supply and Install | 0408AB | Opt | Refurbish and Modify Existing Intermediate Head Cover - Incremental Difference Relative to CLIN AA | 1 | JOB | $ - 0 | 317-inch blade tip diameter. |
Percent of the total CLIN price that is:
Offsite Labor: ___%
| Site Labor: ___% | X | X | a | a | a | a | a | a | a | a | a | a | a | 0% | |||
| 04XX Unit AA Prototype Supply and Install | 0409AA | Base | Refurbish Existing Inner Head Cover | 1 | JOB | $ - 0 | Percent of the total CLIN price that is: |
Offsite Labor: ___%
| Site Labor: ___% | X | X | a | a | a | a | a | a | a | a | a | a | a | 0% | |||
| 04XX Unit AA Prototype Supply and Install | 0409AB | Opt | Supply Replacement Inner Head Cover - Incremental Difference Relative to CLIN AA | 1 | JOB | $ - 0 | Existing inner headcover size and shape. |
______ pounds of carbon steel _______ square feet of all wetted surfaces
Percent of the sum of CLINs AA and AB prices that is:
Carbon Steel: ___%
| Offsite Labor: ___% | X | X | X | X | a | a | a | a | a | a | a | a | a | 0% | ||
| 04XX Unit AA Prototype Supply and Install | 0410 | Base | Supply Stay Vane Modification Components | 1 | JOB | $ - 0 | Leading and trailing edge extensions or alternate method as shown on proposal drawings |
______ pounds of carbon steel _______ square feet of all wetted surfaces
Percent of the total CLIN price that is:
Carbon Steel: ___%
| Offsite Labor: ___% | X | X | X | X | a | a | a | a | a | a | a | a | a | 0% | ||
| 04XX Unit AA Prototype Supply and Install | 0411 | Base | Refurbish Stay Vanes/Ring Including Installation of Stay Vane Modification Components | 1 | JOB | $ - 0 | Percent of the total CLIN price that is: |
Offsite Labor: ___%
| Site Labor: ___% | X | X | a | a | a | a | a | a | a | a | a | a | a | 0% | |||
| 04XX Unit AA Prototype Supply and Install | 0412 | Base | Supply Wicket Gates | 1 | JOB | $ - 0 | Existing wicket gate size and shape. |
______ pounds of stainless-steel _______ square feet of all wetted surfaces
Percent of the total CLIN price that is:
Stainless Steel: ___%
| Offsite Labor: ___% | X | X | X | X | a | a | a | a | a | a | a | a | a | 0% | |||
| 04XX Unit AA Prototype Supply and Install | 0413 | Base | Supply Wicket Gate Operating Mechanism Bushings and Bearing Plate | 1 | JOB | $ - 0 | Percent of the total CLIN price that is: |
Stainless Steel: ___%
| Offsite Labor: ___% | X | X | a | a | a | a | a | a | a | a | a | a | a | 0% | |||
| 04XX Unit AA Prototype Supply and Install | 0414 | Base | Supply Head Cover and Bottom Ring Facing Plates | 1 | JOB | $ - 0 | 309-inch blade tip diameter. |
______ pounds of austenitic stainless-steel _______ square feet of all wetted surfaces
Percent of the total CLIN price that is:
Stainless Steel: ___%
| Offsite Labor: ___% | X | X | X | X | a | a | a | a | a | a | a | a | a | 0% | |||
| 04XX Unit AA Prototype Supply and Install | 0415 | Base | Supply Blade Servomotor Shaft and Appurtenances | 1 | JOB | $ - 0 | Percent of the total CLIN price that is: |
Carbon Steel: ___%
| Offsite Labor: ___% | X | X | a | A | a | a | a | a | a | a | a | a | a | 0% | |||
| 04XX Unit AA Prototype Supply and Install | 0416 | Base | Supply Lower Turbine Shaft and Appurtenances | 1 | JOB | $ - 0 | Percent of the total CLIN price that is: |
Stainless Steel: ___% Carbon Steel: ___%
| Offsite Labor: ___% | X | X | A | A | a | a | a | a | a | a | a | a | 0% | |||
| 04XX Unit AA Prototype Supply and Install | 0417 | Base | Supply Oil and Water Basin at the Blade Servomotor | 1 | JOB | $ - 0 | Percent of the total CLIN price that is: |
Carbon Steel: ___%
| Offsite Labor: ___% | X | X | a | A | a | a | a | a | a | a | a | a | a | 0% | |||
| 04XX Unit AA Prototype Supply and Install | 0418 | Base | Supply Turbine Shaft Packing Box | 1 | JOB | $ - 0 | Percent of the total CLIN price that is: |
Carbon Steel: ___%
| Offsite Labor: ___% | X | X | a | A | a | a | a | a | a | a | a | a | a | 0% | |||
| 04XX Unit AA Prototype Supply and Install | 0419 | Base | Supply Turbine Guide Bearing Oil Sump | 1 | JOB | $ - 0 | Percent of the total CLIN price that is: |
Carbon Steel: ___%
| Offsite Labor: ___% | X | X | a | A | a | a | a | a | a | a | a | a | a | 0% | |||
