7a Electronic Drawings_673-21-151.pdf
PDF 24 MB Posted
- Solicitation number
- 36C24824R0011
About this file
This document provides details for a federal contract opportunity to replace an air handling unit. The solicitation number is 36C24824R0011 for the NRM project 673-21-151 to replace Air Handling Unit ED-203. The pre-solicitation opportunity is being issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 8. Interested parties should monitor the Federal Business Opportunities website for additional details on response dates and award timing as the project involves replacing critical air handling infrastructure for a Veterans facility.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 5 SOW Attachment Asbestos Report - JAHVA ED-203.pdf | ||
| 5 SOW 673-21-151_revised.pdf | ||
| 36C24824R0011.docx | DOCX document | |
| 5 SOW Attachment - Project Design Narrative.pdf | ||
| 7 Electronic Specifications 673-21-151.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Architecture, Engineering, and, Sustainable DesignAESUS 1050 E. Southern Ave, Suite #D, Tempe, Arizona 85282, (480) 454-2861 design group
KEY PLAN NTS NORTH
BLDG 1
C U s e rs
\E m a n te
\D o c u m e n ts
\L o c a l R e v it \2
\6
-2
-1
R e p la c e A ir H a n d lin g U n it
E D
A
R C
H
N E
W c fo n ta in e a e s u s d e s ig n .c o m
.r v t
/1
/2
:0
:5
A
M
G001
COVER SHEET
JAMES A. HALEY VA HOSPITAL
673-21-151
BLDG #1
APRIL 17, 2023 AESUS AESUS
REPLACE AIR HANDLING UNIT
ED-203
100% Construction Documents
DX
A3-301
X
XX
X
DETAIL FLAG NUMBER
DOOR NUMBER
AE-501
BUILDING SECTION CUT
OTHER SECTION CUT
SHEET WHERE APPEARS (TYPICAL)
AE-301
AA
SHEET WHERE APPEARS
ELEVATION NUMBER
SHEET WHERE APPEARS
x x x x
EXISTING COLUMN CENTER LINEA
X
WINDOW TAG
AE-301
AA
AE-301
AA
ELEVATION NUMBER
AE-710
4 2
DASHED LINE
AROUND
AREA DETAILED
PLAN OR DETAIL NUMBERX
NOTE: IN ADDITION TO THE FOLLOWING INFECTION CONTROL MEASURES OF ICRA
CLASS & PERMIT LEVEL IV, THE CONTRACTOR SHALL REVIEW THE VA SAFETY-QUALITY
CONTROL-INFECTION CONTROL DOCUMENTS IN THE SPECIFICATIONS. THE AE WILL
PROVIDE A FORM FOR THE CONTRACTOR TO FILL OUT
DURING CONSTRUCTION:
A. ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING DONE TO PREVENT
CONTAMINATION OF DUCT SYSTEM.
B. COMPLETE ALL CRITICAL BARRIERS I.E. SHEET ROCK, PLYWOOD, PLASTIC,
TO SEAL AREA FROM NON-WORK AREA OR IMPLEMENT CONTROL CUBE
METHOD (CART WITH PLASTIC COVERING AND SEALED CONNECTION TO
WORK SITE WITH HEPA VACUUM FOR VACUUMING PRIOR TO EXIT) BEFORE
CONSTRUCTION BEGINS.
C. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE UTILIZING HEPA
EQUIPPED AIR FILTRATION UNITS. PROVIDE NEGATIVE AIR PRESSURE
MONITOR.
D. SEAL HOLES, PIPES, CONDUITS, AND PUNCTURES APPROPRIATELY.
E. CONSTRUCT ANTEROOM AND REQUIRE ALL PERSONNEL TO PASS THROUGH
THIS ROOM SO THEY CAN BE VACUUMED USING A HEPA VACUUM CLEANER
BEFORE LEAVING WORK SITE OR THEY CAN WEAR CLOTH OR PAPER
COVERALLS THAT ARE REMOVED EACH TIME THEY LEAVE THE WORK SITE.
F. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETED PROJECT
IS INSPECTED BY A SAFETY OFFICER AND INFECTION CONTROL
COORDINATOR AND THOROUGHLY CLEANED BY THE ENVIRONMENTAL
MANAGEMENT SERVICES.
UPON COMPLETION OF PROJECT:
A. REMOVE BARRIER MATERIAL CAREFULLY TO MINIMIZE SPREADING OF DIRT
AND DEBRIS ASSOCIATED WITH CONSTRUCTION.
B. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY
COVERED CONTAINERS.
C. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING UNLESS
SOLID LID.
D. VACUUM WORK AREA WITH HEPA FILTERED VACUUMS.
E. WET MOP AREA WITH DISINFECTANT.
F. REMOVE ISOLATION OF HVAC SYSTEM IN AREAS WHERE WORK IS BEING
PERFORMED.
Approved: Associate Director
Approved: Chief Facilities Management
Approved: Manager / Engineer
Approved: Director
Approved: Union representative
Approved: Safety Officer
EQ-X
CPT1
W-X
E
EA EACH
E EAST
EWC ELECTRIC WATER COOLER
ELEC ELECTRIC (AL)
EL ELEVATION
ELEV ELEVATOR
EMER EMERGENCY
ENGR ENGINEER
EQ EQUAL
EQUIP EQUIPMENT
EXIST EXISTING
ETR EXISTING TO REMAIN
EXP EXPANSION
EXP BT EXPANSION BOLT
EJ EXPANSION JOINT
EXP EXPOSED
EXT EXTERIOR
EIFS EXTERIOR INSULATION AND
FINISH SYSTEM
F
FWC FABRIC WALL COVERING
FT FEET, FOOT
FGL FIBERGLASS
FIN FINISH
FIN GR FINISH GRADE
FDV FIRE DEPARTMENT VALVE
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER
CABINET
FHC FIRE HOSE CABINET
FP FIREPROOF
FIXT FIXTURE
FLASH FLASHING
FLEX FLEXIBLE
FLR FLOOR
FD FLOOR DRAIN
FLUOR FLUORESCENT
FTG FOOTING
FDTN FOUNDATION
FRMG FRAMING
FURN FURNACE, FURNITURE
G
GA GAGE
GALV GALVANIZED
GC GENERAL CONTRACTOR
GEN GENERATOR
GL GLASS
GL BLK GLASS BLOCK
GB GRAB BAR
GR GRADE
GRAN GRANITE
GFCI GROUND FAULT CIRCUIT INTERRUPTER
GUT GUTTER
GYP BD GYPSUM BOARD
H
HNDRL HANDRAIL
HDW HARDWARE
HDWD HARDWOOD
HD HEAD
HVAC HEATING, VENTILATING, AIR CONDITIONING
HT HEIGHT
HPT HIGH POINT
HC HOLLOW CORE
HM HOLLOW METAL
HORIZ HORIZONTAL
HB HOSE BIBB
HOSP HOSPITAL
HR HOUR
I
IN INCH
INFO INFORMATION
ID INSIDE DIAMETER
INSUL INSULATED,INSULATION
INT INTERIOR
J
JAN JANITOR
JT JOINT
K
KPL KICKPLATE
KIT KITCHEN
KB KNEE BRACE
L
LAB LABORATORY
LAM LAMINATE
LC LAUNDRY CHUTE
LV LAVATORY
LT LIGHT
LD LINEAR DIFFUSER
L CL LINEN CLOSET
LL LIVE LOAD
LLV LONG LEG VERTICAL
LPT LOW POINT
M
MACH MACHINE
MH MANHOLE
MFD MANUFACTURED
MFR MANUFACTURER
MRB MARBLE BASE
MRF MARBLE FLOOR
MKR BD MARKER BOARD
MO MASONRY OPENING
MATL MATERIAL
MAX MAXIMUM
MECH MECHANICAL
MED MEDICAL
MC MEDICINE CABINET
MEMB MEMBRANE
MTL METAL
MIN MINIMUM, MINUTE
MISC MISCELLANEOUS
MOD MODIFIED
MLDG MOLDING
N
NAT FIN NATURAL FINISH
NOM NOMINAL
N NORTH
NA NOT APPLICABLE
NIC NOT IN CONTRACT
NTS NOT TO SCALE
NO NUMBER
O
OFF OFFICE
OC ON CENTER
OPNG OPENING
OPP OPPOSITE
OPH OPPOSITE HAND
ORCH ORCHESTRA
ORN ORNAMENTAL
OD OUTSIDE DIAMETER
OH OVERHANG, OVERHEAD
OF/CI OWNER FURNISHED/
CONTRACTOR INSTALLED
O OXYGEN
P
P PAINT
PR PAIR
PNL PANEL
PTD PAPER TOWEL DISPENSER
PTN PARTITION
PERF PERFORATED
PC PIECE
PLAM PLASTIC LAMINATE
PLAS PLASTIC, PLASTER
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PCC PRECAST CONCRETE
PREFAB PREFABRICATE
PREFIN PREFINISH
PROD PRODUCTION
Q
QTY QUANTITY
QT QUARRY TILE
A
AFF ABOVE FINISHED FLOOR
ACST ACOUSTIC (AL)
ACT ACOUSTICAL CEILING TILE
APC ACOUSTICAL PANEL CEILING
AWP ACOUSTICAL WALL PANEL
AWT ACOUSTICAL WALL
ADJ ADJUSTABLE
A/C AIR CONDITIONING
AHU AIR HANDLING UNIT
ALT ALTERNATE
ALUM ALUMINUM
AB ANCHOR BOLT
AL ANGLE
APPROX APPROXIMATE
ARCH ARCHITECT (URAL)
ASPH ASPHALT
ASSY ASSEMBLY
AUTO AUTOMATIC
AWN AWNING
B
BALC BALCONY
BSMT BASEMENT
BM BEAM, BENCHMARK
BR BEDROOM
BLKG BLOCKING
BD BOARD
BOT BOTTOM
BRKT BRACKET
BRK BRICK
B CL BROOM CLOSET
BLDG BUILDING
BLT IN BUILT-IN
BUR BUILT-UP ROOFING
C
CAB CABINET
CPT CARPET
CSMT CASEMENT
