79_201308306_98747_DL_NULL_0001_NULL_NULL_0001_751_U_N_Y_N_N_Y_D.PDF

PDF 98 KB Posted

Attached to
FD20202200175
Solicitation number
FD20202200175
Issued by

View the file

Other files

File Type Posted
110_Z-R701_77751_SP_C_0001_C_NULL_0014_49996_U_N_Y_N_N_Y_D.PDF PDF
60_P-M601_77751_SP_A_0001_A_NULL_0004_49996_U_N_Y_N_N_Y_D.PDF PDF
23_G-R301_77751_SP_D_0002_D_NULL_0001_49996_U_N_Y_N_N_Y_D.PDF PDF
142_Z-R701_77751_SP_C_0020_C_NULL_0001_49996_U_N_Y_N_N_Y_D.PDF PDF
86_Z-F501_77751_SP_NULL_0006_NULL_NULL_0001_49996_U_N_Y_N_N_Y_D.PDF PDF
92_Z-P801_26512_NULL_B_0001_B_NULL_0002_49996_U_N_Y_N_N_Y_D.PDF PDF
5_C-M605_77751_SP_D_0001_D_NULL_0001_753_U_N_Y_N_N_N_D.PDF PDF
112_Z-R701_77751_SP_C_0001_C_NULL_0012_49996_U_N_Y_N_N_Y_D.PDF PDF
137_Z-R701_77751_SP_C_0015_C_NULL_0001_49996_U_N_Y_N_N_Y_D.PDF PDF
103_Z-P801_26512_NULL_B_0011_B_NULL_0001_49996_U_N_Y_N_N_Y_D.PDF PDF
83_Z-F501_77751_SP_NULL_0003_NULL_NULL_0001_49996_U_N_Y_N_N_Y_D.PDF PDF
36_G-R301_77751_SP_D_0015_D_NULL_0001_49996_U_N_Y_N_N_Y_D.PDF PDF
27_G-R301_77751_SP_D_0006_D_NULL_0001_49996_U_N_Y_N_N_Y_D.PDF PDF
89_Z-P801_26512_NULL_B_0001_B_NULL_0005_49996_U_N_Y_N_N_Y_D.PDF PDF
140_Z-R701_77751_SP_C_0018_C_NULL_0001_49996_U_N_Y_N_N_Y_D.PDF PDF
63_P-M601_77751_SP_A_0001_A_NULL_0001_49996_U_N_Y_N_N_Y_D.PDF PDF
109_Z-R701_77751_SP_C_0001_C_NULL_0015_49996_U_N_Y_N_N_Y_D.PDF PDF
71_P-M601_77751_SP_A_0009_A_NULL_0001_49996_U_N_Y_N_N_Y_D.PDF PDF
88_Z-F501_77751_SP_NULL_0008_NULL_NULL_0001_49996_U_N_Y_N_N_Y_D.PDF PDF
113_Z-R701_77751_SP_C_0001_C_NULL_0011_49996_U_N_Y_N_N_Y_D.PDF PDF
11_G-R301_77751_SP_D_0001_D_NULL_0012_49996_U_N_Y_N_N_Y_D.PDF PDF
102_Z-P801_26512_NULL_B_0010_B_NULL_0001_49996_U_N_Y_N_N_Y_D.PDF PDF
72_P-M601_77751_SP_A_15A0960-H_77751_NT_NULL_0001_A_A_0001_752_U_N_Y_N_N_Y_D.PDF PDF
37_G-R301_77751_SP_D_0016_D_NULL_0001_49996_U_N_Y_N_N_Y_D.PDF PDF
73_P-P501_77751_NULL_B_0001_B_NULL_0001_441_U_N_Y_N_N_Y_D.PDF PDF
98_Z-P801_26512_NULL_B_0006_B_NULL_0001_49996_U_N_Y_N_N_Y_D.PDF PDF
144_Z-R701_77751_SP_C_0022_C_NULL_0001_49996_U_N_Y_N_N_Y_D.PDF PDF
31_G-R301_77751_SP_D_0010_D_NULL_0001_49996_U_N_Y_N_N_Y_D.PDF PDF
62_P-M601_77751_SP_A_0001_A_NULL_0002_49996_U_N_Y_N_N_Y_D.PDF PDF
131_Z-R701_77751_SP_C_0009_C_NULL_0001_49996_U_N_Y_N_N_Y_D.PDF PDF
2_160D612512_77751_PL_L_0001_L_NULL_0001_752_U_N_Y_N_N_Y_D.PDF PDF
61_P-M601_77751_SP_A_0001_A_NULL_0003_49996_U_N_Y_N_N_Y_D.PDF PDF
47_G-R301_77751_SP_D_1_77751_AT_NULL_0001_D_D_0001_49996_U_N_Y_N_N_Y_D.PDF PDF
13_G-R301_77751_SP_D_0001_D_NULL_0010_49996_U_N_Y_N_N_Y_D.PDF PDF
84_Z-F501_77751_SP_NULL_0004_NULL_NULL_0001_49996_U_N_Y_N_N_Y_D.PDF PDF
22_G-R301_77751_SP_D_0001_D_NULL_0001_49996_U_N_Y_N_N_Y_D.PDF PDF
80_SP664_77751_NULL_M_0004_M_NULL_0001_49996_U_N_Y_N_N_Y_D.PDF PDF
67_P-M601_77751_SP_A_0005_A_NULL_0001_49996_U_N_Y_N_N_Y_D.PDF PDF
70_P-M601_77751_SP_A_0008_A_NULL_0001_49996_U_N_Y_N_N_Y_D.PDF PDF
120_Z-R701_77751_SP_C_0001_C_NULL_0004_49996_U_N_Y_N_N_Y_D.PDF PDF
34_G-R301_77751_SP_D_0013_D_NULL_0001_49996_U_N_Y_N_N_Y_D.PDF PDF
128_Z-R701_77751_SP_C_0006_C_NULL_0001_49996_U_N_Y_N_N_Y_D.PDF PDF
79_SP664_77751_NULL_M_0003_M_NULL_0001_49996_U_N_Y_N_N_Y_D.PDF PDF
35_G-R301_77751_SP_D_0014_D_NULL_0001_49996_U_N_Y_N_N_Y_D.PDF PDF
4_B-M101_77751_SP_D_0001_D_NULL_0001_441_U_N_Y_N_N_Y_D.PDF PDF
139_Z-R701_77751_SP_C_0017_C_NULL_0001_49996_U_N_Y_N_N_Y_D.PDF PDF
24_G-R301_77751_SP_D_0003_D_NULL_0001_49996_U_N_Y_N_N_Y_D.PDF PDF
82_Z-F501_77751_SP_NULL_0002_NULL_NULL_0001_49996_U_N_Y_N_N_Y_D.PDF PDF
38_G-R301_77751_SP_D_0017_D_NULL_0001_49996_U_N_Y_N_N_Y_D.PDF PDF
91_Z-P801_26512_NULL_B_0001_B_NULL_0003_49996_U_N_Y_N_N_Y_D.PDF PDF
Show 40 more