| 04XX Unit AA Prototype Supply and Install | 0420 | Base | Supply Complete Set of Stator Bars, Including Supplies and Accessories for a Complete New Winding Including Factory Testing | 1 | JOB | $ - 0 | Percent of the total CLIN price that is: |
Copper: ____%
| Offsite Labor: ____% | X | X | a | a | a | a | a | a | a | a | a | a | a | 0% | |||
| 04XX Unit AA Prototype Supply and Install | 0421 | Base | Remove Existing Stator Winding and Install and Test New Stator Winding | 1 | JOB | $ - 0 | Percent of the total CLIN price that is: |
Offsite Labor: ___%
| Site Labor: ___% | X | X | a | a | a | a | a | a | a | a | a | a | a | 0% | |||
| 04XX Unit AA Prototype Supply and Install | 0422 | Base | Supply Surface Air Coolers | 1 | JOB | $ - 0 | Percent of the total CLIN price that is: |
Stainless Steel: ___% Carbon Steel: ___% Copper: ___%
| Offsite Labor: ___% | X | X | a | a | a | a | a | a | a | a | a | 0% | |||
| 04XX Unit AA Prototype Supply and Install | 0423 | Base | Install Surface Air Coolers | 1 | JOB | $ - 0 | Percent of the total CLIN price that is: |
Offsite Labor: ___%
| Site Labor: ___% | X | X | a | a | a | a | a | a | a | a | a | a | a | 0% | |||
| 04XX Unit AA Prototype Supply and Install | 0424 | Base | Pre-Disassembly Watered Operational Testing | 1 | JOB | $ - 0 | Percent of the total CLIN price that is: |
Offsite Labor: ___%
| Site Labor: ___% | X | X | a | a | a | a | a | a | a | a | a | a | a | 0% | |||
| 04XX Unit AA Prototype Supply and Install | 0425 | Base | Generating Unit Disassembly | 1 | JOB | $ - 0 | Percent of the total CLIN price that is: |
Offsite Labor: ___%
| Site Labor: ___% | X | X | a | a | a | a | a | a | a | a | a | a | a | 0% | |||
| 04XX Unit AA Prototype Supply and Install | 0426 | Base | Refurbish Existing Turbine Shaft to Become Intermediate Shaft | 1 | JOB | $ - 0 | Percent of the total CLIN price that is: |
Offsite Labor: ___%
| Site Labor: ___% | X | X | a | a | a | a | a | a | a | a | a | a | a | 0% | ||||||||||||||
| 04XX Unit AA Prototype Supply and Install | 0427 | Base | Not Used | N/A | N/A | $ - 0 | N/A | a | a | a | a | a | a | a | a | a | a | a | a | a | 0% | |||||||
| 04XX Unit AA Prototype Supply and Install | 0428 | Base | Not Used | N/A | N/A | $ - 0 | N/A | a | a | a | a | a | a | a | a | a | a | a | a | a | 0% | |||||||
| 04XX Unit AA Prototype Supply and Install | 0429 | Base | Machine Stay Ring Head Cover Mounting Flange | 1 | JOB | $ - 0 | Percent of the total CLIN price that is: |
Offsite Labor: ___%
| Site Labor: ___% | X | X | a | a | a | a | a | a | a | a | a | a | a | 0% | |||
| 04XX Unit AA Prototype Supply and Install | 0430 | Base | Refurbish Bottom Ring | 1 | JOB | $ - 0 | Percent of the total CLIN price that is: |
Offsite Labor: ___%
| Site Labor: ___% | X | X | a | a | a | a | a | a | a | a | a | a | a | 0% | |||
| 04XX Unit AA Prototype Supply and Install | 0431 | Base | Refurbish Miscellaneous Wicket Gate Operating Mechanism Components | 1 | JOB | $ - 0 | Percent of the total CLIN price that is: |
Offsite Labor: ___%
| Site Labor: ___% | X | X | a | a | a | a | a | a | a | a | a | a | a | 0% | |||
| 04XX Unit AA Prototype Supply and Install | 0432 | Base | Line Boring and Installation of Wicket Gate Stem Bushings | 1 | JOB | $ - 0 | Percent of the total CLIN price that is: |
Offsite Labor: ___%
| Site Labor: ___% | X | X | a | a | a | a | a | a | a | a | a | a | a | 0% | |||
| 04XX Unit AA Prototype Supply and Install | 0433 | Base | Replace Automatic Air Valves, Gate Valves, Scroll Case Drain Valves and Floor Grating, and Draft Tube Drain Valves | 1 | JOB | $ - 0 | Percent of the total CLIN price that is: |
Stainless Steel: ___% Carbon Steel: ___% Offsite Labor: ___%
| Site Labor: ___% | X | X | a | a | a | a | a | a | a | a | a | 0% | |||
| 04XX Unit AA Prototype Supply and Install | 0434 | Base | Refurbish Wicket Gate Operating Ring | 1 | JOB | $ - 0 | Percent of the total CLIN price that is: |
Offsite Labor: ___%
| Site Labor: ___% | X | X | a | a | a | a | a | a | a | a | a | a | a | 0% | |||