CI CAST IRON
CB CATCH BASIN
CLG CEILING
CEM CEMENT
CL CENTER LINE
CER CERAMIC
CT CERAMIC TILE
CO CLEANOUT, CASED OPENING
CLR CLEAR, COLOR
CLO CLOSET
COL COLUMN
CMPST COMPOSITE
CONC CONCRETE
CMU CONCRETE MASONRY UNIT
CONSTR CONSTRUCTION
CONT CONTINUOUS
CONTR CONTRACTOR
COTR CONTRACTING OFFICER
CJ CONTROL JOINT
COP COPING
CU COPPER
CG CORNER GUARD
CORR CORRIDOR
CNTR COUNTER
CSK COUNTER SUNK
D
DMPF DAMPPROOFING
DL DEAD LOAD
DEMO DEMOLITION
DET DETAIL
DIA DIAMETER
DIFF DIFFUSER
DIM DIMENSION
DR DOOR, DRAIN
DH DOUBLE HUNG
DN DOWN
DS DOWNSPOUT
DWR DRAWER
DWG DRAWING
DF DRINKING FOUNTAIN
DUPL DUPLICATE
R
R RADIUS, RISER
RWD REDWOOD
REF REFERENCE, REFRIGERATOR
REINF REINFORCE
REQD REQUIRED
RB RESILIENT BASE
RF RESILIENT FLOORING
RA RETURN AIR
REV REVISION
RD ROOF DRAIN
RM ROOM
RO ROUGH OPENING
RS ROUGH SAWN
S
SCHED SCHEDULE
SECT SECTION
SHTHG SHEATHING
SHT SHEET
SHV SHELVING
SIM SIMILAR
S SOUTH
SP FIN SPECIAL FINISH
SPEC SPECIFICATION
SQ SQUARE
SF SQUARE FEET
SST STAINLESS STEEL
STD STANDARD
STL STEEL
STL JST STEEL JOIST
STOR STORAGE
STRUCT STRUCTURAL
S4S SURFACED FOUR SIDES
SUSP SUSPEND
SW SWITCH
SYMM SYMMETRICAL
T
TK BD TACKBOARD
TEL TELEPHONE
TV TELEVISION
TMPD TEMPERED
TEMP TEMPORARY
TER TERRAZZO
THK THICKNESS
TPD TOILET PAPER DISPENSER
T&G TONGUE AND GROOVE
TOS TOP OF SLAB, STEEL
T TREAD
TYP TYPICAL
U
UC UNDERCUT
UNFIN UNFINISH
UNO UNLESS NOTED OTHERWISE
V
VAC VACUUM
VR VAPOR RETARDER
VNR VENEER
VP VENEER PLASTER
VIF VERIFY IN FIELD
VERT VERTICAL
VEST VESTIBULE
VCT VINYL COMPOSITION TILE
VWC VINYL WALL COVERING
W
W CAB WALL CABINETS
WC WALL COVERING, WATER CLOSET
WP WATERPROOFING, WEATHER
PROOF, WORKING POINT
WT WEIGHT
WWF WELDED WIRE FABRIC
W WEST
WF WIDE FLANGE
WDW WINDOW
W/ WITH
W/O WITHOUT
WD WOOD
WDP WOOD PANELING
13000 Bruce B Downs Blvd
Department of Veterans Affairs
KEYED NOTE
WALL TYPE
X
X WINDOW TREATMENT TYPE
EQUIPMENT
INTERIOR FINISH TYPE
FURNITURE, FIXTURE, EQUIPMENT
CONTRACT LIMIT LINE
COLUMN CENTER LINE
NEW WALL
DEMOLITION
EXISTING WALL
NORTH
Tampa FL VA Health Care System
APPROVED FOR CONSTRUCTION
Project No: 673-21-151
Tampa, FL, 33612
DESIGN TEAM
ABBREVIATIONS OWNER
CODE REFERENCES
BUILDING CODE:
2020 FBC - INTERNATIONAL BUILDING CODE
2020 FBC - EXISTING BUILDING CODE
2020 FBC - INTERNATIONAL ENERGY CONSERVATION CODE
2020 FFPC - NFPA
ACCESSIBILITY CODE & GUIDELINES:
ABAAS & BFDG
MECHANICAL CODE:
2020 FBC - INTERNATIONAL MECHANICAL CODE
PLUMBING CODE:
2020 FBC - INTERNATIONAL PLUMBING CODE
ELECTRICAL CODE:
2020 FBC - INTERNATIONAL ELECTRICAL CODE
PROJECT DESCRIPTION
FACILITY MAP
SYMBOL LEGEND
BUILDING INFORMATION
DESCRIPTION OF BUILDING: BUILDING 1 GROUND FLOOR AND ROOF.
OCCUPANCY: INSTITUTIONAL 1.2 - AMBULATORY CARE
CONSTRUCTION TYPE: TYPE II 1 HR FULLY SPRINKLERED.
ALLOWABLE AREAPER FLOOR: 20,400 (TABLE 5-B AND SECTION 505)
ACTUAL AREA LEVEL 1: 12,012 GSF
COMPONENT RATINGS:
BEARING WALLS - EXTERIOR 1 HR
BEARING WALLS - INTERIOR 1 HR
NON BEARING WALLS - EXTERIOR 1 HR
STRUCTURAL FRAME 1 HR
SHAFT ENCLOSURE 1 HR
FLOORS & FLR/CLGS 1 HR*
ROOFS & ROOF/CLGS 1 HR
OCCUPANCY SEPARATION
STORAGE ROOMS ABOVE 100 SF 1 HR
ELECTRICAL VAULT/ROOMS 3 HR
EXISTING BUILDING 2 HR
* 3 HR FLOOR SLAB & ELEC ROOMS
GENERAL NOTES
VICINITY MAP
INFECTION CONTROL MEASURES
THIS PROJECT SCOPE SHALL INCLUDE BUT NOT BE LIMITED TO REPLACING AIR HANDLER
UNIT ED-203 ON THE ROOF OF BUILDING ONE AT JAMES A. HALEY VA HOSPITAL.
THIS WORK SHALL INCLUDE BUT NOT BE LIMITED TO ARCHITECTURAL, MECHANICAL,
PLUMBING, & ELECTRICAL.
DESCRIPTIONSYMBOL
Replace Air Handling Unit ED-203 673-21-151
James A Haley VA Hospital, Tampa, FL Department of Veterans Affairs
Architect
MPE Engineers
1050 E. Southern Ave. Suite 5, Tempe, Arizona 85282
AESUS Design Group
1050 E. Southern Ave. Suite 5, Tempe, Arizona 85282
AESUS Design Group
Orlando Gonzales (ogonzales@aesusdesign.com)
480-454-2861
David Combs (dcombs@aesusdesign.com)
480-454-2861
NORTH
PROJECT AREA
PROJECT SITE
NFPA
NFPA 101 LIFE SAFETY CODE
NFPA NATIONAL FIRE CODES
NFPA 900 (OSHA)
James A Haley VA Hospital, Tampa, FL
A. ANY CHANGES MUST BE APPROVED BY COR BEFORE DOING ANY
ADDITIONAL WORK. WORK SCHEDULE TO BE PERFORMED DURING
REGULAR DAY SHIFT HOURS (8AM-4:30PM) ANY WORK OUTSIDE OF
REGULAR SCHEDULE REQUIRES APPROVAL FROM COR.
B. COORDINATE STAGING AREA WITH COR, AND FIND INTERIOR
COVERED STORAGE ON SITE FOR MATERIALS THAT MUST BE
PROTECTED FROM ELEMENTS - COORDINATE WITH COR.
C. PERFORM WORK IN ACCORDANCE WITH VHA DIRECTIVE 2004-012
SAFETY AND HEALTH DURING CONSTRUCTION ACTIVITIES AND VHA
DIRECTIVE 7701 OCCUPATIONAL SAFETY AND HEALTH (OSH) .
D. WORK PERFORMED FOR THIS PROJECT MAY INTERRUPT SERVICE TO
ADJACENT AREAS AT TIMES BUT WILL NOT INTERRUPT OVERALL
FACILITY OPERATION. SEE ELECTRICAL FOR POWER INTERRUPTION
AND OUTAGE REQUIREMENTS.
E. CONTRACTOR TO VERIFY ALL DETAILS AGAINST EXISTING
CONDITIONS PRIOR TO PURCHASE OF EQUIPMENT AND PRIOR TO
CONSTRUCTION. CONTRACTOR IS RESPONSIBLE FOR BRINGING ANY
DISCREPANCIES IN PLANS AND EXISTING SITE CONDITIONS TO
IMMEDIATE ATTENTION OF CONTRACTING OFFICER
REPRESENTATIVE.
F. CONTRACTOR SHALL PERFORM ALL WORK AND PROVIDE ALL
MATERIALS IN ACCORDANCE WITH VA MASTER CONSTRUCTION
SPECIFICATIONS, WHICH CAN BE FOUND AT
HTTP://WWW.CFM.VA.GOV/TIL/. WHERE DISCREPANCIES ARE FOUND
THE MORE STRINGENT SHALL APPLY.
G. NOT ALL KEYNOTES ARE ON ALL SHEETS.
ISSUED SHEETS
Sheet Number Sheet Name
GENERAL
G001 COVER SHEET
ARCHITECTURAL
AS100 PHASING PLAN
A300 DEMO ROOF PLAN
A301 ROOF PLAN
AE302 REFLECTED CEILING PLAN - LEVEL 01
AE500 DETAILS
AE955 FIRE RATED ASSEMBLIES
STRUCTURAL
S000 GENERAL STRUCTURAL NOTES & ABBREVIATIONS LIST
S001 TYPICAL INSPECTION SCHEDULES
S100 EXISTING ROOF FRAMING / PLATFORM FRAMING PLANS
MECHANICAL
M000 MECHANICAL SYMBOLS, ABBREVIATIONS, NOTES, AND SCHEDULES
MD100 GROUND FLOOR DEMOLITION PLAN
MD101 FIRST FLOOR DEMOLITION PLAN
MD102 ROOF DEMOLITION PLAN
MH100 GROUND FLOOR NEW WORK PLAN
MH101 FIRST FLOOR NEW WORK PLAN
MH102 ROOF NEW WORK PLAN
M500 MECHANICAL DETAILS
M501 MECHANICAL DETAILS
M600 MECHANICAL SCHEDULES
M800 MECHANICAL CONTROLS DIAGRAM
M801 MECHANICAL CONTROLS DIAGRAM
ELECTRICAL
E001 ELECTRICAL SYMBOLS, ABBREVIATIONS, NOTES, AND SCHEDULES
ED100 ELECTRICAL DEMOLITION PLAN - GROUND FLOOR
ED101 ELECTRICAL DEMOLITION PLAN - FIRST FLOOR
ED102 ELECTRICAL DEMOLITION PLAN - ROOF
ED600 ELECTRICAL DEMOLITION - ONE-LINE DIAGRAM
EP100 ELECTRICAL POWER PLAN - GROUND FLOOR
EP101 ELECTRICAL POWER PLAN - FIRST FLOOR
EP102 ELECTRICAL POWER PLAN - ROOF
E500 ELECTRICAL DETAILS
EP600 ELECTRICAL ONE-LINE DIAGRAM
EP601 ELECTRICAL PANELBOARD SCHEDULES
Revisions: Date:
STAMP
OR
LA
NDO
ER I K GONZALES
PRO F E S S I ONA L ENG
I N
EE
R
ELEVATORNO.
