About this file

This document is an abstract of offers for a construction project. The solicitation sought bids to replace subsurface drainage systems in the 115kV and 230kV switchyards at the Oahe Project in South Dakota. Bids were due by September 16, 2021. The project scope involves removing the existing drainage system and installing a new system with perforated and solid PVC pipe, pipe casing under roadways, aggregate material for bedding and cover, and new gate valves. Care is required during construction to avoid damaging nearby structures, electrical components, grounding mat and underground utilities. Three bids were received ranging from $578,910 to $836,000. The government estimate was $658,000. The apparent low bidder was Sharpe A. Hired Labor for $578,910. The contracting agency is the Department of the Army Corps of Engineers Omaha District.

View the file

Other files for this federal contract opportunity

Other files attached to W9128F21B0022 - Replacement subsurface drainage system in the 115kV and 230kV Oahe SD Switchyard, newest first.
File Type Posted
Amendment 0001 Specs W9128F21B0022.pdf PDF
Amendment 0001 W9128F21B0022 Switchyard Drain Tile.pdf PDF
Amendment 0001 Drawings W9128F21B0022.pdf PDF
Site Visit Sign in W9128F21B0022.pdf PDF
W9128F21B0022 Switchyard Drain Tile Replacement 7987.pdf PDF
W9128F21B0022 Switchyard Drain Tile Replacement Oahe.docx DOCX document
Specs - W9128F21B0022 Switchyard Drain Tile Replacement Oahe.pdf PDF
Dwgs - W9128F21B0022 Switchyard Drain Tile Replacement Oahe Dam SD.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

2. DATE ISSUED 3. DATE OPENED

17-Aug-21 16-Sep-21

I CERTIFY THAT I HAVE OPENED, READ AND

AND RECORDED ON THIS ABSTRACT

ALL OFFERS RECEIVED IN RESPONSE DATE SIGNED

16-Sep-21

C. REASONABLE CONTRACT

7A 7B 7C D. E. F.

ITEM # DESCRIPTION OF OFFER ITEM EST. QUANTITY UNIT UNIT PRICE ESTIMATED AMOUNT UNIT PRICE ESTIMATED AMOUNT UNIT PRICE ESTIMATED AMOUNT

CLIN 0001

Entire work complete for construction and replacement of switchyard drain piping, cleanouts, valves, partial manhole replacement, and associated replacement of aggregate material, excavation and fill. Except for the option item listed below. 1 JOB $418,870.00 $658,000.00 $0.00

CLIN 0002 -

OPTION

Entire work complete for the removal of oil lines and associated replacement of aggregate material, excavation and fill. 1 JOB $160,040.00 $178,000.00 $0.00

TOTAL $578,910.00 $836,000.00 $0.00

SWITCHYARD DRAIN TILE REPLACEMENT, Oahe Project, South Dakota

Bid Security 20% - YES

C. AMENDMENTS ACKNOWLEDGED YES

Bid Security 20%

C. AMENDMENTS ACKNOWLEDGED

6. NUMBER OF AMENDMENTS ISSUED - 1

(Including Profit)

B. REASONABLE CONTRACT

(Without Profit)

A. OFFEROR A. OFFEROR

Sharpe

A. HIRED LABOR

IGE

NO. 1 NO. 2

ABSTRACT OF OFFERS - CONSTRUCTION

1. SOLICITATION NUMBER

W9128F21B0022

4. ISSUING OFFICE

8. GOVERNMENT ESTIMATE

(Check A, B or C AND COMPLETE D, E AND F)

5. PROJECT TITLE 9. OFFERS

TO THIS SOLICITATION

SIGNATURE

NAME AND TITLE OF CERTIFYING OFFICIAL (Type) Constance R Ellard - Contracting Officer , Wayne Weidenhamer - Contracting Specialist

OMAHA, NE 68102-1618

1616 CAPITOL AVENUE

CONTRACTING DIVISION (CENWO-CT)

US ARMY CORPS OF ENGINEERS

l PAGES

File details come from the government source that posted it. Updated .