| 04XX Unit AA Prototype Supply and Install | 0435 | Base | Refurbish Wicket Gate Servomotors | 1 | JOB | $ - 0 | Percent of the total CLIN price that is: |
Offsite Labor: ___%
| Site Labor: ___% | X | X | a | a | a | a | a | a | a | a | a | a | a | 0% | |||
| 04XX Unit AA Prototype Supply and Install | 0436 | Opt | Bore and Hone Wicket Gate Servomotors | 1 | JOB | $ - 0 | Percent of the total CLIN price that is: |
Offsite Labor: ___%
| Site Labor: ___% | X | X | a | a | a | a | a | a | a | a | a | a | a | 0% | |||
| 04XX Unit AA Prototype Supply and Install | 0437 | Opt | Provide Wicket Gate Servomotor Piston Rings | 1 | JOB | $ - 0 | Percent of the total CLIN price that is: |
Offsite Labor: ___%
| Site Labor: ___% | X | X | a | a | a | a | a | a | a | a | a | a | a | 0% | |||
| 04XX Unit AA Prototype Supply and Install | 0438 | Base | Provide Water and Oil Piping Systems and Components | 1 | JOB | $ - 0 | Percent of the total CLIN price that is: |
Offsite Labor: ___%
| Site Labor: ___% | X | X | a | a | a | a | a | a | a | a | a | a | a | 0% | |||
| 04XX Unit AA Prototype Supply and Install | 0439 | Base | Provide Electrical Devices, Temperature Indicating Devices, and Wiring/Cable | 1 | JOB | $ - 0 | Percent of the total CLIN price that is: |
Offsite Labor: ___%
| Site Labor: ___% | X | X | a | a | a | a | a | a | a | a | a | a | a | 0% | |||
| 04XX Unit AA Prototype Supply and Install | 0440 | Base | Provide High Pressure Oil Injection System Components | 1 | JOB | $ - 0 | Percent of the total CLIN price that is: |
Offsite Labor: ___%
| Site Labor: ___% | X | X | a | a | a | a | a | a | a | a | a | a | a | 0% | |||
| 04XX Unit AA Prototype Supply and Install | 0441 | Base | Thrust Bearing Phase 1 Inspections | 1 | JOB | $ - 0 | Percent of the total CLIN price that is: |
Offsite Labor: ___%
| Site Labor: ___% | X | X | a | a | a | a | a | a | a | a | a | a | a | 0% | |||
| 04XX Unit AA Prototype Supply and Install | 0442 | Opt | Thrust Bearing Phase 2 Inspections | 1 | JOB | $ - 0 | Percent of the total CLIN price that is: |
Offsite Labor: ___%
| Site Labor: ___% | X | X | a | a | a | a | a | a | a | a | a | a | a | 0% | |||
| 04XX Unit AA Prototype Supply and Install | 0443 | Opt | Refurbish Thrust Bearing Shoes | 1 | JOB | $ - 0 | Percent of the total CLIN price that is: |
Offsite Labor: ___%
| Site Labor: ___% | X | X | a | a | a | a | a | a | a | a | a | a | a | 0% | |||
| 04XX Unit AA Prototype Supply and Install | 0444 | Opt | Refurbish Thrust Bearing Runner and Collar | 1 | JOB | $ - 0 | Percent of the total CLIN price that is: |
Offsite Labor: ___%
| Site Labor: ___% | X | X | a | a | a | a | a | a | a | a | a | a | a | 0% | |||
| 04XX Unit AA Prototype Supply and Install | 0445 | Opt | Upper Generator Guide Bearing NDT | 1 | JOB | $ - 0 | Percent of the total CLIN price that is: |
Offsite Labor: ___%
| Site Labor: ___% | X | X | a | a | a | a | a | a | a | a | a | a | a | 0% | |||
| 04XX Unit AA Prototype Supply and Install | 0446 | Opt | Refurbish Upper Generator Guide Bearing Shoes | 1 | JOB | $ - 0 | Percent of the total CLIN price that is: |
Offsite Labor: ___%
| Site Labor: ___% | X | X | a | a | a | a | a | a | a | a | a | a | a | 0% | |||
| 04XX Unit AA Prototype Supply and Install | 0447 | Opt | Lower Generator Guide Bearing NDT | 1 | JOB | $ - 0 | Percent of the total CLIN price that is: |
Offsite Labor: ___%
| Site Labor: ___% | X | X | a | a | a | a | a | a | a | a | a | a | a | 0% | |||
| 04XX Unit AA Prototype Supply and Install | 0448 | Opt | Refurbish Lower Generator Guide Bearing Shoes | 1 | JOB | $ - 0 | Percent of the total CLIN price that is: |
Offsite Labor: ___%
| Site Labor: ___% | X | X | a | a | a | a | a | a | a | a | a | a | a | 0% | |||
| 04XX Unit AA Prototype Supply and Install | 0449 | Opt | Turbine Guide Bearing NDT | 1 | JOB | $ - 0 | Percent of the total CLIN price that is: |
Offsite Labor: ___%
| Site Labor: ___% | X | X | a | a | a | a | a | a | a | a | a | a | a | 0% | |||
| 04XX Unit AA Prototype Supply and Install | 0450 | Opt | Refurbish Turbine Guide Bearing | 1 | JOB | $ - 0 | Percent of the total CLIN price that is: |
Offsite Labor: ___%
| Site Labor: ___% | X | X | a | a | a | a | a | a | a | a | a | a | a | 0% | |||