Latest 50 of 153 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

APPLICATION REVISIONS

NEXT ASSY USED ON REV DESCRIPTION DATE APPROVED

FINAL A-10

UNLESS OTHERWISE SPECIFIED

DIMENSIONS ARE IN INCHES

TOLERANCE ON:

FRACTIONS DECIMALS ANGLES

± ~ .X ± ~ ± ~º

.XX± ~

.XXX± ~

DO NOT SCALE DRAWING

CURRENT

CAGE CODE

AF Form 1652 ENGINEERING DRAWING LAYOUT A Exception to AF Form 1652 approved by HQ AFMC/ENP (MS WORD)

TITLE

SIZE CAGE CODE DWG NO.

SCALE WEIGHT SHEET

U.S. AIR FORCE

OO-ALC, HILL AFB, UT 84056

CONTRACT NO.

DRAFTSMAN 429 SCMS/GUMACB

CHARLES COPE 4-24-13

CHECKER AFLCMC EZGEX SO-Hill

A-10 GENERAL ENGINEERING NOTES,

ENGINEERING DATA LIST (EDL)

RODNEY GOULD 5-6-13

MAT ENGINEER AFMC 809 MXSS/CLA

WAYNE PATTERSON 5-2-13

PROJECT ENGINEER AFLCMC/WWAEC

ENRIQUE JIMENEZ 4-24-13

AF. AUTHENTICATION

AFLCMC/WWAEC

A 98747 201308306 DANNY ANDERSON 5-3-13

AF. RELEASE AFLCMC EZGEX SO-Hill

None N/A 1 OF 5 SCOTT KINGSFORD 5-8-13

DISTRIBUTION STATEMENT D - DISTRIBUTION AUTHORIZED TO DEPARTMENT OF DEFENSE AND DOD CONTRACTORS ONLY; CRITICAL TECHNOLOGY. 2013-05-08. OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO THE A-10 System Program Office (Bldg. 1285 6033 ELM LANE, HILL AFB, UT 84056-5819)

WARNING - THIS DOCUMENT CONTAINS TECHNICAL DATA WHOSE EXPORT IS RESTRICTED BY THE ARMS EXPORT CONTROL ACT (TITLE 22, U.S.C. SEC 2751 ET SEQ.) OR EXECUTIVE ORDER 12470. VIOLATIONS OF THESE EXPORT LAWS ARE SUBJECT TO SEVERE CRIMINAL PENALTIES. DISSEMINATION OF THIS DOCUMENT IS CONTROLLED UNDER

DOD DIRECTIVE 5230.25 AND AFI 61-204.

DESTRUCTION NOTICE - FOR UNCLASSIFIED, LIMITED DOCUMENTS, DESTROY BY ANY METHOD THAT WILL PREVENT

DISCLOSURE OF CONTENT OR RECONSTRUCTION OF THE DOCUMENT.

ALL SHEETS SAME REVISION LEVEL

A 98747 201308306 -

NONE N/A 2 OF 5

AF Form 1652A CONTINUATION SHEET

SIZE CAGE CODE DWG NO. REV

SCALE WEIGHT SHEET

SCOPE: This document provides General Engineering Notes to be used in conjunction with U.S. Air Force, Hill Air Logistics Complex, Engineering Data Lists (EDL). This document forms a permanent part of the EDL.

Notes:

1. The following specifications/standards, etc. will be used in lieu of the data indicated. The superseded data will not be furnished unless so indicated.

2. Contractor is responsible to completely research these manuals, specifications, and standards and fully understand the requirements necessary for manufacture of component parts and assemblies. All deviations, minor and major, from the engineering drawing package shall be submitted to the proper A-10 engineering organization for coordination and approval.

3. When military documents listed in the engineering drawing are cancelled they shall be replaced by the industry equivalent document specified on the military document's cancellation notice. The characteristics of type, grade, class, etc. specified in the cancelled military document shall be maintained or exceed those characteristics when applying the industry equivalent document(s). The contractor will coordinate with the proper A-10 engineering organization for authorization and approval of these substitutions prior to the manufacturing of this component. When there is no listed replacement the contractor shall request and recommend a substitute document from the proper A-10 engineering organization by contacting the government contracting official.

4. Use of Northrop Grumman specification Z-R701 in conjunction with MIL-STD-130 is mandatory to ensure the proper marking of the parts. (Z-R701 has unlimited data rights in JEDMICS)

5. "IUID" (Item Unique Identifier) is required IAW MIL-STD-130. Specific instructions for marking methods, location, content and format shall be specified by the contractor and submitted to the government for approval prior to contract delivery. The contractor must demonstrate the marking does not adversely affect item integrity or performance and will remain readable and attached throughout the useable life of the item. IUID is required for items where the individual cost per unit is greater than $5,000 or if the item has been identified as fatigue critical regardless of the items per unit cost.

6. Use of any process or manufacturing technique which creates a net edge on a metallic part by relying on heat at or above the parts melting point to produce the cut is not generally authorized (i.e. laser cutting, electrical discharge machine (EDM), plasma cutting, etc.) without prior A-10 system program office approval. Likewise, other non-heat generating cutting processes involving high pressure fluids and slurries (i.e., water jet) are also not currently approved for use in the production of A-10 parts. Only those processes controlled by A-10 approved program specifications and A-10 drawings are permitted to be used in the manufacture of A-10 parts and assemblies.

7. Controlled Drawing Deviations: The contractor must adhere to specification control, vendor item or source control drawing(s). The items must be procured from the listed vendors. Any deviation and/or modification must be approved by the proper A-10 engineering organization by contacting the government contracting official for substitution from other than suggested/approved sources.

8. Do Not Drill: Do not drill pilot holes. Holes will be drilled upon installation.

NONE N/A 3 OF 5

9. Omit Mating/Mounting Holes: omit mating/mounting hole(s) in part. The part will be matched/back drilled upon installation.

10. Excess Perimeter Material: Contractor will provide 1/4 inch excess trim around entire perimeter of part. Excess trim will be removed upon installation.

11. Heat Treatment of Wrought Aluminum: Utilize SAE AMS 2770 for heat treatment of wrought aluminum alloy in lieu of

SAE AMS-H-6088.

12. Heat Treatment of Aluminum Castings: Utilize SAE AMS 2771 for heat treatment of aluminum alloy castings in lieu of

13. Heat Treatment of Raw Aluminum: Utilize SAE AMS 2772 for heat treatment of aluminum alloy raw materials in lieu of

14. Tooling Development: The government has not procured this part since original manufacture. The status of the tooling and fixtures used to produce the original parts are unknown. The contractor may request that the government search for the original tooling. This tooling is not required by the government for manufacturing of this part. The condition of the tooling is unknown. The contractor may use this tooling at their discretion and usage will be in “as is condition”. The shipping will be at contractor’s expense. The contractor may develop/manufacture their tooling required to produce this part. Prior to tool development, the contractor shall advise the government in writing of their intent to develop new tooling. The contractor shall not proceed to develop new tooling without the express consent of the government procuring agency.

15. Upon completion of the contract the contractors will at their expense return ship all government owned tooling to the government.

16. Any tooling made by the contractor will become property of the government once the contract is complete.

17. The contractor should work through the government procuring agency to contact the proper A-10 engineering organization in order to make sure any newly developed tooling and fixtures will produce an acceptable part that will fit on the aircraft. This will make sure changes and checks are done early to prevent failure of the first article.

18. 3-D Models: The A-10 engineering organization has some 3-dimensional models of this part. These models have not been loaded into JEDMICS as of the date of this instruction. Contact the proper A-10 engineering organization through the government procuring agency to get copies of the 3-dimensional models. All models are in .IGS format.

19. Forging Requirements: If the forging source(s) is known the contractor may procure forgings from sources pre-approved by the properA-10 engineering organization. If forgings are procured from tooling approved by A-10 engineering, original certified forging procedures and dies/tooling or equivalent (e.g., refurbished/resunk by approved forging source and having the same die number designation) shall be used. New tooling at an existing source must be qualified prior to contract award, the detailed part bidder shall provide verification (e.g., forging quote) to the government that the certified dies and procedures are available for their use in the event they are the successful bidder.

NONE N/A 4 OF 5

20. Forging source and the location of the dies are listed (if known) in the “Remarks” section of the EDL of the forging drawing as follows:

A. Forging drawing:

B. Die #:

C. Location of forging dies:

D. Phone:

E. Cage:

21. If the forging source is listed as unknown or the contractor wishes to develop additional sources or new tooling at an existing forging source, the contractor shall advise the government in writing of their intent to procure new forging dies and the proposed forging source prior to contract award. The contractor shall not proceed to obtain new dies without the express consent of the government procuring agency. The government shall have unlimited use of the dies developed under this contract. The contractor shall inform the forging house in writing, at the same time the order for the dies is placed, that the government has unlimited use right of the dies and forward a copy of this letter to the government contracting officer.

22. Prior to production, forging lot qualification shall be accomplished as specified on the forging drawing and SAE

AMS-F-7190 for steel forgings and SAE AMS-A-22771 for aluminum forgings. The detailed part contractor shall assure that this has been accomplished by the forging source and retain in their records for no less than 10 years. The A-10 engineering organization reserves the right to review this documentation as needed.

23. Casting Requirements: The contractor may procure castings from sources pre-approved by the proper A-10 engineering organization or may elect to develop new sources.

24. If castings are procured from sources approved by the A-10 engineering organization original certified casting procedures and tools or equivalent (e.g., refurbished/remanufactured by approved casting source), prior to contract award, the detailed part bidder shall provide verification to the government (e.g. Casting quote) that the certified tooling and casting procedures are available for their use in the event they are the successful bidder.

25. Casting source(s) and the location of the tools shall be listed (if known) in the “Remarks” section of the EDL of the casting drawing as follows:

A. Casting drawing:

B. Location of casting dies:

C. Phone:

D. Cage:

26. If the casting source is listed as unknown or the contractor wishes to develop additional sources, the contractor shall advise the government in writing of their intent to procure new casting tools and the proposed casting source prior to contract award. The government shall have unlimited use of the tools developed under this contract. The contractor shall inform the casting house in writing, at the same time the order for the tools is placed, that the government has unlimited use right of the tools and forward a copy of this letter to the government contracting officer.

The contractor shall confirm successful tooling development to the government contracting officer.

NONE N/A 5 OF 5

27. Prior to production, casting lot qualification shall be accomplished as specified on the casting drawing and SAE

AMS-2175. The detailed part contractor shall assure that this has been accomplished by the casting source and retain in their records for no less than 10 years. The A-10 engineering organization reserves the right to review this documentation as needed.

28. WARNING - The documents listed on this Engineering Data List (EDL) contain technical data whose export is restrictive by the Arms Export Control Act (Title 22, USC, Section 2751, ET SEQ.), or the Export Administration Act of 1979, as amended, Title 50 U.S.C, Append 2401 ET SEQ. Violators of these export laws are subject to severe criminal penalties.

File details come from the government source that posted it. Updated .