CONSTRUCT NEW
SPINAL CORD INJURY
SPACE
663-310 VA Puget Sound Health Care System Seattle, Washington
SPECIFICATIONS
100% Submittal Construction Documents
CONSTRUCT NEW SPINAL CORD INJURY SPACE
VA Puget Sound Health Care System – Seattle, WA Project #: 663-310
Table of Contents 00 01 10 - 01
DEPARTMENT OF VETERANS AFFAIRS
VHA MASTER SPECIFICATIONS
TABLE OF CONTENTS
Section 00 01 10
DIVISION 00 - SPECIAL SECTIONS DATE
00 01 15 List of Drawing Sheets 07-15
DIVISION 01 - GENERAL REQUIREMENTS
01 00 00 General Requirements 12-18
01 32 16.15 Project Schedules (Small Projects – Design/Bid/Build 04-13
01 33 23 Shop Drawings, Product Data, and Samples 05-17
01 35 26 Safety Requirements 02-17
01 35 26a VHA ICRA 1.2 10-24
01 42 19 Reference Standards 05-16
01 45 00 Quality Control 03-19
01 45 29 Testing Laboratory Services 11-18
01 45 35 Special Inspections 03-19
01 57 19 Temporary Environmental Controls 01-11
01 58 16 Temporary Interior Signage 07-15
01 74 19 Construction Waste Management 09-13
01 81 13 Sustainable Construction Requirements 10-17
01 91 00 General Commissioning Requirements 10-15
DIVISION 02 – EXISTING CONDITIONS
02 41 00 Demolition 08-17
DIVISION 03 – CONCRETE
03 30 00 Cast-in-Place Concrete 12-15
DIVISION 05 – METALS
05 12 00 Structural Steel Framing 11-18
05 21 00 Steel Joist Framing 11-18
05 31 00 Steel Decking 02-16
05 40 00 Cold-Formed Metal Framing 05-16
05 50 00 Metal Fabrications 08-18
05 51 00 Metal Stairs 10-15
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 08 00 Facility Exterior Closure Commissioning 11-16
07 13 00 Sheet Waterproofing 04-13
07 21 13 Insulation 10-17
07 22 00 Roof and Deck Insulation 02-16
07 24 00 Exterior Insulation and Finish Systems 02-16
07 27 27 Fluid Applied Membrane Air Barrier, Vapor Retarding 02-16
07 54 23 Thermoplastic Polyolefin (TPO) Roofing 08-16
07 60 00 Flashing and Sheet Metal 07-14
07 81 00 Applied Fireproofing 10-17
07 84 00 Firestopping 02-16
07 92 00 Joint Sealants 10-17
Table of Contents 00 01 10 - 02
07 95 13 Expansion Joint Cover Assemblies 02-16
DIVISION 08 - OPENINGS
08 11 13 Hollow Metal Doors and Frames 08-16
08 14 00 Interior Wood Doors 02-16
08 17 10 Integrated Door Assemblies 02-16
08 41 13 Aluminum-Framed Entrances and Storefronts 03-17
08 71 00 Door Hardware 01-16
08 71 13 Automatic Door Operators 02-16
08 80 00 Glazing 10-15
DIVISION 09 – FINISHES
09 05 16 Subsurface Preparation for Floor Finishes 02-15
09 06 00 Schedule for Finishes 04-15
09 22 16 Non-Structural Metal Framing 06-18
09 29 00 Gypsum Board 06-18
09 30 13 Ceramic/Porcelain Tiling 09-15
09 51 00 Acoustical Ceilings 12-18
09 65 13 Resilient Base and Accessories 02-16
09 65 19 Resilient Tile Flooring 05-18
09 67 23.20 Resinous Epoxy Base With Vinyl Chip Broadcast (RES-2) 07-14
09 68 00 Carpeting 10-15
09 91 00 Painting 01-16
09 96 59 High-Build Glazed Coatings 07-14
DIVISION 10 – SPECIALTIES
10 14 00 Signage 10-15
10 26 00 Wall Protection 10-15
10 28 00 Toilet, Bath, and Laundry Accessories 02-16
10 44 13 Fire Extinguisher Cabinets 08-18
DIVISION 11 – EQUIPMENT
11 05 12 General Motor Requirements for Equipment 11-11
11 73 00 Ceiling Mounted Patient Lift System 01-17
DIVISION 12 – FURNISHINGS
12 24 00 Window Shades 08-17
12 36 00 Countertops 12-18
DIVISION 13 - SPECIAL CONSTRUCTION
13 05 41 Seismic Restraint Requirements for Non-Structural
Components
01-14
DIVISION 14– CONVEYING EQUIPEMENT
14 24 00 Hydraulic Lift 10-18
DIVISION 21- FIRE SUPPRESSION
21 08 00 Commissioning of Fire Suppression System 11-16
21 13 13 Wet-Pipe Sprinkler Systems 06-15
DIVISION 22 – PLUMBING
Table of Contents 00 01 10 - 03
22 05 11 Common Work Results for Plumbing 07-16
22 05 23 General-Duty Valves for Plumbing Piping 09-15
22 07 11 Plumbing Insulation 09-15
22 08 00 Commissioning of Plumbing Systems 11-16
22 11 00 Facility Water Distribution 09-15
22 13 00 Facility Sanitary and Vent Piping 09-15
22 14 00 Facility Storm Drainage 09-15
22 40 00 Plumbing Fixtures 09-15
DIVISION 23 – HEATING, VENTILATING, AND AIR
CONDITIONING (HVAC)
23 05 11 Common Work Results for HVAC 08-17
23 05 12 General Motor Requirements for HVAC and Steam
Generation Equipment
08-17
23 05 41 Noise and Vibration Control for HVAC Piping and
Equipment
02-15
23 05 93 Testing, Adjusting, and Balancing for HVAC 02-15
23 07 11 HVAC and Boiler Plant Insulation 02-15
23 08 00 Commissioning of HVAC Systems 11-16
23 09 23 Direct-Digital Control System for HVAC 09-11
23 21 13 Hydronic Piping 08-17 23 22 13 Steam and Condensate Heating Piping 08-17 23 31 00 HVAC Ducts and Casings 03-13