| 04XX Unit AA Prototype Supply and Install | 0451 | Base | Refurbish Oil Head | 1 | JOB | $ - 0 | Percent of the total CLIN price that is: |
Offsite Labor: ___%
| Site Labor: ___% | X | X | a | a | a | a | a | a | a | a | a | a | a | 0% | ||||||||||||||
| 04XX Unit AA Prototype Supply and Install | 0452 | Base | Not Used | N/A | N/A | $ - 0 | N/A | a | a | a | a | a | a | a | a | a | a | a | a | a | 0% | |||||||
| 04XX Unit AA Prototype Supply and Install | 0453 | Base | Refurbish and Modify Blade Servomotor Oil Pipes | 1 | JOB | $ - 0 | Percent of the total CLIN price that is: |
Offsite Labor: ___%
| Site Labor: ___% | X | X | a | a | a | a | a | a | a | a | a | a | a | 0% | ||||||||||||||
| 04XX Unit AA Prototype Supply and Install | 0454 | Base | Not Used | N/A | N/A | $ - 0 | N/A | a | a | a | a | a | a | a | a | a | a | a | a | a | 0% | |||||||
| 04XX Unit AA Prototype Supply and Install | 0455 | Base | Provide Thrust Bearing Oil Coolers | 1 | JOB | $ - 0 | Percent of the total CLIN price that is |
Stainless Steel: ___% Carbon Steel: ___% Copper: ___% Offsite Labor: ___%
| Site Labor: ___% | X | X | X | a | a | a | a | a | a | a | a | 0% | ||
| 04XX Unit AA Prototype Supply and Install | 0456 | Base | Refurbish Draft Tube Personnel Entry Door | 1 | JOB | $ - 0 | Percent of the total CLIN price that is: |
Offsite Labor: ___%
| Site Labor: ___% | X | X | a | a | a | a | a | a | a | a | a | a | a | 0% | |||
| 04XX Unit AA Prototype Supply and Install | 0457 | Base | Paint with Lead Removal and Disposal | 1 | JOB | $ - 0 | Percent of the total CLIN price that is: |
Offsite Labor: ___%
| Site Labor: ___% | X | X | a | a | a | a | a | a | a | a | a | a | a | 0% | |||
| 04XX Unit AA Prototype Supply and Install | 0458 | Base | Painting | 1 | JOB | $ - 0 | Percent of the total CLIN price that is: |
Offsite Labor: ___%
| Site Labor: ___% | X | X | a | a | a | a | a | a | a | a | a | a | a | 0% | |||
| 04XX Unit AA Prototype Supply and Install | 0459AA | Opt | Draft Tube Floor Fill Modification | 1 | JOB | $ - 0 | Based on drawings S-001 and S-002. |
______ pounds of concrete
Percent of total CLIN price that is:
Concrete Material: ___% Offsite Labor: ___%
| Site Labor: ___% | X | X | X | X | a | a | a | a | a | a | a | a | a | 0% | ||
| 04XX Unit AA Prototype Supply and Install | 0459AB | Opt | Draft Tube Roof Fill Modification – Incremental Difference Relative to CLIN AA | 1 | JOB | $ - 0 | Based on drawings S-003 and S-004. |
______ pounds of concrete
Percent of the sum of CLINs AA and AB prices that is:
Concrete Material: ___% Offsite Labor: ___%
| Site Labor: ___% | X | X | X | X | a | a | a | a | a | a | a | a | a | 0% | ||
| 04XX Unit AA Prototype Supply and Install | 0460 | Base | Inspect, Clean, and Test Stator Core | 1 | JOB | $ - 0 | Percent of the total CLIN price that is: |
Offsite Labor: ___%
| Site Labor: ___% | X | X | a | a | a | a | a | a | a | a | a | a | a | 0% | |||
| 04XX Unit AA Prototype Supply and Install | 0461 | Opt | Perform Additional Interlaminar Insulation Testing | 1 | JOB | $ - 0 | Percent of the total CLIN price that is: |
Offsite Labor: ___%
| Site Labor: ___% | X | X | a | a | a | a | a | a | a | a | a | a | a | 0% | |||
| 04XX Unit AA Prototype Supply and Install | 0462 | Opt | Remove Existing Stator Core and Install and Test New Stator Core | 1 | JOB | $ - 0 | Percent of the total CLIN price that is: |
Offsite Labor: ___%
| Site Labor: ___% | X | X | a | a | a | a | a | a | a | a | a | a | a | 0% | |||
| 04XX Unit AA Prototype Supply and Install | 0463 | Opt | Supply Stator Core Including Materials, Accessories, and Factory Testing | 1 | JOB | $ - 0 | Percent of the total CLIN price that is: |
Electromagnetic Steel: ___%
| Offsite Labor: ___% | X | X | a | a | a | a | a | a | a | a | a | a | a | 0% | |||
| 04XX Unit AA Prototype Supply and Install | 0464 | Base | Clean and Inspect Rotor, Reinsulate Rotor Field Leads, and Test Rotor Field Windings | 1 | JOB | $ - 0 | Percent of the total CLIN price that is: |
Offsite Labor: ___%
| Site Labor: ___% | X | X | a | a | a | a | a | a | a | a | a | a | a | 0% | |||
| 04XX Unit AA Prototype Supply and Install | 0465 | Opt | Refurbish Rotor Field Pole | 3 | EA | $ - 0 | Percent of the total CLIN price that is: |
Offsite Labor: ___%
| Site Labor: ___% | X | X | a | a | a | a | a | a | a | a | a | a | a | 0% | |||
| 04XX Unit AA Prototype Supply and Install | 0466 | Base | Furnish, Install, and Test Surge Arrestors and Refurbish Collector Rings | 1 | JOB | $ - 0 | Percent of the total CLIN price that is: |
Offsite Labor: ___%
| Site Labor: ___% | X | X | a | a | a | a | a | a | a | a | a | a | a | 0% | |||
| 04XX Unit AA Prototype Supply and Install | 0467 | Base | Provide Machine Condition Monitoring System Sensors | 1 | JOB | $ - 0 | Percent of the total CLIN price that is: |
Offsite Labor: ___%
| Site Labor: ___% | X | X | a | a | a | a | a | a | a | a | a | a | a | 0% | |||
| 04XX Unit AA Prototype Supply and Install | 0468 | Opt | Destructively Remove Turbine Shaft-to-Runner Fastener | 30 | EA | $ - 0 | Percent of the total CLIN price that is: |
Offsite Labor: ___%
| Site Labor: ___% | X | X | a | a | a | a | a | a | a | a | a | a | a | 0% | |||
| 04XX Unit AA Prototype Supply and Install | 0469 | Opt | Rotor Balancing | 1 | JOB | $ - 0 | Percent of the total CLIN price that is: |
Offsite Labor: ___%
| Site Labor: ___% | X | X | a | a | a | a | a | a | a | a | a | a | a | 0% | |||
| 04XX Unit AA Prototype Supply and Install | 0470 | Base | Generating Unit Reassembly | 1 | JOB | $ - 0 | Percent of the total CLIN price that is: |
Offsite Labor: ___%
| Site Labor: ___% | X | X | a | a | a | a | a | a | a | a | a | a | a | 0% | |||
| 04XX Unit AA Prototype Supply and Install | 0471 | Base | Generating Unit Commissioning | 1 | JOB | $ - 0 | Percent of the total CLIN price that is: |
Offsite Labor: ___%
| Site Labor: ___% | X | X | a | a | a | a | a | a | a | a | a | a | a | 0% | |||
| 04XX Unit AA Prototype Supply and Install | 0472 | Base | Perform Generator Special Field Test (UNIT AA ONLY) | 1 | JOB | $ - 0 | Percent of the total CLIN price that is: |
Offsite Labor: ___%
| Site Labor: ___% | X | X | a | a | a | a | a | a | a | a | a | a | a | 0% | |||
| 04XX Unit AA Prototype Supply and Install | 0473 | Opt | Perform Model Validation Testing on Generator | 1 | JOB | $ - 0 | Percent of the total CLIN price that is: |
Offsite Labor: ___%
| Site Labor: ___% | X | X | a | a | a | a | a | a | a | a | a | a | a | 0% | |||
| 04XX Unit AA Prototype Supply and Install | 0474 | Opt | Brake Ring Refurbishment | 1 | JOB | $ - 0 | Percent of the total CLIN price that is: |
Offsite Labor: ___%
| Site Labor: ___% | X | X | a | a | a | a | a | a | a | a | a | a | a | 0% | |||
| 05XX Unit AB Prototype Supply and Install | 0501AA | Base | Supply Adjustable Five Blade Runner (Base Requirement) | 1 | JOB | $ - 0 | Fully spherical hub, 309-inch blade tip diameter. Runner construction method as shown on proposal drawings. |
______ pounds of stainless-steel ______ pounds of carbon steel _______ square feet of all wetted surfaces of the hub and blades
Percent of total CLIN price that is:
Stainless Steel: ___% Carbon Steel: ___%
| Offsite Labor: ___% | X | X | X | X | a | a | a | a | a | a | a | 0% | |||
| 05XX Unit AB Prototype Supply and Install | 0501AB | Opt | Supply Adjustable Six Blade Runner - Incremental Difference Relative to CLIN AA | 1 | JOB | $ - 0 | Fully spherical hub, 309-inch blade tip diameter. Runner construction method as shown on proposal drawings. |
______ pounds of stainless-steel ______ pounds of carbon steel _______ square feet of all wetted surfaces of the hub and blades
Percent of the sum of CLIN AA and AB prices that is:
Stainless Steel: ___% Carbon Steel: ___%
| Offsite Labor: ___% | X | X | X | X | a | a | a | a | a | a | a | 0% | |||
| 05XX Unit AB Prototype Supply and Install | 0502AA | Base | Supply Permanent Discharge Ring Section and Insert for Adjustable Blade Runner | 1 | JOB | $ - 0 | Spherical outer blade profile, 309-inch blade tip diameter |
______ pounds of stainless-steel ______ pounds of carbon steel _______ square feet of all wetted surfaces
Percent of total CLIN price that is stainless-steel material: ___% carbon steel material: ___%
| labor: ___% | X | X | X | X | a | a | a | a | a | a | a | 0% | |||
| 05XX Unit AB Prototype Supply and Install | 0502AB | Opt | Supply Embedded Discharge Ring Section and Insert for Adjustable Blade Runner - Incremental Difference Relative to CLIN AA | 1 | JOB | $ - 0 | Spherical outer blade profile, 317-inch blade tip diameter |
______ pounds of stainless-steel ______ pounds of carbon steel _______ square feet of all wetted surfaces
Percent of the sum of CLIN AA and AB prices that is:
Stainless Steel: ___% Carbon Steel: ___%
| Offsite Labor: ___% | X | X | X | X | a | a | a | a | a | a | a | 0% | |||
| 05XX Unit AB Prototype Supply and Install | 0503AA | Base | Modify Existing Discharge Ring Without Demolition and Install Permanent Discharge Ring Section for Adjustable Blade Runner | 1 | JOB | $ - 0 | 309-inch blade tip diameter. |
______ pounds of concrete and grout
Percent of total CLIN price that is:
Concrete and Grout: ___% Offsite Labor: ___%
| Site Labor: ___% | X | X | X | X | a | a | a | a | a | a | a | a | a | 0% | ||
| 05XX Unit AB Prototype Supply and Install | 0503AB | Opt | Install Embedded Discharge Ring Section (Excluding Demolition) for Adjustable Blade Runner - Incremental Difference Relative to CLIN AA | 1 | JOB | $ - 0 | 317-inch blade tip diameter. |
______ pounds of concrete and grout
Percent of the sum of CLINs AA and AB prices that is:
Concrete and Grout: ___% Offsite Labor: ___%
| Site Labor: ___% | X | X | X | X | a | a | a | a | a | a | a | a | a | 0% | ||
| 05XX Unit AB Prototype Supply and Install | 0504AA | Base | Supply Permanent Draft Tube Liner Transition Section for Adjustable Blade Runner | 1 | JOB | $ - 0 | 309-inch blade tip diameter. |
______ pounds of stainless-steel ______ pounds of carbon steel _______ square feet of all wetted surfaces
Percent of total CLIN price that is:
Stainless Steel: ___% Carbon Steel: ___%
| Offsite Labor: ___% | X | X | X | X | a | a | a | a | a | a | a | 0% | |||
| 05XX Unit AB Prototype Supply and Install | 0504AB | Opt | Supply Embedded Draft Tube Liner Transition Section for Adjustable Blade Runner - Incremental Difference Relative to CLIN AA | 1 | JOB | $ - 0 | 317-inch blade tip diameter. |
______ pounds of stainless-steel ______ pounds of carbon steel _______ square feet of all wetted surfaces
Percent of the sum of CLINs AA and AB prices that is:
Stainless Steel: ___% Carbon Steel: ___%
| Offsite Labor: ___% | X | X | X | X | a | a | a | a | a | a | a | 0% | |||
| 05XX Unit AB Prototype Supply and Install | 0505AA | Base | Modify Existing Draft Tube Liner Without Demolition and Install Permanent Draft Tube Liner Transition Section for Adjustable Blade Runner | 1 | JOB | $ - 0 | 309-inch blade tip diameter. |
______ pounds of concrete and grout
Percent of total CLIN price that is:
Concrete and grout material : ___% Offsite Labor: ___%
| Site Labor: ___% | X | X | X | X | a | a | a | a | a | a | a | a | a | 0% | ||
| 05XX Unit AB Prototype Supply and Install | 0505AB | Opt | Install Embedded Draft Tube Liner Transition Section (Excluding Demolition) for Adjustable Blade Runner - Incremental Difference Relative to CLIN AA | 1 | JOB | $ - 0 | 317-inch blade tip diameter. |
______ pounds of concrete and grout
Percent of the sum of CLINs AA and AB prices that is:
Concrete and Grout: ___% Offsite Labor: ___%
| Site Labor: ___% | X | X | X | X | a | a | a | a | a | a | a | a | a | 0% | ||
| 05XX Unit AB Prototype Supply and Install | 0506 | Opt | Demolition of Discharge Ring and Draft Tube Liner Transition – Cubic Yard | 300 | Cubic Yard | $ - 0 | Percent of the total CLIN price that is: |
Offsite Labor: ___%
| Site Labor: ___% | X | X | a | a | a | a | a | a | a | a | a | a | a | 0% | |||
| 05XX Unit AB Prototype Supply and Install | 0507AA | Base | Refurbish Existing Outer Head Cover | 1 | JOB | $ - 0 | Percent of the total CLIN price that is: |
Offsite Labor: ___%
| Site Labor: ___% | X | X | a | a | a | a | a | a | a | a | a | a | a | 0% | |||
| 05XX Unit AB Prototype Supply and Install | 0507AB | Opt | Refurbish and Modify Existing Outer Head Cover - Incremental Difference Relative to CLIN AA | 1 | JOB | $ - 0 | 309-inch blade tip diameter. |
Percent of the total CLIN price that is:
Offsite Labor: ___%
| Site Labor: ___% | X | X | a | a | a | a | a | a | a | a | a | a | a | 0% | |||
| 05XX Unit AB Prototype Supply and Install | 0507AC | Opt | Supply Replacement Outer Head Cover - Incremental Difference Relative to CLIN AA | 1 | JOB | $ - 0 | 317-inch blade tip diameter. |
______ pounds of carbon steel _______ square feet of all wetted surfaces
Percent of the sum of CLINs AA and AC prices that is:
Carbon Steel: ___%
| Offsite Labor: ___% | X | X | X | X | a | a | a | a | a | a | a | a | a | 0% | ||
| 05XX Unit AB Prototype Supply and Install | 0508AA | Base | Refurbish Existing Intermediate Head Cover | 1 | JOB | $ - 0 | Percent of the total CLIN price that is: |
Offsite Labor: ___%
| Site Labor: ___% | X | X | a | a | a | a | a | a | a | a | a | a | a | 0% | |||
| 05XX Unit AB Prototype Supply and Install | 0508AB | Opt | Refurbish and Modify Existing Intermediate Head Cover - Incremental Difference Relative to CLIN AA | 1 | JOB | $ - 0 | 317-inch blade tip diameter. |
Percent of the total CLIN price that is:
Offsite Labor: ___%
| Site Labor: ___% | X | X | a | a | a | a | a | a | a | a | a | a | a | 0% | |||
| 05XX Unit AB Prototype Supply and Install | 0509AA | Base | Refurbish Existing Inner Head Cover | 1 | JOB | $ - 0 | Percent of the total CLIN price that is: |
Offsite Labor: ___%
| Site Labor: ___% | X | X | a | a | a | a | a | a | a | a | a | a | a | 0% | |||
| 05XX Unit AB Prototype Supply and Install | 0509AB | Opt | Supply Replacement Inner Head Cover - Incremental Difference Relative to CLIN AA | 1 | JOB | $ - 0 | Existing inner headcover size and shape. |
______ pounds of carbon steel _______ square feet of all wetted surfaces
Percent of the sum of CLINs AA and AB prices that is:
Carbon Steel: ___%
| Offsite Labor: ___% | X | X | X | X | a | a | a | a | a | a | a | a | a | 0% | ||
| 05XX Unit AB Prototype Supply and Install | 0510 | Base | Supply Stay Vane Modification Components | 1 | JOB | $ - 0 | Leading and trailing edge extensions or alternate method as shown on proposal drawings |
______ pounds of carbon steel _______ square feet of all wetted surfaces
Percent of the total CLIN price that is:
Carbon Steel: ___%
| Offsite Labor: ___% | X | X | X | X | a | a | a | a | a | a | a | a | a | 0% | ||
| 05XX Unit AB Prototype Supply and Install | 0511 | Base | Refurbish Stay Vanes/Ring Including Installation of Stay Vane Modification Components | 1 | JOB | $ - 0 | Percent of the total CLIN price that is: |
Offsite Labor: ___%
| Site Labor: ___% | X | X | a | a | a | a | a | a | a | a | a | a | a | 0% | |||
| 05XX Unit AB Prototype Supply and Install | 0512 | Base | Supply Wicket Gates | 1 | JOB | $ - 0 | Existing wicket gate size and shape. |
______ pounds of stainless-steel _______ square feet of all wetted surfaces
Percent of the total CLIN price that is:
Stainless Steel: ___%
| Offsite Labor: ___% | X | X | X | X | a | a | a | a | a | a | a | a | a | 0% | |||
| 05XX Unit AB Prototype Supply and Install | 0513 | Base | Supply Wicket Gate Operating Mechanism Bushings and Bearing Plate | 1 | JOB | $ - 0 | Percent of the total CLIN price that is: |
Stainless Steel: ___%
| Offsite Labor: ___% | X | X | a | a | a | a | a | a | a | a | a | a | a | 0% | |||
| 05XX Unit AB Prototype Supply and Install | 0514 | Base | Supply Head Cover and Bottom Ring Facing Plates | 1 | JOB | $ - 0 | 309-inch blade tip diameter. |
______ pounds of austenitic stainless-steel _______ square feet of all wetted surfaces
Percent of the total CLIN price that is:
Stainless Steel: ___%
| Offsite Labor: ___% | X | X | X | X | a | a | a | a | a | a | a | a | a | 0% | |||
| 05XX Unit AB Prototype Supply and Install | 0515 | Base | Supply Blade Servomotor Shaft and Appurtenances | 1 | JOB | $ - 0 | Percent of the total CLIN price that is: |
Carbon Steel: ___%
| Offsite Labor: ___% | X | X | a | A | a | a | a | a | a | a | a | a | a | 0% | |||
| 05XX Unit AB Prototype Supply and Install | 0516 | Base | Supply Lower Turbine Shaft and Appurtenances | 1 | JOB | $ - 0 | Percent of the total CLIN price that is: |
Stainless Steel: ___% Carbon Steel: ___%
| Offsite Labor: ___% | X | X | A | A | a | a | a | a | a | a | a | a | 0% | |||
| 05XX Unit AB Prototype Supply and Install | 0517 | Base | Supply Oil and Water Basin at the Blade Servomotor | 1 | JOB | $ - 0 | Percent of the total CLIN price that is: |
Carbon Steel: ___%
| Offsite Labor: ___% | X | X | a | A | a | a | a | a | a | a | a | a | a | 0% | |||
| 05XX Unit AB Prototype Supply and Install | 0518 | Base | Supply Turbine Shaft Packing Box | 1 | JOB | $ - 0 | Percent of the total CLIN price that is: |
Carbon Steel: ___%
| Offsite Labor: ___% | X | X | a | A | a | a | a | a | a | a | a | a | a | 0% | |||
| 05XX Unit AB Prototype Supply and Install | 0519 | Base | Supply Turbine Guide Bearing Oil Sump | 1 | JOB | $ - 0 | Percent of the total CLIN price that is: |
Carbon Steel: ___%
| Offsite Labor: ___% | X | X | a | A | a | a | a | a | a | a | a | a | a | 0% | |||
| 05XX Unit AB Prototype Supply and Install | 0520 | Base | Supply Complete Set of Stator Bars, Including Supplies and Accessories for a Complete New Winding Including Factory Testing | 1 | JOB | $ - 0 | Percent of the total CLIN price that is: |
Copper: ____%
| Offsite Labor: ____% | X | X | a | a | a | a | a | a | a | a | a | a | a | 0% | |||
| 05XX Unit AB Prototype Supply and Install | 0521 | Base | Remove Existing Stator Winding and Install and Test New Stator Winding | 1 | JOB | $ - 0 | Percent of the total CLIN price that is: |
Offsite Labor: ___%
| Site Labor: ___% | X | X | a | a | a | a | a | a | a | a | a | a | a | 0% | |||
| 05XX Unit AB Prototype Supply and Install | 0522 | Base | Supply Surface Air Coolers | 1 | JOB | $ - 0 | Percent of the total CLIN price that is: |
Stainless Steel: ___% Carbon Steel: ___% Copper: ___%
| Offsite Labor: ___% | X | X | a | a | a | a | a | a | a | a | a | 0% | |||
| 05XX Unit AB Prototype Supply and Install | 0523 | Base | Install Surface Air Coolers | 1 | JOB | $ - 0 | Percent of the total CLIN price that is: |
Offsite Labor: ___%
| Site Labor: ___% | X | X | a | a | a | a | a | a | a | a | a | a | a | 0% | |||
| 05XX Unit AB Prototype Supply and Install | 0524 | Base | Pre-Disassembly Watered Operational Testing | 1 | JOB | $ - 0 | Percent of the total CLIN price that is: |
Offsite Labor: ___%
| Site Labor: ___% | X | X | a | a | a | a | a | a | a | a | a | a | a | 0% | |||
| 05XX Unit AB Prototype Supply and Install | 0525 | Base | Generating Unit Disassembly | 1 | JOB | $ - 0 | Percent of the total CLIN price that is: |
Offsite Labor: ___%
| Site Labor: ___% | X | X | a | a | a | a | a | a | a | a | a | a | a | 0% | |||
| 05XX Unit AB Prototype Supply and Install | 0526 | Base | Refurbish Existing Turbine Shaft to Become Intermediate Shaft | 1 | JOB | $ - 0 | Percent of the total CLIN price that is: |
Offsite Labor: ___%
| Site Labor: ___% | X | X | a | a | a | a | a | a | a | a | a | a | a | 0% | ||||||||||||||
| 05XX Unit AB Prototype Supply and Install | 0527 | Base | Not Used | N/A | N/A | $ - 0 | N/A | a | a | a | a | a | a | a | a | a | a | a | a | a | 0% | |||||||
| 05XX Unit AB Prototype Supply and Install | 0528 | Base | Not Used | N/A | N/A | $ - 0 | N/A | a | a | a | a | a | a | a | a | a | a | a | a | a | 0% | |||||||
| 05XX Unit AB Prototype Supply and Install | 0529 | Base | Machine Stay Ring Head Cover Mounting Flange | 1 | JOB | $ - 0 | Percent of the total CLIN price that is: |
Offsite Labor: ___%
| Site Labor: ___% | X | X | a | a | a | a | a | a | a | a | a | a | a | 0% | |||
| 05XX Unit AB Prototype Supply and Install | 0530 | Base | Refurbish Bottom Ring | 1 | JOB | $ - 0 | Percent of the total CLIN price that is: |
Offsite Labor: ___%
| Site Labor: ___% | X | X | a | a | a | a | a | a | a | a | a | a | a | 0% | |||
| 05XX Unit AB Prototype Supply and Install | 0531 | Base | Refurbish Miscellaneous Wicket Gate Operating Mechanism Components | 1 | JOB | $ - 0 | Percent of the total CLIN price that is: |
Offsite Labor: ___%
| Site Labor: ___% | X | X | a | a | a | a | a | a | a | a | a | a | a | 0% |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .