This file contains detailed architectural and engineering drawings for the Spinal Cord Injury Space renovation project at the VA Puget Sound Health Care System in Seattle, Washington. The comprehensive set of drawings (95 total sheets) covers architectural, structural, mechanical, plumbing, electrical, and fire protection aspects of a 9,697 square foot addition and renovation project. The project includes a new therapy gym, transitional living apartment, staff offices, equipment storage spaces, and supporting infrastructure across multiple floor levels. Key design elements include a specialized rehabilitation environment with features like H-tracks, gait tracks, patient lift systems, and adaptive living spaces. The proposed construction date is 2025, with the project focused on creating a comprehensive rehabilitation space for patients with spinal cord injuries and disorders, emphasizing functional design and patient-centered care.
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SO. SNOQUALMIE ST.
SO. ALASKA ST.
C O
LU
M B
IA
N
W A Y S O
B E A C O N
A V E
S O
N O R
TH
D R
IV
E
SOUTH DRIVE
S O U
TH
D R
IV
E
M
ED
IA
R D
EAST LOOP RD.
LOT "F"
LOT "E"
LOT"D"
LO
T "C
LOT
"G"
BL
DG
.1
ENERGY
PLANT
EN
GR
'G
SH
OP
S
F
IS
H E R
H O U S E
E.D.
BL
DG
.1
P A R K
IN
G
S T R U C T U R E
ELEC.
SH
ED
BUILDING 100
NURSING TOWER
LIVING
CENTER
COMMUNITY
MHR BUILDING
BUILDING 100
D&T
ADDITION
DESIGN TEAM
ARCHITECTURAL
SPEES DESIGN BUILD
625 1st Ave #301 Seattle, WA 98014
PHONE: (360) 223-8994
CALLISONRTKL
1717 PACIFIC AVE
DALLAS, TX 75201
PHONE: (360) 223-8994
STRUCTURAL
REID MIDDLETON
728 134TH ST NW
SUITE #200
EVERETT, WA 98204
PHONE: (425) 741-3800
ELECTRICAL
SPEES DESIGN BUILD
625 1st Ave #301 Seattle, WA 98014
PHONE: (360) 223-8994
ENVIRONMENTAL
SPEES - EHSI JV LLC
1011 SW KLICKITAT WAY
SUITE #104
SEATTLE, WA 98134
PHONE: (206) 381-1128
MECHANICAL
SPEES DESIGN BUILD
625 1st Ave #301 Seattle, WA 98014
PHONE: (360) 223-8994
PLUMBING
SPEES DESIGN BUILD
625 1st Ave #301 Seattle, WA 98014
PHONE: (360) 223-8994
PRICING
PEG CONTRACTING
4601 CREEKSTONE DR
SUITE #130
DURHAM, NC 27703
PHONE: (919) 747-4544
COMMISSIONING
ENGINEERING ECONOMICS, INC.
1201 WESTERN AVE
SUITE #325
SEATTLE, WA 98101
PHONE: (800) 869-6902
PROJECT INFORMATION
PROPOSED DATE OF CONSTRUCTION: 2025
AREA WITHIN SCOPE: BUILDING 100, FLOOR 1
CLINIC WITHIN SCOPE: SPINAL CORD INJURY / DISORDERS (SCID)
ICRA CLASS REQUIREMENTS: CLASS IV (TYPE D)
CONSTRUCTION TYPE: 1-B
TOTAL SQUARE FOOTAGE: APPROX. 9,697 SF
REFERENCE DOCUMENTS
NOTE: LOCATED IN SPECIFICATIONS AS APPENDICES
A - PATIENT LIFT SYSTEM MANUFACTURER SITE SPECIFIC DRAWINGS
B - ENVIRONMENTAL SURVEY REPORT
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
100% CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
GI001
COVER
SPEES DESIGN BUILD
1414 FOURTH AVE
SEATTLE, WA 98101
(360) 223-8994
RAY SPEES, PRINCIPAL
SCI/D ADDITION & RENOVATION
VA PUGET SOUND HEALTH CARE SYSTEM - Seattle, WA
663-310
12/02/2024 MK AK
RENOVATE EXISTING SPACE & CONSTRUCT
NEW SPINAL CORD INJURY SPACE
1" = 100'-0"1
SITE PLAN
NORTH
PROJECT # 663-310
VA PUGET SOUND HEALTH CARE SYSTEM - SEATTLE, WASHINGTON
Revisions: Date:
ASI 1 - CONTRACTOR PRE BID QUESTIONS 10/07/2025
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
100% CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
GI002
DRAWING INDEX
SPEES DESIGN BUILD
1414 FOURTH AVE
SEATTLE, WA 98101
(360) 223-8994
RAY SPEES, PRINCIPAL
SCI/D ADDITION & RENOVATION
VA PUGET SOUND HEALTH CARE SYSTEM - Seattle, WA
663-310
12/02/2024 MK AK
SHEET # SHEET NAME
MECHANICAL
M-001 LEGENDS, SYMBOLS, ABBREVIATION & NOTES - MECHANICAL
M-101 THERAPY - FIRST FLOOR PLAN - MECHANICAL
M-102 THERAPY - MEZZANINE - MECHANICAL
M-103 THERAPY - ROOF - MECHANICAL
M-501 DETAILS - MECHANICAL
M-502 DETAILS - MECHANICAL
M-601 SCHEDULES - MECHANICAL
PLUMBING
P-001 NOTES, LEGENDS & SCHEDULES - PLUMBING
P-101 BASEMENT FLOOR PLAN - ADDITION - PLUMBING
P-102 FIRST FLOOR PLAN - ADDITION - PLUMBING
P-103 MEZZANINE PLAN - ADDITION - PLUMBING
P-104 ROOF PLAN - ADDITION - PLUMBING
P-501 DETAILS - PLUMBING
FIRE PROTECTION
F-103 FLOOR PLAN - ADDITION - FIRE PROTECTION
F-104 MEZZANINE PLAN - ADDITION - FIRE PROTECTION
ELECTRICAL
E-001 GENERAL NOTES, ABBREVIATIONS AND LEGENDS
ED101 FIRST FLOOR - ELECTRICAL DEMOLITION PLAN - PHASE 1
EL101 FIRST FLOOR - LIGHTING PLAN - PHASE 1
EL102 FIRST FLOOR - LIGHTING PLAN - PHASE 1 - MEZZANINE
EP101 FIRST FLOOR - POWER PLAN - PHASE 1
EP102 FIRST FLOOR - POWER PLAN - PHASE 1
EP103 FIRST FLOOR - POWER PLAN - PHASE 1 - MEZZANINE
EP104 ROOF - POWER PLAN - PHASE 1
ET101 FIRST FLOOR - SPECIAL SYSTEMS PLAN - PHASE 1
ET102 FIRST FLOOR - SPECIAL SYSTEMS PLAN - PHASE 1 - MEZZANINE
E-401 ENLARGED PLANS
E-402 ENLARGED PLANS
E-501 ELECTRICAL DETAILS
E-502 ELECTRICAL DETAILS
E-601 PARTIAL ONE-LINE DIAGRAM AND ELECTRICAL SCHEDULES - PHASE 1
E-602 ELECTRICAL SCHEDULES
SHEET # SHEET NAME
ARCHITECTURAL
A-001 ARCHITECTURAL SYMBOLS, ABBREVIATIONS & GENERAL NOTES
AD101 DEMO FLOOR PLAN
AE101 BUILDING 100, LEVEL 1 - FLOOR PLAN
AE102 FLOOR PLAN - FRAMING AND DRAINAGE PLAN
AE103 FLOOR PLAN
AE104 FLOOR PLAN - MEZZANINE
AE105 ROOF PLAN
AC101 REFLECTED CEILING PLAN
AC102 REFLECTED CEILING PLAN - MEZZANINE
AE201 BUILDING ELEVATIONS
AE301 BUILDING SECTIONS
AI451 ENLARGED FLOOR PLAN & RCP - TRANSITIONAL APARTMENT
AI452 INTERIOR ELEVATIONS - TRANSITIONAL APARTMENT
AI453 ENLARGED FLOOR PLAN - THERAPY GYM
AI454 ENLARGED RCP - THERAPY GYM
AI455 ENLARGED FLOOR PLAN - THERAPY STORAGE
AI456 ENLARGED RCP - THERAPY STORAGE
AI457 ENLARGED FLOOR PLAN - MEZZANINE
AI458 ENLARGED RCP - MEZZANINE
AI459 INTERIOR ELEVATIONS - THERAPY GYM
AI470 ENLARGED FLOOR PLAN AND DETAILS - STAIR-1 AND LIFT SHAFT
AI471 ENLARGED STAIR #2 PLAN, SECTIONS AND DETAILS
A-501 WALL SECTIONS
A-502 WALL SECTIONS
A-510 EXTERIOR DETAIL - ENLARGED PLANS
A-511 EXTERIOR DETAILS
A-512 EXTERIOR DETAILS
A-513 EXTERIOR DETAILS
A-514 EXTERIOR SOFFIT PLAN
A-601 CURTAIN WALL AND STOREFRONT ELEVATIONS
A-602 DOOR SCHEDULES & DETAILS
A-603 WALL TYPES
A-604 TEMPORARY BARRIER, FLOOR, CEILING AND ROOF ASSEMBLIES
A-605 SCHEDULES
AW001 SIGNAGE KEY & MATERIAL NOTES
AW003 IN-01.01.01
AW006 IN-01.03
AW007 IN-01.04
AW008 IN-01.05
AW010 IN-01.07-01
AW019 IN-01.26
AW031 IN-04.02
AW042 IN-08.01
AW056 IN-15.52-01
AW057 IN-15.52-02
SHEET # SHEET NAME
GENERAL
GI001 COVER
GI002 DRAWING INDEX
GS101 DELIVERY & STORAGE NOTES
GS201 BUILDING 100, BASEMENT - ICRA PLAN
GS202 BUILDING 100, LEVEL 1 - ICRA PLAN
GS301 BUILDING 100, LEVEL 1 - FIRE AND LIFE SAFETY
STRUCTURAL
SF-001 GENERAL STRUCTURAL NOTES
SF-002 SPECIAL INSPECTION SCHEDULE & ABBREVIATIONS
SF-101 PARTIAL FRAMING PLAN
SF-102 MEZZANINE FRAMING PLAN
SF-103 ROOF FRAMING PLAN
SF-301 DETAILS
SF-401 FRAMING ELEVATIONS
SF-501 DETAILS
SF-502 DETAILS
SF-503 MOMENT FRAME/CONNECTION DETAILS
SF-504 TYPICAL LIGHT-GAUGE AND METAL SHEAR WALL DETAILS
SF-505 TYPICAL LIGHT-GAUGE AND METAL SHEAR WALL DETAILS
SF-506 DETAILS
DRAWING INDEX
Revisions: Date:
ASI 1 - CONTRACTOR PRE BID QUESTIONS 10/07/2025
C
UT
TI
NG
BD
-1 B
S.
F.
FI
NI
SH
IN
G
C
UT
TI
NG
BD
-1 B
S.
F.
BD
-1
S.
F.
C
UT
TI
NG
BD
-1 B
S.
F.
FI
NI
SH
IN
G
MA
TC
HL
IN
E
A-
FP
-0 0- 0B f
A-
FP
-0 B
EA
ST
M A
TC
H
LI
N E
A
FP
0- B g
A
FP
1 MA
TC
HL
IN
E
A-
FP
-0 1f
A-
FP
-0 1h
MA
TC
HL
IN
E
A-
FP
-0 1g
A-
FP
-0 1h
#5 #6
#7 #8
LOADING
DOCK
ELEVATORS
ADDITION
ELEVATORS
REMOVE EXIST GATE (AND FENCE
IF REQD) FOR DURATION OF
CONSTRUCTION, STORE &
REINSTALL AS DIRECTED BY VA
COR
ENERGY PLANT
#5 #6
#7 #8
CLC
COURTYARD
EXISTING CONDITIONS
MATERIAL PATH OF TRAVEL
CONSTRUCTION ZONE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
100% CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
GS101
DELIVERY & STORAGE NOTES
SPEES DESIGN BUILD
1414 FOURTH AVE
SEATTLE, WA 98101
(360) 223-8994
RAY SPEES, PRINCIPAL
SCI/D ADDITION & RENOVATION
VA PUGET SOUND HEALTH CARE SYSTEM - Seattle, WA
663-310
12/02/2024 MK AK
LEGEND
1" = 50'-0"
DELIVERY PATH OF TRAVEL BASEMENT LEVEL
1. ALL MATERIALS, PRODUCTS & EQUIPMENT SHALL BE
DELIVERED TO THE VA SEATTLE CAMPUS LOADING DOCK
OFF OF BUILDING 100. ITEMS MAY ONLY BE DELIVERED AT
AN AGREED APON TIME COORDINATED WITH THE VA COR.
2. COORDINATE TIME AND LOCATION OF DELIVERY OF
MATERIALS WITH THE VA COR PRIOR TO DELIVERING
ANY ITEMS TO THE VA.
3. A MEMBER OF THE CONSTRUCTION TEAM MUST BE
AVAILABLE TO PICK UP DELIVERED MATERIALS AND
PRODUCTS FROM THE LOADING DOCK AT THEIR TIME OF
ARRIVAL. COORDINATE TIMES WITH VA COR.
4. MATERIALS, PRODUCTS & EQUIPMENT MAY NOT BE LEFT
UNCLAIMED AT THE LOADING DOCK.
5. ALL WORKERS SHALL TRANSPORT ITEMS FROM THE
LOADING DOCK TO THE CONSTRUCTION ZONES FOLLOWING
ONLY THE ABOVE INDICATED WORKER PATH OF TRAVEL.
6. MATERIALS, PRODUCTS & EQUIPMENT SHALL ONLY BE
BROUGHT THROUGH SERVICE ELEVATORS #5, #6, #7 AND #8.
PATIENT ELEVATORS SHALL NOT BE USED.
7. DO NOT BLOCK ACCESS TO STAIR #5 3D-S05 IN THE CASE
OF AN EMERGENCY.
8. TRUCKS SHALL NOT IDLE IN THE LOADING DOCK. TURN OFF
ENGINE WHILE UNLOADING.
9. VERIFY CONTRACTOR STORAGE AREA WITH COR AT POST-
BID, PRE-CONSTRUCTION MEETING, PRIOR TO ORDERING
OR DELIVERING ANY MATERIALS OR EQUIPMENT.
10. VA COR HAS THE AUTHORITY TO REQUEST RELOCATION OF
ANY AND ALL STORED MATERIALS, TOOLS & EQUIPMENT TO
A DIFFERENT LOCATION AS NEEDED.
11. ONLY STORE MATERIALS, TOOLS, EQUIPMENT AND OTHER
CONSTRUCTION ITEMS IN A VA APPROVED STORAGE AREA.
12. ENSURE COMPLIANCE WITH ALL NECESSARY CONTRACT
DOCUMENTS REGARDING CONTRACTOR STORAGE AREA.
13. ANY DAMAGES TO LANDSCAPING OR SIDEWALKS DURING
CONSTRUCTION SHALL BE RESTORED BY THE
CONTRACTOR.
GENERAL NOTES
1" = 50'-0"
DELIVERY PATH OF TRAVEL LEVEL 1
TRUE
NORTH
TRUE
NORTH
Revisions: Date: 3 of 95
CU
TT
IN
G
BD
-1 B
S.F
FI
NI
SH
IN
G
CU
TT
IN
G
BD
-1 B
S.F
BD
-1
S.F
CU
TT
IN
G
BD
-1 B
S.F
FI
NI
SH
IN
G
MA
TC
HL
IN
E
A-
FP
-0 0- 0B f
A-
FP
-0 1- 0B
EA
ST
M
AT
C H
LI
N E A-
FP
B g
A-
FP
EXISTING CONDITIONS
AREA OF WORK
PATH OF TRAVEL
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
100% CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
GS201
BUILDING 100, BASEMENT - ICRA PLAN
SPEES DESIGN BUILD
1414 FOURTH AVE
SEATTLE, WA 98101
(360) 223-8994
RAY SPEES, PRINCIPAL
SCI/D ADDITION & RENOVATION
VA PUGET SOUND HEALTH CARE SYSTEM - Seattle, WA
663-310
12/02/2024 MK AJ
1" = 30'-0"
BUILDING 100, BASEMENT - ICRA PLAN
TRUE
NORTH
LEGEND
GENERAL NOTES
KEY NOTES (THIS SHEET ONLY)
1. ALL WORK TO TAKE PLACE IN THE BASEMENT AREA WILL
OCCUR AFTER BUSINESS HOURS AND ON WEEKENDS
UNLESS OTHERWISE APPROVED BY THE VA COR.
2. CLASS IV ISOLATED CONSTRUCTION ZONES ARE REQUIRED
TO MAINTAIN NEGATIVE AIR PRESSURE AT ALL TIMES.
COORDINATE LOCATION(S) OF NEGATIVE AIR MACHINES
AND EXHAUST LOCATION WITH VA COR & VA FACILITY ICRA
STAFF AT POST-BID, PRE-CONSTRUCTION MEETING.
3. COMPLY WITH ALL APPLICABLE VA ICRA CLASS
REQUIREMENTS. PROJECT COR MAY HALT WORK AT
ANY TIME IF REQUIREMENTS ARE NOT MET.
4. MAINTAIN A CLEAN, SAFE CONSTRUCTION ZONE AT ALL
TIMES.
5. SEE SHEET A-603 WALL TYPES FOR DETAILED
INFORMATION ON THE CONSTRUCTION OF TEMPORARY
BARRIERS.
6. EXISTING CORRIDOR SPRINKLER HEADS AND SYSTEM
SHALL BE MAINTAINED AND KEPT FUNCTIONING AT ALL
TIMES.
7. TEMPORARY BARRIERS MAY ONLY BE TAKEN DOWN AFTER
THE CONSTRUCTION ZONE IS CLEANED PER ICRA
REQUIREMENTS AND VA COR HAS GIVEN FINAL APPROVAL.
9. DEMO EXISTING ACT CEILING AS REQUIRED TO
CONSTRUCT TEMPORARY BARRIERS. INSTALL NEW ACT
AFTER ALL WORK IS COMPLETED AND TEMPORARY
BARRIERS ARE TAKEN DOWN.
10. CONTRACTOR RESPONSIBLE FOR WIPING DOWN WHEELS
OF CARTS PRIOR TO IT LEAVING THE CONSTRUCTION
ZONE.
11. A MOBILE CRANE SHALL BE USED FOR STEEL
CONSTRUCTION. SEE STRUCTURAL.
12. ALL DEBRIS REMOVED FROM THE WORK AREA THROUGH
INTERIOR HOSPITAL SPACE WILL BE REMOVED IN SEALED,
COVERED CART.
13. ALL CONSTRUCTION MATERIAL DELIVERED TO THE WORK
AREA THROUGH INTERIOR HOSPITAL SPACE WILL BE
DELIVERED IN SEALED, COVERED CART.
14. SEE SPEC SECTION 01 35 26 SAFETY REQUIREMENTS, AND
ICRA FORM FOR SAFETY REQUIREMENTS.
CONTRACTOR TO USE HEPA CART AS MEANS OF
CONSTRUCTION CONTAINMENT, COORDINATE WITH VA
COR.
Revisions: Date: 4 of 95
R
UP
M
AE301
AE301
AE301
AE301
SE
76' -0"
SE
38'-0"
NW SE
0'-0"
NE
380'-0"
NE
421'-9"
NE
459'-9"
NE
383'-9"
E 228'-0" E 266'-0"
S 176'-7"
S 143'-3"
S 128'-9"
NW SE
22'-0"
NE
342'-0"
NE
304'-0"
NE
266'-0"
E 146'-6" E
197'-4" E 201'-0"
S 98'-0"
S 120'-0"
E 223'-0" E 247'-0" E 271'-0" E 293'-0" E296'-8"
CONSTRUCT THERAPY
EXPANSION
PT OT RT
THERAPY GYM
TRANSITIONAL
APARTMENT
PT OT RT
STORAGE
DME STORAGE
WHEELCHAIR
STORAGE &
REPAIR
THERAPY MGR
OFFICE
QUIET ROOM
EXIT CORRIDOR
ELECTRICAL
105A
REHAB CLINIC
1D-118D
LAB
1D-133
STORAGE
1D-118C
OFFICE
1D-118E
OFFICE
1D-118F
REHAB CLINIC
1D-118
OFFICE
1D-117
OFFICE
1D-116
CLOSET
1D-118B
PASSAGE
C1-36
GAIT
1D-105
H.A.C.
1D-115
OFFICE
1D-106
OFFICE
1D-104
EXAM
1D-108C
KITCHEN
1D-101A
CONFERENCE
1D-103
OFFICE
1D-102A
OFFICE
1D-102B
OFFICE
1D-102
OFFICE
1D-102C
SERVERY
1D-101G
CANTEEN
1D-101
DISHWASHING
1D-101C
VENDING DINING
1D-100 SAFE STORAGE
1D-101D
STOREROOM
1D-100A
CORR.
C1-35
CLOSET
1D-101E
CORRIDOR
C1-24
CLEAN SPO
1A-112
SOILED SPO
1A-111
OFFICE
1B-163H.A.C.
1A-110
OFFICE
1A-109
OFFICE
1B-164
CORRIDOR
C1-25
OFFICE
1B-165
OFFICE
1B-166
OFFICE
1B-167
ELECTRICAL
1B-168
IT CLOSET
1B-169
OFFICE
1A-108
CORRIDOR
C1-22
LOBBY
C1-2
ELEV #9
ELEV #10
STAIR #1
1A-S01
ELEV #6
1A-S02
ELEV #5
1A-S03
ELEVATOR
LOBBY
C1-23
ELEV #7
C1-26
ELEV #8
C1-27
ELEV #4
C1-28
ELEV #3
C1-29
ELEV #1
C1-30
ELEV #2
C1-31
PASSENGER
LOBBY
C1-8
DATA
1B-103
TEL
1B-102
CHAPLAIN
SERVICE
1A-104
CORRIDOR
C1-6
CORRIDOR
C1-26
CORRIDOR
C1-20
PASSAGE
C1-9
1-BED
C1-105
TOILET
1C-105A
OFFICE
1C-104BATH
1C-102A
1-BED
1C-102
1-BED
1C-101
TOILET
1C-101A
TOILET
1C-100A
F. LOCKER AND
LOUNGE
1C-100
CONFERENCE
1B-157O.T. CLINIC
1B-159
OFFICE
1B-158B
STORAGE
1B-158A
STORAGE
1B-159BOFFICE
1B-159A
OFFICE
1B-160
OFFICE
1B-161
OFFICE
1B-162
OFFICE
1B-162B
OFFICE
1B-162A
OFFICE
1B-160B
OFFICE
1B-160A
COMMON
C1-115
COMMON
C1-116
COMMON
C1-117
COMMON
C1-118
IT CLOSET
CONTRACTOR AND
MATERIAL ACCESS
DURING CONSTRUCTION
NEGATIVE PRESSURE
WILL BE MAINTAINED IN
THE CONSTRUCTION
SPACE
AREA OF ISOLATION
A-501
A-501
A-502
ANTE ROOM
ICRA CLASS IV
F1
AI470
A-502
A-502
GS301
DEMO PHASE
(TYP ALL REHAB
CLINIC DOORS)
ANTE ROOM
EXISTING CONDITIONS
AREA OF WORK
PATH OF TRAVEL
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
100% CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
GS202
BUILDING 100, LEVEL 1 - ICRA PLAN
SPEES DESIGN BUILD
1414 FOURTH AVE
SEATTLE, WA 98101
(360) 223-8994
RAY SPEES, PRINCIPAL
SCI/D ADDITION & RENOVATION
VA PUGET SOUND HEALTH CARE SYSTEM - Seattle, WA
663-310
12/02/2024 MK MA
1/8" = 1'-0"
BUILDING 100, LEVEL 1 - ICRA PLAN
LEGEND
GENERAL NOTES
KEY NOTES (THIS SHEET ONLY)
1 DOOR(S) TO REMAIN LOCKED AND SEALED AT EDGES TO
PROVIDE AIR TIGHT CONDITION DURING CONTRUCTION
TEMPORARY FRAMED WALL WITH ZIPPERED VISQUEEN
CONSTRACTOR EGRESS AND ACCESS
3 TEMPORARY FRAMED WALL WITH HOLLOW METAL DOOR
TO REMAIN LOCKED EXCEPT WHEN BEING USED BY THE
CONTRACTOR. WHEN IN USE BY CONTRACTOR ACCESS
WILL BE CONTROLLED AND MONITORED BY THE
CONTRACTOR.
TRUE
NORTH
ICRA CLASS IV NOTES:
A. OBTAIN INFECTION CONTROL APPROVAL BEFORE
CONSTRUCTION BEGINS.
B. ALL ITEMS IN PREVIOUS CLASS(ES) MUST ALSO BE
PERFORMED.
C. CONSTRUCT ANTEROOM AND REQUIRE PERSONNEL TO
PASS THROUGH THIS ROOM SO THEY CAN BE VACUUMED
USING A HEPA-FILTERED VACUUM BEFORE LEAVING WORK
SITE OR WEAR CLOTH OR PAPER COVERALLS THAT ARE
REMOVED EACH TIME THEY LEAVE THE WORK SITE.
D. ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING
PERFORMED TO PREVENT CONTAMINATION OF DUCT
SYSTEM.
E. SEAL HOLES, PIPES, CONDUITS, AND PUNCTURES
APPROPRIATELY.
F. MAINTAIN NEGATIVE AIR PRESSURE @ MINIMUM .03 INCHES
WATER GAUGE WITHIN WORK SITE USING HEPA-FILTERED
AIR FILTRATION UNITS.
G. PLACE ADHESIVE WALK OFF MATS AT ENTRANCE TO WORK
AREA WITHIN ANTEROOM.
H. ALL PERSONNEL ENTERING / EXITING THE WORK SITE ARE
REQUIRED TO WEAR SHOE COVERS. SHOE COVERS MUST
BE CHANGED EACH TIME THE WORKER EXITS THE WORK
AREA.
I. IF WORK IS IN OR ADJACENT TO A CRITICAL AREA WHERE
AIRFLOW, TEMPERATURE, AND HUMIDITY LEVELS MUST
REMAIN STABLE THEY WILL BE MONITORED TO MAINTAIN
MINIMUM REQUIRED LEVELS AND NECESSARY ACTIONS
TAKEN DOCUMENTED.
1. ALL WORK TAKING PLACE IN THE BASEMENT AREA WILL
OCCUR AFTER BUSINESS HOURS AND ON WEEKENDS
UNLESS THE SCOPE IS APPROVED BY THE COR ONE WEEK
IN ADVANCE OF BEGINNING.
2. CLASS IV ISOLATED CONSTRUCTION ZONES ARE REQUIRED
TO MAINTAIN NEGATIVE AIR PRESSURE AT ALL TIMES.
COORDINATE LOCATION(S) OF NEGATIVE AIR MACHINES
AND EXHAUST LOCATION WITH VA COR & VA FACILITY ICRA
STAFF AT POST-BID, PRE-CONSTRUCTION MEETING.
3. COMPLY WITH ALL APPLICABLE VA ICRA CLASS
REQUIREMENTS. PROJECT COR MAY HALT WORK AT
ANY TIME IF REQUIREMENTS ARE NOT MET.
4. MAINTAIN A CLEAN, SAFE CONSTRUCTION ZONE AT ALL
TIMES.
5. SEE SHEET A-603 WALL TYPES FOR DETAILED
INFORMATION ON THE CONSTRUCTION OF TEMPORARY
BARRIERS.
6. EXISTING CORRIDOR SPRINKLER HEADS AND SYSTEM
SHALL BE MAINTAINED AND KEPT FUNCTIONING AT ALL
TIMES.
7. TEMPORARY BARRIERS MAY ONLY BE TAKEN DOWN AFTER
THE CONSTRUCTION ZONE IS CLEANED PER ICRA
REQUIREMENTS AND VA COR HAS GIVEN FINAL APPROVAL.
9. DEMO EXISTING ACT CEILING AS REQUIRED TO
CONSTRUCT TEMPORARY BARRIERS. INSTALL NEW ACT
AFTER ALL WORK IS COMPLETED AND TEMPORARY
BARRIERS ARE TAKEN DOWN.
10. CONTRACTOR RESPONSIBLE FOR WIPING DOWN WHEELS
OF CARTS PRIOR TO IT LEAVING THE CONSTRUCTION
ZONE.
11. A MOBILE CRANE SHALL BE USED FOR STEEL
CONSTRUCTION. SEE STRUCTURAL.
12. ALL DEBRIS REMOVED FROM THE WORK AREA THROUGH
INTERIOR HOSPITAL SPACE WILL BE REMOVED IN SEALED,
COVERED CART.
13. ALL CONSTRUCTION MATERIOAL DELIVERED TO THE WORK
AREA THROUGH INTERIOR HOSPITAL SPACE WILL BE
DELIVERED IN SEALED, COVERED CART.
14. SEE SPEC SECTION 01 35 26 SAFETY REQUIREMENTS, AND
ICRA FORM FOR SAFETY REQUIREMENTS.
Revisions: Date: 5 of 95
M
SE
76' -0"
SE
38'-0"
NW SE
0'-0"
NE
380'-0"
NE
421'-9"
NE
459'-9"
NE
383'-9"
E 228'-0" E 266'-0"
S 176'-7"
S 143'-3"
S 128'-9"
NW SE
22'-0"
NE
342'-0"
E 197'-4"
E 201'-0"
S 86'-0"
S 98'-0"
S 120'-0"
E 223'-0" E 247'-0" E 271'-0" E 293'-0" E296'-8"
PT OT RT
THERAPY GYM
TRANSITIONAL
APARTMENT
PT OT RT
STORAGE
DME STORAGE
WHEELCHAIR
STORAGE &
REPAIR
THERAPY MGR
OFFICE
QUIET ROOM
EXIT CORRIDOR
ELECTRICAL
105A
REHAB CLINIC
1D-118D
LAB
1D-133
STORAGE
1D-118C
OFFICE
1D-118E
OFFICE
1D-118F
REHAB CLINIC
1D-118
OFFICE
1D-117
OFFICE
1D-116
CLOSET
1D-118B
PASSAGE
C1-36
GAIT
1D-105
H.A.C.
1D-115
OFFICE
1D-106
OFFICE
1D-104
EXAM
1D-108C
KITCHEN
1D-101A
CONFERENCE
1D-103
OFFICE
1D-102A
OFFICE
1D-102B
OFFICE
1D-102
OFFICE
1D-102C
SERVERY
1D-101G
CANTEEN
1D-101
DISHWASHING
1D-101C
VENDING DINING
1D-100
SAFE STORAGE
1D-101D
STOREROOM
1D-100A
CORR.
C1-35
CLOSET
1D-101E
CORRIDOR
C1-24
OFFICE
1B-163
OFFICE
1B-164
CORRIDOR
C1-25
OFFICE
1B-165
OFFICE
1B-166
OFFICE
1B-167
ELECTRICAL
1B-168
CORRIDOR
C1-26CORRIDOR
C1-20
1-BED
C1-105
TOILET
1C-105A
OFFICE
1C-104BATH
1C-102A
1-BED
1C-102
1-BED
1C-101
TOILET
1C-101A
TOILET
1C-100A
F. LOCKER AND
LOUNGE
1C-100
CONFERENCE
1B-157O.T. CLINIC
1B-159
OFFICE
1B-158B
STORAGE
1B-158A
STORAGE
1B-159BOFFICE
1B-159A
OFFICE
1B-160
OFFICE
1B-161
OFFICE
1B-162
OFFICE
1B-162B
OFFICE
1B-162A
OFFICE
1B-160B
OFFICE
1B-160A
COMMON
C1-115
COMMON
C1-116
COMMON
C1-117
COMMON
C1-118
IT CLOSET
TRANSITIONAL
BEDROOM
101A
TRANSITIONAL
BATH
101B
LAUNDRY
101C
LOBBY
C1-27
93' TO DIRECT EGRESS
MEZZANINE EGRESS
MEZZANINE
EGRESS
EXTENT OF
MEZZANINE ABOVE
RATED WALLS
THAT OCCURE
ON THIS LEVEL
ALSO OCCURE
AT MEZZANINE
RATED WALLS THAT OCCURE
ON THIS LEVEL ALSO OCCURE
AT MEZZANINE
GS301
CLC DINING
ROOM
158H
OFFICE
1B-144C
TOILET
158K
COPIER
158L
OFFICE
158M
CONFERENCE
158N
27' TO TWO OPTIONS
FOR BUILDING EGRESS
MEZZANINE EGRESS
96' TO 2-
HOUR FIRE
RATED WALL
36' TO 2-HOUR
FIRE RATED
WALL
SEMI RECESSED
FIRE EXTINGUISHER
CABINET
SEMI RECESSED
FIRE EXTINGUISHER
CABINET
SEMI RECESSED
FIRE EXTINGUISHER
CABINET
OCCUPANTS
OCCUPANTS
SMOKE ZONE BOUNDARY
2-HR FIRE BARRIER
2-HR FIRE/SMOKE BARRIER
ROUTE OF EMERGENCY EGRESS
EXIT WITH OCCUPANT LOAD & EGRESS CAPACITY
1-HR FIRE BARRIER
AE301
AE301
AE301
AE301
SE
76' -0"
SE
38'-0"
NW SE
0'-0"
NE
380'-0"
NE
421'-9"
NE
459'-9"
NE
383'-9"
S 176'-7"
S 143'-3"
NW SE
22'-0"
E 197'-4"
416 SF
OFFICE
421 SF
OFFICE
LIFT
CEILING
OPEN TO
BELOW
415 SF
OFFICE
111'-0" TO DIRECT
EGRESS @ LEVEL 1
22' TO TWO
OPTIONS FOR
BUILDING EGRESS
123' TO 2-
HOUR FIRE
RATED
WALL
SEMI RECESSED
FIRE EXTINGUISHER
CABINET
LEVEL 1
100' - 0"
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
100% CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
GS301
BUILDING 100, LEVEL 1 - FIRE AND LIFE
SAFETY
SPEES DESIGN BUILD
1414 FOURTH AVE
SEATTLE, WA 98101
(360) 223-8994
RAY SPEES, PRINCIPAL
SCI/D ADDITION & RENOVATION
VA PUGET SOUND HEALTH CARE SYSTEM - Seattle, WA
663-310
12/02/2024 MK MA
3/32" = 1'-0"1
BUILDING 100, LEVEL 1 - FIRE AND LIFE SAFETY
LEGEND
GENERAL NOTES
1. COORDINATE FIRE SPRINKLER SUBMITTALS AND WORK
WITH GOVERNING JURISDICTION PRIOR TO
COMMENCEMENT OF ANY WORK.
2. CORRIDORS AND EGRESS PASSAGEWAYS TO REMAIN
CLEAR AND FREE OF DEBRIS.
3. REFER TO ELECTRICAL DRAWINGS FOR ELECTRICAL
SYMBOLS AND ABBREVIATIONS.
APPLICABLE ARCH CODES
VA DIRECTIVES, DESIGN MANUALS, MASTER SPECIFICATIONS, VA
NATIONAL CAD STANDARD APPLICATION GUIDE, AND OTHER
GUIDANCE ON THE TECHNICAL INFORMATION LIBRARY (TIL)
INTERNATIONAL BUILDING CODE (IBC) - 2021
NFPA 101 LIFE SAFETY CODE - 2021
NFPA NATIONAL FIRE CODES, WITH THE EXCEPTION OF NFPA
5000 AND NFPA 900 - 2021
OCCUPATIONAL, SAFETY AND HEALTH ADMINISTRATION (OSHA)
STANDARDS
FIRE AND LIFE SAFETY DETAILS
CODE REVIEW NFPA 101, 2000 EDITION. DEMOLITION AND
CONSTRUCTION OPERATIONS SHALL COMPLY WITH NFPA 101
4.6.10
OCCUPANCY:
- HOSPITAL, ORDINARY HAZARD
PROTECTION:
- AUTOMATIC SPRINKLER SYSTEM THROUGHOUT
- ONE HOUR SEPARATION AT MECHANICAL ROOMS AND
DESIGNATED HAZARDOUS LOCATIONS
- TWO HOUR SEPARATION AT HORIZONTAL EXIT
PARTITIONS
- FIRE ALARM AND SMOKE DETECTION SYSTEMS
OCCUPANT
- TREATMENT DEPARTMENT 240 SF (GROSS) /
OCCUPANT
- ASSEMBLY AREAS 15 SF (GROSS) /
OCCUPANT
TRAVEL DISTANCES:
- ANY POINT IN ROOM TO EXIT 200 FT
- COMMON PATH OF TRAVEL 75 FT
EXIT CAPACITY:
- HEALTH CARE SPRINKLERED PER 2021 NFPA 101 TABLE
7.3.3.1 = 0.2" / OCCUPANT.
TRUE
NORTH
3/32" = 1'-0"
FLOOR PLAN - ADDITION - MEZZANINE FIRE AND LIFE SAFETY
TRUE
NORTH
1/4" = 1'-0"
LIFE SAFETY SECTION
MAIN FLOOR: 6,087 SF @ 240 SF PER OCCUPANT (INPATIENT
TREATMENT DEPTS) = 25.36 OCCUPANTS = 26 OCCUPANTS
STORAGE: MAXIMUM PROBABLE OCCUPANT LOAD ASSUMES 1
OCCUPANT PER STORAGE ROOM. 3 STORAGE ROOMS x 1
OCCUPANT PER ROOM = 3 OCCUPANTS
MEZZANINE: 1,731 SF @ 150 SF PER OCCUPANT (BUSINESS USE)
= 11.54 OCCUPANTS = 12 OCCUPANTS
MAIN FLOOR = 26 OCCUPANTS
STORAGE = 3 OCCUPANTS
MEZZANINE = 12 OCCUPANTS
TOTAL = 41 OCCUPANTS
21 OCCUPANTS AT EACH EXIT
EXIT CAPACITY:
DOOR 006 = 440 0CCUPANTS
DOOR 009 = 420 OCCUPANTS
EGRESS NOTES
Revisions: Date: 6 of 95
GENERAL STRUCTURAL NOTES
GENERAL
DRAWINGS INDICATE GENERAL AND TYPICAL DETAILS OF CONSTRUCTION. TYPICAL DETAILS AND NOTES SHOWN ON THESE DRAWINGS ARE PART OF THE CONSTRUCTION CONTRACT AND SHALL BE PROVIDED BY THE CONTRACTOR. TYPICAL DETAILS MAY NOT NECESSARILY BE INDICATED ON THE PLANS BUT SHALL APPLY AS SHOWN OR DESCRIBED IN THE DETAILS AND NOTES. WHERE CONDITIONS ARE NOT SPECIFICALLY INDICATED BUT ARE OF SIMILAR CHARACTER TO DETAILS SHOWN, SIMILAR DETAILS OF CONSTRUCTION SHALL BE USED.
STRUCTURAL DRAWINGS SHALL BE USED IN CONJUNCTION WITH ARCHITECTURAL DRAWINGS AND ALL OTHER CONTRACT DOCUMENTS FOR BIDDING AND CONSTRUCTION. CONTRACTOR SHALL VERIFY DIMENSIONS AND CONDITIONS FOR COMPATIBILITY AND SHALL NOTIFY THE VA CONTRACTING OFFICER'S REPRESENTATIVE (COR) OF
ALL DISCREPANCIES PRIOR TO CONSTRUCTION.
DISCREPANCIES: IN CASE OF DISCREPANCIES BETWEEN DRAWINGS, SPECIFICATIONS, REFERENCE STANDARDS, OR GOVERNING CODE, THE MORE STRINGENT REQUIREMENTS SHALL GOVERN. CONTRACTOR SHALL NOTIFY THE VA CONTRACTING OFFICER'S REPRESENTATIVE (COR) OF DISCREPANCIES AND OBTAIN DIRECTION PRIOR TO PROCEEDING.
NOTES ON INDIVIDUAL STRUCTURAL DRAWINGS SHALL TAKE PRIORITY OVER GENERAL STRUCTURAL NOTES. DIMENSIONS
NOTED IN THE DRAWINGS SHALL BE FOLLOWED. DO NOT SCALE DRAWINGS.
SPECIFICATIONS: REFER TO SPECIFICATIONS FOR INFORMATION IN ADDITION TO THESE NOTES AND DRAWINGS.
ARCHITECTURAL: REFER TO ARCHITECTURAL DRAWINGS FOR ELEVATIONS, SLOPES, DEPRESSIONS, NON- BEARING WALLS, FASCIA, ELEVATORS, STAIRS, CURBS, DRAINS, RAILINGS, WATERPROOFING, FINISHES, ETC.
CONTRACTOR-INITIATED CHANGES: SHALL BE SUBMITTED IN WRITING TO THE VA CONTRACTING OFFICER'S REPRESENTATIVE (COR) FOR APPROVAL AT LEAST 10 WORKING DAYS PRIOR TO FABRICATION AND CONSTRUCTION.
CHANGES SHOWN ON SHOP DRAWINGS OR SUBMITTALS ONLY WILL NOT SATISFY THIS REQUIREMENT.
CONTRACTOR RESPONSIBILITIES: DRAWINGS REPRESENT DESIGN OF STRUCTURE IN COMPLETED FORM.
CONTRACTOR SHALL BE RESPONSIBLE FOR METHODS, SEQUENCES, AND SAFETY PRECAUTIONS REQUIRED TO
PERFORM WORK.
CONTRACTOR SHALL DESIGN AND PROVIDE TEMPORARY SHORING AND BRACING OF ALL STRUCTURAL MEMBERS, EXISTING CONSTRUCTION, AND SOIL EXCAVATION AS REQUIRED. SHORING AND BRACING SHALL NOT BE REMOVED UNTIL ALL FINAL CONNECTIONS HAVE BEEN COMPLETED IN ACCORDANCE WITH THE DRAWINGS, AND MATERIALS
HAVE ACHIEVED DESIGN STRENGTH.
EXISTING CONDITIONS: CONTRACTOR SHALL VERIFY ALL EXISTING DIMENSIONS, MEMBER SIZES, AND CONDITIONS PRIOR TO COMMENCING ANY WORK. ALL DIMENSIONS OF EXISTING CONSTRUCTION SHOWN ON THE DRAWINGS ARE INTENDED AS GUIDELINES ONLY AND MUST BE VERIFIED. EXISTING CONDITIONS SHOWN ON DRAWINGS ARE BASED EITHER ON SITE OBSERVATIONS, ORIGINAL DRAWINGS, OR WERE ASSUMED BASED ON EXPECTED CONDITIONS. IF EXISTING CONDITIONS DO NOT CLOSELY MATCH CONDITIONS SHOWN ON DRAWINGS, OR IF EXISTING MATERIALS ARE OF QUESTIONABLE OR SUBSTANDARD QUALITY, NOTIFY VA CONTRACTING OFFICER'S
REPRESENTATIVE (COR), PRIOR TO COMMENCING ANY WORK.
STRUCTURAL OBSERVATION SHALL BE PERFORMED IS NOT REQUIRED PER IBC SECTION 1704.6
SPECIAL INSPECTION PER IBC SECTION 1704, SHALL BE PERFORMED BY AN AGENCY APPROVED BY THE VA CONTRACTING OFFICER'S REPRESENTATIVE (COR), SELECTED BY THE CONTRACTOR AND AS OUTLINED IN THE
STRUCTURAL INSPECTION SCHEDULE.
CODES
BUILDING CODE: ALL MATERIALS, WORKMANSHIP, DESIGN, AND CONSTRUCTION SHALL CONFORM TO THE DRAWINGS, SPECIFICATIONS AND THE INTERNATIONAL BUILDING CODE (IBC), 2015 EDITION AS AMENDED BY THE
STATE OF WASHINGTON
STANDARDS: REFERENCE TO ASTM AND OTHER STANDARDS SHALL MEAN THE LATEST EDITION REFERENCED IN THE 2015 IBC EDITION IN EFFECT ON THE BID DATE, UNLESS NOTED IN THESE DOCUMENTS OR DESIGNATED BY
THE GOVERNING CODE.
DESIGN CRITERIA
FLOOR DESIGN DATA:
IN ADDITION TO THE SELF WEIGHT, THE FOLLOWING LOADS ARE USED FOR DESIGN:
UNIFORM CONCENTRATED SUPERIMPOSED
LIVE LOAD LIVE LOAD DEAD LOAD REDUCIBLE
(PSF) (LBS) (PSF) (SEE NOTE)
HOSPITAL, OPERATING 60 1,000 5 YES
ROOMS/LABORATORIES
OFFICES 50 2,000 5 YES
OFFICE BUILDING LOBBIES AND 100 2,000 5 YES
FIRST FLOOR CORRIDORS
OFFICE PARTITIONS 15 - - NO
LIGHT STORAGE 125 - 5 NO
WHERE APPLICABLE, LIVE LOADS HAVE BEEN REDUCED PER IBC SECTION 1607.10.2 1607.10.1
WIND DESIGN DATA:
WIND BASE SHEAR VW (N-S) = 20 KIPS
VW (E-W) = 20 KIPS
ANALYTICAL PROCEDURE [ENVELOPE PROCEDURE, ASCE 7 CHAPTER 28
TYPE OF STRUCTURE RIGID (ASCE 7 SECTION 26.9.2)
BASIC WIND SPEED V = 115 MPH, ULTIMATE 3 SECOND GUST (ASCE 7 FIG 26.5-1A - 26.5-1C)
VASD = 90 MPH, NOMINAL 3 SECOND GUST (IBC EQUATION 16-33)
EXPOSURE CATEGORY B (ASCE 7 SECTION 26.7.3)
INTERNAL PRESSURE COEFFICIENT 0.18 (ASCE 7 FIGURE 26.11-1)
ENCLOSURE CLASSIFICATION ENCLOSED (ASCE 7 SECTION 26.10.1)
DIRECTIONALITY FACTOR Kd = 0.85 : MWFRS (ASCE 7 TABLE 26.6-1) TOPOGRAPHIC FACTOR Kzt = 1.0 (ASCE 7 SECTION 26.8)
EARTHQUAKE DESIGN DATA:
SEISMIC-FORCE-RESISTING SYSTEM: STEEL SPECIAL MOMENT FRAMES
& LIGHT-FRAMED WALLS WITH SHEAR PANELS
ANALYTICAL PROCEDURE: EQUIVALENT LATERAL FORCE PROCEDURE
SEISMIC BASE SHEAR: VE (N-S) = 60 KIPS
(ASCE 7 SECTION 12.8.1) VE (E-W) = 60 KIPS
SEISMIC RESPONSE COEFFICIENT: CS (N-S) = 0.225
(ASCE 7 SECTION 12.8.1.1) CS (E-W) = 0.225
SEISMIC IMPORTANCE FACTOR Ie 1.5 (ASCE 7 TABLE 1.5-2)
SITE CLASS D (ASCE 7 SECTION 11.4.2)
SS = 1.48 (ASCE 7 SECTION 11.4.1)
S1 = 0.52 (ASCE 7 SECTION 11.4.1)
SDS = 0.98 (ASCE 7 SECTION 11.4.4)
SD1 = 0.52 (ASCE 7 SECTION 11.4.4)
SEISMIC DESIGN CATEGORY D (ASCE 7 SECTION 11.6)
RESPONSE MODIFICATION COEFFICIENT R = 6.5 (ASCE 7 TABLE 12.2-1)
SYSTEM OVERSTRENGTH FACTOR Ω 0 = 2.5 (ASCE 7 TABLE 12.2-1)
DEFLECTION AMPLIFICATION FACTOR Cd = 3.5 (ASCE 7 TABLE 12.2-1)
SUBMITTALS
SHOP DRAWINGS SHALL BE SUBMITTED TO THE ARCHITECT FOR REVIEW PRIOR TO FABRICATION OR
CONSTRUCTION OF THESE ITEMS:
STRUCTURAL STEEL STEEL DECK
STRUCTURAL STEEL EMBEDDED ITEMS IN CONCRETE
STEEL JOISTS
CONTRACTOR SHALL REVIEW AND STAMP SUBMITTALS PRIOR TO SUBMISSION. DIMENSIONS AND QUANTITIES ARE CONTRACTOR'S RESPONSIBILITY AND WILL NOT BE REVIEWED. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL MATERIALS PLACED PRIOR TO RECEIPT OF REVIEWED SHOP DRAWINGS. CONTRACTOR SHALL ALLOW A MINIMUM
OF 10 WORKING DAYS FOR REVIEW.
SHOP DRAWING SUBMITTALS PROCESSED BY THE ENGINEER ARE NOT CHANGE ORDERS. THE PURPOSE OF SHOP DRAWING SUBMITTALS BY THE CONTRACTOR IS TO DEMONSTRATE TO THE ENGINEER THAT THE CONTRACTOR UNDERSTANDS THE DESIGN CONCEPT BY INDICATING WHICH MATERIAL IS INTENDED TO BE FURNISHED AND INSTALLED AND BY DETAILING THE INTENDED FABRICATION AND INSTALLATION METHODS. IF DEVIATIONS, DISCREPANCIES, OR CONFLICTS BETWEEN SHOP DRAWING SUBMITTALS AND THE CONTRACT DOCUMENTS ARE DISCOVERED EITHER PRIOR TO OR AFTER SHOP DRAWING SUBMITTALS ARE PROCESSED BY THE VA CONTRACTING OFFICER'S REPRESENTATIVE (COR), THE DESIGN DRAWINGS AND SPECIFICATIONS SHALL CONTROL AND SHALL BE
FOLLOWED.
DEFERRED SUBMITTALS: DRAWINGS AND CALCULATIONS FOR BIDDER-DESIGNED COMPONENTS, SEALED BY THE WASHINGTON STATE REGISTERED PROFESSIONAL STRUCTURAL ENGINEER RESPONSIBLE FOR THE DESIGN, SHALL BE SUBMITTED TO THE VA CONTRACTING OFFICER'S REPRESENTATIVE (COR), FOR REVIEW OF GENERAL
CONFORMANCE WITH THE DESIGN OF THE BUILDING. DEFERRED SUBMITTALS INCLUDE:
CURTAIN WALL AND CLADDING SYSTEMS DESIGN-BUILD STEEL STAIR SYSTEMS
OPEN-WEB STEEL JOISTS
SEISMIC BRACING AND ANCHORAGE
OF MECHANICAL UNITS AND FIXTURES
SUBMITTALS OF BIDDER-DESIGNED COMPONENTS SHALL INCLUDE LOCATIONS, MAGNITUDES, AND DIRECTIONS OF ALL FORCES TRANSFERRED TO THE STRUCTURE. CALCULATIONS SUBMITTED FOR BIDDER-DESIGNED
COMPONENTS ARE FOR INFORMATION ONLY AND WILL NOT BE REVIEWED.
SEISMIC BRACING AND ANCHORAGE OF MECHANICAL UNITS AND OTHER MECHANICAL AND ELECTRICAL FIXTURES NOT SPECIFICALLY SHOWN ON THE PROJECT DRAWINGS SHALL BE DESIGNED BY A REGISTERED STRUCTURAL ENGINEER IN THE STATE WHERE THE PROJECT IS LOCATED. THE MECHANICAL AND ELECTRICAL CONTRACTORS MUST RETAIN THE SERVICES OF A STRUCTURAL ENGINEER AND IS RESPONSIBLE FOR ALL COSTS RELATED TO THE
PURCHASE AND INSTALLATION OF SEISMIC BRACING AND ANCHORAGE OF THEIR SYSTEMS.
RENOVATION:
DEMOLITION: CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS BEFORE COMMENCING ANY DEMOLITION.
SHORING SHALL BE INSTALLED TO SUPPORT EXISTING CONSTRUCTION AS REQUIRED AND IN A MANNER SUITABLE TO THE WORK SEQUENCES. EXISTING REINFORCING SHALL BE SAVED WHERE POSSIBLE AND AS NOTED ON DRAWINGS. SAW-CUTTING, IF AND WHERE USED, SHALL NOT CUT EXISTING REINFORCING THAT IS TO BE SAVED.
DEMOLITION DEBRIS SHALL NOT BE ALLOWED TO DAMAGE OR OVERLOAD THE EXISTING STRUCTURE.
CONSTRUCTION LOADING (INCLUDING DEMOLITION DEBRIS) ON EXISTING FLOOR SYSTEMS SHALL BE LIMITED TO
40 PSF.
1. ALL NEW OPENINGS THROUGH EXISTING WALLS, SLABS, AND BEAMS SHALL BE ACCOMPLISHED BY SAWCUTTING WHEREVER POSSIBLE. ALL NEW OPENINGS SHALL BE SAWCUT NEAT AND CLEAN; NO OVERCUTTING AT OPENING CORNERS SHALL BE ALLOWED, UNLESS NOTED OTHERWISE. AS REQUIRED, CORE DRILL CORNERS AND CHIP, GRIND, OR CUT THE CORNERS TO PROVIDE REQUIRED DIMENSIONS.
2. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS AND LOCATION OF MEMBERS PRIOR TO CUTTING ANY
OPENINGS.
3. SMALL ROUND OPENINGS SHALL BE ACCOMPLISHED BY CORE DRILLING.
CONCRETE ANCHORAGE
EXPANSION BOLTS INTO CONCRETE SHALL BE ONE OF THE FOLLOWING. INSTALL PER MANUFACTURER'S INSTRUCTIONS AND APPLICABLE IAPMO OR ICC-ES REPORTS. NOMINAL EMBEDMENT DEPTH SHALL BE AS NOTED
BELOW, UNLESS NOTED OTHERWISE.
HILTI KWIK BOLT TZ (ESR-1917)
3/8" EXPANSION BOLTS 2 5/16"
1/2" EXPANSION BOLTS 3 5/8"
5/8" EXPANSION BOLTS 4 7/16"
3/4" EXPANSION BOLTS 5 9/16"
SIMPSON STRONG-BOLT 2 (ESR 3037)
3/8" EXPANSION BOLTS 2 7/8"
1/2" EXPANSION BOLTS 3 7/8"
5/8" EXPANSION BOLTS 5 1/8"
3/4" EXPANSION BOLTS 5 3/4"
DEWALT POWER STUD+ SD2 (ESR 2502)
3/8" EXPANSION BOLTS 2 3/8"
1/2" EXPANSION BOLTS 3 3/4"
5/8" EXPANSION BOLTS 4 7/8"
3/4" EXPANSION BOLTS 5 3/4"
EPOXY-GROUTED RODS OR REBAR TO CONCRETE SHALL BE GROUTED WITH ONE OF THE FOLLOWING: HILTI HIT- RE 500-V3 (ESR 3814), HILTI HIT-HY200 (ESR-3187), SIMPSON SET-XP (ESR 2508), OR DEWALT PURE110+ (ESR-3298).
INSTALL PER MANUFACTURER'S INSTRUCTIONS AND APPLICABLE IAPMO OR ICC-ES REPORTS. EMBEDMENT
DEPTHS SHALL BE AS NOTED BELOW, UNLESS NOTED OTHERWISE.
3/8" ROD OR #3 BAR 4"
1/2" ROD OR #4 BAR 5"
5/8" ROD OR #5 BAR 7"
3/4" ROD OR #6 BAR 9"
7/8" ROD OR #7 BAR 12"
1" ROD OR #8 BAR 15"
HEAVY DUTY SCREW ANCHORS INTO CONCRETE SHALL BE SIMPSON TITEN HD (ESR-2713), DEWALT SCREW-BOLT+
(ESR-3889) OR HILTI KWIK HUS EZ (ESR-3027).
DRIVE PINS AND OTHER POWDER-ACTUATED FASTENERS SHALL BE ITW RAMSET/RED HEAD (ESR-1799), HILTI XU
LOW VELOCITY (ESR-2269), OR DEWALT POWER ACTUATED FASTENERS (ESR-2024)
UNDERCUT ANCHORS SHALL BE USP DUC (ESR-1970), HILTI HDA (ESR-1546) OR POWERS ATOMIC+ UNDERCUT
ANCHOR (ESR-3067).
POST-INSTALLED ANCHORS SHALL NOT BE USED AS SUBSTITUTES FOR CAST-IN-PLACE ANCHOR BOLTS OR
REINFORCING STEEL UNLESS SPECIFICALLY APPROVED BY THE STRUCTURAL ENGINEER.
PRODUCT SUBSTITUTES PROPOSED BY THE CONTRACTOR SHALL BE SUBMITTED FOR REVIEW WITH IAPMO OR ICC-
ES REPORTS INDICATING EQUIVALENT OR GREATER LOAD CAPACITIES.
NO REINFORCING BARS SHALL BE CUT TO PLACE POST-INSTALLED ANCHORS. ALL DEFECTIVE ANCHOR HOLES SHALL BE GROUTED WITH EPOXY ADHESIVE AND A NEW HOLE DRILLED A MINIMUM OF 3 BOLT DIAMETERS AWAY.
POST-INSTALLED CONCRETE ANCHORS ARE NOT PERMITTED IN POST-TENSIONED CONCRETE SLABS, EXCEPT AS
PERMITTED UNDER POST-TENSIONING NOTES.
STEEL
REFERENCE STANDARDS: STRUCTURAL STEEL SHALL CONFORM TO ALL REQUIREMENTS OF THE FOLLOWING
DOCUMENTS:
AISC 360 "SPECIFICATION FOR STRUCTURAL STEEL BUILDINGS"
AISC 341 "SEISMIC PROVISIONS FOR STRUCTURAL STEEL BUILDINGS"
AISC 303 "CODE OF STANDARD PRACTICE FOR STEEL BUILDINGS AND BRIDGES"
AWS D1.1 "STRUCTURAL WELDING CODE - STEEL"
AISC 348 "SPECIFICATION FOR STRUCTURAL JOINTS USING ASTM A325 OR A490 BOLTS"
AISC 358 "PREQUALIFIED CONNECTIONS FOR SPECIAL AND INTERMEDIATE STEEL
MOMENT FRAMES FOR SEISMIC APPLICATIONS"
MATERIALS:
TYPE OF MEMBER ASTM SPECIFICATION YIELD
WIDE FLANGES (W), STRUCTURAL TEES (WT) A992 50 KSI
PLATES, ANGLES, CHANNELS A36 36 KSI
THREADED RODS (TR) AND BARS
SPECIAL SHAPES (NOTED A572 50 KSI
GRADE 50 ON DRAWINGS)
STEEL PIPES A53 (TYPE E OR S, GRADE B) 35 KSI
HOLLOW STRUCTURAL STEEL (HSS) A500 (GRADE B) 46 KSI
MACHINE BOLTS (MB) A307
CONNECTION BOLTS (HSB) A325: F3125, GRADE A325 A490: F3125, GRADE A490
ANCHOR RODS (AR) F1554 GRADE 36, WELDABLE
GRADE 55, WELDABLE (WHERE NOTED
GRADE 105 (WHERE NOTED
TENSION CONTROL BOLTS F1852
LOAD-INDICATING WASHERS F959, TYPE A325 A490
CAMBER: ALL MEMBERS SHALL BE ERECTED WITH NATURAL OR INDUCED CAMBER UPWARDS, UNLESS NOTED OTHERWISE. CAMBER INDICATED ON DRAWINGS SHALL BE AS DELIVERED TO THE JOB SITE. CONTRACTOR SHALL CONSIDER CAMBER LOSS DUE TO SHIPPING AND HANDLING. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL
ERECTION AIDS INCLUDING ERECTION ANGLES AND LIFT HOLES.
STRUCTURAL STEEL EXPOSED TO WEATHER SHALL BE ZINC-COATED HOT-DIPPED GALVANIZED PER ASTM A123.
ALL FIELD WELDS EXPOSED TO WEATHER SHALL BE COATED WITH BRUSH APPLIED PAINT CONTAINING ZINC DUST COMPLYING WITH ASTM A780. ALL BOLTS AND ANCHOR RODS EXPOSED TO WEATHER SHALL BE ZINC-COATED HOT-
DIPPED GALVANIZED PER ASTM A153.
BOLTED CONNECTIONS NOT SPECIFIED AS SLIP-CRITICAL NEED ONLY BE TIGHTENED TO AISC SNUG-TIGHT CRITERIA, UNLESS NOTED OTHERWISE. CONNECTION PLATES SHALL HAVE AISC STANDARD ROUND HOLES UNLESS NOTED OTHERWISE. ALL OVERSIZED OR SLOTTED HOLES SHALL HAVE WASHERS PROVIDED IN ACCORDANCE WITH
AISC 360, UNLESS NOTED OTHERWISE.
PRETENSIONED OR SLIP-CRITICAL CONNECTIONS SHALL USE LOAD-INDICATING WASHERS OR TENSION CONTROL BOLTS SUCH AS BETHLEHEM INDICATOR BOLTS, LeJEUNE TENSION CONTROL BOLTS, ETC. CONNECTED PLIES
SHALL BE PREPARED TO MEET THE REQUIREMENTS FOR CLASS A FAYING SURFACES.
WELDING: ALL WELDS SHALL COMPLY WITH AWS D1.1. WELDS SHALL BE MADE USING LOW HYDROGEN E70XX ELECTRODES. ONLY AWS PREQUALIFIED WELDED JOINTS SHALL BE USED. SHOP DRAWINGS SHALL SHOW ALL WELDING WITH AWS A2.4 STANDARD SYMBOLS. WELDS SHOWN ON DRAWINGS ARE MINIMUM SIZES. INCREASE WELD SIZE TO AWS MINIMUM SIZES BASED ON PLATE THICKNESS. WELDS NOT SPECIFIED SHALL BE CONTINUOUS
[3/16"] FILLET WELDS.
ALL WELDS INDICATED ON THE DRAWINGS AS "NOTCH TOUGH WELD FILLER MATERIAL REQUIRED" SHALL BE MADE WITH A FILLER WELD METAL THAT HAS A MINIMUM CHARPY V-NOTCH TOUGHNESS OF 20 FT.-LBS. AT 0 DEGREES F.
IN ADDITION TO MEETING THE ABOVE REQUIREMENTS, ALL WELDS INDICATED AS "DEMAND CRITICAL" SHALL BE MADE WITH MATERIAL WITH A MINIMUM CHARPY V-NOTCH TOUGHNESS OF 40 FT-LBS AT 70 DEGREES F. SEE AISC 341-10 CHAPTER A AND AWS D1.8 SECTION 6.3 FOR ADDITIONAL REQUIREMENTS. PROPOSED FILLER MATERIAL FOR BOTH SHOP AND FIELD WELDS SHALL BE SUBMITTED FOR REVIEW PRIOR TO CONSTRUCTION.
WELDS SHOWN ON DRAWINGS ARE FOR FINAL CONNECTIONS. UNLESS FIELD WELD SYMBOLS ARE SHOWN, CONTRACTOR SHALL BE RESPONSIBLE FOR DETERMINING IF A WELD SHOULD BE SHOP OR FIELD WELDED IN
ORDER TO FACILITATE STEEL ERECTION.
CONTRACTOR SHALL BE RESPONSIBLE FOR ALL JOINT PREPARATIONS AND WELDING PROCEDURES, INCLUDING ROOT OPENINGS AND FACE DIMENSIONS, GROOVE ANGLES, BACKING BARS, COPES, WELD ACCESS HOLES, TAPERS, AND SURFACE ROUGHNESS.
WELDER CERTIFICATION: AWS OR WASHINGTON ASSOCIATION OF BUILDING OFFICIALS (WABO).
FIREPROOFING: REFER TO SPECIFICATIONS FOR REQUIRED FIREPROOFING AND TO ARCHITECTURAL DRAWINGS FOR REQUIRED FIRE RESISTANCE RATINGS. STRUCTURAL FRAME CONSISTS OF THE COLUMNS; THE GIRDERS, BEAMS, TRUSSES, AND SPANDRELS HAVING DIRECT CONNECTIONS TO THE COLUMNS; AND BRACING MEMBERS
DESIGNED TO CARRY GRAVITY LOADS.
ANCHOR RODS SHALL BE INSTALLED TO AISC SNUG-TIGHT CRITERIA WITH HEX NUTS AND LOCK WASHERS OR JAM NUTS AT THE TOP. AT THE BOTTOM, PROVIDE A STANDARD SIZE HEAD, TACK-WELDED NUT OR DOUBLE NUT. NO HEATING OR BENDING OF ANCHOR RODS IS PERMITTED. ENLARGEMENT OF ANCHOR ROD HOLES BY BURNING IS
NOT PERMITTED. BASE PLATE HOLES FOR ANCHOR RODS SHALL BE AS SHOWN BELOW
AR MAXIMUM HOLE MINIMUM WASHER MINIMUM WASHER
DIAMETER DIAMETER DIAMETER THICKNESS
5/8" 1 1/16" 1 1/2" 3/16" 3/4" 1 5/16" 2" 1/4" 7/8" 1 9/16" 2 1/2" 5/16" 1" 1 13/16" 3" 3/8"
STEEL DECK SIZE, TYPE, GAGE, AND ATTACHMENTS SHALL BE PROVIDED AS INDICATED IN THE DRAWINGS. STEEL DECK SHALL CONFORM TO THE REQUIREMENTS OF THE STEEL DECK INSTITUTE. CEILINGS, LIGHT FIXTURES, DUCTS, AND OTHER ITEMS SHALL NOT BE SUSPENDED FROM NON-COMPOSITE DECKS. STEEL DECK GAGES SHOWN ON THE DRAWINGS ARE BASED ON UNSHORED CONDITIONS. HEAVIER DECK GAGES MAY BE REQUIRED FOR SOME SPECIAL CONDITIONS. DECK SUPPLIER SHALL VERIFY DECK CAPACITY BASED ON ACTUAL DECK LAYOUT AND SPAN CONDITIONS. CONTRACTOR SHALL PROVIDE CLOSURE PLATES, FLASHING, AND ALL
MISCELLANEOUS LIGHT GAGE METAL NECESSARY TO COMPLETE THE WORK.
WELDED HEADED STUDS (WHS) AND THREADED STUDS (CPL OR CFL) SHALL COMPLY WITH ASTM A108 GR.1010 THROUGH 1020 WITH MINIMUM TENSILE STRENGTH OF 60 KSI. STUDS SHALL BE WELDED IN CONFORMANCE WITH THE REQUIREMENTS OF AWS CHAPTER 7. UNLESS OTHERWISE NOTED, STUDS SHALL BE WELDED BY THE AUTOMATIC MACHINE WELDING PROCESS WITH EQUIPMENT RECOMMENDED BY THE MANUFACTURER. LENGTHS
SHOWN ON DRAWINGS ARE FINAL LENGTHS AFTER WELDING.
DEFORMED BAR ANCHORS (DBA) SHALL COMPLY WITH ASTM A496 AND THE REQUIREMENTS FOR TYPE "C" STUDS IN ACCORDANCE WITH AWS D1.1. UNLESS OTHERWISE NOTED, DEFORMED BAR ANCHORS SHALL BE WELDED BY THE AUTOMATIC MACHINE WELDING PROCESS IN ACCORDANCE WITH AWS CHAPTER 7, WITH EQUIPMENT RECOMMENDED BY THE MANUFACTURER. LENGTHS SHOWN ON DRAWINGS ARE FINAL LENGTHS AFTER WELDING.
AT NON-BRACED/MOMENT FRAME AND NON-STRUT CONNECTIONS, A706 GRADE 60 REINFORCING BARS OF AN EQUAL DIAMETER AND LENGTH OF THE SPECIFIED DBA's MAY BE USED PROVIDED THEY ARE WELDED TO THE SUPPORTING STEEL WITH E80XX ELECTRODES IN ACCORDANCE WITH AWS D1.4 AND THE TABLE BELOW:
BAR SIZE ALL-AROUND FILLET WELD SIZE
#4, 1/2" DIA 1/4"
#5, 5/8" DIA 5/16"
#6, 3/4" DIA 3/8"
DIMENSIONAL TOLERANCE FOR STRUCTURAL STEEL MEMBERS SHALL BE PER THE AISC CODE OF STANDARD PRACTICE FOR STEEL BUILDINGS AND BRIDGES, SECTION 6.4 AND ASTM SPECIFICATION A6. UNLESS SPECIFICALLY ALLOWED BY THE ENGINEER, COLUMN MEMBERS SHALL NOT BE MODIFIED BY THE ROTARY STRAIGHTENING
PROCESS.
ARCHITECTURALLY EXPOSED STRUCTURAL STEEL: ANY STRUCTURAL STEEL THAT IS EXPOSED TO VIEW UPON COMPLETION OF THE PROJECT SHALL COMPLY WITH SECTION 10 OF AISC 303. SEE SPECIFICATIONS FOR SPECIFIC FABRICATION AND ERECTION REQUIREMENTS FOR ARCHITECTURALLY EXPOSED STRUCTURAL STEEL.
OPEN WEB STEEL JOISTS AND JOIST GIRDERS (INCLUDING BRIDGING) SHALL CONFORM TO THE SPECIFICATIONS OF THE STEEL JOIST INSTITUTE, LATEST EDITION, AND IBC SECTION 2207. SEE PLANS AND DETAILS FOR LOADING REQUIREMENTS. IN ADDITION, ALL JOISTS AND JOIST GIRDERS SHALL BE DESIGNED TO SUPPORT A SINGLE 500 LB.
DOWNWARD POINT LOAD FROM ANY TOP OR BOTTOM CHORD PANEL POINT TO ACCOUNT FOR MISC. ARCH. AND MECH. ITEMS. ENDS OF BRIDGING ROWS SHALL BE FIELD WELDED TO STRUCTURAL STEEL MEMBERS OR TO PLATES EMBEDDED IN CONCRETE OR MASONRY UNLESS OTHERWISE NOTED. JOIST MANUFACTURER SHALL CHECK ROOF JOISTS AND JOIST GIRDERS AND PROVIDE UPLIFT BRIDGING AS REQUIRED TO ADEQUATELY BRACE THE BOTTOM CHORD AGAINST LATERAL MOVEMENT UNDER WIND UPLIFT PRESSURES (SEE PLAN NOTES FOR UPLIFT FORCES). CONTRACTOR SHALL COORDINATE BRIDGING LAYOUT PRIOR TO JOIST ERECTION TO AVOID CONFLICTS WITH MECHANICAL DUCTWORK OR OTHER MISCELLANEOUS ITEMS. SIZE JOISTS AND JOIST GIRDERS TO MEET THE DEFLECTION REQUIREMENTS PER THE SPECIFICATIONS AND CAMBER IN ACCORDANCE WITH THE
STEEL JOIST INSTITUTE STANDARDS, UNLESS OTHERWISE NOTED.
JOISTS THAT OCCUR WITHIN 3'-0" OF STEEL COLUMNS AND ALL JOISTS EXCEEDING 40'-0" IN LENGTH SHALL BE BOLTED TO THEIR SUPPORTS IN LIEU OF THE SPECIFIED FIELD WELDING, EXCEPT AT JOISTS MARKED 'STRUT' WHERE THE FIELD WELDING SHALL ALSO APPLY. USE (2) 1/2" DIAMETER A307 BOLTS FOR K-SERIES JOISTS AND (2) 3/4" DIAMETER A307 BOLTS FOR LH AND DLH-SERIES JOISTS (VERIFY BOLT SIZE/SPACING WITH JOIST SUPPLIER).
BOLTING REQUIREMENT MAY BE OMITTED FOR JOISTS LESS THAN 40'-0" IN LENGTH WHERE WIDE FLANGE BEAMS
FRAME INTO STEEL COLUMNS IN AT LEAST TWO DIRECTIONS.
SUBMIT SHOP DRAWINGS AND DESIGN CALCULATIONS TO THE ARCHITECT FOR REVIEW PRIOR TO FABRICATION.
SUBMITTALS SHALL INDICATE ALL CHORD AND WEB MEMBER SIZES AND SHOW ALL END CONNECTIONS. DESIGN CALCULATIONS SHALL BEAR THE STAMP AND SIGNATURE OF A REGISTERED PROFESSIONAL ENGINEER
REGISTERED STRUCTURAL ENGINEER.
COLD-FORMED STEEL FRAMING SHALL COMPLY WITH ASTM A653, TYPE SS, GRADE 33, UNLESS NOTED OTHERWISE.
FOR SIZES SHOWN ON DRAWINGS, REFER TO "STEEL STUD MANUFACTURER'S ASSOCIATION" STANDARD SPECIFICATION. ALL COLD-FORMED FRAMING SHALL ALSO CONFORM TO THE A.I.S.I. "SPECIFICATION FOR THE DESIGN OF COLD-FORMED STEEL STRUCTURAL MEMBERS." ALL STUDS, TRACKS, AND JOISTS SHALL BE GALVANIZED PER ASTM A924, G60. FASTENINGS NOT SHOWN ON DRAWINGS SHALL BE AS RECOMMENDED BY THE
MANUFACTURER.
LIGHT GAGE METAL FRAMING CLIPS AND CONNECTORS: NOTATIONS CALLED OUT BY LETTERS AND NUMBERS REFER TO PRODUCTS MANUFACTURED BY "THE STEEL NETWORK" AS SPECIFIED IN THEIR LATEST CATALOG.
ALTERNATE CONNECTORS MANUFACTURED AND TESTED IN ACCORDANCE WITH ICC-AC261, THAT MEET OR EXCEED THE SPECIFIED CONNECTORS' CAPACITY MAY BE USED SUBJECT TO REVIEW AND APPROVAL BY THE STRUCTURAL ENGINEER. MILL CERTIFICATIONS, SUBSTANTIATING TEST DATA, AND A LIST STATING THE ITEM-FOR- ITEM SUBSTITUTION AND CAPACITY COMPARISONS MUST BE SUBMITTED TO THE STRUCTURAL ENGINEER FOR ANY PROPOSED SUBSTITUTES. INSTALL NUMBER AND SIZE OF FASTENERS AS SPECIFIED BY MANUFACTURER.
CONNECTORS SHALL BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER'S INSTRUCTIONS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL ENGINEERING COSTS RELATING TO REVIEW AND/OR RE-DESIGN
TO ACCOMMODATE PROPOSED SUBSTITUTIONS.
SNOW DESIGN DATE:
GROUND SNOW LOAD Pg = 20 PSF (ASCE 7 FIGURE 7-1) P f = 20 PSF (ASCE 7 SECTION 7.3); 25 PSF MIN UNIFORM SNOWFLAT-ROOF SNOW LOAD
LOAD IN ACCORDANCE WITH SEAW WHITE PAPER 8-2010
Ce = 1.0 (ASCE 7 TABLE 7-2)SNOW EXPOSURE FACTOR I s = 1.0 (ASCE 7 TABLE 7.3.3)SNOW LOAD IMPORTANCE FACTOR C t = 1.0 (ASCE 7 TABLE 7-3)THERMAL FACTOR
PhaseARCHITECT/ENGINEER OF RECORD
321 4 5 6 7 8 9 10
REID MIDDLETON
728 134th Street SW
(425) 741 - 3800
A/E:
1414 Fourth Ave Seattle, WA, 98105
(360) 223 - 8994
RAY SPEES, PRESIDENT
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
100% CONSTRUCTION
DOCUMENTS
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Structural Engineer:
Lynnwood, WA, 98204
NOMAN SHAFI, PROJECT DESIGNER
663-310
Revisions: Date:
SPEES DESIGN BUILD
SCI/D ADDITION & RENOVATION
VA Puget Sound Health Care System - Seattle WA
Suite 200
12/02/2024 NS PJC
37358
S
F
E T
TA
IN
O
GT
N
O WASH
IGE
EEN
O
R
LNA
P
FOR
SSE
I N
GNELARU
TC
UR
TS
E R
NI
E
FULLY SPRINKLERED
GENERAL STRUCTURAL NOTES
SF-001
PhaseARCHITECT/ENGINEER OF RECORD
321 4 5 6 7 8 9 10
REID MIDDLETON
728 134th Street SW
(425) 741 - 3800
A/E:
1414 Fourth Ave Seattle, WA, 98105
(360) 223 - 8994
RAY SPEES, PRESIDENT
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
100% CONSTRUCTION
DOCUMENTS
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Structural Engineer:
Lynnwood, WA, 98204
NOMAN SHAFI, PROJECT DESIGNER
663-310
Revisions: Date:
SPEES DESIGN BUILD
SCI/D ADDITION & RENOVATION
VA Puget Sound Health Care System - Seattle WA
Suite 200
12/02/2024 NS PJC
37358
S
F
E T
TA
IN
O
GT
N
O WASH
IGE
EEN
O
R
I N
GNELARU
TC
UR
TS
E R
NI
E
FULLY SPRINKLERED
SPECIAL INSPECTION SCHEDULE
& ABBREVIATIONS
SF-002
SPECIAL INSPECTION SCHEDULE
STRUCTURAL STEEL SPECIAL INSPECTION
INSPECTION TASKS PRIOR TO WELDING
INSPECTION TASKS PRIOR TO WELDING QAQC
WELDING PROCEDURE SPECIFICATIONS (WPSS) AVAILABLE PP
MANUFACTURER CERTIFICATIONS FOR WELDING CONSUMABLES AVAILABLE PP
MATERIAL IDENTIFICATION (TYPE/GRADE) OO
WELDER IDENTIFICATION SYSTEM 1 OO
FIT-UP OF GROOVE WELDS (INCLUDING JOINT GEOMETRY), JOINT PREPARATION,
DIMENSIONS (ALIGNMENT, ROOT OPENING, ROOT FACE, BEVEL), CLEANLINESS
(CONDITION OF STEEL SURFACES), TACKING (TACK WELD QUALITY AND LOCATION),
BACKING TYPE AND FIT (IF APPLICABLE)
OO
CONFIGURATION AND FINISH OF ACCESS HOLES OO
FIT-UP OF FILLET WELDS, DIMENSIONS (ALIGNMENT, GAPS AT ROOT), CLEANLINESS
(CONDITION OF STEEL SURFACES), TACKING (TACK WELD QUALITY AND LOCATION) OO
CHECK WELDING EQUIPMENT -O
1 THE FABRICATOR OR ERECTOR, AS APPLICABLE, SHALL MAINTAIN A SYSTEM BY WHICH A WELDER WHO HAS WELDED A JOINT OR MEMBER CAN BE
IDENTIFIED. STAMPS, IF USED, SHALL BE THE LOW-STRESS TYPE.
2 WHEN WELDING OF DOUBLER PLATES, CONTINUITY PLATES OR STIFFENERS HAS BEEN PERFORMED IN THE k-AREA, VISUALLY INSPECT THE WEB k-AREA
FOR CRACKS WITHIN 3 INCHES OF THE WELD.
INSPECTION TASKS DURING WELDING
INSPECTION TASKS DURING WELDING QAQC
USE OF QUALIFIED WELDERS OO
CONTROL AND HANDLING OF WELDING CONSUMABLES, PACKAGING, EXPOSURE
CONTROL OO
NO WELDING OVER CRACKED TACK WELDS OO
ENVIRONMENTAL CONDITIONS, WIND SPEED WITHIN LIMITS, PRECIPITATION
AND TEMPERATURE OO
WPS FOLLOWED, SETTINGS ON WELDING EQUIPMENT, TRAVEL SPEED, SELECTED
WELDING MATERIALS, SHIELDING GAS TYPE/FLOW RATE, PREHEAT APPLIED, INTERPASS
TEMPERATURE MAINTAINED (MIN / MAX), PROPER POSITION (F, V, H, OH)
OO
WELDING TECHNIQUES, INTERPASS AND FINAL CLEANING, EACH PASS WITHIN PROFILE
LIMITATIONS, EACH PASS MEETS QUALITY REQUIREMENTS
OO
INSPECTION TASKS PRIOR TO BOLTING
INSPECTION TASKS PRIOR TO BOLTING QAQC
MANUFACTURER’S CERTIFICATIONS AVAILABLE FOR FASTENER MATERIALS PO
FASTENERS MARKED IN ACCORDANCE WITH ASTM REQUIREMENTS OO
PROPER FASTENERS SELECTED FOR THE JOINT DETAIL (GRADE, TYPE, BOLT
LENGTH IF THREADS ARE TO BE EXCLUDED FROM SHEAR PLANE)
OO
PROPER BOLTING PROCEDURE SELECTED FOR JOINT DETAIL OO
CONNECTING ELEMENTS, INCLUDING THE APPROPRIATE FAYING SURFACE CONDITION AND HOLE
PREPARATION, IF SPECIFIED, MEET APPLICABLE REQUIREMENTS
OO
PRE-INSTALLATION VERIFICATION TESTING BY INSTALLATION PERSONNEL OBSERVED AND
DOCUMENTED FOR FASTENER ASSEMBLIES AND METHODS USED
OP
PROPER STORAGE PROVIDED FOR BOLTS, NUTS, WASHERS AND OTHER FASTENER
COMPONENTS OO
INSPECTION TASKS DURING BOLTING
INSPECTION TASKS DURING BOLTING QAQC
FASTENER ASSEMBLIES, OF SUITABLE CONDITION, PLACED IN ALL HOLES
AND WASHERS (IF REQUIRED) ARE POSITIONED AS REQUIRED
OO
JOINT BROUGHT TO THE SNUG-TIGHT CONDITION PRIOR TO THE PRETENSIONING
OPERATION
OO
FASTENER COMPONENT NOT TURNED BY THE WRENCH PREVENTED FROM ROTATING OO
FASTENERS ARE PRETENSIONED IN ACCORDANCE WITH THE RCSC SPECIFICATION,
PROGRESSING SYSTEMATICALLY FROM THE MOST RIGID POINT TOWARD THE FREE
EDGES
OO
SPECIAL INSPECTION OF CONCRETE CONSTRUCTION
VERIFICATION AND INSPECTION REFERENCED
STANDARD 1CONTINUOUS PERIODIC IBC
REFERENCE
1. INSPECT ANCHORS POST-INSTALLED
IN HARDENED CONCRETE MEMBERS 2
ACI 318: 17.8.2.4 -
INSPECTION TASKS AFTER BOLTING
INSPECTION TASKS AFTER BOLTING QAQC
DOCUMENT ACCEPTANCE OR REJECTION OF BOLTED CONNECTIONS PP
REFERENCED
STANDARD
IBC
REFERENCE
1705.2.1AISC 360 CH. N
REFERENCED
STANDARD
IBC
REFERENCE
1705.2.1AISC 360 CH. N
REFERENCED
STANDARD
IBC
REFERENCE
1705.2.1AISC 360 CH. N
REFERENCED
STANDARD
IBC
REFERENCE
1705.2.1AISC 360 CH. N
& AWS D1.1
REFERENCED
STANDARD
IBC
REFERENCE
1705.2.1AISC 360 CH. N
& AWS D1.1
BOLTING
SPECIAL INSPECTION FOR STRUCTURAL STEEL SHALL BE ACCORDANCE WITH AISC 341, AISC 360, AND THE FOLLOWING INFORMATION.
WELDING
TASK - INDICATES WHETHER TO OBSERVE OR PERFORM (OR BOTH) THE INSPECTION TASK.
DOC - THE INSPECTOR SHALL PREPARE REPORTS INDICATING THAT THE WORK HAS BEEN PERFORMED IN ACCORDANCE WITH THE
CONTRACT DOCUMENTS.
O - OBSERVE THESE FUNCTIONS ON A RANDOM, DAILY BASIS, OPERATIONS NEED NOT BE DELAYED PENDING INSPECTIONS.
FREQUENCY OF OBSERVATIONS SHALL BE ADEQUATE TO CONFIRM THAT THE WORK HAS BEEN PERFORMED IN ACCORDANCE
WITH THE APPLICABLE DOCUMENTS.
P - PERFORM, FOR EACH JOINT OR MEMBER PRIOR TO THE FINAL ACCEPTANCE OF THE ITEM.
QC - TASKS INDICATED AS "QC" SHALL BE EXECUTED BY THE FABRICATOR AND ERECTOR IN ACCORDANCE WITH AISC 360 CHAPTER N QA - TASKS INDICATED AS "QA" SHALL BE EXECUTED BY THE SPECIAL INSPECTOR IN ACCORDANCE WITH AISC 360 CHAPTER N.
NONSTRUCTURAL COMPONENTS
1. DESIGNATED SEISMIC SYSTEM
VERIFICATION AND INSPECTION TASK
REFERENCED
STANDARDCONTINUOUS PERIODIC IBC
REFERENCE
a. VERIFY THE LABEL, ANCHORAGE AND MOUNTING
CONFORMS TO THE CERTIFICATE OF COMPLIANCE
1705.12.6
SEISMIC REQUIREMENTS FOR NONSTRUCTURAL COMPONENTS
2. ARCHITECTURAL COMPONENTS
a. ERECTION AND FASTENING OF EXTERIOR CLADDING
1,2
b. ERECTION AND…