23 34 00 HVAC Fans 02-15
23 36 00 Air Terminal Units 02-15
23 37 00 Air Outlets and Inlets 02-15
23 40 00 HVAC Air Cleaning Devices 02-12
23 74 13 Packaged, Outdoor, Central-Station Air-Handling Units 04-11
DIVISION 26 – ELECTRICAL
26 05 11 Requirements for Electrical Installations 01-16
26 05 19 Low-Voltage Electrical Power Conductors and Cables 01-17
26 05 26 Grounding and Bonding for Electrical Systems 01-17
26 05 33 Raceway and Boxes for Electrical Systems 01-18
26 08 00 Commissioning of Electrical Systems 11-16
26 09 23 Lighting Controls 01-18
26 22 00 Low-Voltage Transformers 01-18
26 23 00 Low-Voltage Switchgear 01-17
26 24 16 Panelboards 01-18
26 27 26 Wiring Devices 01-18
26 36 23 Automatic Transfer Switches 01-17
26 43 13 Surge Protective Devices 01-17
26 51 00 Interior Lighting 01-18
DIVISION 27 – COMMUNICATIONS
27 05 11 Requirements for Communications Installations 06-15
27 05 26 Grounding and Bonding for Communications Systems 06-15
27 05 33 Raceways and Boxes for Communications Systems 10-18
27 08 00 Commissioning of Communications Systems 11-16
27 10 00 Control, Communication and Signal Wiring 06-15
Table of Contents 00 01 10 - 04
27 11 00 Telecommunications Room Fittings 06-15
27 15 00 Communications Structured Cabling 01-16
27 52 23 Nurse Call and Code Blue Systems 10-18
DIVISION 28 – ELECTRONIC SAFETY AND SECURITY
28 05 00 Common Work Results for Electronic Safety and Security 04-18
28 05 13 Conductors and Cables for Electronic Safety and
Security
10-18
28 05 26 Grounding and Bonding for Electronic Safety and
Security
09-11
28 05 28.33 Conduits and Backboxes for Electronic Safety and
Security
09-11
28 08 00 Commissioning of Electronic Safety and Security Systems 11-16
28 13 00 Physical Access Control System 10-11
28 16 00 Intrusion Detection System 10-11
28 23 00 Video Surveillance 09-11
28 31 00 Fire Detection and Alarm 10-11
List of Drawing Sheets 00 01 15 - 01
SECTION 00 01 15
LIST OF DRAWING SHEETS
The drawings listed below accompanying this specification form a part of the contract.
Drawing No. Title
GENERAL
GI001 COVER
GI002 DRAWING INDEX
GS101 DELIVERY & STORAGE NOTES
GS201 BUILDING 100, BASEMENT - ICRA PLAN
GS202 BUILDING 100, LEVEL 1 - ICRA PLAN
GS301 BUILDING 100, LEVEL 1 - FIRE AND LIFE SAFETY
STRUCTURAL
SF-001 GENERAL STRUCTURAL NOTES
SF-002 SPECIAL INSPECTION SCHEDULE & ABBREVIATIONS
SF-101 PARTIAL FRAMING PLAN
SF-102 MEZZANINE FRAMING PLAN
SF-103 ROOF FRAMING PLAN
SF-301 DETAILS
SF-401 FRAMING ELEVATIONS
SF-501 DETAILS
SF-502 DETAILS
SF-503 MOMENT FRAME/CONNECTION DETAILS
SF-504 TYPICAL LIGHT-GAUGE AND METAL SHEAR WALL DETAILS
SF-505 TYPICAL LIGHT-GAUGE AND METAL SHEAR WALL DETAILS
SF-506 DETAILS
ARCHITECTURAL
A-001 ARCHITECTURAL SYMBOLS, ABBREVIATIONS & GENERAL NOTES
AD101 DEMO FLOOR PLAN
AE101 BUILDING 100, LEVEL 1 - FLOOR PLAN
AE102 FLOOR PLAN - FRAMING AND DRAINAGE PLAN
AE103 FLOOR PLAN
AE104 FLOOR PLAN - MEZZANINE
List of Drawing Sheets 00 01 15 - 02
AE105 ROOF PLAN
AC101 REFLECTED CEILING PLAN
AC102 REFLECTED CEILING PLAN - MEZZANINE
AE201 BUILDING ELEVATIONS
AE301 BUILDING SECTIONS
AI451 ENLARGED FLOOR PLAN & RCP - TRANSITIONAL APARTMENT
AI452 INTERIOR ELEVATIONS - TRANSITIONAL APARTMENT
AI453 ENLARGED FLOOR PLAN - THERAPY GYM
AI454 ENLARGED RCP - THERAPY GYM
AI455 ENLARGED FLOOR PLAN - THERAPY STORAGE
AI456 ENLARGED RCP - THERAPY STORAGE
AI457 ENLARGED FLOOR PLAN - MEZZANINE
AI458 ENLARGED RCP - MEZZANINE
AI459 INTERIOR ELEVATIONS - THERAPY GYM
AI470 ENLARGED FLOOR PLAN AND DETAILS - STAIR-1 AND LIFT
SHAFT
AI471 ENLARGED STAIR #2 PLAN, SECTIONS AND DETAILS
A-501 WALL SECTIONS
A-502 WALL SECTIONS
A-510 EXTERIOR DETAIL - ENLARGED PLANS
A-511 EXTERIOR DETAILS
A-512 EXTERIOR DETAILS
A-513 EXTERIOR DETAILS
AW001 SIGNAGE KEY & MATERIAL NOTES
AW003 IN-01.01.01
AW006 IN-01.03
AW007 IN-01.04
AW008 IN-01.05
AW010 IN-01.07-01
AW019 IN-01.26
AW031 IN-04.02
AW042 IN-08.01
AW056 IN-15.52-01
AW057 IN-15.52-02
A-601 STOREFRONT ELEVATIONS AND WINDOW SCHEDULE
A-602 DOOR SCHEDULES & DETAILS
List of Drawing Sheets 00 01 15 - 03
A-603 WALL TYPES
A-604 TEMPORARY BARRIER, FLOOR, CEILING AND ROOF ASSEMBLIES
A-605 SCHEDULES
MECHANICAL
M-001 LEGENDS, SYMBOLS, ABBREVIATION & NOTES - MECHANICAL
M-101 THERAPY - FIRST FLOOR PLAN - MECHANICAL
M-102 THERAPY - MEZZANINE - MECHANICAL
M-103 THERAPY - ROOF - MECHANICAL
M-501 DETAILS – MECHANICAL
M-502 DETAILS - MECHANICAL
M-601 SCHEDULES - MECHANICAL
PLUMBING
P-001 NOTES, LEGENDS & SCHEDULES - PLUMBING
P-101 BASEMENT FLOOR PLAN - ADDITION - PLUMBING
P-102 FIRST FLOOR PLAN - ADDITION - PLUMBING
P-103 MEZZANINE PLAN - ADDITION - PLUMBING
P-104 ROOF PLAN - ADDITION - PLUMBING
P-501 DETAILS – PLUMBING
P-701 MED GAS PIPING RISER DIAGRAMS
FIRE PROTECTION
F-103 FLOOR PLAN - ADDITION - FIRE PROTECTION
F-104 MEZZANINE PLAN - ADDITION - FIRE PROTECTION
ELECTRICAL
E-001 GENERAL NOTES, ABBREVIATIONS AND LEGENDS
ED101 FIRST FLOOR - ELECTRICAL DEMOLITION PLAN - PHASE 1
EL101 FIRST FLOOR - LIGHTING PLAN - PHASE 1
EL102 FIRST FLOOR - LIGHTING PLAN - PHASE 1 - MEZZANINE
EP101 FIRST FLOOR - POWER PLAN - PHASE 1
EP102 FIRST FLOOR - POWER PLAN - PHASE 1
EP103 FIRST FLOOR - POWER PLAN - PHASE 1 - MEZZANINE
EP104 ROOF - POWER PLAN – PHASE 1
List of Drawing Sheets 00 01 15 - 04
ET101 FIRST FLOOR - SPECIAL SYSTEMS PLAN - PHASE 1
ET102 FIRST FLOOR - SPECIAL SYSTEMS PLAN - PHASE 1 -
MEZZANINE
E-401 ENLARGED PLANS
E-402 ENLARGED PLANS
E-501 ELECTRICAL DETAILS
E-502 ELECTRICAL DETAILS
E-601 PARTIAL ONE-LINE DIAGRAM AND ELECTRICAL SCHEDULES –
PHASE 1
E-602 ELECTRICAL SCHEDULES
- - - END - - -
General Requirements 01 00 00 - 01
SECTION 01 00 00
GENERAL REQUIREMENTS
TABLE OF CONTENTS
1.1 SAFETY REQUIREMENTS
1.2 GENERAL INTENTION
1.3 STATEMENT OF BID ITEM(S)
1.4 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR
1.5 CONSTRUCTION SECURITY REQUIREMENTS
1.6 OPERATIONS AND STORAGE AREAS
1.7 ALTERATIONS
1.8 DISPOSAL AND RETENTION
1.9 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES, AND
IMPROVEMENTS
1.10 RESTORATION
1.11 PHYSICAL DATA
1.12 AS-BUILT DRAWINGS
1.13 USE OF ROADWAYS, PARKING LOTS, AND GROUNDS
1.14 TEMPORARY USE OF MECHANICAL AND ELECTRICAL EQUIPMENT
1.15 TEMPORARY USE OF EXISTING ELEVATORS
1.16 TEMPORARY TOILETS
1.17 AVAILABILITY AND USE OF UTILITY SERVICES
1.18 TESTS
1.19 INSTRUCTIONS
1.20 GOVERNMENT FURNISHED PROPERTY
1.21 RELOCATED EQUIPMENT ITEMS
1.22 PHOTOGRAPHIC DOCUMENTATION
1.23 HISTORIC PRESERVATION
1.24 EQUIPMENT
1.25 FINAL PAYMENT
1.26 WARRANTY CALLS
1.27 INTERIM LIFE SAFETY MEASURE
General Requirements 01 00 00 - 02
SECTION 01 00 00
GENERAL REQUIREMENTS
1.1 SAFETY REQUIREMENTS
A. Refer to section 01 35 26, SAFETY REQUIREMENTS for safety and infection control requirements.
1.2 GENERAL INTENTION
A. Visits to the site by Bidders shall be made in accordance with what is listed in the solicitation and at the discretion of the Contracting
Officer.
B. All bids will take into consideration the existing site conditions; it is the responsibility of the Contractor to review the entire job area and existing site conditions prior to bid submission to properly be able to price the work. All proposals shall include a detailed cost breakdown (materials, labor, and equipment) by trade, specification division and section; lump sum costs are not acceptable.
C. The office of Spees Design Build, as Architect-Engineers (A/E), will render certain technical services during construction. Such services shall be considered as advisory to the Government and shall not be construed as expressing or implying a contractual act of the Government without affirmations by Contracting Officer (CO) or his duly authorized representative (COR).
D. Normal Operation / Construction Hours: Unless otherwise noted on the contract drawings or specifications, construction operations at the VA
Puget Sound Health Care System – Seattle Campus are 7:30 AM to 4:30 PM, Monday through Friday, with the exception of Federal Holidays. The project area is located adjacent to Building 100 operates 7:00 AM to
5:30 PM schedule, but also has inpatients and is on-call 24/7 for emergencies. There is no guarantee that normal operations will conclude promptly at 5:30 PM. Requests to work beyond normal work hours shall be submitted in writing to the COR for approval and will include a description of work to be performed. Approval is subject to availability of the Project Engineer, type of work to be performed, and the specific hours requested. Contractors are reminded that patients are generally asleep after 10:00 PM. Approval to work beyond this time will also include an evaluation of the anticipated noise level
General Requirements 01 00 00 - 03 generated by the Contractor. Under no circumstances will the Contractor proceed without express written approval of the Project Engineer.
E. At the end of each working day, the Contractor will notify the COR in sufficient time for VA personnel to inspect all work that was finished throughout the day.
F. All employees of general contractor and subcontractors shall comply with VA security management program and obtain permission of the VA police, be identified by project and employer, and restricted from unauthorized access.
G. VA Green Environmental Management System (GEMS) Training: Prior to commencing work, the Contractor Superintendent shall complete the following GEMS Awareness Training and submit the signed form to the
Project Engineer.
VA Puget Sound Healthcare System
Green Environmental Management System (GEMS) Awareness Training
VA Puget Sound GEMS Program Manager: John Call(john.call@va.gov)
Purpose of the GEMS Program: Combines all aspects of environmental management into a centralized program to ensure Pollution Prevention, regulatory compliance, continuous environmental improvement, and integration of healthy environmental practices into the VA Puget Sound
Healthcare System.
• Executive Order (EO) 13148 “Greening the Government through Leadership in Environmental Management:”
• Executive Order (EO) 13693 “Planning for Sustainability in the Next
Decade:”
• VA Directive 0057 and VHA Directive 7707
The primary function of the GEMS Program is to:
1. Maintain regulatory compliance
2. Manage pollution prevention
3. Strive for continual environmental improvement
4. Provide Environmental Guidance to all VA Puget Sound Services
General Requirements 01 00 00 - 04
Potential harmful effects of our everyday activities:
• Financial penalty for non-compliance
• Negative effects of poor chemical management
• Toxic effects of chemicals to the environment
• Accidental spills of hazardous materials
• Contamination of surface/runoff water
• Excessive use of water resources
• Creation of additional waste to landfills
Waste Reduction:
Contractors must complete and fill out a Records of Materials Recycled and Reused to turn into the COR when requested and upon completion of contract. This form may be found at the end of Specification Section 01
74 19 “Construction Waste Management.” This form and other records of
Construction and Demolition (C&D) waste and recycling must be maintained and available upon request and contract completion.
Recyclable materials include:
• Confidential
White Paper
• Cardboard
• Ink & Toner
• Scrap Metal
• Oil
• Batteries
• Glass
• Cement Fiber
Products
• Carpet and Pad
• Insulation
• Wallboard
• Wood
• Asphalt
• Concrete
• Fluorescent
Lamps
• Pallets/Wood
• Grease
• Reusable
Fixtures/
Accessories
Universal Waste – Mercury, Batteries, and Lamps:
Recycle all batteries and lamps including alkaline, lead acid, Ni-Cad, lithium, etc. Contractors must provide all bill of ladings or waste manifests to the COR if Universal Waste is disposed as part of this contract.
Mercury Reduction:
The VA mandates the use of alternate non-mercury products and be
“virtually mercury free.”
Hazardous Waste:
SCID ADDITION & RENOVATION
General Requirements 01 00 00 - 05
All items that are hazardous are to be handled and disposed of properly in accordance with federal and state regulations. If any hazardous waste is generated, the Contractor must advise the COR. The GEMS
Program Manager must also be contacted to discuss accumulation limits, storage areas, and other application regulatory compliance issues. All hazardous waste manifests must be signed by the GEMS Program Manager
(except asbestos disposal manifests).
• Most items with an SDS meet Washington State toxicity levels
• Used oil, hydraulic fuel, diesel fuel, jet fuel
• Contaminated soil
• Epoxies, adhesives, etc.
• Waste paints, varnishes, solvents, sealers
• Spill or clean-up material used on above items
• Concentrated lead-based paint
• Asbestos (Toxic Substance) – GEMS Program Manager does not need to sign. See below.
Asbestos waste manifests must be turned into the COR and GEMS Program
Manager promptly after asbestos removal.
Spill Prevention Control and Countermeasure Plan:
Contractors may choose to use the facility’s SPCC Plan but must also provide a basic amendment specific to the project. Storage of hazardous materials and fuels must be in weather protected areas; preferably in a berm or spill-protected areas accessible only to authorized personnel.
Air Emissions:
No visible air emissions are allowed in accordance with Puget Sound
Clean Air Agency (PSCAA) regulations. A basic dust control plan must be provided to the COR prior to work starting. Any work on refrigerators, air conditioners, chillers or other sources of ozone depleting substances must be reviewed by the GEMS Program Manager. Asbestos notifications with PSCAA are required when applicable.
Storm Water:
Contractors must abide by all Clean Water Act and storm water requirements. Follow Seattle Public Utility Storm Water Regulations at
VA Seattle and the “Western Washington Storm Water Manual” at VA
American Lake, or stricter best management plans (BMP). BMPS will be
General Requirements 01 00 00 - 06 provided to the COR and Project Engineer prior to work starting. If a construction permit is required, provide all documentation (including
NOI and NPDES permit) and a Storm Water Pollution Prevention Plan to the Project Engineer.
Federal Green Purchasing Program:
The VA mandates that at least 95% (or maximum extent practical) of new contract actions for products and services, including construction, are energy efficient, water efficient, bio-based, and/or environmentally preferable. Products acquired will be non-ozone depleting, contain recycled content, or are non-toxic or less toxic where such products and services meet agency performance requirements. Green products compilation: http://www.gsa.gov/portal/content/198257
Recycled Content Products – The EPA recommends recycled content levels that you should use when purchasing CPG items
(https://www.epa.gov/smm/comprehensive-procurement-guideline-cpg-program)
Environmentally Preferred Products (EPP) – These products are alternatives to products that contain hazardous materials such as green cleaning products or mercury-free thermometers (www.epa.gov/epp)
Non-Ozone Depleting Substances (ODSs) – EPA identifies alternatives to
ODSs through its Significant New Alternatives Policy (SNAP) program and provides recommendations for specific products such as refrigerants and fire extinguishers (www.epa.gov/ozone/snap/list/index.html)
Alternative Fuel Vehicles (AFVs) – The Energy Policy Act (EPACT) of
2005, EO 13423, and EO 13693 mandate that 75% of Light Duty Vehicles in
U.S. Metropolitan areas be AFVs. Agencies receive a credit for AFVs. As part of EO 13423, agencies are required to reduce petroleum usage by 2% annually. Whereas EO 13693 mandate agencies reduce fleet-wide per-mile greenhouse gas emissions by at least 15% by FY 2021 and 30% by FY 2025 relative to FY 2014 baselines.
Project #: 663-310
General Requirements 01 00 00 - 07
Bio Based Products – The Farm Security and Rural Investment Act of 2002 requires the purchase of bio based products designated by the USDA
(www.biopreferred.gov)
Energy Star & energy efficient products – The Energy Policy Act of 2005 requires agencies purchase Energy Star products or energy-efficient products designated by the Department of Energy’s Federal Energy
Management Program (www.energystar.gov)
Green Building and Water Reduction – EO 13693 requires agencies to promote building energy conservation, efficiency, and management by reducing agency building energy intensity (BTUs per gross square foot) by 2.5% annually. Renewable electric and alternative energies must account for 16% of agency building energy amounts by FY 2020. Agencies are also required to improve agency water efficiency and management, including storm water management through installation of green infrastructure features, water meters, and overall water usage reduction as specified per the EO.
I have read and acknowledged VA Puget Sound Healthcare System GEMS
Awareness Training
Project Manager/Superintendent Name: ________________________________
Project Manager/Superintendent Signature: ___________________________
Company: ___________________________ Date: __________________________
1.3 STATEMENT OF BID ITEM(S)
A. ITEM I, GENERAL CONSTRUCTION: BASE BID: Contractor shall completely prepare project areas for construction operations, including selective demolition and removal of existing materials, and furnishing all necessary tools, equipment, labor, materials, temporary equipment and items, specialty services, supervision. Perform all work to demolish ≈
9500 sf existing roof plaza system to allow the construction of a new, approximately 7,300 sf building to house a new PT OT RT Gym (Physical, Occupational, and Recreational Therapy) for the Spinal Cord Injury /
Disorders Clinic(SCID/D) at the VA Puget Sound Health Care System –
Seattle Campus. The new building also includes an approximately 750 sf transitional
Project #: 663-310
General Requirements 01 00 00 - 08 apartment, with the purpose of helping patients practice living in a residential environment. Additionally, there is storage space and ≈
1,700 sf mezzanine for staff observation and office space. This project prioritizes compliance with current VA SCI/D Center Design Guide specifications and VA Space Planning Criteria-Chapter 104. Provide all architectural mechanical, and electrical work. All work shall be performed per contract drawings and specifications.
1.4 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR
A. Drawings, specifications, and contract documents may be obtained from the project COR. Copies will be at Contractor's expense.
1.5 CONSTRUCTION SECURITY REQUIREMENTS
A. Security Plan:
1. Physical security of the construction site and installations will meet requirements from the VA document ‘Physical Security Design
Manual for VA Life-Safety Protected Facilities’.
2. The security plan defines both physical and administrative security procedures that will remain effective for the entire duration of the project.
3. The General Contractor is responsible for assuring that all sub-contractors working on the project and their employees also comply with these regulations.
4. The General Contractor shall furnish to the Project Engineer lists of employees that will be or may be in the construction areas. The
List shall be on Company letter head that provides all of the company contact information, shall provide the project number and title, locations of work, names of the employees, their titles, their job types, and personal contact numbers (i.e. cell phone).
All sub-contractors, vendors and suppliers for the project shall furnish the same listing on their individual company letter heads to the GC whom will provide the lists to the Project Engineer. These lists shall be updated as necessary during the entire duration of the project. These lists may be used to provide a check list record of personnel on-site each day to be provided with the Contractors
Daily Log reports. These lists may be used to provide a check list record of personnel on-site each day to be provided to the VA Police
General Requirements 01 00 00 - 09
Department and their Dispatch Office where normal sign in and sign out occurs.
B. Security Procedures:
1. Contractor shall be required to obtain identification badges for employees working on the job site. IDs will be obtained by filling out VA Form 711, OF 306, and OF 612 and returning them to the
Contracting Officer for completion. These forms will then be forwarded for abbreviated background investigations, and then an appointment will be scheduled for each employee for fingerprinting and photos for the temporary ID badge. Contractor must account for return of all issued badges at the end of construction.
2. General Contractor’s employees shall not enter the project site without appropriate badge. They may also be subject to inspection of their personal effects when entering or leaving the project site.
3. If working outside of “regular hours” is permitted by the CO or COR or as defined in the contract, The Contractor shall give 3 days’ notice to the COR so that security and or escort arrangements can be provided for the employees. This notice is separate from any notices required for utility shutdown or access closure described later in this section.
4. No photography of VA premises is allowed without written permission of the Contracting Officer. Photography may never include VA patients or personnel.
5. VA reserves the right to close down or shut down the project site and order General Contractor’s employees off the premises in the event of a national emergency. The General Contractor may return to the site only with the written approval of the Contracting Officer.
C. Document Control:
1. Before starting any work, the General Contractor/Sub Contractors shall submit an electronic security memorandum describing the approach to following goals and maintaining confidentiality of
“sensitive information”.
2. The General Contractor is responsible for safekeeping of all drawings, project manual, and other project information. This
General Requirements 01 00 00 - 10 information shall be shared only with those with a specific need to accomplish the project.
3. Certain documents, sketches, videos, or photographs and drawings may be marked “Law Enforcement Sensitive” or “Sensitive Unclassified”.
Secure such information in separate containers and limit the access to only those who will need it for the project. Return the information to the Contracting Officer upon request.
4. These security documents shall not be removed or transmitted from the project site without the written approval of Contracting
Officer.
5. All paper waste or electronic media such as CD’s and diskettes shall be shredded and destroyed in a manner acceptable to the VA.
6. Notify Contracting Officer and Site Security Officer immediately when there is a loss or compromise of “sensitive information”.
7. All electronic information shall be stored in specified location following VA standards and procedures using an Engineering Document
Management Software (EDMS).
a. Security, access and maintenance of all project drawings, both scanned and electronic shall be performed and tracked through the
EDMS system.
b. “Sensitive information” including drawings and other documents may be attached to e-mail provided all VA encryption procedures are followed.
D. Motor Vehicle Restrictions
1. Loading Dock access shall be restricted to picking up and dropping off of materials and supplies. Materials shall be picked up and transported from the loading dock to an assigned storage area within the project area the day they are delivered. Materials, tools and any other work equipment may not be stored in the loading dock overnight. Verify delivery/drop off location with COR prior to sending any materials to the Medical Center. Movement of materials, tools and other equipment shall utilize the service elevators, preferably outside of normal operating hours.
2. Contractors are prohibited from parking on all VA Medical Center property, including patient/visitor and employee parking areas.
General Requirements 01 00 00 - 11
Parking in the Loading Dock is never permitted unless Contractor has received prior written approval from Project Engineer. Submit parking requests through the Project Engineer. Violators will be ticketed.
E. Temporary Heating and Electrical: Install, use and maintain installations in accordance with 29 CFR 1926, NFPA 241 and NFPA 70.
F. Means of Egress: Do not block exiting for occupied buildings, including paths from exits to roads. Minimize disruptions and coordinate with
Project Engineer.
G. Egress Routes for Construction Workers: Maintain free and unobstructed egress. Inspect daily. Report findings weekly to the Project Engineer.
H. Fire Extinguishers: Provide and maintain an extinguisher/s in construction areas and temporary assigned storage areas in accordance with 29 CFR 1926, NFPA 241 and NFPA 10.
I. Flammable and Combustible Liquids: Store, dispense, and use liquids in accordance with 29 CFR 1926, NFPA 241 and NFPA 30.
1.6 OPERATIONS AND STORAGE AREAS
A. The Contractor shall confine all operations (including storage of materials) on Government premises to the designated project area. Other areas must be authorized or approved by the Project Engineer and the
Contracting Officer. The Contractor shall hold and save the Government, its officers and agents, free and harmless from liability of any nature occasioned by the Contractor's performance.
B. The contractor shall not be allowed to erect or park a temporary building on site for this project, unless given specific approval by the COR.
C. The Contractor shall, under regulations prescribed by the Project
Engineer and the Contracting Officer, use only established roadways when and as authorized by the Project Engineer and the Contracting
Officer. When materials are transported in prosecuting the work, vehicles shall not be loaded beyond the loading capacity recommended by the manufacturer of the vehicle or prescribed by any Federal, State, or local law or regulation. When it is necessary to cross curbs, sidewalks, or landscaped areas the Contractor shall protect them from damage. The Contractor shall repair or pay for the repair of any damaged curbs, sidewalks, landscaped areas, or roads.
General Requirements 01 00 00 - 12
(FAR 52.236-10)
D. Space available for storing materials shall be as determined by the COR during the pre-construction meeting. The Contractor shall keep all work areas, storage areas, staging areas, access areas, and egress routes clean and neat at all times. The Contractor shall provide sufficient trash containers so there is no debris lying around. The containers shall be emptied at least daily and trash disposed of by the
Contractor. See section 1.5.R for disposal hours.
E. Workmen are subject to rules of the Medical Center applicable to their conduct.
F. Execute work in such a manner as to interfere as little as possible with work being done by others. Keep roads clear of construction materials, debris, standing construction equipment and vehicles at all times.
G. Execute work so as to interfere as little as possible with normal functioning of the Medical Center as a whole, including operations of utility services, fire protection systems and any existing equipment, and with work being done by others. Use of equipment and tools that transmit vibrations and noises through the building structure, are not permitted in buildings that are occupied, during construction, jointly by patients or medical personnel, and Contractor's personnel, except as permitted by Project Engineer where required by limited working space.
1. Do not store materials and equipment in other than assigned areas.
2. Schedule delivery of materials and equipment to immediate construction working areas within buildings in use by Department of
Veterans Affairs in quantities sufficient for not more than ten(10) workdays. Provide unobstructed access to the Medical Center areas required to remain in operation.
3. Contractor shall permit access to Department of Veterans Affairs personnel and patients through other construction areas which serve as routes of access to such affected areas and equipment. Coordinate alteration work in areas occupied by Department of Veterans
Affairs so that Medical Center operations will continue during the construction period. The immediate rooms of alterations shall be temporarily vacated while alterations are performed.
General Requirements 01 00 00 - 13
H. Utilities Services:
1. Where necessary to cut existing pipes, electrical wires, conduits, cables, etc., of utility services, or of fire protection systems or communications systems (except telephone), they shall be cut and capped at suitable places where shown; or, in absence of such indication, where directed by Project Engineer. All such actions shall be coordinated with the VA or Utility Company involved:
2. Whenever it is required that a connection fee be paid to a public utility provider for new permanent service to the construction project, for such items as water, sewer, electricity, gas or steam, payment of such fee shall be the responsibility of the Government and not the Contractor.
H. Phasing:
1. The Medical Center must maintain its operation 24 hours a day, 7 days a week. Therefore, any interruption in service must be scheduled and coordinated with the Project Engineer to ensure that no lapses in operation occur. It is the Contractor’s responsibility to develop a work plan and schedule detailing, at a minimum, the procedures to be employed, the equipment and materials to be used, the interim life safety measure to be used during the work, and a schedule defining the duration of the work with milestone subtasks.
2. To ensure such executions, Contractor shall furnish the Project
Engineer with a schedule of approximate phasing dates on which the
Contractor intends to accomplish work in each specific room.
3. In addition, Contractor shall notify the Project Engineer two weeks in advance of the proposed date of starting work in each building.
Arrange such phasing dates to ensure accomplishment of this work in successive phases mutually agreeable to the Medical Center Director, Project Engineer, and Contractor.
4. Unless otherwise instructed by COR, construction work shall be completed during normal functioning business hours.
5. The Contractor is to submit the phasing schedule in writing to the
Contracting Officer for review and approval no later than two weeks after issuance of the Notice to Proceed.
6. All renovation activities will take place at a busy Medical Center.
The Contractor shall not interfere with existing, on-going
General Requirements 01 00 00 - 14 functions, or normal activity of the hospital. The Contractor will provide walk-off mats for dust control, appropriate construction barriers, and keep noise & vibration to a minimum during normal business hours. Certain portions of the work will be confined to evenings, and/or weekends.
7. No work shall start until the preconstruction survey and inspection is completed.
8. The Contractor shall provide a detailed asbestos abatement schedule.
9. Any utility service, parking lot, roadway, loading dock, and/or
Grounds interruptions requests shall be submitted in writing two weeks in advance of the planned utility interruption/access closure.
10. Set up phasing by areas in accordance with information received from the Medical Center through the Project Engineer and the
Contracting Officer.
I. Occupied Buildings: Buildings 100 will be occupied during performance of work, but the immediate rooms being alterations will be vacated during work.
1. Contractor shall take all measures and provide all material necessary for protecting existing equipment and property in affected areas of construction against dust and debris, so that equipment and affected areas to be used in the Medical Centers operations will not be hindered. Contractor shall permit access to Department of Veterans
Affair’s personnel and patients through other construction areas which serve as routes of access to such affected areas and equipment. Coordinate alteration work in areas occupied by
Department of Veterans Affairs so that Medical Center operations will continue during the construction period.
J. Buildings and Systems: When a construction area is turned over to
Contractor, the Contractor shall accept entire responsibility including upkeep and maintenance. Therefore:
1. Contractor shall maintain a minimum temperature of 40 degrees F at all times, except as otherwise specified.
2. Contractor shall maintain in operating condition existing fire protection and alarm equipment. In connection with fire alarm
General Requirements 01 00 00 - 15 equipment, Contractor shall make arrangements for pre-inspection of site with Fire Department or Company (Department of Veterans Affairs or municipal) whichever will be required to respond to an alarm from
Contractor's employee or watchman.
K. Utilities Services: Maintain existing utility services for the Medical
Center at all times.Provide temporary facilities, labor, materials, equipment, connections, and utilities to assure uninterrupted services.
Where necessary to cut existing water, steam, gases, sewer or air pipes, or conduits, wires, cables, etc. of utility services or of fire protection systems and communications systems (including telephone), they shall be cut and capped at a main branch or suitable places where shown; or, in absence of such indication, where directed by the Project
Engineer.
1. No utility service such as water, gas, steam, sewers or electricity, or fire protection systems and communications systems may be interrupted without prior written approval of the Project Engineer.
Electrical work shall be accomplished with all affected circuits or equipment de-energized. When an electrical outage cannot be accomplished, work on any energized circuits or equipment shall not commence without the Medical Center Director’s prior knowledge and written approval. Refer to specification Sections 26 05 11, REQUIREMENTS FOR ELECTRICAL INSTALLATIONS, 27 05 11 REQUIREMENTS FOR
COMMUNICATIONS INSTALLATIONS, and 28 05 11, REQUIREMENTS FOR
ELECTRONIC SAFETY AND SECURITY INSTALLATIONS for additional requirements.
2. Contractor shall submit a request to interrupt any such services to the Project Engineer, in writing, 21 calendar days in advance of proposed interruption. Request shall state reason, date, exact time of, and approximate duration of such interruption.
L. Roads, Parking Lots, Docks and Grounds: To minimize interference of construction activities with flow of Medical Center traffic, comply with the following:
1. Keep roads, walks and entrances to grounds, to parking and to occupied areas of buildings clear of construction materials, debris and standing construction equipment and vehicles.
General Requirements 01 00 00 - 16
2. Interruptions of these areas must be requested, in writing, at least two weeks prior to the desired time and shall be performed as directed by the Project Engineer.
M. Coordination of Work: Coordinate the work for this contract with other construction operations as directed by the Project Engineer. This includes the scheduling of traffic and the use of roadways, as specified in ‘USE OF ROADWAYS, PARKING LOTS, AND GROUNDS’ article in this specification section.
N. Coordination of Construction with Medical Center: The activities at the
Medical Center shall take precedence over construction activities. The
Contractor must cooperate and coordinate with the Medical Center, through the Project Engineer, in arranging the construction schedule to cause the least possible interference with facility activities on the campus. All communication between the contractor and the medical center personnel must be done through the Project Engineer and/or CO.
Contractors are not to disturb Medical Center Personnel during hours of operation. Construction noise during the events or services shall not disturb the events or service. Trucks and workmen shall not pass through the event or service area during this period:
1. The Contractor is required to discontinue work sufficiently in advance of Easter Sunday, Mother's Day, Father's Day, Memorial Day, Veteran's Day and/or Federal holidays, to permit them to clean up all areas of operation adjacent to existing event or service areas before these dates.
2. The Medical Center observes the following Federal Holidays: New
Year’s Day, Labor Day, Martin Luther King Jr. Day, Columbus Day, Presidents Day, Veterans Day, Memorial Day, Thanksgiving, Independence Day, and Christmas Day.
3. Clean-up shall include the removal of all equipment, tools, materials and debris and leaving the areas in a clean, neat condition.
O. Reports:
1. Daily Logs: The Contractor shall furnish a daily report log for each day from the date of Notice to Proceed until Final Acceptance, including those days that no work is performed. The report shall
General Requirements 01 00 00 - 17 have attached there to a copy of inspections conducted by the VA, a list of all employees on site that day. This report will include or be in addition to daily inspections.
2. Payment Requests: Monthly payment requests from the Contractor will not be processed unless all paperwork is current, including daily reports, asbestos reports, updated process schedules, and certified payrolls for the prime and all subs.
3. Submittal Register: The Contractor shall utilize the specifications and drawings to prepare and provide a Submittal Register. The submittal register shall list all submittals by specification section, paragraph, and drawing numbers from the beginning to the end of the documents. The Submittal Register shall be provided to the Project Engineer within fifteen (15) working days after receipt of Notice To Proceed. The Government may require additional submittals at its discretion at no additional cost. See
Specification 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES, for additional requirements.
P. Safety Data Sheet (SDS): Contractor shall provide one loose-leaf binder, permanently labeled “SDS for ‘Project Name’ with copies of each
Safety Data Sheet for each product, chemical, and other required materials to be used on this project.
1. All instructions for use shall be compiled with.
2. Products will not be used until SDSs are submitted to the Project
Engineer. These shall be provided for any material no later than the day before those materials arrive on VA property.
3. The Contractor shall maintain a current binder on the job site at all times, readily available for viewing by the Project Engineer, Contracting Officer, or Safety Officer.
4. At no time shall the Contractor have, or permit the sub-contractors to have, materials on VA property/station without SDS.
Q. Fire Retardant Materials: All materials used on this project, including temporary barriers, plywood, poly, and other required materials shall be fire retardant. All poly shall be 6 mil. minimum. The semi-permanent construction barriers shall be smoke tight.
General Requirements 01 00 00 - 18
1.7 ALTERATIONS
A. Survey: Before any work is started, the Contractor shall make a thorough survey with the Project Engineer of areas in which alterations occur and areas which are anticipated routes of access. The Contractor shall furnish a report, signed by all three, which lists any deficiencies noted at that time. This report shall be approved by the
VA prior to the start of any work. The inspection shall include a list by rooms and spaces:
1. Existing conditions and types of resilient flooring, doors, windows, walls and other surfaces not required to be altered throughout affected areas of building(s) and grounds
2. Existence and conditions of items such as plumbing fixtures and accessories, electrical fixtures, equipment, blinds, shades, etc., required by drawings to be either reused or relocated, or both.
3. Shall note any discrepancies between drawings and existing conditions at site(s).
4. Shall designate areas for working space, materials storage and routes of access to areas within buildings where alterations occur and which have been agreed upon by Contractor, Project Engineer.
5. Verify all necessary dimensions to ensure the correct products are ordered.
B. Relocated Items: Any items required by drawings to be either reused or relocated or both, found during this survey to be nonexistent, or in opinion of the Project Engineer, to be in such condition that their use is impossible or impractical, shall be furnished and/or replaced by
Contractor with new items in accordance with specifications which will be furnished by Government. Provided the contract work is changed by reason of this subparagraph B, the contract will be modified accordingly, under provisions of clause entitled "DIFFERING SITE
CONDITIONS" (FAR 52.236-2) and "CHANGES" (FAR 52.243-4 and VAAR
852.236-88).
C. Re-Survey: At the end of every work day, the Contractor and Project
Engineer together shall make a thorough re-survey of the rooms completed that day involved. They shall furnish a report stating what work was done and if the room was approved by the COR.:
General Requirements 01 00 00 - 19
1. Re-survey report shall also list any damage caused by Contractor to such flooring and other surfaces, despite protection measures; and, will form basis for determining extent of repair work required of
Contractor to restore damage caused by Contractor's workmen in executing work of this contract.
D. Protection: Provide the following protective measures:
1. Temporary protection against damage for portions of existing finishes and construction areas where work is to be done, materials handled, and equipment moved and/or relocated.
2. Protection of interior of existing structures at all times, from damage, dust and weather inclemency. Wherever work is performed, floor surfaces that are to remain in place shall be adequately protected prior to starting work, and this protection shall be maintained intact until all work in the area is completed.
3. Once the Contractor is notified by the VA of problems or damage to
VA property, the Contractor shall take immediate corrective action to protect and restore said property. During normal duty hours, corrective action shall be initiated within two (2) hours. After normal duty hours, corrective action shall be initiated within four
(4) hours. The Daily Log for that day shall explain the problem(s) and corrective action(s) taken.
4. Access doors in barriers shall have a lock that needs to meet the VA facility hardware standards (Commercial, Grade 1 door hardware, in
SFIC format; for example, Schlage ND series, L series, CO series, or
Trilogy by Alarm Lock DL2700 series) so that VA can install a core to allow Contractor, engineering, safety, and VA Police to have access to the space at all times. Locks are required to be SFIC compatible. Contractors will be provided a facility key for the lock to access the space. Walk-off mats shall be provided at all access doors.
5. Block off all ducts and diffusers to prevent circulation of dust into occupied areas during construction. Provide negative air machines as specified, to maintain negative pressure within the construction area(s).
6. The Contractor shall not allow trash and debris to accumulate in any area of the project site. As a minimum, trash and debris shall be
General Requirements 01 00 00 - 20 removed , ensuring no flammable materials or trash is left in any construction area or the storage area overnight. All debris shall be removed from the job site in a closed container and disposed of in a proper manner.
E. Final Cleanup:
1. Upon completion of project, or as work progresses, remove all construction debris from above ceiling, vertical shafts, and utility chases that have been part of the construction.
2. Perform final cleaning in accordance with Infection Control requirements detailed in specification section 01 35 00 SAFETY
REQUIREMENTS.
1.8 DISPOSAL AND RETENTION
A. Materials and equipment accruing from work removed and from demolition of buildings or structures, or parts thereof, shall be disposed of as follows and/or in accordance with Section 01 74 19, CONSTRUCTION WASTE
MANAGEMENT:
1. Reserved items which are to remain property of the Government are identified by attached tags or noted on drawings and/or in specifications as items to be stored. The Project Engineer may also designate items to remain the property of the Government. Items shall be removed or dislodged from present locations in such a manner as to prevent damage which would be detrimental to re-installation and reuse. Store such items where directed by
Project Engineer.
2. Items not reserved shall become property of the Contractor and be removed by Contractor from the Medical Center or taken to the
Engineering Shop area by the Contractor on a case-by-case basis as directed by the Project Engineer.
3. Items of portable equipment and furnishings located in rooms and spaces in which work is to be done under this contract shall remain the property of the Government. When rooms and spaces are vacated by the Department of Veterans Affairs during the alteration period, such items which are NOT required by drawings and specifications to be either relocated or reused will be removed by the Government in advance of work to avoid interfering with Contractor's operation.
General Requirements 01 00 00 - 21
4. During above-ceiling work, the Contractor will have to clear rooms, protect VA property and finishes, and move furnishings as necessary to protect the area and items from dust and debris, in the performance of the work above the ceiling.
5. PCB Transformers and Capacitors and Other Hazardous Waste: The
Contractor shall be responsible for disposal of the Polychlorinated
Biphenyl (PCB) transformers and capacitors and other Hazardous
Waste. The transformers and capacitors and other Hazardous Waste shall be taken out of service and handled in accordance with the procedures of the Environmental Protection Agency (EPA) and the
Department of Transportation (DOT) as outlined in Code of Federal
Regulation (CFR),…
This is the start of the file's text. The full file is on GovTribe.