0.1 0.2 0.3 0.4 0.5 0.7
E.3
D.1
B.6
EXISTING
STAIRS
EXISTING BUILDINGEXISTING ROOF
AREA OF WORK
EXISTING ROOF
PARAPET
EXISTING ROOF
PARAPET
EXISTING ROOF BELOW
EXISTING EQUIPMENT
ROOF ACCESS
A. ANY CHANGES MUST BE APPROVED BY COR BEFORE DOING ANY
ADDITIONAL WORK. WORK SCHEDULE TO BE PERFORMED DURING
REGULAR DAY SHIFT HOURS (8AM-4:30PM) ANY WORK OUTSIDE OF
REGULAR SCHEDULE REQUIRES APPROVAL FROM COR.
B. COORDINATE STAGING AREA WITH COR, AND FIND INTERIOR
COVERED STORAGE ON SITE FOR MATERIALS THAT MUST BE
PROTECTED FROM ELEMENTS - COORDINATE WITH COR.
C. PERFORM WORK IN ACCORDANCE WITH VHA DIRECTIVE 2004-012
SAFETY AND HEALTH DURING CONSTRUCTION ACTIVITIES AND VHA
DIRECTIVE 7701 OCCUPATIONAL SAFETY AND HEALTH (OSH) .
D. WORK PERFORMED FOR THIS PROJECT MAY INTERRUPT SERVICE
TO ADJACENT AREAS AT TIMES BUT WILL NOT INTERRUPT OVERALL
FACILITY OPERATION. SEE ELECTRICAL FOR POWER INTERRUPTION
AND OUTAGE REQUIREMENTS.
E. CONTRACTOR TO VERIFY ALL DETAILS AGAINST EXISTING
CONDITIONS PRIOR TO PURCHASE OF EQUIPMENT AND PRIOR TO
CONSTRUCTION. CONTRACTOR IS RESPONSIBLE FOR BRINGING
ANY DISCREPANCIES IN PLANS AND EXISTING SITE CONDITIONS TO
IMMEDIATE ATTENTION OF CONTRACTING OFFICER
REPRESENTATIVE.
F. CONTRACTOR SHALL PERFORM ALL WORK AND PROVIDE ALL
MATERIALS IN ACCORDANCE WITH VA MASTER CONSTRUCTION
SPECIFICATIONS, WHICH CAN BE FOUND AT
HTTP://WWW.CFM.VA.GOV/TIL/. WHERE DISCREPANCIES ARE FOUND
THE MORE STRINGENT SHALL APPLY.
GENERAL NOTES
A. THE CONTRACTORS SHALL COORDINATE EQUIPMENT AND
MATERIAL TRAFFIC AND STORAGE WITH COR.
B. ALL UTILITY WORK SHALL BE COORDINATED WITH MECHANICAL,
PLUMBING ELECTRICAL, AND FIRE PROTECTION.
C. ALL ASPECTS OF CONTRACTOR STAGING AND CONSTRUCTION
PHASING SHALL BE APPROVED BY COR.
D. ALL HOSPITAL ACCESS POINTS, AND ALL BUILDING EXITS, MUST
REMAIN ACCESSIBLE, CLEAR AND UNOBSTRUCTED THROUGHOUT
ALL PHASES OF DEMOLITION AND CONSTRUCTION. SHORT-TERM
CLOSURE MAY BE ACCEPTABLE AS COORDINATED WITH COR.
E. THE CONTRACTOR SHALL COORDINATE ALL ROOF TOP WORK AND
ROOF REPAIRS WITH THE COR.
GENERAL PHASING NOTES
A. THE CONTRACTOR SHALL USE THE FOLLOWING AS A GUIDE FOR ALL
ICRA BARRIERS. TEMPORARY INFECTION CONTROL BARRIERS
SHALL BE CONSTRUCTED AS FOLLOWS DEPENDING UPON LENGTH
OF NEED:
A. 1 DAY MAXIMUM - PLASTIC
B. 1 WEEK MAXIMUM - FLAME-RETARDANT PLASTIC
C. GREATER THAN 1 WEEK - SEE NOTE B AND C.
B. TEMPORARY CONSTRUCTION BARRIERS SHALL BE 3 5/8" METAL
STUDS @ 16" O.C. WITH 5/8" TYPE "X" GYP. BD. EACH SIDE. BARRIERS
ARE TO EXTEND TO THE BOTTOM OF EXISTING CEILINGS. PROVIDE
NON-DAMAGING SEAL AT INTERSECTION WITH CEILING. PROVIDE
PLASTIC SHEET BARRIER SEAL BETWEEN TOP OF WALL AND
STRUCTURE ABOVE. TAPE ALL SEAMS AND PENETRATION
OPENINGS TO PREVENT CONTAMINATION FROM PASSING OVER THE
TOP OR UNDERNEATH THE WALL FROM CONSTRUCTION AREAS.
C. TEMPORARY CONSTRUCTION BARRIERS AT ANTE ROOMSHALL BE 3
5/8" METAL STUDS @ 16" O.C. WITH 5/8" TYPE "X" GYP. BD. EACH
SIDE. BARRIERS ARE TO EXTEND TO THE BOTTOM OF EXISTING
ROOF DECK. TAPE ALL SEAMS AND PENETRATION OPENINGS TO
PREVENT CONTAMINATION FROM PASSING OVER THE TOP OR
UNDERNEATH THE WALL FROM CONSTRUCTION AREAS TO ACHIEVE
1 HR FIRE/SMOKE RATING.
D. TEMPORARY CONSTRUCTION BARRIERS SHALL BE EITHER TYPE I
OR TYPE II. TYPE I BARRIERS SHALL BE ANCHORED TO THE
FLOORING SURFACE (WHICH IS INTENDED TO BE REPLACED) WITH
POWER ACTUATED FASTENERS. TYPE II BARRIERS SHALL BE
ANCHORED TO THE FLOORING SURFACE (WHICH IS INTENDED TO
REMAIN) BY TAPING BOTTOM STUD TRACK TO FLOOR SURFACE OR
BY OTHER METHODS WHICH WILL NOT HARM FLOOR SURFACE.
E. TEMPORARY PARTITIONS SHALL NOT CONSTRICT WALKWAYS TO
LESS THAN 42" CLEAR. ANY EXITS CHANGED OR BLOCKED SIGNAGE
NEEDS TO BE POSTED FOR THE MODIFICATIONS.
F. PROVIDE TEMPORARY RATED DOOR AND FRAME IN CONSTRUCTION
BARRIER AT ENTRY POINTS TO THE CONSTRUCTION AREAS.
DOORS ARE TO REMAIN LOCKED AT ALL TIMES. CONSTRUCTION
CORES WILL BE PROVIDED BY THE VA.
G. CONTRACTOR TO INSTALL TEMPORARY UPRIGHT SPRINKLERS IN
THE WORK AREA TO MAINTAIN SPRINKLER PROTECTION.
TEMPORARY CONSTRUCTION
FLOOR PLAN LEGEND
INCLUDED IN SCOPE OF WORK
1 HR BARRIER
2 HR BARRIER
1 HR FIRE/SMOKE BARRIER
2 HR FIRE/SMOKE BARRIER
SMOKE BARRIER
GENERAL HVAC PHASING:
PRIOR TO REMOVING THE EXISTING AND/OR ORDERING
THE NEW AHU, THE CONTRACTOR SHALL TAKE THE
FOLLOWING STEPS TO ENSURE SHUT DOWN TIMES ARE
KEEP TO A MINIMUM.
CONDUCT A PRE-CON MEETING TO ENSURE THE
APPROPRIATE COORDINATION IS COMPLETE TO
SUCCESSFULLY REMOVE AND REPLACE THE EXISTING
AHU IN 5 DAYS OR LESS.
THE CONTRACTOR SHALL WALK THE SITE WITH VA
CONTRACTING & FACILITIES PERSONNEL AND ALL
ASSOCIATED SUBCONTRACTORS TO REVIEW THE
DESIGN INTENT.
THE CONTRACTOR SHALL PROVIDE A WORK/PHASING
PLAN TO IDENTIFY WHAT STEPS ARE NECESSARY TO
MINIMIZE THE SHUT DOWN TIME. NOTE: THE
CONTRACTOR WILL BE ALLOTTED 5 DAYS TO REMOVE
AND REINSTALL THE AHU. PROVIDE TEMPORARY
HEATING AND COOLING FOR THE EMERGENCY
DEPARTMENT PHARMACY AREA DURING CONSTRUCTION.
THE CONTRACTOR SHALL PRODUCE COORDINATION
DRAWING TO IDENTIFY THE INSTIUATION AND
PLACEMENT OF THE NEW EQUIPMENT AND ALL
ASSOCIATED UTILITY ROUTES. THIS SHALL INCLUDE BLJT
NOT BE LIMITED TO MECHANICAL, PLUMBING,
ELECTRICAL, CONTROLS, AND ASSOCIATED
ARCHITECTURAL AND STRUCTURAL COMPONENTS.
A "FINAL" PRE-CON MEETING SHALL BE CONDUCTED TO
ENSURE ALL TRADES ARE COORDINATED AND THE
PLANNED AHU REMOVAL AND INSTAUATION FITS WITHIN
THE PARAMETERS AS DESCRIBED ABOVE.
PHASE 1:
1. CONTRACTOR SHALL PROVIDE AN INVESTIGATIVE SITE VISIT TO DETERMINE THE EXTENT OF:
A. DEMOLITION OF THE SUPPLY AND RETURN AIR DUCTWORK LOCATED IN THE CORRIDOR OF
THE EMERGENCY DEPARTMENT LOCATED ON THE 1ST FLOOR (REFER TO SHEET MD101).
B. DEMOLITION OF THE CHILLED/HEATING HOT WATER SYSTEMS LOCATED ON THE GROUND
FLOOR. (REFER TO SHEET MD100)
2. PRIOR TO DEMOLITION OF THE DUCTWORK AND PUMPS THE CONTRACTOR SHALL:
A. MANUFACTURER THE NEW DUCTWORK. THIS WILL MINIMIZE THE DOWNTIME OF THE
EMERGENCY DEPARTMENT DURING INSTALLATION.
