05021 Q and As.docx
DOCX document 15 KB Posted
- Attached to
- Aquaneering Xenopus Aquatic System
- Solicitation number
- 75N98026Q01208-05021
About this file
This is a Questions and Answers document providing clarification on installation requirements for the Aquaneering Xenopus Aquatic System solicitation (75N98026Q01208-05021) issued by the National Institutes of Health Office of Logistics and Acquisition Operations.
The document addresses key facility and installation logistics for the aquatic system. The installation location (room E018) currently houses IVC mouse racks and has existing electrical power and a dechlorinated water source suitable for frogs. Floor drains are present in the area, though they have been covered with removable plates since the space previously housed non-aquatics. The Animal Resources Section of CMB will be responsible for receiving and confirming equipment delivery, while the vendor is responsible for the complete installation. No building modifications or utility connections are anticipated, as necessary infrastructure is already in place.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| NOI SAM CSS 05021.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Clarification regarding the installation requirements for the project.
· What is currently in the space where the rack will be installed? Currently, the space is used to house IVC mouse racks.
· Electrical power available. Yes.
· Is a water source available? If so, is water dechlorinated and suitable for frogs? Yes, there is a water source and the water is dechlorinated.
· Is there a floor drain in the installation area? Yes, floor drains are present. The room was previously used to house non-aquatics, the floor drains have been covered with a removable plate.
· Who is responsible for receiving, offloading, and placing the equipment? Animal Resources Section of CMB will be responsible for receiving confirmation of the equipment in E018. The vendor is responsible for installation.
· Will the installer be responsible for any building modifications or utility connections, or will those preparations be completed before installation? No building modifications are expected.