About this file

This is a Fiscal Year 2024-2026 Bipartisan Infrastructure Law (BIL) Work Plan and Long-Term Plan document prepared by the Coastal & Heartland National Estuary Partnership (CHNEP), a cooperative partnership comprising federal agencies, state entities, regional planning councils, water management districts, universities, and local governments across a 5,416-square-mile service area in Southwest Florida. The work plan outlines how CHNEP will expend approximately $2.73 million in BIL funding over three fiscal years (FY24-FY26) to implement projects addressing climate resilience, water quality improvement, habitat restoration, and hydrological restoration aligned with CHNEP's 2019 Comprehensive Conservation and Management Plan (CCMP). Primary deliverables include six county-level Comprehensive Vulnerability Assessments ($200,000 each for DeSoto, Hardee, Manatee, Sarasota, Glades, and Hendry Counties), enhancements to the CHNEP Water Atlas data management system ($285,000 total), and restoration and research projects ($1,214,400 total) to be selected through a competitive process with preference for disadvantaged communities. The work plan covers the period FY24-FY26, with vulnerability assessments staggered across the three-year period and restoration projects extending through FY28. Management Conference administration, travel, and operations account for approximately $30,000 in travel costs over the three-year period.

The BIL provides approximately $909,800 annually to CHNEP through the Environmental Protection Agency, totaling $2,729,400 across FY24-FY26 with no time limitations on expenditure. All BIL funding must implement CHNEP's EPA-approved CCMP and directly advance the law's two core goals: tackling climate change through emissions reduction and resilience building, and advancing environmental justice by ensuring at least 40 percent of FY24-FY26 BIL funding benefits disadvantaged communities. Funding priorities emphasize nature-based solutions, wetland restoration as carbon sinks, freshwater hydrological flow restoration to mitigate saltwater intrusion, community vulnerability assessments incorporating social vulnerability indices, and public engagement in underserved areas. The restoration and research projects totaling $1,214,400 over three years require demonstration of long-term conservation use, transferable methodologies, and monitoring and educational components. No incumbent contractors are identified, and all supporting data, metadata, and GIS files must be provided to both benefiting counties and CHNEP for public records access and coordination purposes.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FISCAL YEAR 2024-2026 BIPARTISAN INFRASTRUCTURE LAW

WORK PLAN AND LONG-TERM PLAN

Sunset views from the BIL-funded Tiki Point living shoreline project site in Punta Gorda. / Photo credit: Rhonda Paprocki

May 25, 2023

1050 Loveland Blvd.

Port Charlotte, FL 33980

(941) 833-6580 www.CHNEP.org

Coastal & Heartland National Estuary Partnership FY24-FY26 BIL Work Plan Page 2 of 30

The Coastal & Heartland National Estuary Partnership (CHNEP) is comprised of citizens, elected officials, resource managers and commercial and recreational resource users working to improve water quality and ecological integrity of other natural resources in its boundaries. A cooperative decision-making process is used to address diverse resource management concerns in its 5,416-square-mile area.

Many of these partners also financially support the Partnership. The governmental entities in the CHNEP and its service area include:

U.S. Environmental Protection Agency

U.S. Fish & Wildlife Service

U.S. Army Corps of Engineers

U.S. Geological Survey

U.S. Department of Agriculture

National Oceanic & Atmospheric Administration

Florida Department of Environmental Protection

Florida Fish & Wildlife Conservation Commission

Florida Department of Economic Opportunity

Florida Department of Agriculture

Central Florida Regional Planning Council

Southwest Florida Regional Planning Council

Southwest Florida Water Management District

South Florida Water Management District

West Coast Inland Navigation District

Peace River/Manasota Regional Water Supply Authority

Florida Gulf Coast University

University of South Florida

University of Florida

Polk, Sarasota, Manatee, Lee, Charlotte, DeSoto, Hardee, Hendry, Highlands, and Glades Counties and the incorporated Cities and Towns of Dundee, Haines City, Auburndale, Lake Alfred, Lake Wales, Lake Hamilton, Lakeland, Winter Haven, Eagle Lake, Bartow, Fort Meade, Bowling Green, Wauchula, Zolfo Springs, Arcadia, Venice, North Port, Punta Gorda, Fort Myers, Fort Myers Beach, Cape Coral, Sanibel, Estero, LaBelle, Moore Haven, and Clewiston.

Coastal & Heartland National Estuary Partnership FY24-FY26 BIL Work Plan Page 3 of 30

TABLE OF CONTENTS

BIPARTISAN INFRASTRUCTURE FUNDING FOR THE CHNEP

CCMP FOCUS IN FY2024-FY2026

FISCAL YEAR 2024, 2025 and 2026 ANNUAL BUDGET

Table 1: Fiscal Year 2024, 2025 and 2026 BIL Budget Overview

Table 2: Fiscal Year 2024 Travel Budget

CHNEP BIL FUNDED WORK PLAN TASKS

Task 1 Management Conference: Administration, Finance, Operations

Task 3 Research Coordination

Task 3.2 CHNEP Water Atlas

Task 3.7 DeSoto County Comprehensive Vulnerability Assessment

Task 3.8 Hardee County Comprehensive Vulnerability Assessment

Task 3.9 Manatee County Comprehensive Vulnerability Assessment

Task 3.10 Sarasota County Comprehensive Vulnerability Assessment

Task 3.11 Glades County Comprehensive Vulnerability Assessment

Task 3.12 Hendry County Comprehensive Vulnerability Assessment

Task 4 Watershed Coordination

Task 4.5 Restoration/Research TBD Projects

Coastal & Heartland National Estuary Partnership FY24-FY26 BIL Work Plan Page 4 of 30

COASTAL & HEARTLAND NATIONAL ESTUARY PARTNERSHIP

Policy Committee

Mr. Brian Smith, Co-Chair Ms. Jennifer Carpenter, Co-Chair

US Environmental Protection Agency, Region 4 Florida Department of Environmental Protection

Hon. Sandy Meeks

Hardee County

Hon. Emory Howard

Hendry County

Hon. Scott Kirouac

Highlands County

Hon. Ray Sandelli

Lee County

Hon. James Satcher

Manatee County

Hon. Bill Braswell

Polk County

Hon. Mark Smith

Sarasota County

Hon. Ken Doherty

Charlotte County

Hon. Ashley Coone

Desoto County

Hon. Tony Whidden

Glades County

Hon. Robert Heine, Jr.

City of Arcadia

Hon. Steve Githens

City of Bartow

Hon. Jessica Cosden

City of Cape Coral

Hon. Fred Burson

City of Fort Myers

Hon. Bill Veach

Town of Fort Myers Beach

Hon. Bill Read

City of Lakeland

Hon. Alice White

City of North Port

Hon. Donna Peterman

City of Punta Gorda

Hon. Mike Miller

City of Sanibel

Hon. Steve Hickox

Desoto County

Hon. Nicolas Pachota

City of Venice

Mr. M. J. Carnevale

City of Winter Haven

Hon. Katy Errington

Village of Estero

Hon. Barbara Arnold

City of Fort Meade

Ms. Allie McCue

Florida Fish & Wildlife Conservation Commission

Mr. Chauncey Goss

South Florida Water Management District

Ms. Margaret Wuerstle

Southwest Florida Regional Planning Council

Mr. Jack Bispham

Southwest Florida Water Management District

Mr. Don McCormick

Southwest Florida Regional Planning Council

Ms. Jennifer Codo-Salisbury

Central Florida Regional Planning Council

Management Committee Co-Chairs Ms. Claire Jubb & Mr. David Hutchinson

Technical Advisory Committee Co-Chairs Mr. Ernesto Lasso de La Vega & Mr. Mark Walton

Citizens Advisory Committee Co-Chairs Mr. Harry Phillips & Ms. Debi Osborne

CHNEP Executive Director Ms. Jennifer Hecker

Coastal & Heartland National Estuary Partnership FY24-FY26 BIL Work Plan Page 5 of 30

BIPARTISAN INFRASTRUCTURE FUNDING FOR THE CHNEP

On November 15, 2021, President Biden signed the Bipartisan Infrastructure Law (P.L. 117-58), also known as the “Infrastructure Investment and Jobs Act of 2021” (IIJA) or “BIL.” The law’s investment in water is nothing short of transformational. It includes $50 billion to the U.S. Environmental Protection Agency

(EPA) for water infrastructure, the single largest investment in water that the federal government has ever made. The BIL provides $132 million in funding for the 28 longstanding National Estuary Programs (NEPs) for fiscal years 2022 through 2026. This funding is being evenly distributed to the NEPs, annually providing each with approximately $909,800 in BIL funds. Importantly, NEP BIL funds are available until expended.

On July 26th, EPA issued a NEP BIL Funding Implementation Memorandum (memorandum), which applies to funding provided under the BIL and provides guidance on uses of funds, timeframes, how to award the funds, and tracking and reporting requirements. The memorandum describes the process for FY 2022 – FY

2026 BIL funds and may be supplemented by additional implementation memoranda as needed. Unless otherwise noted in this document, the FY 2021 – FY 2024 Clean Water Act §320 National Estuary Program

Funding Guidance also applies to BIL funding. It outlines the core goals of BIL funding are to:

1) “Tackle the Climate Crisis” by reducing emissions that cause climate change and accelerating resilience and adaptation to climate change impacts; and

2) “Take Decisive Action to Advance Environmental Justice and Civil Rights” by promoting EJ and protecting civil rights at the federal, state, and local levels.

As such, it states that NEP projects funded through BIL should seek to: (1) Accelerate and more extensively implement CCMPs, (2) Ensure that benefits reach disadvantaged communities – including that at least 40% of the BIL funding goes to projects benefitting such communities in FY24-26, and (3) Build the adaptive capacity of ecosystems and communities – including addressing climate change and using green and nature-based solutions to enhance resiliency.

It goes on to state that where possible and aligned with the priorities identified in their Comprehensive

Conservation and Management Plans (CCMPs), NEPs should engage and educate the public and private sectors on key climate-related vulnerabilities and solutions and provide technical and financial assistance to accelerate progress in response to a changing climate. NEPs should elevate climate efforts through BIL implementation including, but not limited to:

➢ Assessment and planning projects that involve climate change vulnerability assessments, community resilience and adaptation plans, or hazard mitigation plans

➢ Restoration, water infrastructure, green infrastructure, stormwater management, and nonpoint source projects that prioritize innovative climate adaptation, hazard mitigation, and resilience solutions

➢ Projects focused on climate-related research, including those that measure, monitor, and increase carbon sequestration

➢ Projects focused on climate-related outreach and education

As with annual appropriations distributed to NEPs to implement CWA §320, the funds distributed under the

BIL must implement the management conference and EPA-approved CCMP and Work Plan. Therefore, the

CHNEP is required to put forth a BIL Work Plan and Budget for each year - with CHNEP being allowed to combine the last three years (FY24-FY26). Due to the long-term nature of BIL funding, each NEP is also required to develop a BIL Long-Term Plan to submit no later than June 1, 2023.

Accordingly, CHNEP has drafted this BIL FY24-FY26 Work Plan and Long-Term Plan to outline how it plans to expend the last three years of Bipartisan Infrastructure Law funding to further resiliency in the

CHNEP area, including addressing climate-related factors that affect improving water quality, restoring hydrology, protecting fish, wildlife and their habitat and increasing public engagement as outlined in the four action plans in the 2019 CHNEP CCMP.

Coastal & Heartland National Estuary Partnership FY24-FY26 BIL Work Plan Page 6 of 30

CCMP FOCUS IN FY2024-FY2026

The Fiscal Year 2024-2026 BIL Work Plan and Budget reflects the approved 2019 CCMP, which outlines the 5-year organizational strategic plan and has the following visions, goals, objectives, and strategies:

WATER QUALITY

VISION: Waters that meet their designated human uses for drinking, shellfish harvesting, or swimming and fishing, while supporting appropriate and healthy aquatic life.

GOAL: Water Quality Improvement.

OBJECTIVE: Meet or exceed water quality standards for designated uses of natural waterbodies and waterways with no degradation of Outstanding Florida Waters.

STRATEGY: Support comprehensive and coordinated water quality monitoring programs and projects and programs that reduce pollutants entering waterways.

WQ-1: Support a comprehensive and coordinated water quality monitoring and assessment strategy

▪ CHNEP will continue working with partners to collect water quality monitoring data and uploading it to the CHNEP Water Atlas for access by interested parties and the public.

▪ CHNEP will work with our partners to develop new information pages on the Water Atlas as needed.

▪ CHNEP will continue to fund and support the Coastal Charlotte Harbor Monitoring Network

(CCHMN).

WQ-2: Develop water quality standards, pollutant limits, and clean-up plans

▪ CHNEP will continue to support, providing technical comment as appropriate, the development and implementation of water quality standards, pollutant limits and clean-up plans.

WQ-3: Reduce urban stormwater and agricultural runoff pollution

▪ CHNEP will continue to provide public presentations and information on urban stormwater and agricultural runoff pollution.

▪ CHNEP will continue to support partners in the implementation of stormwater and agricultural runoff reduction projects.

WQ-4: Reduce wastewater pollution

▪ CHNEP will continue to support partners in the implementation of wastewater discharge reduction and reuse projects, as well as septic to sewer conversion projects.

WQ-5: Reduce harmful algae blooms

▪ CHNEP will continue to provide public presentations and information on harmful algae blooms and nutrient pollution, as well as research algae bloom remediation techniques.

HYDROLOGICAL RESTORATION

VISION: Natural freshwater flow across the landscape to the estuaries.

GOAL: Enhanced and improved waterbodies with more natural hydrologic conditions.

Coastal & Heartland National Estuary Partnership FY24-FY26 BIL Work Plan Page 7 of 30

OBJECTIVE: Adequate aquifer recharge and freshwater volume and timing of flow to support healthy natural systems.

STRATEGY: Support data-driven watershed planning and hydrological restoration projects to preserve or restore natural flow regimes and provide sufficient fresh surface and groundwater to natural systems.

HR-1: Conduct data collection, modeling, and analyses to support hydrologic restoration

▪ CHNEP will continue to actively participate in gathering data and supporting modeling and analyses as well as fund integrated ground and surface water models to improve decision-making with regards to hydrological restoration projects. Currently, these include the South Lee County Watershed

Initiative and the Charlotte Harbor Flatwoods Initiative projects.

HR-2: Increase fresh surface water and groundwater availability to support healthy natural systems

▪ CHNEP will continue to promote water conservation and sufficient flows and levels of freshwater to support natural systems.

HR-3: Preserve and restore natural flow regimes

▪ CHNEP will work with partners to identify funding sources to facilitate capital programs that coordinate water storage, flood control, water quality and disaster planning.

▪ CHNEP will continue participating and providing technical assistance in Everglades’ restoration through project review, meeting participation and technical comment.

FISH, WILDLIFE & HABITAT PROTECTION

VISION: A diverse environment of interconnected, healthy habitats that support natural processes and viable, resilient native plant and animal communities.

GOAL: Natural habitat protection and restoration.

OBJECTIVE: Permanently acquire, connect, protect, manage, and restore natural terrestrial and aquatic habitats.

STRATEGY: Promote and facilitate permanent acquisition and effective protection and management of critical natural habitats including wildlife dispersal areas, movement and habitat migration corridors, wetlands, flowways, and environmentally sensitive lands and estuarine habitats.

FW-1: Protect, restore, and monitor estuarine habitats

▪ CHNEP will continue to work with Southwest Florida Estuarine Restoration Team (SWERT) partners on designing, permitting, and constructing seagrass, oyster, and other estuarine restoration projects in CHNEP area.

FW-2: Protect, restore, and monitor environmentally sensitive lands and waterways including critical habitat areas

▪ CHNEP will continue to share the Habitat Restoration Needs report and maps to support the conservation, management and enhancement of environmentally sensitive lands and critical habitat areas necessary for habitat resilience and migration.

▪ CHNEP will continue to offer grants to assist engaged citizens that promote the protection and management of public environmental lands and waterways.

▪ CHNEP will continue to directly engage in funding and project managing habitat restoration projects.

Coastal & Heartland National Estuary Partnership FY24-FY26 BIL Work Plan Page 8 of 30

FW-3: Assess and promote the benefits of land, waterway, and estuary protection and habitat restoration

▪ CHNEP will continue to use its comprehensive regional Economic Valuation study to promote the economic return on investment from land, water and estuarine protection and restoration investments.

PUBLIC ENGAGEMENT

VISION: An informed, engaged public making choices and taking actions that increase protection and restoration of estuaries and watersheds.

GOAL: Public education and engagement.

OBJECTIVE: Increase the proportion of the population that supports and participates in actions to protect and restore estuaries and watersheds.

STRATEGY: Promote environmental awareness, understanding, and stewardship to the general public, new target audiences, and policymakers; and strengthen non-profit partner collaboration in education and engagement programs.

PE-1: Promote environmental literacy, awareness, and stewardship through expanded education and engagement opportunities for the general public

▪ CHNEP will continue to host routine volunteer events, as well as routinely host and participate in community events to provide environmental education and public engagement opportunities.

▪ CHNEP will continue to produce free educational materials and distribute them throughout the

CHNEP area.

▪ CHNEP will continue to disseminate information about public engagement opportunities through

Constant Contact, on social media, and on the www.chnep.org website.

PE-2: Expand reach of education and engagement opportunities to new target audiences

▪ CHNEP will continue to conduct educational workshops and events, including in underserved communities, as a way to introduce natural resource protection information to new target audiences in that area.

PE-3: Strengthen non-profit partner collaboration in education and engagement programs

▪ CHNEP will continue to administer a Conservation Grant program to foster community natural resource protection projects and initiatives that support CCMP implementation, including with non-profit partners.

▪ CHNEP will continue to seek and work with non-profit organizations on collaborative initiatives.

▪ CHNEP will continue to sponsor events that foster non-profit partner collaboration to educate and engage the public on issues relating to CCMP implementation.

PE-4: Increase outreach to policymakers to enhance understanding and support for CCMP implementation

▪ CHNEP will continue to meet and send information to local, state, and federal policymakers, explaining CHNEP’s role in supporting CCMP implementation.

Coastal & Heartland National Estuary Partnership FY24-FY26 BIL Work Plan Page 9 of 30

FISCAL YEAR 2024, 2025 and 2026 ANNUAL BUDGET

Table 1: Fiscal Year 2024, 2025 and 2026 BIL Budget Overview

Revenue

Federal (EPA FY24 Bipartisan Infrastructure Law (BIL) Funding) $ 909,800

Federal (EPA FY25 Bipartisan Infrastructure Law (BIL) Funding) $ 909,800

Federal (EPA FY26 Bipartisan Infrastructure Law (BIL) Funding) $ 909,800

Total Revenue $ 2,729,400

Expenditures

Desoto County Comprehensive Vulnerability Assessment $ 200,000

Hardee County Comprehensive Vulnerability Assessment $ 200,000

Manatee County Comprehensive Vulnerability Assessment $ 200,000

Sarasota County Comprehensive Vulnerability Assessment $ 200,000

Glades County Comprehensive Vulnerability Assessment $ 200,000

Hendry County Comprehensive Vulnerability Assessment $ 200,000

CHNEP Water Atlas Maintenance & Improvements $ 285,000

Travel $ 30,000

Restoration Project(s) TBD $ 1,214,400

Total Expenditures $2,729,400

Coastal & Heartland National Estuary Partnership FY24-FY26 BIL Work Plan Page 10 of 30

Table 2: Fiscal Year 2024 Travel Budget

Date Purpose

Staff Location

Length of Stay

Travel

Mode Reg. Fee

Estimated

Cost

October

RAE Living Shorelines Tech

Workshop 1 Galveston, TX 3 Air $ 150 $ 950

October

Grant Management Boot

Camp 1 Orlando, FL 3 Auto $ 500 $ 750

Nov. 2023 Coastal Estuarine Research

Federation Meeting 2 Portland, OR 5 Air $ 595 $ 3,900

Jan. 2024 Everglades Coalition 1 Coral Springs, FL 4 Auto $ 0 $ 1,300

Feb. 2024 American Water Resources 4 Fort Myers, FL N/A Auto $ 300 $ 200

Feb. 2024 Gulf of Mexico Conference 4 Tampa, FL 4 Auto $ 1,800 $ 4,000

Mar. 2024 NEP/EPA Spring Mtg. 1 Washington, DC 4 Air $ 300 $ 2,000

April 2024 League of Environmental

Educators in Florida 1 Ocala, Florida 2 Auto $ 150 $ 600

Oct. 2023 -

Sep. 2024

Local Meetings/ Mileage 6 Various Florida

Locations N/A Auto $ 300 $ 7,205

Subtotal $ 4,095 $ 20,905

Total $ 25,000

Note: $10,000 from EPA BIL and $15,000 from EPA 320

Coastal & Heartland National Estuary Partnership FY24-FY26 BIL Work Plan Page 11 of 30

CHNEP BIL FUNDED WORK PLAN TASKS

The CHNEP projects are organized according to task. There are five tasks, as follows:

Task 1: Management Conference

1.1 Materials and Supplies

Task 2: Public Engagement

2.1 Conservation Grants

2.2 2025 Calendar and 2024 Harbor Happenings Magazines

2.3 Public Engagement Events

2.4 Sponsorships

Task 3: Research Coordination

3.1 Water Quality and Seagrass Monitoring and Mapping Programs

3.2 CHNEP Water Atlas

3.3 Charlotte County Comprehensive Vulnerability Assessment

3.4 Polk County Comprehensive Vulnerability Assessment

3.5 Highlands County Comprehensive Vulnerability Assessment

3.6 Lee County Comprehensive Vulnerability Assessment

3.7 DeSoto County Comprehensive Vulnerability Assessment

3.8 Hardee County Comprehensive Vulnerability Assessment

3.9 Manatee County Comprehensive Vulnerability Assessment

3.10 Sarasota County Comprehensive Vulnerability Assessment

3.11 Glades County Comprehensive Vulnerability Assessment

3.12 Hendry County Comprehensive Vulnerability Assessment

Task 4: Watershed Coordination

4.1 Submerged Aquatic Vegetation Restoration

4.2 Pine Island Flatwoods Preserve Wetland Habitat Enhancement

4.3 Myakka Headwaters Project

4.4 Tiki Point Harborwalk Living Shoreline Pilot Project

4.5 Restoration/Research Project(s) TBD

Task 5: Policymaker Education

5.1 Comprehensive Conservation & Management Plan Updating and Reprinting

Note that only those tasks and projects bolded above are funded with FY24-26 Bipartisan Infrastructure Law funding.

Coastal & Heartland National Estuary Partnership FY24-FY26 BIL Work Plan Page 12 of 30

Task 1 Management Conference: Administration, Finance, Operations

Objective: Provide committee structure that supports the implementation of the CCMP; support administration of CHNEP; ensure compliance with grant and agreement requirements as awardee and awarder; and seek additional funding support for identified projects.

Description: The CHNEP office provides staff support to the Management Conference, furnishes operations and finance support, ensures compliance with Host Agency procedures, secures funding from partners, and assists partners seeking grants and contracts to implement the CCMP.

CCMP Elements Implemented: All

Outputs/Deliverables

▪ Management Conference committee meetings for 4 committees, 3x/yr.

▪ Management Conference adoption of Annual Work Plan before June 1, 2023

▪ GPRA Reporting through EPA’s NEPORT, by September 14, 2023

Milestones

▪ Administration of Program Office operations and finances, ongoing

▪ Collaborate with partners on CCMP implementation, ongoing

▪ Compliance with Host Agency finance and procurement requirements, ongoing

▪ Compliance with Funders’ grant reporting requirements, ongoing

FY 24 Budget

EPA 320 Funds (FY24):

Personnel (Salaries & Benefits) $538,810

Staff Travel $ 15,000

Overhead Host Administrative Fees $184,869

Communications Software and Fees $ 9,000

EPA BIL (FY24):

Staff Travel $ 10,000

SWFWMD

Personnel (Salaries & Benefits) $ 56,000

FDEP

Personnel (Salaries & Benefits) $ 75,000

Note: Total personnel costs are $669,810

Local:

Meeting Support $ 7,000

Task 1 Total Budget $ 895,679

Note: $10,000 per year travel funded through BIL in FY25 and FY26 as well (for a total of

$30,000 of FY24-FY26 BIL funding)

Outcomes

▪ Fully informed and engaged CHNEP Management Conference

▪ Other federal, state, and non-profit grants obtained to funding CCMP implementation

▪ Increased participation, understanding and support of NEP mission by partners

▪ Continued commitment from partners to fund CHNEP and CCMP activities

▪ Funding opportunities and assistance provided to partners to implement initiatives and projects that further CCMP implementation

Coastal & Heartland National Estuary Partnership FY24-FY26 BIL Work Plan Page 13 of 30

Estimated Timeline: FY24-FY26

Task 3 Research Coordination

Work Plan Objective: To ensure collection, reporting and access to consistent region-wide, technically sound water quality and biological data throughout the CHNEP area. To identify and resolve gaps in scientific data and address emerging research needs through partnerships and innovative research.

Description: CHNEP coordinates some water quality sampling as well as works with partners to identify and resolve gaps in water quality and biological data, specifically through refinements to the Monitoring

Strategy. In addition, CHNEP assists partners with compiling, analyzing, mapping, and conveying complex technical information in an understandable manner so it can be used to implement effective resource protection and restoration projects. The resulting data is used to assess resource status and trends, to be incorporated into resource management plans.

CCMP Elements Implemented: WQ-1, WQ-2, HR-1, FW-2, and PE-1.

Partners and Roles: outlined below in the respective subtasks

Outputs/Deliverables, Milestones

▪ CHNEP Water Atlas: Review and assess uploaded water quality sampling data

▪ Water Quality Monitoring: Monthly water quality data, quarterly RAMP participation, and CCHMN annual field audits and meetings

▪ Seagrass Monitoring: Annual seagrass data

▪ Seagrass Aerial Mapping: Biennial and 6-year seagrass aerial mapping

▪ Data Management: Biannual up-dates of water quality data

▪ Data Access: Ongoing access to water quality data, graphing and analyses and response to data requests

▪ Data Analysis and Use: Annual up-dates of water quality contour maps and, and periodic refinement of Research Needs Inventory and environmental indicators

FY 24 Budget

EPA 320 Funds: Staff Time

FDEP Funds (Staff Time): Staff Time

SWFWMD Funds (Staff Time): Staff Time

Estimated Total Budget: Staff Time

Outcomes

▪ Consistent region-wide, technically sound water quality and biological data needed to assess resource status, trends, and complex interactions

▪ Public access to water quality and seagrass data to partners via CHNEP Water Atlas

▪ Increased data analyses, maps, and graphs to enhance and evaluate protection and restoration efforts

▪ Increased collaboration of monitoring, mapping and management among resource managers and agencies from throughout the CHNEP Area

▪ Expanded used of data by partners to assess resource conditions, manage resources and implement effective and efficient management programs and restoration projects

Coastal & Heartland National Estuary Partnership FY24-FY26 BIL Work Plan Page 14 of 30

Task 3.2 CHNEP Water Atlas

Project Objective: To ensure continuing access to technical information from throughout the CHNEP Study

Area to scientists, resource managers and users, elected officials and the public through a user-friendly web-based tool. The resulting data, maps and graphs are easily accessible for use to evaluate resource conditions, answer site and topic specific questions, and convey scientific information in an understandable manner to support effective management programs and restoration projects.

Project Description: CHNEP maintains and enhances the CHNEP Water Atlas, a web-based, data management and mapping system that provides historical information, scientific data, water resource maps, resource management actions, volunteer opportunities and current events from throughout the CHNEP area.

Tools are available to map, analyze and graph data related to specific locations and topics to assists partners with identifying, prioritizing, and implementing projects that address CCMP water quality, habitat, hydrology, and stewardship goals. CHNEP support includes maintenance, improvements, and enhancements of all the CHNEP Water Atlas components, including home page design and database updates. In addition to maintenance, the CHNEP works with USF to make upgrades and improvements on an annual basis. New

Water Atlas Features/Improvements planned for 2024 include:

▪ Lake Okeechobee Waterbody Page: This task is to develop a Lake Okeechobee waterbody page with the updated waterbody page design, linked to the common map that displays GIS layers for the four categories: water quality, habitat, hydrology, and climate change. The focus of the additions will be water quality (nutrients and salinity) and cyanobacteria (if available), as well as the ecological impacts to the Caloosahatchee Watershed of freshwater releases from Lake Okeechobee (shown in the Estuary Tracker). The Lake Okeechobee & Caloosahatchee Estuary Tracker will be incorporated into the page above the Water Quality section of the page.

▪ Improvements to Basin Pages: This task is to enhance the existing Basin pages to include summary information at the basin-level for water quality and hydrology, highlighted links to featured CHNEP projects, and a new “Climate Change” category in the Related Information section.

▪ Adding Real-Time Data Collected by Partners onto the CHNEP Water Atlas Real-Time Data

Mapper: This task is to pull in the Sanibel -Captiva Conservation Foundation (SCCF) River, Estuary and Coastal Observing Network (RECON) Data onto Real-Time Data Mapper.

CCMP Elements Implemented: WQ-1, WQ-2, HR-1, FW-1, FW-2, FW-3, PE-1, and PE-3.

Partners and Roles: All entities creating publicly accessible water quality data

Outputs/Deliverables Milestones:

▪ Post and provide access to water quality data updates every 6 months

▪ Post and provide access to data analyses, maps and graphs as requested

▪ Annual Update of WBID Boundaries and NNC Values

▪ Conducting trend analysis on water quality data annually and providing in user friendly format

▪ Conducting analysis on seagrass and macroalgae data annually and providing in user friendly format

Coastal & Heartland National Estuary Partnership FY24-FY26 BIL Work Plan Page 15 of 30

FY 24 Budget:

EPA BIL FY23 Funds: $95,000

Total Budget: $95,000 + Staff Time

Note: $95,000 per year Water Atlas funded through BIL in FY25 and FY26 as well, for a total of

$285,000 of FY24-26 BIL funding.

▪ Data publicly provided to public and resource managers to assess effectiveness of protection and restoration efforts

▪ Increased coordination on sampling and monitoring efforts amongst resource managers and agencies in the CHNEP area

BIL Priorities Supported:

1) Tackle the Climate Crisis” by reducing emissions that cause climate change and accelerating resilience and adaptation to climate change impacts through providing the public all accessible climate change data for the region in one place where they can readily view and utilize.

Coastal & Heartland National Estuary Partnership FY24-FY26 BIL Work Plan Page 16 of 30

Task 3.7 DeSoto County Comprehensive Vulnerability Assessment

Project Objective: To identify local climate change impacts and vulnerabilities and present adaptation responses that can help reduce community vulnerability and/or increase resilience in DeSoto County, Florida.

Project Description: This project will use the climate adaptation planning process to conduct public workshops and data analysis to identify pre-existing conditions and climate stressors, including vulnerability modeling to develop recommended Adaptation Action Areas (AAA’s) for DeSoto County. The Consultant will gather and update the County’s vulnerability assessment utilizing new elevation data, updated sea level rise projections, shoreline information, capital project data, social vulnerability index, and stormwater management data. The updated vulnerability modeling with new elevation data will be used to determine infrastructure and habitat impacts as well as areas of increasing vulnerability for a 2030, 2060, and 2100 sea level rise assumption horizon. Using the best available data, the contractor will also incorporate an analysis of stormwater management and social vulnerability using best practices such as the Center for Disease

Control's Social Vulnerability Index or other evaluation strategy (identifying vulnerable populations and potential public health risks).That information and input will be synthesized into a summary of current and projected climate changes for the community. The contractor will then use these vulnerability assessments to develop proposed adaptation strategies. One of the foundational concepts of Fla Stat 380.093 and FEMA’s

CRS program is to assess the flood risk of a community using best available tools, data, and methodologies.

The larger goal of both programs is to capture multiple types of weather-related scenarios to project and model how various flood risks would affect the community. This project will produce a final Climate

Change Vulnerability Assessment for DeSoto County that meets all Florida Statutory requirements. This will qualify DeSoto County to access additional state funding sources.

CCMP Elements Implemented: Potentially all CCMP elements

Partners and Roles: CHNEP (Funder), DeSoto County

Outputs/Deliverables Milestones

▪ Data Collection and Analysis

▪ Vulnerability Modeling and Analysis (including stormwater, social, etc.)

▪ Summary of Current and Project Climate Changes

▪ Summary of Proposed Adaption Strategies and recommended Adaptation Action Areas

FY24 Budget:

EPA FY24 BIL Funds: $ 200,000

Total Budget: $ 200,000 + Staff Time

Outcomes

▪ Climate Change Vulnerability Assessment for DeSoto County that meets state Statutory requirements

BIL Priorities Supported:

1) “Tackle the Climate Crisis” by reducing emissions that cause climate change and accelerating resilience and adaptation to climate change impacts; in assisting restoration of wetlands that act as carbon sinks and restoration of freshwater hydrological flows that can mitigate saltwater intrusion from sea level rise.

Coastal & Heartland National Estuary Partnership FY24-FY26 BIL Work Plan Page 17 of 30

2) “Take Decisive Action to Advance Environmental Justice and Civil Rights” by promoting EJ and protecting civil rights at the federal, state, and local levels to identify and address additional vulnerabilities that may affect disadvantaged communities in selected County.

Coastal & Heartland National Estuary Partnership FY24-FY26 BIL Work Plan Page 18 of 30

Task 3.8 Hardee County Comprehensive Vulnerability Assessment

Project Objective: To identify local climate change impacts and vulnerabilities and present adaptation responses that can help reduce community vulnerability and/or increase resilience in Hardee County, Florida.

Project Description: This project will use the climate adaptation planning process to conduct public workshops and data analysis to identify pre-existing conditions and climate stressors, including vulnerability modeling to develop recommended Adaptation Action Areas (AAA’s) for Hardee County. The Consultant will gather and update the County’s vulnerability assessment utilizing new elevation data, updated sea level rise projections, shoreline information, capital project data, social vulnerability index, and stormwater management data. The updated vulnerability modeling with new elevation data will be used to determine infrastructure and habitat impacts as well as areas of increasing vulnerability for a 2030, 2060, and 2100 sea level rise assumption horizon. Using the best available data, the contractor will also incorporate an analysis of stormwater management and social vulnerability using best practices such as the Center for Disease

Control's Social Vulnerability Index or other evaluation strategy (identifying vulnerable populations and potential public health risks).That information and input will be synthesized into a summary of current and projected climate changes for the community. The contractor will then use these vulnerability assessments to develop proposed adaptation strategies. One of the foundational concepts of Fla Stat 380.093 and FEMA’s

CRS program is to assess the flood risk of a community using best available tools, data, and methodologies.

The larger goal of both programs is to capture multiple types of weather-related scenarios to project and model how various flood risks would affect the community. This project will produce a final Climate

Change Vulnerability Assessment for Hardee County that meets all Florida Statutory requirements. This will qualify Hardee County to access additional state funding sources.

CCMP Elements Implemented: Potentially all CCMP elements

Partners and Roles: CHNEP (Funder), Hardee County

Outputs/Deliverables Milestones

▪ Data Collection and Analysis

▪ Vulnerability Modeling and Analysis (including stormwater, social, etc.)

▪ Summary of Current and Project Climate Changes

Outcomes

▪ Climate Change Vulnerability Assessment for Hardee County that meets state Statutory resilience and adaptation to climate change impacts; in assisting restoration of wetlands that act as

Coastal & Heartland National Estuary Partnership FY24-FY26 BIL Work Plan Page 19 of 30 protecting civil rights at the federal, state, and local levels to identify and address additional

Coastal & Heartland National Estuary Partnership FY24-FY26 BIL Work Plan Page 20 of 30

Task 3.9 Manatee County Comprehensive Vulnerability Assessment

Project Objective: To identify local climate change impacts and vulnerabilities and present adaptation responses that can help reduce community vulnerability and/or increase resilience in Manatee County, Florida.

Project Description: This project will use the climate adaptation planning process to conduct public workshops and data analysis to identify pre-existing conditions and climate stressors, including vulnerability modeling to develop recommended Adaptation Action Areas (AAA’s) for Manatee County. The Consultant will gather and update the County’s vulnerability assessment utilizing new elevation data, updated sea level rise projections, shoreline information, capital project data, social vulnerability index, and stormwater management data. The updated vulnerability modeling with new elevation data will be used to determine infrastructure and habitat impacts as well as areas of increasing vulnerability for a 2030, 2060, and 2100 sea level rise assumption horizon. Using the best available data, the contractor will also incorporate an analysis of stormwater management and social vulnerability using best practices such as the Center for Disease

Control's Social Vulnerability Index or other evaluation strategy (identifying vulnerable populations and potential public health risks).That information and input will be synthesized into a summary of current and projected climate changes for the community. The contractor will then use these vulnerability assessments to develop proposed adaptation strategies. One of the foundational concepts of Fla Stat 380.093 and FEMA’s

CRS program is to assess the flood risk of a community using best available tools, data, and methodologies.

The larger goal of both programs is to capture multiple types of weather-related scenarios to project and model how various flood risks would affect the community. This project will produce a final Climate

Change Vulnerability Assessment for Manatee County that meets all Florida Statutory requirements. This will qualify Manatee County to access additional state funding sources.

CCMP Elements Implemented: Potentially all CCMP elements

Partners and Roles: CHNEP (Funder), Manatee County

Outputs/Deliverables Milestones

▪ Data Collection and Analysis

▪ Vulnerability Modeling and Analysis (including stormwater, social, etc.)

▪ Summary of Current and Project Climate Changes

Outcomes

▪ Climate Change Vulnerability Assessment for Manatee County that meets state Statutory resilience and adaptation to climate change impacts; in assisting restoration of wetlands that act as

Coastal & Heartland National Estuary Partnership FY24-FY26 BIL Work Plan Page 21 of 30 protecting civil rights at the federal, state, and local levels to identify and address additional

Estimated Timeline: FY25-FY27

Coastal & Heartland National Estuary Partnership FY24-FY26 BIL Work Plan Page 22 of 30

Task 3.10 Sarasota County Comprehensive Vulnerability Assessment

Project Objective: To identify local climate change impacts and vulnerabilities and present adaptation responses that can help reduce community vulnerability and/or increase resilience in Sarasota County, Florida.

Project Description: This project will use the climate adaptation planning process to conduct public workshops and data analysis to identify pre-existing conditions and climate stressors, including vulnerability modeling to develop recommended Adaptation Action Areas (AAA’s) for Sarasota County. The Consultant will gather and update the County’s vulnerability assessment utilizing new elevation data, updated sea level rise projections, shoreline information, capital project data, social vulnerability index, and stormwater management data. The updated vulnerability modeling with new elevation data will be used to determine infrastructure and habitat impacts as well as areas of increasing vulnerability for a 2030, 2060, and 2100 sea level rise assumption horizon. Using the best available data, the contractor will also incorporate an analysis of stormwater management and social vulnerability using best practices such as the Center for Disease

Control's Social Vulnerability Index or other evaluation strategy (identifying vulnerable populations and potential public health risks).That information and input will be synthesized into a summary of current and projected climate changes for the community. The contractor will then use these vulnerability assessments to develop proposed adaptation strategies. One of the foundational concepts of Fla Stat 380.093 and FEMA’s

CRS program is to assess the flood risk of a community using best available tools, data, and methodologies.

The larger goal of both programs is to capture multiple types of weather-related scenarios to project and model how various flood risks would affect the community. This project will produce a final Climate

Change Vulnerability Assessment for Sarasota County that meets all Florida Statutory requirements. This will qualify Sarasota County to access additional state funding sources.

CCMP Elements Implemented: Potentially all CCMP elements

Partners and Roles: CHNEP (Funder), Sarasota County

Outputs/Deliverables Milestones

▪ Data Collection and Analysis

▪ Vulnerability Modeling and Analysis (including stormwater, social, etc.)

▪ Summary of Current and Project Climate Changes

Outcomes

▪ Climate Change Vulnerability Assessment for Sarasota County that meets state Statutory resilience and adaptation to climate change impacts; in assisting restoration of wetlands that act as

Coastal & Heartland National Estuary Partnership FY24-FY26 BIL Work Plan Page 23 of 30 protecting civil rights at the federal, state, and local levels to identify and address additional

Estimated Timeline: FY25-FY27

Coastal & Heartland National Estuary Partnership FY24-FY26 BIL Work Plan Page 24 of 30

Task 3.11 Glades County Comprehensive Vulnerability Assessment

Project Objective: To identify local climate change impacts and vulnerabilities and present adaptation responses that can help reduce community vulnerability and/or increase resilience in Glades County, Florida.

Project Description: This project will use the climate adaptation planning process to conduct public workshops and data analysis to identify pre-existing conditions and climate stressors, including vulnerability modeling to develop recommended Adaptation Action Areas (AAA’s) for Glades County. The Consultant will gather and update the County’s vulnerability assessment utilizing new elevation data, updated sea level rise projections, shoreline information, capital project data, social vulnerability index, and stormwater management data. The updated vulnerability modeling with new elevation data will be used to determine infrastructure and habitat impacts as well as areas of increasing vulnerability for a 2030, 2060, and 2100 sea level rise assumption horizon. Using the best available data, the contractor will also incorporate an analysis of stormwater management and social vulnerability using best practices such as the Center for Disease

Control's Social Vulnerability Index or other evaluation strategy (identifying vulnerable populations and potential public health risks).That information and input will be synthesized into a summary of current and projected climate changes for the community. The contractor will then use these vulnerability assessments to develop proposed adaptation strategies. One of the foundational concepts of Fla Stat 380.093 and FEMA’s

CRS program is to assess the flood risk of a community using best available tools, data, and methodologies.

The larger goal of both programs is to capture multiple types of weather-related scenarios to project and model how various flood risks would affect the community. This project will produce a final Climate

Change Vulnerability Assessment for Glades County that meets all Florida Statutory requirements. This will qualify Glades County to access additional state funding sources.

CCMP Elements Implemented: Potentially all CCMP elements

Partners and Roles: CHNEP (Funder), Glades County

Outputs/Deliverables Milestones

▪ Data Collection and Analysis

▪ Vulnerability Modeling and Analysis (including stormwater, social, etc.)

▪ Summary of Current and Project Climate Changes

▪ Climate Change Vulnerability Assessment for Glades County that meets state Statutory requirements resilience and adaptation to climate change impacts; in assisting restoration of wetlands that act as carbon sinks and restoration of freshwater hydrological flows that can mitigate saltwater intrusion from sea level rise.

2) “Take Decisive Action to Advance Environmental Justice and Civil Rights” by promoting EJ and protecting civil rights at the federal, state, and local levels to identify and address additional

Coastal & Heartland National Estuary Partnership FY24-FY26 BIL Work Plan Page 25 of 30

Estimated Timeline: FY26-FY28

Task 3.12 Hendry County Comprehensive Vulnerability Assessment

Project Objective: To identify local climate change impacts and vulnerabilities and present adaptation responses that can help reduce community vulnerability and/or increase resilience in Hendry County, Florida.

Project Description: This project will use the climate adaptation planning process to conduct public workshops and data analysis to identify pre-existing conditions and climate stressors, including vulnerability modeling to develop recommended Adaptation Action Areas (AAA’s) for Hendry County. The Consultant will gather and update the County’s vulnerability assessment utilizing new elevation data, updated sea level rise projections, shoreline information, capital project data, social vulnerability index, and stormwater management data. The updated vulnerability modeling with new elevation data will be used to determine infrastructure and habitat impacts as well as areas of increasing vulnerability for a 2030, 2060, and 2100 sea level rise assumption horizon. Using the best available data, the contractor will also incorporate an analysis of stormwater management and social vulnerability using best practices such as the Center for Disease

Control's Social Vulnerability Index or other evaluation strategy (identifying vulnerable populations and potential public health risks).That information and input will be synthesized into a summary of current and projected climate changes for the community. The contractor will then use these vulnerability assessments to develop proposed adaptation strategies. One of the foundational concepts of Fla Stat 380.093 and FEMA’s

CRS program is to assess the flood risk of a community using best available tools, data, and methodologies.

The larger goal of both programs is to capture multiple types of weather-related scenarios to project and model how various flood risks would affect the community. This project will produce a final Climate

Change Vulnerability Assessment for Hendry County that meets all Florida Statutory requirements. This will qualify Hendry County to access additional state funding sources.

CCMP Elements Implemented: potentially all CCMP elements

Partners and Roles: CHNEP (Funder), Hendry County

Outputs/Deliverables Milestones

▪ Data Collection and Analysis

▪ Vulnerability Modeling and Analysis (including stormwater, social, etc.)

▪ Summary of Current and Project Climate Changes

Outcomes

▪ Climate Change Vulnerability Assessment for Hendry County that meets state Statutory

3) “Tackle the Climate Crisis” by reducing emissions that cause climate change and accelerating resilience and adaptation to climate change impacts; in assisting restoration of wetlands that act as

Coastal & Heartland National Estuary Partnership FY24-FY26 BIL Work Plan Page 26 of 30 from sea level rise.

4) “Take Decisive Action to Advance Environmental Justice and Civil Rights” by promoting EJ and protecting civil rights at the federal, state, and local levels to identify and address additional

Estimated Timeline: FY26-FY28

Coastal & Heartland National Estuary Partnership FY24-FY26 BIL Work Plan Page 27 of 30

Task 4 Watershed Coordination

Work Plan Objective: To coordinate partner efforts around protection and restoration on a watershed scale.

Description: CHNEP to coordinate protection and restoration efforts including mapping, monitoring, reporting (including in the annual development of the Government Performance and Review Act (GPRA) report). Additionally, CHNEP staff will provide technical support in watershed initiatives such as: Southern

Water Use Caution Area (SWUCA) Recovery Strategy, Minimum Flows and Levels, Reasonable Assurance

Plans, Basin Management Action Plans, Southwest Florida Comprehensive Watershed Management Plan, Charlotte Harbor Flatwoods Initiative, Lehigh Watershed Initiative, South Lee County Watershed Initiative, and Caloosahatchee River Watershed Protection Plan. Southwest Florida Estuarine Restoration Team

(SWERT) facilitates region-wide estuarine habitat restoration that addresses endangered smalltooth sawfish critical habitat. CHNEP also participates in state and federal processes to identify landscape scale conservation corridors with public and private partnerships to provide habitat and species migration and climate change adaptation. Additionally, CHNEP participates in Everglades Restoration projects relevant to the CHNEP Study Area; this includes participating on the Science Coordination Group on behalf of

Southwest Florida. As opportunities arise, CHNEP also assists partners in conducting restoration activities.

CCMP Elements Implemented: All

Partners: CHNEP, Florida Gulf Coast University, Florida SeaGrant, Coastal Wildlife Club, Lee County

Parks and Recreation Department, Lee County Department of Natural Resources, Charlotte Harbor

Environmental Center, Sanibel-Captiva Conservation Foundation, Friends of Charlotte Harbor Aquatic

Preserves, Lee County Conservation 2020 Program, Calusa Land Trust, City of Fort Myers, Mote Marine

Lab, Sarasota Estuary Program, and Tampa Bay Estuary Program.

Outputs/Deliverables Milestones

▪ GPRA Report

▪ Technical support for Charlotte Harbor Flatwoods Initiative, Lehigh Watershed Initiative, & South

Lee County Watershed Initiative

FY 24 Budget

EPA 320 Funds: Staff Time

FDEP Funds: Staff Time

SWFWMD Funds: Staff Time

Total Budget: Staff Time

Outcomes

▪ Improved resource management

▪ Annual summaries of partners’ restoration activities through the GPRA report

▪ Increased…