B. PROVIDE A PLAN TO COOL THE EXISTING SPACE UTILIZING TEMPORARY HVAC DURING THE
DEMOLITION AND INSTALLATION OF THE NEW DUCTWORK. THE CONTRACTOR WILL
BERESPONSIBLE TO PROVIDE A MEANS AND METHODS TO THIS PORTION OF THE PHASING
AND THIS SHALL BE INCLUDED IN THE INITIAL BID. THIS PLAN SHALL BE REVIEWED AND
APPROVED BY THE AE.
C. PROVIDE TEMPORARY HVAC UNITS IN APPROVED LOCATIONS. TEMPORARY HVAC SHALL BE
ON STAND-BY AND READY TO BE ACTIVATED AS SOON AS THE DEMOLITION OF THE
DUCTWORK IS STARTED.
D. MANUFACTURE ALL PIPE FITTING NECESSARY TO SEAMLESSLY INSTALL THE NEW
CHILLED/HEATING WATER PUMPS.
3. CONTRACTOR SHALL START-UP TEMPORARY HVAC UNITS AND VERIFY THEY ARE OPERATIONAL.
4. THE CONTRACTOR SHALL DEMOLISH:
A. EXISTING DUCTWORK AND ALL ASSOCIATED SUPPORTS.
B. CHILLED/HEATING WATER PUMPS AND ASSOCIATED PIPING AND SUPPORT.
5. THE CONTRACTOR SHALL INSTALL:
A. NEW PREFABRICATED SUPPLY AND RETURN DUCTWORK.
B. NEW CHILLED/HEATING WATER PUMPS AND ASSOCIATED PIPES.
6. THE CONTRACTOR SHALL TEST ALL NEW CONSTRUCTION AS SPECIFIED.
7. THE TEMPORARY HVAC UNITS SHALL BE LEFT IN PLACE FOR FUTURE USE.
PHASE 2:
1. SIMULTANEOUSLY:
A. DEMOLISH AHU ED-203
1. SHUT DOWN AND DISCONNECT EXISTING UTILITIES FROM AHU.
2. REMOVE EXISTING LIGHTING PROTECTION AND RETAIN FOR RE-USE.
3. REMOVE EXISTING AHU AND ASSOCIATED DUCTWORK. MECHANICAL AND
ELECTRICAL EQUIPMENT SHALL BE STRATEGICALLY DISCONNECTED AND
RECONNECTED TO ALLOW FOR NORMAL OPERATION TO OCCUR.
TEMPORARY UNITS MAY BE NECESSARY TO MINIMIZE SHUT DOWNS.
4. THE CONTRACTOR SHALL VERIFY ALL ABANDON AND NEW PENETRATIONS
UNDER THE AHU ARE SEALED WITH THE APPROPRIATE RATING AND ARE
WATER TIGHT.
5. REMOVE THE EXISTING AHU CONCRETE PAD, ROOF CURB, AND ASSOCIATED
ROOFING AS REQUIRED FOR THE NEW AHU. THE BASIS OF DESIGN IS TO
BUILD A NEWA STEEL STRUCTURE TO SUPPORT THE NEW AHU
CONFIGURATION. NOTE, THE CONTRACTOR WILL BE REQUIRED TO UTILIZE
THE MECHANICAL SCHEDULES AND SPECIFICATIONS FOR THE NEW AHU
CONFIGURATION. SEE STRUCTURAL NOTES FOR ADDITIONAL INFORMATION.
2. ACTIVATE TEMPORARY HVAC UNITS
3. WITHIN 5-DAYS OF DEMOLISHING THE EXISTING AHU, THE CONTRACTOR SHALL HAVE THE NEW
AHU INSTALLED AND ALL CONNECTIONS COMPLETED. THESE INCLUDE
A. INSTALL NEW FLASHING FOR THE EXISTING DECK PENETRATIONS. VERIFY EXACT SIZE
AND DIMENSIONS WITH UNIT MANUFACTURES PRIOR TO ORDERING AND/OR
INSTALLATION. PATCH AND REPAIR EXISTING ROOFING AS REQUIRED TO MAINTAIN A
WARRANTABLE ROOF. THE CONTRACTOR SHALL VERIFY ANY EXISTING ROOF
WARRANTIES PRIOR TO ANY ROOF TOP WORK TO MAKE SURE HE/SHE WILL NOT BE
VOIDING ANY WARRANTIES IN PLAY.
B. INSTALL NEW AHU AND ASSOCIATED DUCTWORK. THIS SHALL INCLUDE BUT NOT BE
LIMITED TO INCREASING THE SIZE OF THE SUPPLY AND RETURN DUCTS BELOW THE
SLAB. SEE PLANS FOR ADDITIONAL INFO.
C. CONNECT ALL UTILITIES TO THE NEW AHU EQUIPMENT.
D. COORDINATE AND ADJUST THE SEQUENCE OF OPERATIONS AND CONTROLS.
4. AFTER ALL PREVIOUS WORK HAS BEEN TESTED AND APPROVED, THE CONTRACTOR SHALL
PROCEED WITH CONNECTING THE CONTROLS FOR THE NEW AHU.
5. CONTRACTOR SHALL REMOVE ALL TEMPORARY HVAC UNITS.
THE CONTRACTOR SHALL. REVIEW AND EXPAND THE ABOVE LIST AS HE/SHE FEELS FIT AS THE
0.1 0.2 0.3 0.4 0.5 0.7
E.3
D.1
B.6
TEMPORARY WALL
LOCATION, SEE
TEMPORARY
CONSTRUCTION
NOTES, THIS SHEET.
REMOVE AND REPLACE
EXISTING DOOR WITH 4' X 7'
DOOR AND FRAME GC TO
REPLACE AUTO OPENER AND
ACCESS CONTROL AS REQ'D.
EXISTING DOOR TO
REMAIN CLOSED AND
SEALED FOR THE
DURATION OF PHASE 1.
TEMPORARY ANTE-ROOM FOR
CONTRACTOR ACCESS. SEE
TEMPORARY CONSTRUCTION
NOTE C, THIS SHEET.
EXISTING DOOR TO
REMAIN CLOSED AND
SEALED FOR THE
DURATION OF PHASE 1.
AREA OF WORK
TEMPORARY
EGRESS/ACCESS
DURING CONSTRUCTION
REMOVE EXISTING
WALL FRAMING AND
HEADER AS REQ'D
FOR NEW DOOR AND
FRAME.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Architecture, Engineering, and, Sustainable DesignAESUS 1050 E. Southern Ave, Suite #D, Tempe, Arizona 85282, (480) 454-2861 design group
KEY PLAN NTS NORTH
BLDG 1
C U s e rs
\E m a n te
\D o c u m e n ts
\L o c a l R e v it \2
\6
-2
-1
R e p la c e A ir H a n d lin g U n it
E D
A
R C
H
N E
W c fo n ta in e a e s u s d e s ig n .c o m
.r v t
/1
/2
:0
:5
A
M
AS100
PHASING PLAN
JAMES A. HALEY VA HOSPITAL
673-21-151
BLDG #1
APRIL 17, 2023 AESUS AESUS
REPLACE AIR HANDLING UNIT
ED-203
100% Construction Documents
1/8" = 1'-0"2 PHASE 2 - ROOF PLAN
1/8" = 1'-0"1 PHASE 1 - FLOOR PLAN
Revisions: Date:
STAMP
OR
LA
NDO
ER I K GONZALES
PRO F E S S I ONA L ENG
I N
DEMOLITION SYMBOL LEGEND
KEYED DEMOLITION NOTES
ITEMS SHOWN DASHED TO BE
DEMOLISHED
DEMOLITION GENERAL NOTES
REFER TO SHEET G-001 FOR ARCH DWG REFERENCE AND
MATERIAL SYMBOLS AS WELL AS ABBREVIATIONS USED ON
THIS SET OF DRAWINGS.
AREA OF WORK CONTAINTS BUILDING INFRASTRUCTURE
WHICH MAY BE CRITICAL TO THE ONGOING OPERATIONS OF
THE HOSPITAL. ATTENTION SHALL BE BROUGHT TO THE COR
PRIOR TO ANY DEMOLITION OR SHUT-DOWNS. MAJOR
SHUTDOWNS REQUIRE 30 DAYS ADVANCE.NOTICE. MINOR
SHUTDOWNS REQUIRE 21 DAYS ADVANCE NOTICE.
DEMOLITION OPERATIONS ARE TO PROCEED WITH NECESSARY
PREPARATIONS AND PRECAUTIONS TAKEN TO PROTECT ITEMS
AND FINISHES TO REMAIN. THE CONTRACTOR SHALL
COORDINATE DEMOLITION OPERATIONS WITH THE VA AND
EACH SPECIFIC DEPARTMENTS PRIOR TO ANY DEMO WORK.
REMOVE AND DISPOSE ALL DEMOLISHED MATERIALS OFF SITE
WHICH ARE NOT SCHEDULED TO REMAIN, BE RELOCATED, OR
BECOME THE PROPERTY OF THE OWNER.
PIPES NO LONGER IN USE WITHIN DEMOLITION AREA ARE TO
BE REMOVED BACK TO SOURCE
DO NOT PENETRATE THE FLOOR SLAB WITHOUT COORDINATING
WITH STRUCTURAL REQUIREMENTS.
UNLESS SPECIFICALLY NOTED OTHERWISE, EXISTING FLOOR
AND CEILING MATERIALS SHALL REMAIN IN PLACE. PROTECT
FLOORS AND CEILINGS FROM DAMAGE DURING DEMOLITION
AND RENOVATION WORK.
EXISTING CONDITIONS SHOWN ARE FROM AVAILABLE RECORD
DRAWINGS AND VISUAL FIELD SURVEYS. THE CONTRACTOR
SHALL VERIFY ACTUAL EXISTING CONDITIONS AND NOTIFY THE
VA OF ANY DISCREPANCIES.
DEMO WORK SHALL BE DONE IN A MANNER WHICH WILL NOT
CAUSE UNNECESSARY INCONVENIENCE OR DANGER TO USERS
OF THE PREMISES AND ADJACENT AREAS AND NOT INTERFERE
WITH ITS OPERATION. ANY DEMO WORK TO BE PERFORMED
MUST BE PLANNED IN ADVANCE AND APPROVED BY THE COR.
ANY EQUIPMENT, MATERIALS AND SUPPLIES TEMPORARILY
REMOVED FOR THE PURPOSE OF PROTECTION SHALL BE
REPLACED IN ORIGINAL LOCATIONS AND CONDITIONS. ANY
MATERIAL DAMAGED SHALL BE REPLACED WITH NEW
MATERIALS OF LIKE AND QUALITY.
REFER TO AND COORDINATE WITH MECHANICAL AND
ELECTRICAL DWGS. FOR ADDITIONAL DEMOLITION
INFORMATION.
ALL MATERIALS INDICATED TO BE REMOVED SHALL BE
DISPOSED OF AND REMOVED FROM THE SITE. COORDINATE
WITH THE COR, THE REMOVAL AND FINAL DISPOSAL
LOCATION/DESTINATION(S) OF DEMOLITION. THE GC SHALL
PROVIDE MONTHLY NEMA TRACKING REPORTS.
ALL REMOVED MATERIALS AND EQUIPMENT WHICH IS
SALVAGEABLE SHALL REMAIN THE PROPERTY OF THE OWNER.
DELIVER SUCH SALVAGED MATERIALS AND EQUIPMENT ON THE
PREMISES AS DIRECTED BY THE COR AND NEATLY STORE
THEM AND PROTECT FROM DAMAGE. ALL OTHER MATERIAL AND
EQUIPMENT SHALL BE REMOVED FROM THE PROJECT SITE AT
THE CONTRACTOR'S EXPENSE. OWNER WILL IDENTIFY
LOCATION TO PUT SALVAGED MATERIAL AT CONTRACTOR KICK
OFF MEETING.
PATCH/REPAIR ALL ELEMENTS THAT ARE TO REMAIN AND ARE
DAMAGED FROM THE DEMO WORK, BACK WITH CONSTRUCTION
TO MATCH EXISTING CONDITIONS.
IN WALLS TO BE REMOVED, STRIP ALL EXISTING ELECTRICAL
WIRING TO NEAREST ACTIVE J-BOX & CONDUIT.
INTERIM LIFE SAFETY MEASURES APPLY. COORDINATE
WITH HOSPITAL'S SAFETY OFFICER AND COR.
MATERIALS AND EQUIPMENT ACCRUING FROM WORK REMOVED
AND FROM DEMOLITION OF BUILDING OR STRUCTURES, OR
PARTS THEREOF, SHALL BE DISPOSED PER SPECIFICATION SECTION 01 74 19
REMOVE ALL EXISTING ABANDONED CONDUITS, WIRES, AND
PIPES ASSOCIATED WITH THIS CONTRACT.
DIMENSIONS ON DEMO PLANS TO BE VERIFIED WITH
CONDITIONS ON SITE BY G.C.
A.
B.
C.
D.
E.
F.
G.
H.
I.
J.
K.
L.
M.
N.
O.
P.
Q.
R.
S.
T.
THE CONTRACTOR SHALL NOTIFY THE COR 14 DAYS IN ADVANCE OF ANY
SCHEDULED DEMO WORK IN THE AREA TO ALLOW THE GOVERNMENT TO
REMOVE PERSONAL BELONGINGS AND DESIGNATE ALL MEDICAL
EQUIPMENT, FURNITURE, AND OTHER ITEMS TO BE SALVAGED AND
STORED BY THE CONTRACTOR. ALL ITEMS NOT DESIGNATED AS
"SALVAGED" BY THE GOVERNMENT AFTER THIS TIME SHALL BE DISPOSED
OF BY THE CONTRACTOR.
0.4 0.5 0.7
E.3
D.1
B.6
EXISTING
STAIRS
1 2
+/-40' - 0"
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Architecture, Engineering, and, Sustainable DesignAESUS 1050 E. Southern Ave, Suite #D, Tempe, Arizona 85282, (480) 454-2861 design group
KEY PLAN NTS NORTH
BLDG 1
C U s e rs
\E m a n te
\D o c u m e n ts
\L o c a l R e v it \2
\6
-2
-1
R e p la c e A ir H a n d lin g U n it
E D
A
R C
H
N E
W c fo n ta in e a e s u s d e s ig n .c o m
.r v t
/1
/2
:0
:5
A
M
A300
DEMO ROOF PLAN
JAMES A. HALEY VA HOSPITAL
673-21-151
BLDG #1
APRIL 17, 2023 AESUS AESUS
REPLACE AIR HANDLING UNIT
ED-203
100% Construction Documents
FLOOR PLAN KEYNOTES
1 DEMOLISH THE EXISTING AHU AND ASSOCIATED COMPONENTS. REMOVE AND
RETAIN THE EXISTING LIGHTNING PROTECTION EQUIPMENT FOR RE-INSTILLATION.
SEE MPE FOR ADDITIONAL INFO.
2 DEMOLISH EXISTING CONCRETE PAD, ROOF CURBS, AND ASSOCIATED
COMPONENTS. THE EXISTING ROOF PENETRATIONS SHALL BE PROTECTED IN
PLACE. SEE NEW WORK PLAN FOR AHU CONFIGURATION.
3 EXISTING ROOF TO REMAIN, TYPICAL. PATCH AND REPAIR ROOF AS A RESULT OF
CONSTRUCTION ACTIVITY.
4 EXISTING ROOF DRAINS TO REMAIN, TYPICAL.
5 EXISTING BUILDING, TYPICAL.
6 EXISTING WALK PADS, TYPICAL.
7 EXTENT OF ROOF DEMOLITION, COORDINATE WITH NEW WORK PLAN, TYPICAL.
8 EXISTING ROOF PENETRATIONS TO REMAIN.
9 EXISTING ROOF PARAPET.
10 EXISTING ROOF BELOW.
11 REMOVE EXISTING WALK PADS, TYPICAL.
3/16" = 1'-0"1 ROOF DEMO
CONTRACT LIMIT LINE
COLUMN CENTER LINE
NEW WALL
DEMOLITION
EXISTING WALL
FLOOR PLAN SYMBOLS
PROPOSED
EQUIPMENT
Revisions: Date:
STAMP
OR
LA
NDO
ER I K GONZALES
PRO F E S S I ONA L ENG
I N
0.4 0.5 0.7
E.3
D.1
B.6
EXISTING
STAIRS
+/-40' - 0"
AE500
4' - 0" 3' - 6"
6' - 10" 23' - 1"
35' - 10"
1' - 7"
LANDING
AE500
NOTE: ALL AHU CURB
DIMENSIONS TO BE VERIFIED
WITH SHOP DRAWINGS.
FLOOR PLAN GENERAL NOTES
1. WRITTEN DIMENSIONS SHALL HAVE PRECEDENCE.
LARGER SCALE DRAWING SHALL HAVE PRECEDENCE OVER
SMALLER SCALE DRAWINGS. THE GC SHALL NOTIFY THE VA OF ANY
DISCREPANCIES OR CONFLICTS BEFORE PROCEEDING WITH THAT PORTION
OF THE WORK.
2. THE CONTRACTORS SHALL COORDINATE EQUIPMENT AND MATERIAL
TRAFFIC AND STORAGE WITH COR.
3. ALL UTILITY WORK SHALL BE COORDINATED WITH MECHANICAL, PLUMBING,
ELECTRICAL, AND FIRE PROTECTION.
4. ALL ASPECTS OF CONTRACTOR STAGING AND CONSTRUCTION PHASING
SHALL BE APPROVED BY COR.
5. REFER AND ADHERE TO THE INFECTION PREVENTION MEASURE
REQUIREMENTS IN SPECIFICATION SECTION 01 35 26 17
TEMPORARY ICRA BARRIER SHALL BE PROVIDED AT ALL
PATIENT RELATED AREAS AND COMPLETED PRIOR TO THE START OF ANY
WORK.
6. ASBESTOS REMEDIATION IS PART OF THE SCOPE. ALL AREAS OF WORK SHALL
BE CLEARED PRIOR TO THE START OF CONSTRUCTION.
7. THE CONTRACTOR IS RESPONSIBLE FOR REMOVING, STORING AND RELOCATING ALL
EQUIPMENT & FURNITURE TO BE SALVAGED. ALL EXISTING CEILING MOUNTED
8. PRIOR TO THE START OF ANY WORK. THE CONTRATOR IS REQUIRED TO
VISIT THE SITE TO FAMILIARIZE THEMSELVES WITH THE
EXTENT AND NATURE OF WORK TO BE PERFORMED. EXISTING CONDITIONS
MAY SLIGHTLY VARY FROM THOSE SHOWN ON THE DRAWINGS. THE
CONTRACTOR SHALL VERIFY EXISTING CONDITIONS, DIMENSIONS AND
MATERIALS IN THE FIELD AND GENERATE A LIST OF DISCREPANCIES IN WRITING
AND REPORT TO THE COR. REFER TO SPECIFICATIONS FOR FURTHER
INFORMATION.
9. THE CONTRACTOR SHALL VERIFY ALL ITEMS AND/OR MATERIALS AND/OR
EQUIPMENT TO BE SALVAGED, PRIOR TO THE START OF DEMOLITION WORK.
10. ALL DIMENSIONS ARE TAKEN FROM EXISTING FACE OF WALLS.
11. BEFORE DEMOLITION, CONTRACTOR TO VERIFY WITH THE COR THE
SIGNAGE TO BE SALVAGED AND STORED FOR FUTURE USE. EXISTING AND
NEW SIGNAGE TO MATCH EXISTING WHN ADJACENT TO EXISTING
SIGNAGE. ALL OTHER NEW SIGNAGE TO MATCH FACILITY STANDARDS.
12. ALL HOSPITAL ACCESS POINTS, AND ALL BUILDING EXITS, MUST REMAIN
ACCESSIBLE, CLEAR AND UNOBSTRUCTED THROUGHOUT ALL PHASES OF
DEMOLITION AND CONSTRUCTION. SHORT-TERM CLOSURE MAY BE
ACCEPTABLE AS COORDINATED WITH COR. SEE ILSM REQUIREMENTS ON AD-101.
13. THE CONTRACTOR SHALL PATCH AND REPAIR ALL FIREPROOFING DAMAGED
DURING CONSTRUCTION. MATCH EXISTING 1 HR FIRE RATING PER TYPE II
CONSTRUCTION. ALL NEW FIREPROOFING TO MEET CURRENT CODES.
14. ALL EXISTING PENETRATIONS, WITHIN LIMIT OF WORK AND NEW
CONSTRUCTION, ARE TO BE SEALED TO MATCH EXISTING CONSTRUCTION
AND RATING.
15. PROTECT ALL EXISITNG CONDITIONS & EQUIPMENT DURING
CONSTRUCTION.
16. THE CONTRACTOR SHALL COORDINATE ALL ROOF TOP WORK WITH COR
AND EXISTING WARRANTY INFORMATION. INDEPENDENT INSPECTOR TO VERIFY
ROOF TOP WORK.
17. PRIOR TO SAW CUTTING AND/OR CORE DRILLING CONCRETE, THE
CONTRACTOR SHALL X-RAY USING "A MODERN DETECTION SYSTEMS" TO
LOCATE REINFORCING AND OBSTRUCTIONS IN THE CONCRETE.
18. THE CONTRACTOR IS RESPONSIBLE FOR PROTECTING ANY OPENINGS AND
RESPONSIBLE FOR ANY DAMAGE THAT MAY RESULT FROM SUCH OPENINGS
BEING LEFT UNPROTECTED OR THOSE THAT HAVE OCCURED AS A RESULT OF
PROTECTING THE OPENINGS.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Architecture, Engineering, and, Sustainable DesignAESUS 1050 E. Southern Ave, Suite #D, Tempe, Arizona 85282, (480) 454-2861 design group
KEY PLAN NTS NORTH
BLDG 1
C U s e rs
\E m a n te
\D o c u m e n ts
\L o c a l R e v it \2
\6
-2
-1
R e p la c e A ir H a n d lin g U n it
E D
A
R C
H
N E
W c fo n ta in e a e s u s d e s ig n .c o m
.r v t
/1
/2
:0
:5
A
M
A301
ROOF PLAN
JAMES A. HALEY VA HOSPITAL
673-21-151
BLDG #1
APRIL 17, 2023 AESUS AESUS
REPLACE AIR HANDLING UNIT
ED-203
100% Construction Documents
FLOOR PLAN KEYNOTES
1 EXTENT OF ROOF REMOVAL AND REPAIR, TYPICAL.
2 NEW EXTERIOR AHU MOUNTED ON A PREBABRICATED STRUCTURAL CURB. VERIFY
EXACT SIZE AND CONFIGURATION WITH SHOP DRAWING SUBMITTAL(S). THE GC
SHALL VERIFY EXISTING AND NEW ROOF PENETRATIONS ARE SEALED, PERFORM A
LEAK TEST TO VERIFY. SEE MECHANICAL FOR ADDITIONAL INFO.
3 PREFABRICATED STRUCTURAL CURB FOR AHU, SEE MECHANICAL AND
STRUCTURAL FOR ADDITIONAL INFO. THE GC SHALL VERIFY THE ACTUAL AHU
EQUIPMENT SIZE PRIOR TO ORDERING THE CURB. PROVIDE COORDINATION
DRAWINGS FOR REVIEW.
4 EXISTING ROOF TO REMAIN, TYPICAL. PATCH AND REPAIR ROOF AS A RESULT OF
CONSTRUCTION ACTIVITY.
5 PREFABRICATED STAIR, LANDING, AND GUARDRAILS ATTACHED TO THE
STRUCTURAL CURB.
6 EXISTING WALK PADS, TYPICAL.
7 EXISTING ROOF PENETRATION, SEE MECHANICAL FOR ADDTIONAL INFO, TYPICAL.
8 NEW WALK PADS, TYPICAL.
9 PROVIDE A MIN. 10" CONTINUOUS HIGH DENSITY RIGID INSULATION. TAPE AND
SEAL ALL SEAMS, TYPICAL.
3/16" = 1'-0"1 ROOF NEW WORK
CONTRACT LIMIT LINE
COLUMN CENTER LINE
NEW WALL
DEMOLITION
EXISTING WALL
FLOOR PLAN SYMBOLS
PROPOSED
EQUIPMENT
Revisions: Date:
STAMP
OR
LA
NDO
ER I K GONZALES
PRO F E S S I ONA L ENG
I N
TOILET/SHOWER
RN MGR
ON CALL
BEREAV/COUNSEL
CONF/TRAINING
TLT TLT
ENTRY
WAITING
PRE-TRIAGE
TRIAGE 1 TRIAGE 2 TRIAGE 3
STAFF LOCKER/BREAK
EKG
HAC
MON EXAM 1
CL LINEN
WHEELCHAIR STOR.
CLEAN UTIL/EQUIP
SECURE EXAM
UNIT CLERK
PACS/CONSULT
MEDS
NURSE STATION
VESTIBULE
MON EXAM 2
SOIL UTILITY
PAT TLT./
SHOWER
MON EXAM 13
MON EXAM 12
MON EXAM 11
MON EXAM 10
MON EXAM 9
PROCEDURE/CAST
CL LINEN
MON EXAM 6
MON EXAM 5 MON EXAM 4
RADIOGRAPHY
MON EXAM 3
MON EXAM 14
(ISOLATION)
MON EXAM 15
(ISOLATION)
MON EXAM 14
(ISOLATION)
MON EXAM 15
(ISOLATION)
1E-110A
1E-109
1E-110
1E-115
1E-108
1E-106 1E-107 V1-04-1
1E-101
1E-102 1E-103 1E-104 1E-105
1E-113
1E-116
1E-118
1E-119
1A-222
1A-202
1E-138
1E-143
1E-145
1E-148
1E-147
1E-146
V1-05-1
1E-120
1E-136
1E-134
1E-140
1E-139
1E-137
1E-135
1E-133
1E-132
1E-130
1E-128 1E-127 1E-126
1E-125
1E-124
1E-141 1E-142
1E-131 1E-129
RCP GENERAL NOTES
1. IN THE CASE OF MINOR DISCREPANCIES BETWEEN MEP AND
ARCHITECTURAL DOCUMENTS IN THE LOCATION OF CEILING MOUNTED
COMPONENTS, THE ARCHITECTURAL REFLECTED CEILING PLAN SHALL
GOVERN. IN THE CASE OF MAJOR DISCREPANCIES, THE ARCHITECT SHALL
BE NOTIFIED AS SOON AS THE DISCREPANCY IS DISCOVERED PRIOR TO
PROCEEDING WITH THE WORK.
2. REFERENCE MECHANICAL AND ELECTRICAL DRAWINGS FOR MOUNTING
LOCATIONS OF ITEMS WHERE NO CEILING IS REQUIRED OR INDICATED
3. LIGHTS, DIFFUSERS, EXIT SIGNS, SMOKE DETECTORS, SPEAKERS, STROBES
AND MISCELLANEOUS DEVICES SHALL BE CENTERED IN THE CEILING TILE IN
WHICH THEY OCCUR, UNLESS NOTED OTHERWISE
4. ALL CORRIDOR SPRINKLER HEADS SHALL BE ALIGNED IN THE SAME
LOCATION PARALLEL TO THE WALL WITHIN EACH SPECIFIC CEILING
CONSTRUCTION. ARCHITECTURALLY SIGNIFICANT SPRINKLER HEAD
LOCATIONS MAY BE SHOWN ON REFLECTED CEILING PLAN FOR DESIGN
INTENT ONLY.
5. ACCESS DOOR LOCATIONS ARE INDICATED ON RCP'S ONLY WHERE
ARCHITECTURALLY SIGNIFICANT. REFERENCE SPECIFICATIONS AND MEP
DRAWINGS FOR OTHER ACCESS DOOR LOCATIONS. ACCESS PANELS ARE
REQUIRED IN GYP BD CEILINGS ADJACENT TO BUT NOT LIMITED TO VAV
BOXES AND CEILING MOUNTED BOOMS.
6. EXIT SIGNS ARE SHOWN ON REFLECTED CEILING PLAN ONLY WHERE
LOCATION IS ARCHITECTURAL SIGNIFICANT. CONTRACTOR TO VERIFY IN
FIELD THAT ALL EXIT SIGNS ARE VISIBLE AND NOTIFY COR IF ADDITIONAL
EXIT SIGNS NOT SHOWN ON PLAN ARE NEEDED.
7. THE GC SHALL REMOVE AND REINSTALL THE EXISTING CEILING AND
COMPONENTS TO IT'S ORIGINAL CONDITION AND LOCATION. ANY ITEMS LOST
AND/OR BROKEN DURING CONSTRUCTION WILL BE THE GC RESPONSIBILITY
TO REPLACE OR FIX. IT IS RECOMMENDED THAT THE GC VISIT THE SITE
PRIOR TO CONSTRUCTION TO SURVEY THE EXISTING CONDITIONS AND
IDENTIFY ANY DELINQUENT ITEMS.
0.1 0.3 0.4 0.5 0.7
E.3
D.1
B.6
LIMITS OF WORK
LIMITS OF WORK
CEILING SYMBOLS
SUPPLY AIR
FLUORESCENT LIGHT
2X4 ACOUSTIC CEILING
TILE
SPRINKLER
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Architecture, Engineering, and, Sustainable DesignAESUS 1050 E. Southern Ave, Suite #D, Tempe, Arizona 85282, (480) 454-2861 design group
KEY PLAN NTS NORTH
BLDG 1
C U s e rs
\E m a n te
\D o c u m e n ts
\L o c a l R e v it \2
\6
-2
-1
R e p la c e A ir H a n d lin g U n it
E D
A
R C
H
N E
W c fo n ta in e a e s u s d e s ig n .c o m
.r v t
/1
/2
:0
:5
A
M
AE302
REFLECTED CEILING PLAN - LEVEL 01
JAMES A. HALEY VA HOSPITAL
673-21-151
BLDG #1
APRIL 17, 2023 AESUS AESUS
REPLACE AIR HANDLING UNIT
ED-203
100% Construction Documents
RCP KEYNOTES
1 REMOVE AND REINSTALL THE EXISTING CEILING AND ASSOCIATED COMPONENTS
AS REQUIRED FOR THE HVAC UPGRADES.
2 REMOVED AND REINSTALL THE EXISTING MECHANICAL DIFFUSER, TYPICAL AS
REQUIRED FOR THE HVAC UPGRADES.
3 REMOVED AND REINSTALL THE EXISTING LIGHTS, TYPICAL AS REQUIRED FOR THE
HVAC UPGRADES.
4 EXISTING SPRINKLER HEADS, GC TO PROVIDE TEMPORARY UPRIGHT SPRINKLER
HEADS DURING CONSTRUCTION AS REQ'D FOR CEILING REMOVAL AND REINSTALL
NEW SPRINKLER HEADS AT THE TIME OF CEILING REINSTALLATION. GC TO
PROVIDE NEW SPRINKLER HEADS WITH THE SAME PERFORMANCE ATTRIBUTES,
MATCH THE EXISTING APPEARANCE.
3/16" = 1'-0"1 _LEVEL 01 RCP OVERALL NEW
Revisions: Date:
STAMP
OR
LA
NDO
ER I K GONZALES
PRO F E S S I ONA L ENG
I N
SCALE:
SCALE:
SCALE:
SCALE:
SCALE:
SCALE:
SCALE:
3" [7
5]
2'-0 1/16" [300]
MECHANICAL DUCT
PER MEP
SLEEVE-SEAL
SLEEVE TO DUCT
GENERAL NOTE:
SEAL ALL SEAMS, JOINTS,
AND FASTENER
PENETRATIONS -
PROVIDE STIFFENERS
AND CROSS BRACING AS
NEEDED TO PREVENT
BENDING.
PREFABRICATED,
INSULATED, ROOF
CURB - ANCHORED
TO CONC DECK
[2
] M
IN
V A
R
IE
S
VARIES
16 GA GALVANIZED
METAL ENCLOSURE
SLOPE 1/4" FT [1:50] MIN
REGLET AND
COUNTERFLASHING
ROOFING SYSTEM
GASKETED
FASTENERS AT 12"
[300mm] OC MAX
SEALANT
FILL VOID WITH
MINERAL WOOL
INSULATION -
SUPPORT WITH
POULTRY NETTING
SPRAYED VAPOR
RETARDER
NOTE: THE
CONTRACTOR
SHALL PROVIDE
UNI-STRUT DUCT
SUPPORTS AS
REQ'D. ON ROOF
AND EXTERIOR
WALL. SEE
MECHANICAL FOR
DUCT RUN.
M
IN
C U
R B
T O
B E
C U
S T
O M
H E
IG
H
T T
O C
O O
R D
IN
A
T E
W
IT
H D
U C
T T
R A
N S
IT
IO
N
MECHANICAL EQUIPMENT
CONT. VIP-RT
GASKET, TYPICAL
REGLET AND
COUNTERFLASHING
PREFABRICATED
STRUCTURAL ROOF
CURB, TYPICAL
SEALANT
TPO ROOF
MEMBRANE OVER
RIGID INSULATION.
EXISTING METAL DECK TO REMAIN
STEEL ANGLE / CHANNEL, SEE
STRUCTURAL
CONT. WOOD MAILER
REMOVE, PATCH,
AND REPAIR ROOF
AS REQ'D FOR AHU
CURB INSTALLATION.
10" HIGH DENSITY
RIGID INSULATION
4"[100]
MIN
[2
TEMPERATURE APPROPRIATE
SEALANT-TOOL TO FACILITATE
WATER RUN OFF
1" [25MM] SS DRAW
BAND
PREFABRICATED
COVER / ROOF BOOT
NOTE: ALL ROOF AND
FLOOR PENETRATIONS
SHALL BE FIRE SEALED TO
MATCH EXISTING RATING
WELDED SEAM
[2
M
IN
4"[100]
MIN
SEALANT-TOOL TO
FACILITATE WATER
RUN OFF
1" [25mm] SS
DRAW BAND
WELDED SEAM
PREFABRICATED
COVER/ROOF BOOT
TYPICAL: 12 GA AT LAY-IN CLNG OR 8
GA AT GYP BD CLG VERTICAL HANGER
WIRE AT 4'-0" EA WAY W/ MIN 3 TIGHT
TURNS IN 1 1/2" BOTH ENDS OF WIRE
TYPICAL (8" OUT FROM WALL TYP)
12 GA AT LAY-IN CLG OR 8 GA AT GYP BD
CLG BRACING WIRE W/ MIN 4 TIGHT
TURNS IN 1 1/2" BOTH ENDS OF WIRE
TYP PROVIDED ORIENTED 90 TO EACH
OTHER AT 12'-0" OC 1ST POINT 6' FROM
EACH WALL
COMPRESSION STRUTS: 1 1/2" DEEP
20 GA WALL STUD ATTACH TO MAIN
RUNNERS WITH 1/4" MACHINE BOLT
AND TO STRUCTURE WITH 3/16"
DIAMETER POWER-DRIVEN
FASTENER. COMPRESSION STRUT
SHALL NOT REPLACE HANGER WIRE
MAIN RUNNER
CROSS RUNNER
2" (MAX) FROM BRACING
WIRES TO CROSS RUNNERS
CEILING
FIXTURE 4
MAX
(TYP)
12 GA AT LAY-IN CLG OR 8 GA AT
GYP BD CLNG WIRE ATTACHED
TO OPPOSING CORNERS AT
FIXTURES DIAGONAL
1. ICBO (INTERNATIONAL COUNCIL OF BUILDING OFFICIALS) EVALUATION REPORT - 4071 GYPSUM WALLBOARD (066). (THIS REPORT HAS THE SAME REQUIREMENTS FOR GYP BD CEILINGS AND LAY-IN
CEILING.
2. ALL LATERAL SUPPORTS MUST BE LOCATED A MIN OF 6" (152mm) FROM HORIZONTAL UNBRACED PIPES
AND DUCTWORK.
3. VERTICAL STRUTS FASTENED TO THE MAIN RUNNER SHALL BE EXTENDED TO AND FASTENED TO THE STRUCTURAL MEMBERS SUPPORTING THE ROOF OR FLOOR ABOVE. THE STRUT SHALL BE ADEQUATE TO
RESIST THE VERTICAL LOAD INDUCED BY THE BARRIER WIRES.
4. THE VERTICAL STRUTS AT HORIZONTAL RESTRAINT POINTS SHALL BE PLACED 12'-0" (3658mm) OC IN BOTH DIRECTIONS, WITH THE FIRST POINT WITHIN 6'-0" (1830mm) FROM EACH WALL.
NOTES
MAX.
MIN.
M A
X
STRUCTURE 13 GA. X
4 " WIDE
CEILING CLIP "HILTI"
OR EQUAL
4 TIGHT TURNS, TYP.
VERTICAL HANGER
WIRE 8 GA. MIN.
SAFETY WIRE, 8 GA.
MIN. CONNECTED TO
DECK
CONDUIT AND
CONNECTOR
RETAINER CLIP
GRID SPACING (CENTER TO CENTER) WIDTH (A): 6", 12", 24", 48"
LENGTH (B): 24", 48"
8 GA SPLAY BRACE
WIRES IN PLANE OF EA
RUNNER, VERTICAL
ANGLE 45 DEG MAX,
TYP. OF 4.
CROSS
RUNNERS
MAIN
RUNNERS
RUNNER, TYP. FOR 4
BRACING IN LINE WITH
NO. 8 GA. SPLAY WIRE
MAIN RUNNER
TYP. FOR 4
45 MAX.
8 GA SPLAY WIRES
@ 4'-0" O.C.-WHERE OCCURS
NO. 8GA HANGER WIRE
TYP.
2' MAX
CROSS TEE
DISTANCE FROM
CEILING TO STRUC.
ABOVE
0' TO 5'-0"
5'-0" TO 8'-0"
STRUT SIZE
2" X 2" X 1/8"
STEEL ANGLE
3" X 3" X 3/16"
STEEL ANGLE
4 TIGHT TURNS
WITHIN 1 1/2" OF
END, TYP AT EA
END
NOTE:
1. COMPRESSION STRUT IS TO BE INSTALLED AT CROSS RUNNER
INTERSECTION.
2. DIAGONAL BRACING WIRES ARE TO BE INSTALLED WITHIN 2" OF
CROSS RUNNER INTERSECTION.
3. COMPRESSION STRUCT IS NOT TO BE INSTALLED IN PLACE OF
VERTICAL HANGER WIRE.
KL/R < 200
WIRE SHALL BE ATTACHED
TO SUSPENDED MEMBERS
W/ A MIN. OF 4 TURNS
VERTICAL HANGER
(2) #12 SDST
SCREWS AT STRUT
TO MAIN RUNNER
STEEL ANGLE
COMPRESSION
STRUT (SEE DTL 5),
FREE SIDE
FIXED SIDE
F
IX
E
D S
ID
E
F R
E E
S
ID
E
NOTE:
1. 4'-0" MAX SPACING TO FIRST
BRACE LINE AT LEAST 96 SF BRACE
SPACING.
2. PROVIDE TRAPEZE OR OTHER
SUPPLEMENTARY SUPPORT
MEMBERS AT OBSTRUCTIONS TO
MAIN HANGER SPACING.
3. 8" MAX TO HANGER WIRE OR 1/4
THE LENGTH OF THE END RUNNER,
WHICHEVER IS LESS
LINE OF PERIMETER WALL
20 GA PERIMETER WALL ANGLE
CROSS RUNNER @ 2'-0" O.C.
8 GA VERTICAL HANGER WIRES @
4'-0" @ EA WAY MAX.
MAIN RUNNER @ 4'-0" O.C.
8 GA PERIMETER HANGER WIRES @
TERMINAL END OF EACH MAIN
RUNNER AND CROSS TEE
4 WAY 45 DEG DIAGONAL 8 GA WIRE
BRACING AND COMPRESSION STRUT.
ONE EVERY 96 SF MAX FOR OSHPD
8 GA MIN WIRE AT ALL 4 CORNERS OF
LIGHT FIXTURE AND AIR TERMINALS
NOTE:
ANGLE MOLDING
DRYWALL
MAIN BEAM
CROSS TEE
SPLAY WIRES
@ 4'-0" O.C.-WHERE OCCURS
NO. 8GA HANGER WIRE
- DRYWALL GRID SYSTEM SHALL BE INSTALL PER
MANUFACTURES SPECIFICATIONS
- WIRE SHALL BE ATTACHED TO SUSPENDED
MEMBERS W/ A MIN. OF 4 TURNS
DRYWALL
0.145" DIA HILTI "X-DNI"
WITH 1 1/2" EMBEDMENT
W/ WASHER
2 "
/ 2
8 "
A B
SEE NOTE 1
S E
E N
O T
E
TYP. VERTICAL HANGER WIRE ATTACHMENT
N.T.S.
TYP. FIXTURE SUPPORT
N.T.S.
TYP. SUSPENDED CEILING PLAN
N.T.S.
TYP. SUSPENDED CEILING DETAIL
NTS
TYP. SUSPENDED CEILING DETAIL
NTS
TYP. SUSPENDED CEILING
N.T.S.
TYP. SUSPENDED CEILING DETAIL
NTS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Architecture, Engineering, and, Sustainable DesignAESUS 1050 E. Southern Ave, Suite #D, Tempe, Arizona 85282, (480) 454-2861 design group
C U s e rs
\E m a n te
\D o c u m e n ts
\L o c a l R e v it \2
\6
-2
-1
R e p la c e A ir H a n d lin g U n it
E D
A
R C
H
N E
W c fo n ta in e a e s u s d e s ig n .c o m
.r v t
/1
/2
:0
:5
A
M
AE500
DETAILS
JAMES A. HALEY VA HOSPITAL
673-21-151
BLDG #1
APRIL 17, 2023 AESUS AESUS
REPLACE AIR HANDLING UNIT
ED-203
100% Construction Documents
1 1/2" = 1'-0"5
CEILING GRID ATTACHMENT
FOR SEISMIC CONDITION1
1" = 1'-0"6 SUSPENDED CEILING DETAILS
1/2" = 1'-0"1 MECHANICAL DUCT PENETRATION BOX
1 1/2" = 1'-0"2 EQUIPMENT CURB
1 1/2" = 1'-0"3 VENT PIPE PENETRATION
1 1/2" = 1'-0"4 POST BASE AT ROOF
Revisions: Date:
STAMP
OR
LA
NDO
ER I K GONZALES
PRO F E S S I ONA L ENG
I N
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Architecture, Engineering, and, Sustainable DesignAESUS 1050 E. Southern Ave, Suite #D, Tempe, Arizona 85282, (480) 454-2861 design group
KEY PLAN NTS NORTH
BLDG 1
C U s e rs
\E m a n te
\D o c u m e n ts
\L o c a l R e v it \2
\6
-2
-1
R e p la c e A ir H a n d lin g U n it
E D
A
R C
H
N E
W c fo n ta in e a e s u s d e s ig n .c o m
.r v t
/1
/2
:0
:5
A
M
AE955
FIRE RATED ASSEMBLIES
JAMES A. HALEY VA HOSPITAL
673-21-151
BLDG #1
APRIL 17, 2023 AESUS AESUS
REPLACE AIR HANDLING UNIT
ED-203
100% Construction Documents
REFEREN
CE O
N
LY
REFEREN
CE O
N
LY
REFEREN
CE O
N
LY
REFEREN
CE O
N
LY
REFEREN
CE O
N
LY
REFEREN
CE O
N
LY
Revisions: Date:
STAMP
OR
LA
NDO
ER I K GONZALES
PRO F E S S I ONA L ENG
I N o n e e ig h th in c h o n e fo o t
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM
08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
15. FOR ITEMS TO BE SUBMITTED AS DEFERRED SUBMITTALS SEE SECTION 13 ON S1.1.
14. ALL SIGNED AND SEALED SHOP DRAWINGS AND/OR CALCULATIONS THAT ARE REQUIRED TO BE SUBMITTED FOR REVIEW SHALL BE DONE BY OR UNDER THE DIRECTION OF A QUALIFIED PROFESSINOAL ENGINEER
REGISTERED IN THE STATE OR COMMONWEALTH IN WHICH THE PROJECT IS LOCATED.
13. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS, ELEVATIONS, AND CONDITIONS WITH PREVIOUS CONSTRUCTION, EXISTING SERVICES AND THE SITE BEFORE BEGINNING WORK. THE CONTRACTOR'S STARTING WORK WITHOUT NOTIFYING THE OWNER OF READILY APPARENT DISCREPANCIES, DEFECTS, OR OMISSIONS TO EXISTING CONDITIONS THAT EFFECT HIS WORK CONSTITUTE HIS ACCEPTANCE OF THAT...
12. CONTRACTORS SHALL VISIT THE SITE PRIOR TO BID TO ASCERTAIN CONDITIONS WHICH MAY ADVERSELY
AFFECT THE WORK OR COST THEREOF.
11. SEE SECTION 13 ON S1.1 FOR LIST OF MINIMUM REQUIRED SHOP DRAWING SUBMITTALS.
10. ALL ASTM AND OTHER REFERENCES ARE PER THE LATEST EDITIONS OF THOSE STANDARDS, UNLESS
NOTED OTHERWISE.
9. TEMPORARY OR PERMANENT SYSTEMS OR FRAMING MEMBERS THAT ARE NOT SPEFICIALLY DESIGNED, DETAILED, OR SPECIFIED IN THE CONTRACT DOCUMENTS BUT ARE REQUIRED TO COMPLETE THE FINISHED STRUCTURE, SHALL BE DESIGNED AND DETAILED BY OR UNDER THE DIRECTION OF A QUALIFIED PROFESSIONAL ENGINEER REGISTERED IN THE STATE OR COMMONWEALTH IN WHICH THE PROJECT IS LOCATED. ALL REQUESTED SUBMITTALS FOR THESE SYSTEMS OR FRAMING MEMBERS SHALL BE SIGNED AND SEALED BY SAID QUALIFIED PROFESSIONAL ENGINEER. SEE SECTION 15 ON S1.1 ADDITIONAL
INFORMATION.
8. LOADING APPLIED TO THE STRUCTURE DURING THE PROCESS OF CONSTRUCTION SHALL NOT EXCEED THE SAFE LOAD-CARRYING CAPACITY OF THE STRUCTURAL MEMBERS. THE LIVE LOADING VALUES USED IN THE DESIGN OF THIS STRUCTURE ARE INDICATED IN THE "DESIGN CRITERIA NOTES". DO NOT APPLY ANY ERECTION OR CONSTRUCTION LOADS UNTIL STRUCTURAL FRAMING IS PROPERLY CONNECTED TOGETHER
AND UNTIL ALL TEMPORARY BRACING IS IN PLACE.
7. ALL STRUCTURAL SYSTEMS, WHICH ARE TO BE COMPRISED OF COMPONENTS TO BE FIELD ERECTED, SHALL BE SUPERVISED BY THE SUPPLIER DURING MANUFACTURE, DELIVERY, HANDLING, STORAGE, AND ERECTION
IN ACCORDANCE WITH THE SUPPLIER'S INSTRUCTIONS AND REQUIREMENTS.
6. CONTRACTOR IS TO VERIFY ALL DIMENSIONS RELATIVE TO ARCHITECTURAL DRAWIGNS PRIOR TO BEGINNING OF CONSTRUCTION. ANY DISCREPANCIES MUST BE REPORTED TO THE ENGINEER BEFORE
PROCEEDING WITH WORK.
5. DRAWINGS INDICATE GENERAL AND TYPICAL DETAILS OF CONSTRUCTION. TYPICAL DETAILS ARE NOT ALL CUT ON THE DRAWINGS, BUT APPLY UNLESS NOTED OTHERWISE. WHERE ANY DISCREPANCIES OCCUR
BETWEEN PLANS, DETAILS, GENERAL STRUCTURAL NOTES AND SPECIFICATIONS, THE GREATER
REQUIREMENTS SHALL GOVERN. WHERE CONDITIONS ARE NOT SPECIFICALLY SHOWN, SIMILAR DETAILS OF
CONSTRUCTION SHALL BE USED, SUBJECT TO APPROVAL BY THE ENGINEER.
4. THE ENGINEER SHALL NOT BE RESPONSIBLE FOR THE METHODS, TECHNIQUES, AND SEQUENCES OF PROCEDURES TO PERFORM THE WORK. THE SUPERVISION OF THE WORK IS THE SOLE RESPONSIBILITY OF
THE CONTRACTOR.
3. THE STRUCTURAL DRAWINGS HEREIN REPRESENT THE FINISHED STRUCTURE. THE CONTRACTOR SHALL PROVIDE ALL TEMPORARY GUYING AND BRACING REQUIRED TO ERECT AND HOLD THE STRUCTURE IN PROPER ALIGNMENT UNTIL ALL STRUCTURAL WORK AND CONNECTIONS HAVE BEEN COMPLETED. THE RESEARCH, DESIGN, SAFETY, ADEQUACY, AND INSPECTION OF ERECTION BRACING, SHORING, TEMPORARY
SUPPORTS, ETC. IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR.
2. THE CONTRACTOR SHALL BE RESPONSIBLE FOR COMPLYING WITH ALL SAFETY PRECAUTIONS AND REGULATIONS DURING THE WORK. THE ENGINEER WILL NOT ADVISE ON, NOR ISSUE DIRECTION, AS TO
SAFETY PRECAUTIONS AND PROGRAMS.
1. THE STRUCTURAL DRAWINGS SHALL BE USED IN CONJUNCTION WITH THE DRAWINGS OF ALL OTHER DISCIPLINES AND SPECIFICATIONS. THE CONTRACTOR SHALL ESTABLISH AND VERIFY THE REQUIREMENTS OF OTHER TRADES AS TO SLEEVES, CHASES, HANGERS, INSERT ANCHORS, HOLES, AND OTHER ITEMS TO BE PLACED OR SET IN THE STRUCTURAL WORK. DO NOT PENETRATE ANY STRUCTURAL ELEMENTS (BEAMS, COLUMNS, WALLS, SLABS, STEEL DECKS, ETC) WITHOUT PRIOR WRITTEN APPROVAL OF THE STRUCTURAL
ENGINEER THROUGH THE ARCHTIECT.
2. GENERAL
C. DO NOT LEAVE THE SITE UNTIL SATISFIED NO FIRE HAZARDS EXISTS.
B. STRUCTURAL LIQUEFACTION - WELD IN SMALL INCREMENTS. ALLOW WELDS TO HARDEN BEFORE
CONTINUING TO THE NEXT INCREMENT.
A. FIRE HAZARD - PROTECT EXISTING COMBUSTIBLES PRIOR TO WELDING. KEEP A SEPERATE
WATCHMAN AND SEVERAL FIRE EXTINGUISHERS ON HAND.
RECOMMENDATIONS TO PREVENT THESE HAZARDS:
B. STRUCTURAL LIQUEFACTION - DUE TO WELDING ACROSS THE FULL SECTION OF EXISTING
STRUCTURAL MEMBERS
A. FIRE HAZARD - DUE TO THE EXISTING CONSTRUCTION AND BUILDING CONTENTS.
7. WELDING TO AND WITHIN THE EXISTING FACILITY PRESENTS POTENTIAL HAZARDS, INCLUDING:
6. THE CONTRACTOR SHALL LOCATE REBAR IN EXISTING CONSTRUCTION PRIOR TO DRILLING OF HOLES AND SHALL TAKE CARE NOT TO DAMAGE EXISTING BARS. BEAMS AND COLUMNS ARE CRITICAL LOCATIONS WHERE HOLES ARE NOT PERMITTED. IF DAMAGE TO EXISTING REBAR OCCURS DURING CONSTRUCTION, THE CONTRACTOR IS RESPONSIBLE FOR REPAIRING THE DAMAGE. REPAIR PROCEDURES NOT DETAILED IN THE CONTRACT DOCUMENTS WILL REQUIRE PREPARATION BY A REGISTERED PROFESSIONAL ENGINEER AND
MUST BE APPROVED BY THE ENGINEER OF RECORD.
5. THE CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS TO PREVENT OVERCUTTING ANY NEW PENETRATIONS. SUGGESTED METHODS INCLUDE CORING HOLES AT THE CORNERS AND SAWCUTTING OR
USING CONCRETE CHAIN SAWS WITH PLUNGE CUTTING CAPABILITIES.
4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE DESIGN AND ERECTION OF ALL SHORING NECESSARY TO SAFEGUARD THE EXISTING STRUCTURE. IF SHORING IS SHOWN IT IS A PARTIAL AND SCHEMATIC REPRESENTATION OF THAT REQUIRED.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .