PROJECT MANUAL
BIDDING & CONTRACT DOCUMENTS
Sludge Drying Bed Project
Contract No. 1 – General Construction
Prepared for:
Tiadaghton Valley Municipal Authority
290 Rice Road
Jersey Shore, Pennsylvania 17740
Prepared by:
LARSON DESIGN GROUP
1000 Commerce Park Drive, Suite 201
Williamsport, PA 17701
LDG Project No. 7666-023
August 2025
THIS PAGE INTENTIONALLY LEFT BLANK
LDG 7666-023
TABLE OF CONTENTS 000110 - 1
TABLE OF CONTENTS
SERIES 00 PROCUREMENT AND CONTRACTING REQUIREMENTS
Cover
000110 Table of Contents
000101 Project Title Page
001100 (C-111) Advertisement for Bids
002113 (C-200) Instructions to Bidders
002513 Pre-Bid Meeting
003100 Available Project Information
Prevailing Wage Report
Water Quality Management Permit
004113.1 (C-410) Bid Form – Contract No. 1
004303 (C-430) Bid Bond (Penal Sum)
004393 Bid Submittal Checklist
004513.1 (C-451) Qualifications Statement
004519 Non-Collusion Affidavit
005100.1 (C-510) Notice of Award – Contract No. 1
005213 (C-520) Agreement Form
005500.1 (C-550) Notice to Proceed – Contract No. 1
006113.13 (C-610) Performance Bond
006113.16 (C-615) Payment Bond
006516.1 (C-625) Certificate of Substantial Completion
006519.16 Affidavit of Release of Liens Form
006519.19 Consent of Surety to Final payment Form
007213 (C-700) General Conditions
007314 (C-800) Supplementary Conditions
DIVISION 01 - GENERAL REQUIREMENTS
011000 Summary
012100 Allowances
012300 Alternates
012500 Substitution Procedures
012600 Contract Modification Procedures
012900 Payment Procedures
012900.1 Contractor’s Application for Payment
013100 Project Management and Coordination
013100.1 RFI Form
013200 Construction Progress Documentation
013233 Photographic Documentation
013300 Submittal Procedures
013300.1 Contractor’s Certification
014000 Quality Requirements
014200 References
015000 Temporary Facilities and Controls
TABLE OF CONTENTS 000110 - 2
016000 Product Requirements
017300 Execution
017700 Closeout Procedures
017823 Operation and Maintenance Data
017839 Project Record Documents
017900 Demonstration and Training
DIVISION 31 - EARTHWORK
310513 Soils
310516 Aggregates
312000 Earth Moving
312333 Trenching and Backfilling for Utilities
312500 Erosion and Sediment Control
DIVISION 33 – UTILITIES
330526 Utility Identification
333100 Sanitary Utility Sewerage Piping
333400 Underground Pressure Piping
333800 Piping Systems Testing
DIVISION 40 – PROCESS INTEGRATION
400513.53 Ductile Iron Process Piping
400523 Process Valves
END OF SECTION 000110
PROJECT TITLE PAGE 000101 - 1
DOCUMENT 000101 - PROJECT TITLE PAGE
1.1 PROJECT MANUAL– BIDDING & CONTRACT DOCUMENTS
A. Project: Sludge Drying Bed Project
B. Owner: Tiadaghton Valley Municipal Authority
290 Rice Road
Jersey Shore, PA 17740
C. Owner Phone: (570) 398-2366
D. Engineer’s Project No: 7666-023
E. Engineer: Larson Design Group
1000 Commerce Park Drive, Suite 201
Williamsport, PA 17701
F. Engineer Phone: (570) 323-6603
G. Engineer Fax: (570) 323-9902
H. Engineer Web Site: www.larsondesigngroup.com
I. Issued: August 22, 2025
J. Copyright 2019 Larson Design Group. All rights reserved.
END OF DOCUMENT 000101
http://www.larsondesigngroup.com/
EJCDC® C-111, Advertisement for Bids for Construction Contracts.
Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page 1
JERSEY SHORE, LYCOMING COUNTY, PENNSYLVANIA
SLUDGE DRYING BED PROJECT
CONTRACT No. 1 – GENERAL CONSTRUCTION
ADVERTISEMENT FOR BIDS
Sealed Bids for the construction of the Sludge Drying Bed project will be received electronically via PennBid (https://pennbid.bonfirehub.com) by Tiadaghton Valley Municipal Authority until 2 P.M. local time on October 3, 2025.
Bidding and Contract Documents may be viewed and downloaded online at no cost on PennBid (https://pennbid.bonfirehub.com). Following registration, complete sets of Bidding & Contract Documents may be downloaded from the website as portable document format (PDF) files. The cost of printing Bidding and Contract Documents will be the sole responsibility of the interested party. For questions pertaining to access and use of the website, contact PennBid at 610-693-4769, or by email at info@pennbid.net.
A Pre-Bid Conference will be held at 10:00 AM local time on September 16, 2025 at the Tiadaghton Valley Municipal Authority Wastewater Treatment Plant, 290 Rice Road, Jersey Shore, PA 17740.
Attendance at the Pre-Bid Conference is highly encouraged but is not mandatory.
Each bid must be accompanied by a certified check or bid bond in the amount of ten (10%) percent of the total bid, as a guarantee that the bidder will execute the contract and furnish the necessary bonds if the contract is awarded to him.
The Supplementary Conditions set forth requirements for the payment by the Contractor and all Subcontractors of minimum wage rates for all classes of laborers and mechanics as set forth by all applicable provisions of the Pennsylvania Prevailing Wage Rate, and the Bid shall be prepared accordingly.
The Contractor shall ensure that employees and applicants for employment are not discriminated against because of race, age, color, religion, sex, national origin or handicap status; and comply with the Nondiscrimination/Sexual Harassment Clause included in the Supplementary Conditions, the Americans with Disabilities Act, the Pennsylvania Human Relations Act, federal and Pennsylvania laws and regulations, relating to non-discrimination and sexual harassment, drug-free workplaces and disadvantage business enterprises.
The Tiadaghton Valley Municipal Authority reserves the right to waive any irregularities and to reject any and all bids and to award either contract to the lowest responsible bidder for the total of all bid items.
No bidder may withdraw his or her bid within ninety (90) days after the actual opening thereof.
Tiadaghton Valley Municipal Authority is an Equal Opportunity Employer.
https://pennbid.bonfirehub.com/
EJCDC® C-111, Advertisement for Bids for Construction Contracts.
Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page 2
Advertise Date:
Proof of Publication requested.
END OF ADVERTISEMENT FOR BIDS
EJCDC® C-200 (Rev. 1), Instructions to Bidders for Construction Contracts.
Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page i
INSTRUCTIONS TO BIDDERS
TABLE OF CONTENTS
Page
Article 1 – Defined Terms
Article 2 – Copies of Bidding Documents
Article 3 – Qualifications of Bidders
Article 4 – Site and Other Areas; Existing Site Conditions; Examination of Site; Owner’s Safety Program;
Other Work at the Site
Article 5 – Bidder’s Representations
Article 6 – Pre-Bid Conference
Article 7 – Interpretations and Addenda
Article 8 – Bid Security
Article 9 – Contract Times
Article 10 – Liquidated Damages
Article 11 – Substitute and “Or-Equal” Items
Article 12 – Subcontractors, Suppliers, and Others
Article 13 – Preparation of Bid
Article 14 – Basis of Bid
Article 15 – Submittal of Bid
Article 16 – Modification and Withdrawal of Bid
Article 17 – Opening of Bids
Article 18 – Bids to Remain Subject to Acceptance
Article 19 – Evaluation of Bids and Award of Contract
Article 20 – Bonds and Insurance
Article 21 – Signing of Agreement
Article 22 – Sales and Use Taxes
Article 23 – Contracts to be Assigned
Article 24 - Wage Rate Requirements
Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page 1
ARTICLE 1 – DEFINED TERMS
1.01 Terms used in these Instructions to Bidders have the meanings indicated in the General Conditions and Supplementary Conditions. Additional terms used in these Instructions to Bidders have the meanings indicated below:
A. Issuing Office – The office from which the Bidding Documents are to be issued and where the Bidding procedures are to be administered:
Larson Design Group 1000 Commerce Park Drive, Suite 201 Williamsport, PA 17701
B. Bidder – The individual or entity who submits a Bid.
C. Bidding Documents – Project Manual Bidding & Contract Documents.
D. Successful Bidder – The lowest responsible Bidder submitting a responsive Bid to whom Owner makes an award.
ARTICLE 2 – COPIES OF BIDDING DOCUMENTS
2.01 Complete sets of the Bidding Documents may be obtained from the following website: PennBid (bonfirehub.com). Bidders are required to register on the website for the ability to view and/or acquire the Bidding Documents.
2.02 Complete sets of Bidding Documents shall be used in preparing Bids; neither Owner nor Engineer assumes any responsibility for errors or misinterpretations resulting from the use of incomplete sets of Bidding Documents.
2.03 Owner and Engineer, in making copies of Bidding Documents available on the above terms, do so only for the purpose of obtaining Bids for the Work and do not authorize or confer a license for any other use.
ARTICLE 3 – QUALIFICATIONS OF BIDDERS
3.01 To demonstrate Bidder’s qualifications to perform the Work, Bidder shall submit the following information with the Bid.
A. Qualifications Statement.
B. Non-Collusion Affidavit.
3.02 A Bidder’s failure to submit required qualification information may disqualify Bidder from receiving an award of the Contract.
3.03 No requirement in this Article 3 to submit information will prejudice the right of Owner to seek additional pertinent information regarding Bidder’s qualifications.
3.04 Bidder is advised to carefully review those portions of the Bid Form requiring Bidder’s representations and certifications.
https://pennbid.bonfirehub.com/portal/?tab=login https://pennbid.bonfirehub.com/portal/?tab=login
Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page 2
ARTICLE 4 – SITE AND OTHER AREAS; EXISTING SITE CONDITIONS; EXAMINATION OF SITE; OWNER’S
SAFETY PROGRAM; OTHER WORK AT THE SITE
4.01 Site and Other Areas
A. The Site is identified in the Bidding Documents. By definition, the Site includes rights-of-way, easements, and other lands furnished by Owner for the use of the Contractor. Any additional lands required for temporary construction facilities, construction equipment, or storage of materials and equipment, and any access needed for such additional lands, are to be obtained and paid for by Contractor.
4.02 Existing Site Conditions
A. Subsurface and Physical Conditions; Hazardous Environmental Conditions
1. The Supplementary Conditions identify:
a. those reports known to Owner of explorations and tests of subsurface conditions at or adjacent to the Site.
b. those drawings known to Owner of physical conditions relating to existing surface or subsurface structures at the Site (except Underground Facilities).
c. reports and drawings known to Owner relating to Hazardous Environmental Conditions that have been identified at or adjacent to the Site.
d. Technical Data contained in such reports and drawings.
2. Owner will make copies of reports and drawings referenced above available to any Bidder on request. These reports and drawings are not part of the Contract Documents, but the Technical Data contained therein upon whose accuracy Bidder is entitled to rely, as provided in the General Conditions, has been identified and established in the Supplementary Conditions. Bidder is responsible for any interpretation or conclusion Bidder draws from any Technical Data or any other data, interpretations, opinions, or information contained in such reports or shown or indicated in such drawings.
3. If the Supplementary Conditions do not identify Technical Data, the default definition of Technical Data set forth in Article 1 of the General Conditions will apply.
B. Underground Facilities: Information and data shown or indicated in the Bidding Documents with respect to existing Underground Facilities at or adjacent to the Site are set forth in the Contract Documents and are based upon information and data furnished to Owner and Engineer by owners of such Underground Facilities, including Owner, or others. Call Before You Dig! Pennsylvania State law requires a three (3) business day notice (does not include state holidays or weekends), but not more than ten (10) business days prior to the start of excavation and 10 business day notice, but not more than 90 business days in Design Stage.
Call 8-1-1 or 1-800-242-1776, PA One Call Serial No. 2251672586. The Designer has obtained this Serial Number(s) as required by PA Act 287, as amended.
C. Adequacy of Data: Provisions concerning responsibilities for the adequacy of data furnished to prospective Bidders with respect to subsurface conditions, other physical conditions, and Underground Facilities, and possible changes in the Bidding Documents due to differing or unanticipated subsurface or physical conditions appear in Paragraphs 5.03, 5.04, and 5.05 of the General Conditions. Provisions concerning responsibilities for the adequacy of data furnished to prospective Bidders with respect to a Hazardous Environmental Condition at the Site, if any, and possible changes in the Contract Documents due to any Hazardous
Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page 3
Environmental Condition uncovered or revealed at the Site which was not shown or indicated in the Drawings or Specifications or identified in the Contract Documents to be within the scope of the Work, appear in Paragraph 5.06 of the General Conditions.
4.03 Site Visit and Testing by Bidders
A. Bidder shall conduct the required Site visit during normal working hours, and shall not disturb any ongoing operations at the Site.
B. Bidder is not required to conduct any subsurface testing, or exhaustive investigations of Site conditions.
C. On request, and to the extent Owner has control over the Site, and schedule permitting, the Owner will provide Bidder access to the Site to conduct such additional examinations, investigations, explorations, tests, and studies as Bidder deems necessary for preparing and submitting a successful Bid. Owner will not have any obligation to grant such access if doing so is not practical because of existing operations, security or safety concerns, or restraints on Owner’s authority regarding the Site.
D. Bidder shall comply with all applicable Laws and Regulations regarding excavation and location of utilities, obtain all permits, and comply with all terms and conditions established by Owner or by property owners or other entities controlling the Site with respect to schedule, access, existing operations, security, liability insurance, and applicable safety programs.
E. Bidder shall fill all holes and clean up and restore the Site to its former condition upon completion of such explorations, investigations, tests, and studies.
4.04 Owner’s Safety Program
A. Site visits and work at the Site may be governed by an Owner safety program. As the General Conditions indicate, if an Owner safety program exists, it will be noted in the Supplementary Conditions.
4.05 Other Work at the Site
A. Reference is made to Article 8 of the Supplementary Conditions for the identification of the general nature of other work of which Owner is aware (if any) that is to be performed at the Site by Owner or others (such as utilities and other prime contractors) and relates to the Work contemplated by these Bidding Documents. If Owner is party to a written contract for such other work, then on request, Owner will provide to each Bidder access to examine such contracts (other than portions thereof related to price and other confidential matters), if any.
ARTICLE 5 – BIDDER’S REPRESENTATIONS
5.01 It is the responsibility of each Bidder before submitting a Bid to:
A. examine and carefully study the Bidding Documents, and any data and reference items identified in the Bidding Documents;
B. visit the Site, conduct a thorough, alert visual examination of the Site and adjacent areas, and become familiar with and satisfy itself as to the general, local, and Site conditions that may affect cost, progress, and performance of the Work;
C. become familiar with and satisfy itself as to all Laws and Regulations that may affect cost, progress, and performance of the Work;
Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page 4
D. carefully study all: (1) reports of explorations and tests of subsurface conditions at or adjacent to the Site and all drawings of physical conditions relating to existing surface or subsurface structures at the Site that have been identified in the Supplementary Conditions, especially with respect to Technical Data in such reports and drawings, and (2) reports and drawings relating to Hazardous Environmental Conditions, if any, at or adjacent to the Site that have been identified in the Supplementary Conditions, especially with respect to Technical Data in such reports and drawings;
E. consider the information known to Bidder itself; information commonly known to contractors doing business in the locality of the Site; information and observations obtained from visits to the Site; the Bidding Documents; and the Site-related reports and drawings identified in the Bidding Documents, with respect to the effect of such information, observations, and documents on (1) the cost, progress, and performance of the Work; (2) the means, methods, techniques, sequences, and procedures of construction to be employed by Bidder; and (3) Bidder’s safety precautions and programs;
F. agree, based on the information and observations referred to in the preceding paragraph, that at the time of submitting its Bid no further examinations, investigations, explorations, tests, studies, or data are necessary for the determination of its Bid for performance of the Work at the price bid and within the times required, and in accordance with the other terms and conditions of the Bidding Documents;
G. become aware of the general nature of the work to be performed by Owner and others at the Site that relates to the Work as indicated in the Bidding Documents;
H. promptly give Engineer written notice of all conflicts, errors, ambiguities, or discrepancies that Bidder discovers in the Bidding Documents and confirm that the written resolution thereof by Engineer is acceptable to Bidder;
I. determine that the Bidding Documents are generally sufficient to indicate and convey understanding of all terms and conditions for the performance and furnishing of the Work;
and
J. agree that the submission of a Bid will constitute an incontrovertible representation by Bidder that Bidder has complied with every requirement of this Article, that without exception the Bid and all prices in the Bid are premised upon performing and furnishing the Work required by the Bidding Documents.
ARTICLE 6 – PRE-BID CONFERENCE
6.01 A Pre-Bid Conference will be held at the time and location stated in the Advertisement for Bids.
Representatives of Owner and Engineer will be present to discuss the Project. Bidders are encouraged to attend and participate in the conference. Engineer will transmit to all prospective Bidders of Record such Addenda as Engineer considers necessary in response to questions arising at the conference. Oral statements may not be relied upon and will not be binding or legally effective.
ARTICLE 7 – INTERPRETATIONS AND ADDENDA
7.01 Bidder shall submit all questions about the meaning or intent of the Bidding Documents via the “Messages/Vendor Discussions” feature in PennBid no later than seven (7) days prior to the date for receipt of bids.
Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page 5
7.02 Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda delivered to all parties recorded as having received the Bidding Documents. Questions received less than seven days prior to the date for opening of Bids may not be answered. Only questions answered by Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect.
7.03 Addenda may be issued to clarify, correct, supplement, or change the Bidding Documents.
ARTICLE 8 – BID SECURITY
8.01 A Bid must be accompanied by Bid security made payable to Owner in an amount of 10 percent of Bidder’s maximum Bid price (determined by adding the base bid and all alternates) and in the form of a certified check, bank money order, or a Bid bond (on the form included in the Bidding Documents) issued by a surety meeting the requirements of Paragraphs 6.01 and 6.02 of the General Conditions.
8.02 The Bid security of the apparent Successful Bidder will be retained until Owner awards the contract to such Bidder, and such Bidder has executed the Contract Documents, furnished the required contract security, and met the other conditions of the Notice of Award, whereupon the Bid security will be released. If the Successful Bidder fails to execute and deliver the Contract Documents and furnish the required contract security within 15 days after the Notice of Award, Owner may consider Bidder to be in default, annul the Notice of Award or Notice of Award, and the Bid security of that Bidder will be forfeited to the Owner as liquidated damages for such failure and not as a penalty.
8.03 The Bid security of other Bidders that Owner believes to have a reasonable chance of receiving the award may be retained by Owner until the earlier of seven days after the Effective Date of the Contract or 90 days after the Bid opening, whereupon Bid security furnished by such Bidders will be released.
8.04 Bid security of other Bidders that Owner believes do not have a reasonable chance of receiving the award will be released within seven days after the Bid opening.
ARTICLE 9 – CONTRACT TIMES
9.01 The number of days within which, or the dates by which the Work is to be substantially completed, and completed and ready for final payment, are set forth in the Agreement.
ARTICLE 10 – LIQUIDATED DAMAGES
10.01 Provisions for liquidated damages, if any, for failure to timely attain a Milestone, Substantial Completion, or completion of the Work in readiness for final payment, are set forth in the Agreement.
ARTICLE 11 – SUBSTITUTE AND “OR-EQUAL” ITEMS
11.01 The Contract for the Work, if awarded, will be on the basis of materials and equipment specified or described in the Bidding Documents, and those “or-equal” or substitute materials and equipment subsequently approved by Engineer prior to the submittal of Bids and identified by Addendum. No item of material or equipment will be considered by Engineer as an “or-equal” or substitute unless written request for approval has been submitted by Bidder and has been received by Engineer at least 15 days prior to the date of receipt of Bids in the case of a proposed substitute and 5 days prior in the case of a proposed “or-equal.” Each such request
Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page 6 shall comply with the requirements of Paragraphs 7.04 and 7.05 of the General Conditions. The burden of proof of the merit of the proposed item is upon Bidder. Engineer’s decision of approval or disapproval of a proposed item will be final. If Engineer approves any such proposed item, such approval will be set forth in an Addendum issued to all prospective Bidders. Bidders shall not rely upon approvals made in any other manner. Substitutes and “or-equal” materials and equipment may be proposed by Contractor in accordance with Paragraph 7.04 and 7.05 of the General Conditions after the effective date of the Contract.
11.02 All prices that Bidder sets forth in its Bid shall be based on the presumption that the Contractor will furnish the materials and equipment specified or described in the Bidding Documents, as supplemented by Addenda. Any assumptions regarding the possibility of post-Bid approvals of “or-equal” or substitution requests are made at Bidder’s sole risk.
11.03 If an award is made, Contractor shall be allowed to submit proposed substitutes and “or-equals” in accordance with the General Conditions.
ARTICLE 12 – SUBCONTRACTORS, SUPPLIERS, AND OTHERS
12.01 Subsequent to the submittal of the Bid, Owner may not require the Successful Bidder or Contractor to retain any Subcontractor, Supplier, or other individual or entity against which Contractor has reasonable objection.
12.02 If required by the bid documents, the apparent Successful Bidder, and any other Bidder so requested, shall submit with the bid, a list of the Subcontractors or Suppliers proposed for all portions of the Work.
If requested by Owner after bid submission, such list shall be accompanied by an experience statement with pertinent information regarding similar projects and other evidence of qualification for each such Subcontractor, Supplier, or other individual or entity. If Owner or Engineer, after due investigation, has reasonable objection to any proposed Subcontractor, Supplier, individual, or entity, Owner may, before the Notice of Award is given, request apparent Successful Bidder to submit an acceptable substitute, in which case apparent Successful Bidder shall submit a substitute, Bidder’s Bid price will be increased (or decreased) by the difference in cost occasioned by such substitution, and Owner may consider such price adjustment in evaluating Bids and making the Contract award.
12.03 If apparent Successful Bidder declines to make any such substitution, Owner may award the Contract to the next lowest Bidder that proposes to use acceptable Subcontractors, Suppliers, or other individuals or entities. Declining to make requested substitutions will constitute grounds for forfeiture of the Bid security of any Bidder. Any Subcontractor, Supplier, individual, or entity so listed and against which Owner or Engineer makes no written objection prior to the giving of the Notice of Award will be deemed acceptable to Owner and Engineer subject to subsequent revocation of such acceptance as provided in Paragraph 7.06 of the General Conditions.
12.04 Contractor shall not be required to employ any Subcontractor, Supplier, individual, or entity against whom Contractor has a reasonable objection.
12.05 The Contractor shall not award work to Subcontractor(s) in excess of the limits stated in SC7.06.
ARTICLE 13 – PREPARATION OF BID
13.01 The Bid Form is included with the Bidding Documents for Reference. Bidders shall complete the electronic bid form within PennBid (“Prepare Your Submission” tab)
Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page 7
13.02 A Bid by a corporation shall be executed in the corporate name by a corporate officer (whose title must appear under the signature), accompanied by evidence of authority to sign. The corporate address and state of incorporation shall be shown.
13.03 A Bid by a partnership shall be executed in the partnership name and signed by a partner (whose title must appear under the signature), accompanied by evidence of authority to sign.
The partnership’s address for receiving notices shall be shown.
13.04 A Bid by a limited liability company shall be executed in the name of the firm by a member or other authorized person and accompanied by evidence of authority to sign. The state of formation of the firm and the firm’s address for receiving notices shall be shown.
13.05 A Bid by an individual shall show the Bidder’s name and address for receiving notices.
13.06 A Bid by a joint venture shall be executed by an authorized representative of each joint venturer in the manner indicated on the Bid Form. The joint venture’s address for receiving notices shall be shown.
13.07 All names shall be printed in ink below the signatures.
13.08 The Bid shall contain an acknowledgment of receipt of all Addenda, the numbers of which shall be filled in on the Bid Form.
13.09 Postal and e-mail addresses and telephone number for communications regarding the Bid shall be shown.
13.10 The Bid shall contain evidence of Bidder’s authority and qualification to do business in the state where the Project is located, or Bidder shall covenant in writing to obtain such authority and qualification prior to award of the Contract and attach such covenant to the Bid. Bidder’s state contractor license number, if any, shall also be shown on the Bid Form.
ARTICLE 14 – BASIS OF BID
14.01 Base Bid with Alternates
A. Bidders shall submit a Bid on a lump sum basis for the base Bid and include a separate price for each alternate described in the Bidding Documents and as provided for in the Bid Form.
The price for each alternate will be the amount added to or deleted from the base Bid if Owner selects the alternate.
14.02 Unit Price
A. Bidders shall submit a Bid on a unit price basis for each item of Work listed in the unit price section of the Bid Form.
B. The “Bid Price” (sometimes referred to as the extended price) for each unit price Bid item will be the product of the “Estimated Quantity” (which Owner or its representative has set forth in the Bid Form) for the item and the corresponding “Bid Unit Price” offered by the Bidder. The total of all unit price Bid items will be the sum of these “Bid Prices”; such total will be used by Owner for Bid comparison purposes. The final quantities and Contract Price will be determined in accordance with Paragraph 13.03 of the General Conditions.
C. Discrepancies between the multiplication of units of Work and unit prices will be resolved in favor of the unit prices. Discrepancies between the indicated sum of any column of figures and the correct sum thereof will be resolved in favor of the correct sum.
Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page 8
14.03 Allowances
A. For cash allowances the Bid price shall include such amounts as the Bidder deems proper for Contractor's overhead, costs, profit, and other expenses on account of cash allowances, if any, named in the Contract Documents, in accordance with Paragraph 13.02.B of the General Conditions.
ARTICLE 15 – SUBMITTAL OF BID
15.01 Bids shall be submitted online via the PennBid Program (https://pennbid.bonfirehub.com) by the date and time indicated in the Invitation for Bids along with the Bid security and the other documents required to be submitted as identified herein.
Bids received after the date and time prescribed for the opening of bids, or not submitted at the correct location or in the designated manner, will not be accepted and will be returned to the Bidder unopened.
ARTICLE 16 – MODIFICATION AND WITHDRAWAL OF BID
16.01 A Bid may be withdrawn or modified at any time within PennBid prior to the due date and time identified in the Invitation for Bids.
16.02 If a Bidder wishes to modify its Bid prior to Bid opening, Bidder must withdraw its initial Bid in the manner specified in Paragraph 16.01 and submit a new Bid prior to the date and time for the opening of Bids.
16.03 If within two (2) business days after Bids are opened any Bidder files a duly signed written notice with Owner and promptly thereafter demonstrates to the reasonable satisfaction of Owner that there was a material and substantial mistake in the preparation of its Bid, that Bidder may withdraw its Bid, and the Bid security will be returned. Thereafter, if the Work is rebid, that Bidder will be disqualified from further bidding on the Work.
ARTICLE 17 – OPENING OF BIDS
ARTICLE 18 – A SUMMARY OF BIDS RECEIVED WILL BE ISSUED VIA A PUBLIC NOTICE ON PENNBID SHORTLY AFTER BID OPENING, THE TIME OF WHICH IS LISTED IN THE INVITATION TO BID. IT SHOULD BE NOTED THAT BID RESULTS ARE SUBJECT TO FURTHER REVIEW AND SHOULD NOT BE CONSTRUED
AS ISSUANCE OF AN AWARD.BIDS TO REMAIN SUBJECT TO ACCEPTANCE
18.01 All Bids will remain subject to acceptance for the period of time stated in the Bid Form, but Owner may, in its sole discretion, release any Bid and return the Bid security prior to the end of this period.
ARTICLE 19 – EVALUATION OF BIDS AND AWARD OF CONTRACT
19.01 Owner reserves the right to reject any or all Bids, including without limitation, nonconforming, nonresponsive, unbalanced, or conditional Bids. Owner will reject the Bid of any Bidder that Owner finds, after reasonable inquiry and evaluation, to not be responsible. If Bidder purports to add terms or conditions to its Bid, takes exception to any provision of the Bidding Documents, or attempts to alter the contents of the Contract Documents for purposes of the Bid, then the Owner will reject the Bid as nonresponsive; provided that Owner also reserves the right to waive all minor informalities not involving price, time, or changes in the Work.
Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page 9
19.02 If Owner awards the contract for the Work, such award shall be to the responsible Bidder submitting the lowest responsive Bid.
19.03 Evaluation of Bids
A. In evaluating Bids, Owner will consider whether or not the Bids comply with the prescribed requirements, unit prices, and other data, as may be requested in the Bid Form or prior to the Notice of Intent to Award.
B. To determine the Bid prices for purposes of comparison, Owner shall announce to all bidders a “Base Bid” budget after receiving all Bids, but prior to opening them. After determination of the Successful Bidder based on this comparative process and on the responsiveness, responsibility, and other factors set forth in these Instructions, the award may be made to said Successful Bidder on its base Bid.
19.04 In evaluating whether a Bidder is responsible, Owner will consider the qualifications of the Bidder and may consider the qualifications and experience of Subcontractors and Suppliers proposed for those portions of the Work for which the identity of Subcontractors and Suppliers must be submitted as provided in the Bidding Documents.
19.05 Owner may conduct such investigations as Owner deems necessary to establish the responsibility, qualifications, and financial ability of Bidders and any proposed Subcontractors or Suppliers.
ARTICLE 20 – BONDS AND INSURANCE
20.01 Article 6 of the General Conditions, as may be modified by the Supplementary Conditions, sets forth Owner’s requirements as to performance and payment bonds and insurance. When the Successful Bidder delivers the Agreement (executed by Successful Bidder) to Owner, it shall be accompanied by required bonds and insurance documentation.
ARTICLE 21 – SIGNING OF AGREEMENT
21.01 When Owner issues a Notice of Award to the Successful Bidder, it shall be accompanied by the unexecuted counterparts of the Agreement along with the other Contract Documents as identified in the Agreement. Within 15 days thereafter, Successful Bidder shall execute and deliver the required number of counterparts of the Agreement (and any bonds and insurance documentation required to be delivered by the Contract Documents) to Owner. Within ten days thereafter, Owner shall deliver one fully executed counterpart of the Agreement to Successful Bidder, together with printed and electronic copies of the Contract Documents as stated in Paragraph 2.02 of the General Conditions.
ARTICLE 22 – SALES AND USE TAXES
22.01 Owner is exempt from Pennsylvania state sales and use taxes on materials and equipment to be incorporated in the Work. Said taxes shall not be included in the Bid. Refer to Paragraph SC-7.09 of the Supplementary Conditions for additional information.
ARTICLE 23 – CONTRACTS TO BE ASSIGNED
Not Used
Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page 10
ARTICLE 24 – WAGE RATE REQUIREMENTS
24.01 Wage Rates: The Supplementary Conditions set forth requirements for the payment by the Contractor and its’ Subcontractors of minimum wage rates for all classes of laborers and mechanics as set forth by all applicable provisions of the Pennsylvania Prevailing Wage Act.
PRE-BID CONFERENCE 002513 - 1
DOCUMENT 002513 – PRE-BID CONFERENCE
1.1 PRE-BID CONFERENCE
A. Engineer will conduct a pre-bid conference as indicated below:
1. Conference Date: September 16, 2025
2. Conference Time: 10:00 AM
3. Location: Tiadaghton Valley Municipal Authority WWTP, 290 Rice Road, Jersey Shore, PA 17740.
B. Attendance:
1. Prime Bidders: Attendance at pre-bid conference is recommended.
2. Subcontractors: Attendance at pre-bid conference is recommended.
C. Bidder Questions: Submit written questions to be addressed at pre-bid conference minimum of two business days prior to conference.
D. Agenda: pre-bid conference agenda will include review of topics that may affect proper preparation and submittal of bids, including the following:
1. Procurement and Contracting Requirements:
a. Advertisement for Bids.
b. Instructions to Bidders.
c. Bidder Qualifications.
d. Bonding.
e. Insurance.
f. Bid Security.
g. Bid Form and Attachments.
h. Bid Submittal Requirements.
i. Bid Submittal Checklist.
j. Notice of Award.
2. Communication during Bidding Period:
a. Obtaining documents.
b. Access to PennBid Website (https://pennbid.bonfirehub.com)
c. Bidder's Requests for Information.
d. Bidder's Substitution Request/Prior Approval Request.
e. Addenda.
3. Contracting Requirements:
a. Agreement.
b. The General Conditions.
c. The Supplementary Conditions.
d. Other Owner requirements.
https://pennbid.bonfirehub.com/
PRE-BID CONFERENCE 002513 - 2
4. Construction Documents:
a. Scopes of Work.
b. Temporary Facilities.
c. Use of Site.
d. Work Restrictions.
e. Alternates, Allowances, and Unit Prices.
f. Substitutions following award.
5. Separate Contracts:
a. Work by Owner.
b. Work of Other Contracts.
6. Schedule:
a. Project Schedule.
b. Contract Time.
c. Liquidated Damages.
d. Other Bidder Questions.
7. Site/facility visit or walkthrough.
8. Post-Conference Addendum.
E. Minutes: Entity responsible for conducting the conference will record and distribute minutes to attendees. Minutes will be issued as modifications to the Bidding and Contract Documents in a written Addendum.
1. Sign-in Sheet: Minutes will include list of attendees.
END OF DOCUMENT 002513
AVAILABLE PROJECT INFORMATION 003100 - 1
DOCUMENT 003100 - AVAILABLE PROJECT INFORMATION
1.1 SUMMARY
A. Available Project Information Includes:
1. Approval
2. Pennsylvania Prevailing Wage Rate Decision
B. Related Documents:
1. Document 00 21 13 - Instructions to Bidders
1.2 Water Quality Management Permit
A. A copy of the Water Quality Management (WQM) Permit is included in the Project Manual.
1.3 DAVIS BACON WAGE RATE DECISION
A. A copy of the Davis Bacon Wage Rate Decision is included in the Project Manual.
END OF SECTION 003100
Project Name: TVMA Sludge Drying Bed Project
General Description: This project will install a sludge drying bed at the
TVMA WWTP.
Project Locality Nippenose Township
Awarding Agency: Tiadaghton Valley Municipal Authority
Contract Award Date: 10/3/2025
Serial Number: 25-08064
Project Classification: Highway
Determination Date: 8/21/2025
Assigned Field Office: Scranton
Field Office Phone Number: (570)963-4577
Toll Free Phone Number: (877)214-3962
Project County: Lycoming County
BUREAU OF LABOR LAW COMPLIANCE
PREVAILING WAGES PROJECT RATES
Commonwealth of Pennsylvania Department of Labor & Industry Report Date: 8/21/2025 Page 1 of 7
Project: 25-08064 - Building Effective Date
Expiration Date
Hourly Rate Fringe Benefits
Total
Asbestos & Insulation Workers 7/1/2024 $39.08 $24.92 $64.00
Asbestos & Insulation Workers 7/1/2025 $39.08 $28.17 $67.25
Boilermaker (Commercial, Institutional, and Minor Repair Work)
3/1/2024 $36.71 $19.13 $55.84
Boilermakers 1/1/2024 $52.10 $35.72 $87.82
Bricklayers, Stone Masons, Pointers, Caulkers, Cleaners
4/28/2024 $38.78 $20.03 $58.81
Bricklayers, Stone Masons, Pointers, Caulkers, Cleaners
5/4/2025 $40.63 $20.03 $60.66
Bricklayers, Stone Masons, Pointers, Caulkers, Cleaners
5/3/2026 $42.48 $20.03 $62.51
Carpenters - Piledriver/Welder 1/1/2024 $42.13 $21.97 $64.10
Carpenters - Piledriver/Welder 1/1/2025 $43.38 $22.72 $66.10
Carpenters - Piledriver/Welder 1/1/2026 $44.63 $23.47 $68.10
Carpenters, Drywall Hangers, Framers, Instrument Men, Lathers, Soft Floor Layers
6/1/2024 $36.56 $17.72 $54.28
Cement Finishers & Plasterers 4/28/2024 $30.23 $22.27 $52.50
Cement Finishers & Plasterers 5/4/2025 $32.23 $22.27 $54.50
Cement Finishers & Plasterers 5/3/2026 $34.23 $22.27 $56.50
Cement Finishers & Plasterers 5/3/2027 $33.49 $25.01 $58.50
Cement Masons 6/1/2024 $37.78 $15.05 $52.83
Drywall Finisher 5/1/2024 $31.82 $24.75 $56.57
Drywall Finisher 5/1/2025 $33.24 $25.08 $58.32
Electricians 6/1/2024 $35.46 $26.40 $61.86
Electricians 6/1/2025 $38.50 $26.76 $65.26
Electricians 6/1/2026 $41.57 $27.28 $68.85
Electricians 6/1/2027 $44.69 $27.95 $72.64
Elevator Constructor 1/1/2024 $60.76 $39.19 $99.95
Elevator Constructor 1/1/2025 $63.40 $40.03 $103.43
Glazier 5/1/2024 $32.46 $20.93 $53.39
Iron Workers (Bridge, Structural Steel, Ornamental, Precast, Reinforcing)
7/1/2024 $37.26 $32.63 $69.89
Iron Workers (Bridge, Structural Steel, Ornamental, Precast, Reinforcing)
7/1/2025 $38.76 $33.38 $72.14
Laborers (Class 01 - See notes) 5/1/2023 $23.08 $18.03 $41.11
Laborers (Class 02 - See notes) 5/1/2023 $25.08 $18.03 $43.11
Laborers (Class 03 - See notes) 4/30/2023 $26.98 $18.22 $45.20
Laborers (Class 04 - See notes) 4/30/2023 $28.48 $18.22 $46.70
Laborers (Class 05 - See notes) 4/30/2023 $28.98 $18.22 $47.20
Laborers (Class 06 - See notes) 5/1/2023 $25.08 $18.03 $43.11
Marble Mason 5/1/2024 $35.25 $19.24 $54.49
Marble Mason 5/1/2025 $37.20 $19.24 $56.44
Marble Mason 5/1/2026 $39.15 $19.24 $58.39
Millwright 6/1/2024 $41.07 $22.95 $64.02
Millwright 6/1/2025 $43.00 $22.95 $65.95
Millwright 6/1/2026 $44.97 $22.95 $67.92
Operators (Building, Class 01 - See Notes) 5/1/2024 $43.73 $30.08 $73.81
BUREAU OF LABOR LAW COMPLIANCE
PREVAILING WAGES PROJECT RATES
Report Date: 8/21/2025 Page 2 of 7
Expiration Date
Hourly Rate Fringe Benefits
Total
Operators (Building, Class 01 - See Notes) 5/1/2025 $44.89 $30.92 $75.81
Operators (Building, Class 01 - See Notes) 5/1/2026 $46.05 $31.76 $77.81
Operators (Building, Class 01A - See Notes) 5/1/2024 $45.98 $30.74 $76.72
Operators (Building, Class 01A - See Notes) 5/1/2025 $47.14 $31.58 $78.72
Operators (Building, Class 01A - See Notes) 5/1/2026 $48.30 $32.42 $80.72
Operators (Building, Class 02 - See Notes) 5/1/2024 $43.45 $29.99 $73.44
Operators (Building, Class 02 - See Notes) 5/1/2025 $44.61 $30.83 $75.44
Operators (Building, Class 02 - See Notes) 5/1/2026 $45.77 $31.67 $77.44
Operators (Building, Class 02A - See Notes) 5/1/2023 $44.54 $29.82 $74.36
Operators (Building, Class 02A - See Notes) 5/1/2024 $45.70 $30.66 $76.36
Operators (Building, Class 02A - See Notes) 5/1/2025 $46.86 $31.50 $78.36
Operators (Building, Class 02A - See Notes) 5/1/2026 $48.02 $32.34 $80.36
Operators (Building, Class 03 - See Notes) 5/1/2023 $39.57 $28.34 $67.91
Operators (Building, Class 03 - See Notes) 5/1/2024 $40.73 $29.18 $69.91
Operators (Building, Class 03 - See Notes) 5/1/2025 $41.88 $30.03 $71.91
Operators (Building, Class 03 - See Notes) 5/1/2026 $43.04 $30.87 $73.91
Operators (Building, Class 04 - See Notes) 5/1/2023 $38.42 $28.02 $66.44
Operators (Building, Class 04 - See Notes) 5/1/2024 $39.59 $28.85 $68.44
Operators (Building, Class 04 - See Notes) 5/1/2025 $40.74 $29.70 $70.44
Operators (Building, Class 04 - See Notes) 5/1/2026 $41.90 $30.54 $72.44
Operators (Building, Class 05 - See Notes) 5/1/2023 $37.97 $27.89 $65.86
Operators (Building, Class 05 - See Notes) 5/1/2024 $39.13 $28.73 $67.86
Operators (Building, Class 05 - See Notes) 5/1/2025 $40.30 $29.56 $69.86
Operators (Building, Class 05 - See Notes) 5/1/2026 $41.45 $30.41 $71.86
Operators (Building, Class 06 - See Notes) 5/1/2023 $37.10 $27.62 $64.72
Operators (Building, Class 06 - See Notes) 5/1/2024 $38.26 $28.46 $66.72
Operators (Building, Class 06 - See Notes) 5/1/2025 $39.42 $29.30 $68.72
Operators (Building, Class 06 - See Notes) 5/1/2026 $40.58 $30.14 $70.72
Operators (Building, Class 07A- See Notes) 5/1/2024 $53.10 $34.27 $87.37
Operators (Building, Class 07A- See Notes) 5/1/2025 $54.56 $35.21 $89.77
Operators (Building, Class 07A- See Notes) 5/1/2026 $56.03 $36.14 $92.17
Operators (Building, Class 07B- See Notes) 5/1/2024 $52.75 $34.17 $86.92
Operators (Building, Class 07B- See Notes) 5/1/2025 $54.22 $35.10 $89.32
Operators (Building, Class 07B- See Notes) 5/1/2026 $55.69 $36.03 $91.72
Painters Class 1 (see notes) 5/1/2023 $29.98 $23.28 $53.26
Painters Class 1 (see notes) 5/1/2024 $30.36 $24.15 $54.51
Painters Class 1 (see notes) 5/1/2025 $31.32 $24.44 $55.76
Painters - Line Stripping 12/1/2024 $44.12 $27.91 $72.03
Painters Class 2 (see notes) 5/1/2023 $33.58 $23.58 $57.16
Painters Class 2 (see notes) 5/1/2025 $35.58 $25.08 $60.66
Painters Class 3 (see notes) 5/1/2023 $40.18 $23.58 $63.76
Painters Class 3 (see notes) 5/1/2025 $42.67 $25.09 $67.76
Pile Driver Divers (Building, Heavy, Highway) 1/1/2024 $60.95 $21.97 $82.92
Pile Driver Divers (Building, Heavy, Highway) 1/1/2025 $62.82 $22.72 $85.54
BUREAU OF LABOR LAW COMPLIANCE
PREVAILING WAGES PROJECT RATES
Report Date: 8/21/2025 Page 3 of 7
Expiration Date
Hourly Rate Fringe Benefits
Total
Pile Driver Divers (Building, Heavy, Highway) 1/1/2026 $64.70 $23.47 $88.17
Piledrivers 1/1/2024 $40.63 $21.97 $62.60
Piledrivers 1/1/2025 $41.88 $22.72 $64.60
Piledrivers 1/1/2026 $43.13 $23.47 $66.60
Plasterers 6/1/2023 $37.81 $13.90 $51.71
Plasterers 6/1/2024 $38.46 $14.45 $52.91
Plumber/Pipefitter 5/1/2023 $41.36 $29.72 $71.08
Plumber/Pipefitter 5/1/2025 $45.30 $29.91 $75.21
Roofers 5/1/2024 $34.25 $21.89 $56.14
Roofers 5/1/2025 $36.10 $21.89 $57.99
Sheet Metal Workers 5/1/2024 $36.13 $31.23 $67.36
Sheet Metal Workers 5/1/2025 $37.30 $32.31 $69.61
Sign Makers and Hangars 7/15/2023 $31.76 $24.63 $56.39
Sign Makers and Hangars 7/15/2024 $32.32 $25.82 $58.14
Sign Makers and Hangars 7/15/2025 $33.48 $26.41 $59.89
Sprinklerfitters 4/1/2024 $46.45 $28.62 $75.07
Sprinklerfitters 4/1/2025 $49.75 $29.21 $78.96
Terrazzo Finisher 5/1/2024 $35.66 $20.76 $56.42
Terrazzo Finisher 5/1/2025 $36.32 $21.68 $58.00
Terrazzo Grinder 5/1/2024 $36.42 $20.76 $57.18
Terrazzo Grinder 5/1/2025 $37.10 $21.68 $58.78
Terrazzo Mechanics 5/1/2024 $36.44 $22.51 $58.95
Terrazzo Mechanics 5/1/2025 $37.17 $23.43 $60.60
Tile & Marble Finisher 5/1/2024 $33.36 $16.99 $50.35
Tile & Marble Finisher 5/1/2025 $35.31 $16.99 $52.30
Tile & Marble Finisher 5/1/2026 $37.26 $16.99 $54.25
Tile Setter 5/1/2024 $35.25 $19.24 $54.49
Tile Setter 5/1/2025 $37.20 $19.24 $56.44
Tile Setter 5/1/2026 $39.15 $19.24 $58.39
Truckdriver class 1(see notes) 5/1/2021 $37.72 $0.00 $37.72
Truckdriver class 1(see notes) 5/1/2025 $41.87 $0.00 $41.87
Truckdriver class 2 (see notes) 5/1/2021 $37.79 $0.00 $37.79
Truckdriver class 2 (see notes) 5/1/2025 $41.94 $0.00 $41.94
Truckdriver class 3 (see notes) 5/1/2025 $42.43 $0.00 $42.43
Window Film / Tint Installer 6/1/2019 $24.52 $12.08 $36.60
Window Film / Tint Installer 6/1/2024 $26.37 $14.83 $41.20
BUREAU OF LABOR LAW COMPLIANCE
PREVAILING WAGES PROJECT RATES
Report Date: 8/21/2025 Page 4 of 7
Project: 25-08064 - Heavy/Highway Effective
Expiration Date
Hourly Rate Fringe Benefits
Total
Carpenter 5/1/2024 $36.12 $19.79 $55.91
Carpenter 5/1/2025 $36.87 $20.49 $57.36
Carpenter 5/1/2026 $37.63 $21.18 $58.81
Carpenter Welder 5/1/2024 $36.87 $19.79 $56.66
Carpenter Welder 5/1/2025 $37.62 $20.49 $58.11
Carpenter Welder 5/1/2026 $38.38 $21.18 $59.56
Carpenters - Piledriver/Welder 1/1/2024 $36.87 $19.79 $56.66
Carpenters - Piledriver/Welder 1/1/2025 $37.62 $20.49 $58.11
Carpenters - Piledriver/Welder 1/1/2026 $38.38 $21.18 $59.56
Cement Finishers 6/1/2016 $32.43 $11.35 $43.78
Electric Lineman 9/2/2024 $66.56 $30.17 $96.73
Electric Lineman 1/1/2025 $66.33 $30.40 $96.73
Iron Workers (Bridge, Structural Steel, Ornamental, Precast, Reinforcing)
7/1/2024 $37.26 $32.63 $69.89
Laborers (Class 01 - See notes) 5/1/2024 $25.61 $19.49 $45.10
Laborers (Class 01 - See notes) 5/1/2025 $26.61 $19.99 $46.60
Laborers (Class 02 - See notes) 5/1/2024 $32.23 $19.49 $51.72
Laborers (Class 02 - See notes) 5/1/2025 $33.23 $19.99 $53.22
Laborers (Class 03 - See notes) 5/1/2024 $29.22 $19.49 $48.71
Laborers (Class 03 - See notes) 5/1/2025 $30.22 $19.99 $50.21
Laborers (Class 04 - See notes) 5/1/2024 $29.57 $19.49 $49.06
Laborers (Class 04 - See notes) 5/1/2025 $30.57 $19.99 $50.56
Laborers (Class 05 - See notes) 5/1/2024 $30.24 $19.49 $49.73
Laborers (Class 05 - See notes) 5/1/2025 $31.24 $19.99 $51.23
Laborers (Class 06 - See notes) 5/1/2024 $29.66 $19.49 $49.15
Laborers (Class 06 - See notes) 5/1/2025 $30.66 $19.99 $50.65
Laborers (Class 07 - See notes) 5/1/2024 $29.95 $19.49 $49.44
Laborers (Class 07 - See notes) 5/1/2025 $30.95 $19.99 $50.94
Laborers (Class 08 - See notes) 5/1/2024 $30.43 $19.49 $49.92
Laborers (Class 08 - See notes) 5/1/2025 $31.43 $19.99 $51.42
Millwright 6/1/2024 $43.46 $23.33 $66.79
Millwright 6/1/2025 $45.46 $23.33 $68.79
Millwright 6/1/2026 $47.52 $23.33 $70.85
Operators (Heavy, Class 01 - See Notes) 5/1/2023 $41.14 $28.82 $69.96
Operators (Heavy, Class 01 - See Notes) 5/1/2024 $42.30 $29.66 $71.96
Operators (Heavy, Class 01 - See Notes) 5/1/2025 $43.46 $30.50 $73.96
Operators (Heavy, Class 01 - See Notes) 5/1/2026 $44.61 $31.35 $75.96
Operators (Heavy, Class 01A - See Notes) 5/1/2023 $43.39 $29.48 $72.87
Operators (Heavy, Class 01A - See Notes) 5/1/2024 $44.55 $30.32 $74.87
Operators (Heavy, Class 01A - See Notes) 5/1/2025 $45.71 $31.16 $76.87
Operators (Heavy, Class 01A - See Notes) 5/1/2026 $46.86 $32.01 $78.87
Operators (Heavy, Class 02 - See Notes) 5/1/2023 $40.86 $28.73 $69.