This is a request for proposals (RFP) from the National Institutes of Health (NIH) National Institute of Allergy and Infectious Diseases (NIAID) to maintain and operate the Centers of Excellence for Influenza Research and Response (CEIRR) Influenza Data Processing and Communication Center (iDPCC). The iDPCC will process, coordinate, track, and analyze data collected by CEIRR and conduct outreach to publicize NIAID influenza research programs and facilitate access to influenza resources. The base period of performance is one year with seven one-year options. Pricing is cost-reimbursement with a fixed fee. The RFP is set aside for small businesses and responses are due by April 6, 2020. The iDPCC will maintain 10.4 FTEs annually and perform tasks such as maintaining data systems, coordinating CEIRR activities, and communicating resources to the scientific community.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| RFP 75N93020R00002 - iDPCC - Solicitation Questions and Responses.pdf | ||
| RFP 75N93020R00002.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
- 1 -
SOLICITATION
SECTION A - SOLICITATION/CONTRACT FORM
1. Requisition or other Purchase Authority: FAR 1.602-1
2. Request for Proposal (RFP) Number:
75N93020R00002
3. Issue Date:
January 6, 2020
4. Set Aside:
[ ] No
[X] Yes See Part IV Section L
5. Title : CEIRR Influenza Data Processing and Communication Center
6. ISSUED BY:
Office of Acquisitions National Institute of Allergy and Infectious Diseases National Institutes of Health 5601 Fishers Lane Rockville, MD 20852
7. SUBMIT OFFERS TO:
See Part III, Section J, "Packaging and Delivery of the Proposal," ATTACHMENT 1 of this Solicitation.
8. Proposals for furnishing the supplies and/or services in THE SCHEDULE will be received at the place specified in, and in the number of copies specified in Attachment 1, "Packaging and Delivery of the Proposal," until 12 noon local time on April 6, 2020. Offers will be valid for 120 days unless a different period is specified by the offeror on the Attachment entitled, "Proposal Summary and Data Record, NIH 2043.
9. This solicitation requires delivery of proposals as stated in ATTACHMENT 1, "PACKAGING AND DELIVERY OF THE PROPOSAL." If proposals are required to be delivered to two different locations, the OFFICIAL POINT OF RECEIPT for determining TIMELY DELIVERY is the address provided for the OFFICE OF ACQUISITIONS.
IF YOUR PROPOSAL IS NOT RECEIVED BY THE CONTRACTING OFFICER OR HIS DESIGNEE AT THE PLACE AND TIME SPECIFIED FOR THE OFFICE OF ACQUISITIONS, THEN IT WILL BE CONSIDERED LATE AND HANDLED IN ACCORDANCE WITH subparagraph (c)(3) of FAR Clause 52.215-1, Instructions to Offerors--Competitive Acquisition," LOCATED IN SECTION L.1. OF THIS SOLICITATION.
10. Offeror must be registered in the System for Award Management (SAM) prior to award of a contract. Offerors must access the CCR through The System for Award Management (SAM) at http://www.sam.gov
11. FOR INFORMATION CALL: Hamed Makou, Contract Specialist
PHONE: 301-761-7466
e-MAIL: hamed.makou@nih.gov
COLLECT CALLS WILL NOT BE ACCEPTED.
Deadline for Receipt of Questions: March 4, 2020 When submitting questions, the solicitation number must be included in the subject line.
Aileene N. Lewis Contracting Officer National Institute of Allergy and Infectious Diseases Office of Acquisitions http://www.sam.gov
RFP Number : 75N93020R00002
- 2 -
RFP TABLE OF CONTENTS
PART I - THE SCHEDULE
SECTION A - SOLICITATION/CONTRACT FORM
SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS
SECTION C - DESCRIPTION/SPECIFICATIONS/WORK STATEMENT
SECTION D - PACKAGING, MARKING AND SHIPPING
SECTION E - INSPECTION AND ACCEPTANCE
SECTION F - DELIVERIES OR PERFORMANCE
SECTION G - CONTRACT ADMINISTRATION DATA
SECTION H - SPECIAL CONTRACT REQUIREMENTS
PART II - CONTRACT CLAUSES
PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
SECTION J - LIST OF ATTACHMENTS
SOLICITATION ATTACHMENTS
TECHNICAL PROPOSAL ATTACHMENTS
BUSINESS PROPOSAL ATTACHMENTS
INFORMATIONAL ATTACHMENTS
PART IV - REPRESENTATIONS AND INSTRUCTIONS
SECTION K - REPRESENTATIONS, CERTIFICATIONS AND OTHER STATEMENTS OF OFFERORS
SECTION L - INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS
1. GENERAL INFORMATION
a. INSTRUCTIONS TO OFFERORS--COMPETITIVE ACQUISITION
b. NOTICE OF SMALL BUSINESS SET-ASIDE
c. NAICS CODE AND SIZE STANDARD
d. TYPE OF CONTRACT AND NUMBER OF AWARDS
e. LEVEL OF EFFORT
f. COMMITMENT OF PUBLIC FUNDS
g. PROMOTING EFFICIENT SPENDING
h. COMMUNICATIONS PRIOR TO CONTRACT AWARD
i. RELEASE OF INFORMATION
j. PREPARATION COSTS
k. SERVICE OF PROTEST
2. INSTRUCTIONS TO OFFERORS
a. GENERAL INSTRUCTIONS
1. Contract Type and General Clauses
2. Authorized Official and Submission of Proposal
3. Proposal Summary and Data Record (NIH-2043)
4. Separation of Technical and Business Proposals
5. Alternate Proposals
6. Evaluation of Proposals
7. Potential Award Without Discussions
8. Use of the Metric System of Measurement
9. Standards for Privacy of Individually Identifiable Health Information
- 3 -
10. Privacy Act - Treatment of Proposal Information
11. Selection of Offerors
12. Institutional Responsibility Regarding Investigator Conflicts of Interest
13. Certification of Filing and Payment of Taxes
14. Past Performance Information
15. Prohibition on Contractor Involvement with Terrorist Activities
17. Electronic Information Technology Accessibility Notice, HHSAR 352.239-73 (December 2015)
18. Solicitation Provisions Incorporated by Reference
b. TECHNICAL PROPOSAL INSTRUCTIONS
1. Technical Discussions
2. Other Considerations
3. Technical Evaluation
4. Obtaining and Disseminating Biomedical Research Resources
c. BUSINESS PROPOSAL INSTRUCTIONS
1. Basic Cost/Price Information
2. Proposal Cover Sheet
3. Information Other than Cost or Pricing Data
4. Requirements for Cost or Pricing Data or Information Other than Cost and Pricing Data
5. Salary Rate Limitation
6. Total Compensation Plan
7. Other Administrative Data
8. Qualifications of the Offeror
9. Subcontractors
10. Proposer's Annual Financial Report
11. Travel Costs/Travel Policy
12. Certification of Visas for Non-U.S. Citizens
SECTION M - EVALUATION FACTORS FOR AWARD
1. GENERAL
2. COST/PRICE EVALUATION
3. EVALUATION OF OPTIONS
4. EVALUATION OF DATA SHARING PLAN
5. TECHNICAL EVALUATION FACTORS
6. EVALUATION OF ELECTRONIC AND INFORMATION TECHNOLOGY ACCESSIBILITY- SECTION
7. PAST PERFORMANCE FACTOR
- 4 -
PART I - THE SCHEDULE
THE INFORMATION SET FORTH IN SECTION A - SOLICITATION/CONTRACT FORM, HEREIN CONTAINS IMPORTANT INFORMATION FOR ANY OFFEROR INTERESTED IN RESPONDING TO THIS SOLICITATION.
ANY CONTRACT RESULTING FROM THIS SOLICITATION WILL INCLUDE IN ITS SECTION A - SOLICITATION/ CONTRACT FORM, ACCOUNTING, APPROPRIATION AND GENERAL INFORMATION APPLICABLE TO THE
CONTRACT AWARD.
THE CONTRACT SCHEDULE SET FORTH IN SECTIONS B THROUGH H, HEREIN, CONTAINS CONTRACTUAL INFORMATION PERTINENT TO THIS SOLICITATION. IT IS NOT AN EXACT REPRESENTATION OF THE CONTRACT DOCUMENT THAT WILL BE AWARDED AS A RESULT OF THIS SOLICITATION. THE CONTRACT COST OR PRICE AND OTHER CONTRACTUAL PROVISIONS PERTINENT TO THE OFFEROR (i.e., those relating to the organizational structure [e.g., Non-Profit, Commercial] and specific cost authorizations unique to the Offeror's proposal and requiring Contracting Officer Prior Approval) WILL BE DISCUSSED IN THE NEGOTIATION PROCESS AND WILL BE INCLUDED IN THE RESULTANT CONTRACT. THE ENCLOSED CONTRACT SCHEDULE IS
INTENDED TO PROVIDE THE OFFEROR WITH THE NECESSARY INFORMATION TO UNDERSTAND THE
TERMS AND CONDITIONS OF THE RESULTANT CONTRACT.
SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS
ARTICLE B.1. BRIEF DESCRIPTION OF SUPPLIES OR SERVICES
The Contractor shall maintain and operate secure state-of-the-art computer-based systems that provide for tracking, processing, coordination, and analysis of data collected, generated, and processed primarily by the NIAID Centers of Excellence for Influenza Research and Response (CEIRR). The Contractor shall also function as a central communication/outreach resource for the CEIRR and other NIAID Influenza initiatives to provide access to NIAID-generated resources for the broader scientific community.
Options may be included to extend the terms of the contract, add additional level of effort, accomplish outreach activities, or perform discrete analytics projects in collaboration with CEIRR investigators or others approved by
NIAID.
ARTICLE B.2. ESTIMATED COST - OPTION
1. The estimated cost of the Base Period of this contract is TBD.
2. The fixed fee for the Base Period of this contract is TBD. The fixed fee shall be paid in direct ratio to the level of effort expended; that is, the percent of fee paid shall be equal to the percent of total effort expended. Payment shall be subject to the withholding provisions of the clauses ALLOWABLE COST AND PAYMENT and FIXED FEE referenced in the General Clause Listing in Part II, ARTICLE I.1. of this contract.
3. The total estimated amount of the contract, represented by the sum of the estimated cost plus the fixed fee for the Base Period is TBD.
4. If the Government exercises its option pursuant to the OPTION PROVISION Article in SECTION H of this contract, the Government's total estimated contract amount represented by the sum of the estimated cost plus the fixed fee will be increased as follows:
5.
Period Contract
Year Estimated
Cost($)
Fixed Fee($)
Cost
Plus Fixed
Base Period Year 1
- 5 -
Period Contract Year
Cost($)
Fixed
Cost
Plus Fixed Fee($)
Option Period(s):
Option 1 Year 2
Option 2 Year 3
Option 3 Year 4
Option 4 Year 5
Option 5 Year 6
Option 6 Year 7
Sub-Total
[Base Period and Option(s)]
Quantity Option(s) to increase Level of Effort
Note: Quantity Options can be exercised for up to 10 additional FTEs per contract year
Contract Year Estimated Cost
Fixed Fee ($) Estimated Cost
Plus Fixed Fee ($)
Option 7A (1 FTE) Year 1
Maximum Allowed (10 FTEs)
Option 7B (1FTE) Year 2
Option 7C (1 FTE) Year 3
Option 7D (1 FTE) Year 4
Option 7E (1 FTE) Year 5
Option 7F (1 FTE) Year 6
- 6 -
Quantity Option(s) to increase Level of Effort
Option 7G (1 FTE) Year 7
Collaborative Analytics Projects
Note: Collaborative Analytics Projects may be exercised up to 5 times per contract year.
Fixed Fee ($) Estimated Cost Plus Fixed Fee ($)
Option 8A (1 Time) Year 1
(5 Times)
Option 8B (1 Time) Year 2
Option 8C (1 Time) Year 3
Option 8D (1 Time) Year 4
Option 8E (1 Time) Year 5
Option 8F (1 Time) Year 6
Option 8G (1 Time) Year 7
Communication Options
Note: Communication Options may be exercised up to 5 times per contract year.
Fixed Fee ($) Estimated Cost Plus Fixed Fee ($)
Option 9A (1 Time) Year 1
- 7 -
Communication Options
Option 9B (1 Time) Year 2
Option 9C (1 Time) Year 3
Option 9D (1 Time) Year 4
Option 9E (1 Time) Year 5
Option 9F (1 Time) Year 6
Option 9G (1 Time) Year 7
Final Transition Option
Contract Year
Estimated Cost ($)
Fixed Fee
Estimated Cost Plus Fixed Fee
Option 10 Year 7
Extension of Services Option (no more than 6 additional months over the life of the contract)
Contract Year
Estimated Cost ($)
Fixed Fee
Estimated Cost Plus Fixed Fee
Option 11
- 8 -
ARTICLE B.3. PROVISIONS APPLICABLE TO DIRECT COSTS
This article will prohibit or restrict the use of contract funds, unless otherwise approved by the Contracting Officer. The following is a list of items that may be included in the resultant contract as applicable. 1) Conferences & Meetings, 2) Food for Meals, Light Refreshments & Beverages, 3) Promotional Items, 4) Acquisition, by purchase or lease, of any interest in real property; 5) Special rearrangement or alteration of facilities; 6) Purchase or lease of any item of general purpose office furniture or office equipment regardless of dollar value; 7) Travel Costs including Foreign Travel; 8) Consultant Costs; 9) Subcontract Costs; 10) Patient Care Costs; 11) Accountable Government Property; 12) Printing costs; and 13) Research Funding.
ARTICLE B.4. ADVANCE UNDERSTANDINGS
Specific elements of cost, which normally require prior written approval of the Contracting Officer before incurrence of the cost (e.g., foreign travel, consultant fees, subcontracts) will be included in this Article if the Contracting Officer has granted his/her approval prior to contract award.
See Attachment 8, "Advance Understandings" for additional information pertaining to this solicitation.
- 9 -
SECTION C - DESCRIPTION/SPECIFICATIONS/WORK STATEMENT
ARTICLE C.1. STATEMENT OF WORK
a. Independently and not as an agent of the Government, the Contractor shall be required to furnish all the necessary services, qualified personnel, material, equipment, and facilities, not otherwise provided by the Government, as needed to perform the Statement of Work, dated November 6, 2019, attached hereto and made a part of this Solicitation (See SECTION J - List of Attachments).
ARTICLE C.2. REPORTING REQUIREMENTS
All reports required herein shall be submitted in electronic format.
All electronic reports submitted shall be compliant with Section 508 of the Rehabilitation Act of 1973. Additional information about testing documents for Section 508 compliance, including guidance and specific checklists, by application, can be found at: http://www.hhs.gov/web/508/index.html under "Making Files Accessible."
a. Technical Progress Reports
1. In addition to the required reports set forth elsewhere in this Schedule, the preparation and submission of regularly recurring Technical Progress Reports will be required in any contract resulting from this solicitation. These reports will require descriptive information about the activities undertaken during the reporting period and will require information about planned activities for future reporting periods. The frequency and specific content of these reports will be determined prior to contract award. [Note: Beginning May 25, 2008, the Contractor shall include the applicable PubMed Central or NIH Manuscript Submission reference number when citing publications that arise from its NIH funded research.]
For proposal preparation purposes only, it is estimated that in addition to the required electronic version(s) 1 hard copies of these reports will be required as follows:
[ ] Monthly [ ] Quarterly [X] Semi-Annually [X] Annually [ ] Annually (with a requirement for a Draft Annual Report) [X] Final - Upon final completion of the contract [ ] Final - Upon final completion of the contract (with a requirement for a Draft Final Report)
2. Summary of Salient Results
The Contractor will be required to prepare and submit, with the final report, a summary (not to exceed 200 words) of salient results achieved during the performance of the contract. This report will be required on or before the expiration date of the contract.
b. Other Reports/Deliverables
1. Reporting of Financial Conflict of Interest (FCOI) http://www.hhs.gov/web/508/index.html
- 10 -
All reports and documentation required by 45 CFR Part 94, Responsible Prospective Contractors including, but not limited to, the New FCOI Report, Annual FCOI Report, Revised FCOI Report, and the Mitigation Report, shall be submitted to the Contracting Officer in Electronic format. Thereafter, reports shall be due in accordance with the regulatory compliance requirements in 45 CFR Part 94.
45 CFR Part 94 is available at: http://www.ecfr.gov/cgi-bin/text-idx?
c=ecfr&SID=0af84ca649a74846f102aaf664da1623&rgn=div5&view=text&node=45:1.0.1.1.51&idno=45.
See Part 94.5, Management and reporting of financial conflicts of interest for complete information on reporting requirements.
(Reference subparagraph g. of the INSTITUTIONAL RESPONSIBILITY REGARDING INVESTIGATOR FINANCIAL CONFLICTS OF INTEREST Article in SECTION H of this contract.)
2. Source Code and Object Code
Unless otherwise specified herein, the Contractor shall deliver to the Government, upon the expiration date of the contract, all source code and object code developed, modified, and/or enhanced under this contract.
INFORMATION AND/OR PHYSICAL SECURITY
1. Security Assessment and Authorization (SA&A)- A valid authority to operate (ATO) certifies that the Contractor's information system meets the contract's requirements to protect the agency data. If the system under this contract does not have a valid ATO, the Contractor (and/or any subcontractor) shall work with the agency and supply the deliverables required to complete the ATO within the specified timeline(s) within three
(3) months after contract award. The Contractor shall conduct the SA&A requirements in accordance with HHS IS2P, NIST SP 800-37, Guide for Applying the Risk Management Framework to Federal Information Systems: A Security Life Cycle Approach (latest revision).
For an existing ATO, Contracting Officer Representative must make a determination if the existing ATO provides appropriate safeguards or if an additional ATO is required for the performance of the contract and state as such.
NIH acceptance of the ATO does not alleviate the Contractor's responsibility to ensure the system security and privacy controls are implemented and operating effectively.
2. SA&A Package Deliverables - The Contractor (and/or any subcontractor) shall provide an SA&A package within 30 days of contract award to the CO and/or COR. The following SA&A deliverables are required to complete the SA&A package.
• System Security Plan (SSP) - due within 30 days after contract award. The SSP shall comply with the NIST SP 800-18, Guide for Developing Security Plans for Federal Information Systems, the Federal Information Processing Standard (FIPS) 200, Recommended Security Controls for Federal Information Systems, and NIST SP 800-53, Security and Privacy Controls for Federal Information Systems and Organizations applicable baseline requirements, and other applicable NIST guidance as well as HHS and NIH policies and other guidance. The SSP shall be consistent with and detail the approach to IT security contained in the Contractor's bid or proposal that resulted in the award of this contract.
The SSP shall provide an overview of the system environment and security requirements to protect the information system as well as describe all applicable security controls in place or planned for meeting those requirements. It should provide a structured process for planning adequate, cost-effective security protection for a system. The Contractor shall update the SSP at least annually thereafter.
• Security Assessment Plan/Report (SAP/SAR) - due 30 days after the contract award. The security assessment shall be conducted by the assessor and be consistent with NIST SP 800-53A, NIST SP 800-30, and HHS and NIH policies. The assessor will document the assessment results in the SAR.
http://www.ecfr.gov/cgi-bin/text-idx?c=ecfr&SID=0af84ca649a74846f102aaf664da1623&rgn=div5&view=text&node=45:1.0.1.1.51&idno=45 http://www.ecfr.gov/cgi-bin/text-idx?c=ecfr&SID=0af84ca649a74846f102aaf664da1623&rgn=div5&view=text&node=45:1.0.1.1.51&idno=45
- 11 -
The NIH should determine which security control baseline applies and then make a determination on the appropriateness/necessity of obtaining an independent assessment. Assessments of controls can be performed by contractor, government, or third parties, with third party verification considered the strongest. If independent assessment is required, include statement below.
Thereafter, the Contractor, in coordination with the NIH shall conduct/assist in the assessment of the security controls and update the SAR at least annually.
• Independent Assessment - due 90 days after the contract award. The Contractor (and/or subcontractor) shall have an independent third-party validate the security and privacy controls in place for the system(s). The independent third party shall review and analyze the Security Authorization package, and report on technical, operational, and management level deficiencies as outlined in NIST SP 800-53. The Contractor shall address all "high" deficiencies before submitting the package to the Government for acceptance. All remaining deficiencies must be documented in a system Plan of Actions and Milestones (POA&M).
• POA&M - due 30 days after contract award. The POA&M shall be documented consistent with the HHS Standard for Plan of Action and Milestones and NIH policies. All high-risk weaknesses must be mitigated within 30 days and all medium weaknesses must be mitigated within 60 days from the date the weaknesses are formally identified and documented. The NIH will determine the risk rating of vulnerabilities. Identified risks stemming from deficiencies related to the security control baseline implementation, assessment, continuous monitoring, vulnerability scanning, and other security reviews and sources, as documented in the SAR, shall be documented and tracked by the Contractor for mitigation in the POA&M document. Depending on the severity of the risks, NIH may require designated POAM weaknesses to be remediated before an ATO is issued.
Thereafter, the POA&M shall be updated at least quarterly.
3. Contingency Plan and Contingency Plan Test - due 60 days after contract award. The Contingency Plan must be developed in accordance with NIST SP 800-34, Contingency Planning Guide for Federal Information Systems, and be consistent with HHS and NIH policies. Upon acceptance by the System Owner, the Contractor, in coordination with the System Owner, shall test the Contingency Plan and prepare a Contingency Plan Test Report that includes the test results, lessons learned and any action items that need to be addressed.
Thereafter, the Contractor shall update and test the Contingency Plan at least annually.
• E-Authentication Questionnaire - The contractor (and/or any subcontractor) shall collaborate with government personnel to ensure that an E-Authentication Threshold Analysis (E-auth TA) is completed to determine if a full E-Authentication Risk Assessment (E-auth RA) is necessary. System documentation developed for a system using E-auth TA/E-auth RA methods shall follow OMB 04-04 and NIST SP 800-63, Rev. 2, Electronic Authentication Guidelines.
Based on the level of assurance determined by the E-Auth, the Contractor (and/or subcontractor) must ensure appropriate authentication to the system, including remote authentication, is in-place in accordance with the assurance level determined by the E-Auth (when required) in accordance with HHS policies.
4. POSITION SENSITIVITY DESIGNATIONS
All Contractor (and/or any subcontractor) employees must obtain a background investigation commensurate with their position sensitivity designation that complies with Parts 1400 and 731 of Title 5, Code of Federal Regulations (CFR). The following position sensitivity designation levels apply to this solicitation/contract:
[ ] Level 6: Public Trust - High Risk. Contractor/subcontractor employees assigned to Level 6 positions shall undergo a Suitability Determination and Background Investigation (MBI).
[X] Level 5: Public Trust - Moderate Risk. Contractor/subcontractor employees assigned to Level 5 positions with no previous investigation and approval shall undergo a Suitability Determination and a Minimum Background Investigation (MBI), or a Limited Background Investigation (LBI).
[ ] Level 1: Non-Sensitive. Contractor/subcontractor employees assigned to Level 1 positions shall undergo a Suitability Determination and National Check and Inquiry Investigation (NACI).
- 12 -
1. HOMELAND SECURITY PRESIDENTIAL DIRECTIVE (HSPD)-12
Roster-
1. The Contractor (and/or any subcontractor) shall submit a roster by name, position, e-mail address, phone number and responsibility, of all staff working under this acquisition where the Contractor will develop, have the ability to access, or host and/or maintain a government information system(s). The roster shall be submitted to the COR and/or CO within fourteen (14) calendar days after the effective date of this contract. Any revisions to the roster as a result of staffing changes shall be submitted within seven (7) calendar days of the change.
The COR will notify the Contractor of the appropriate level of investigation required for each staff member. An electronic template, "Roster of Employees Requiring Suitability Investigations," is available for contractor use at:
https://ocio.nih.gov/aboutus/publicinfosecurity/acquisition/Documents/SuitabilityRoster_10-15-12.xlsx.
2. If the Contractor is filling a new position, the Contractor shall provide a position description and the Government will determine the appropriate suitability level. Upon receipt of the Government's notification of applicable Suitability Investigations required, the Contractor shall complete and submit the required forms within 30 days of the notification.
3. Upon receipt of the Government's notification of applicable Suitability Investigations required, the Contractor shall complete and submit the required forms within 30 days of the notification.
4. The Contractor shall notify the Contracting Officer in advance when any new personnel, who are subject to a background check/investigation, will work under the contract and if they have previously been the subject of national agency checks or background investigations.
5. All contractor and subcontractor employees shall comply with the conditions established for their designated position sensitivity level prior to performing any work under this contract. Contractors may begin work after the fingerprint check has been completed.
6. Investigations are expensive and may delay performance, regardless of the outcome of the investigation. Delays associated with rejections and consequent re-investigations may not be excusable in accordance with the FAR clause, Excusable Delays - see FAR 52.249-14. Accordingly, the Contractor shall ensure that any additional employees whose names it submits for work under this contract have a reasonable chance for approval.
7. Typically, the Government investigates personnel at no cost to the Contractor. However, multiple investigations for the same position may, at the Contracting Officer's discretion, justify reduction(s) in the contract price of no more that the cost of the additional investigation(s).
8. The Contractor shall include language similar to this "HHS Controlled Facilities and Information Systems Security" language in all subcontracts that require subcontractor personnel to have the same frequency and duration of (1) physical access to an HHS-controlled facility; (2) logical access to an HHS-controlled information system; (3) access to sensitive HHS data/information, whether in an HHS-controlled information system or in hard copy; or (4) any combination of circumstances (1) through (3).
9. The Contractor shall direct inquiries, including requests for forms and assistance, to the Contracting Officer or designee.
10. Within 7 calendar days after the Government's final acceptance of the work under this contract, or upon termination of the contract, the Contractor shall return all identification badges to the Contracting Officer or designee.
5. CONTRACT INITIATION AND EXPIRATION
1. General Security Requirements- The Contractor (and/or any subcontractor) shall comply with information security and privacy requirements, Enterprise Performance Life Cycle (EPLC) processes, HHS Enterprise Architecture requirements to ensure information is appropriately protected from initiation to expiration of the contract. All information systems development or enhancement tasks supported by the contractor shall follow the HHS EPLC framework and methodology or and in accordance with the HHS Contract Closeout Guide (2012).
HHS EA requirements may be located here: https://www.hhs.gov/ocio/ea/documents/proplans.html https://ocio.nih.gov/aboutus/publicinfosecurity/acquisition/Documents/SuitabilityRoster_10-15-12.xlsx https://www.hhs.gov/ocio/ea/documents/proplans.html
- 13 -
2. System Documentation- Contractors (and/or any subcontractors) must follow and adhere to NIST SP 800-64, Security Considerations in the System Development Life Cycle, at a minimum, for system development and provide system documentation at designated intervals (specifically, at the expiration of the contract) within the EPLC that require artifact review and approval.
3. Sanitization of Government Files and Information- As part of contract closeout and at expiration of the contract, the Contractor (and/or any subcontractor) shall provide all required documentation in accordance with the NIH Media Sanitization and Disposal Policy to the CO and/or COR to certify that, at the government's direction, all electronic and paper records are appropriately disposed of and all devices and media are sanitized in accordance with NIST SP 800-88, Guidelines for Media Sanitization.
4. Notification- The Contractor (and/or any subcontractor) shall notify the CO and/or COR and system ISSO within fifteen days before an employee stops working under this contract.
5. Contractor Responsibilities Upon Physical Completion of the Contract- The contractor (and/or any subcontractors) shall return all government information and IT resources (i.e., government information in non-government-owned systems, media, and backup systems) acquired during the term of this contract to the CO and/or COR. Additionally, the Contractor shall provide a certification that all government information has been properly sanitized and purged from Contractor-owned systems, including backup systems and media used during contract performance, in accordance with HHS and/or NIH policies.
6. The Contractor (and/or any subcontractor) shall perform and document the actions identified in the NIH Contractor Employee Separation Checklist https://ocio.nih.gov/aboutus/publicinfosecurity/acquisition/Documents/ Emp-sep-checklist.pdf when an employee terminates work under this contract within 2 days of the employee's exit from the contract. All documentation shall be made available to the CO and/or COR upon request.
7. Contractor Non-Disclosure Agreement (NDA)- Each Contractor (and/or any subcontractor) employee having access to non-public government information under this contract shall complete the NIH non-disclosure agreement https://ocio.nih.gov/aboutus/publicinfosecurity/acquisition/Documents/Nondisclosure.pdf , as applicable. A copy of each signed and witnessed NDA shall be submitted to the Contracting Officer (CO) and/or CO Representative (COR) prior to performing any work under this acquisition.
8. Vulnerability Scanning Reports The Contractor shall report the results of the required monthly special vulnerability scans no later than 10 days following the end of each reporting period. If required monthly, this report may be included as part of the Technical Progress Report. Otherwise, this report shall be submitted under a separate cover on monthly basis.
9. Government Access for Security Assessment. In addition to the Inspection Clause in the contract, the Contractor (and/or any subcontractor) shall afford the Government access to the Contractor's facilities, installations, operations, documentation, information systems, and personnel used in performance of this contract to the extent required to carry out a program of security assessment (to include vulnerability testing), investigation, and audit to safeguard against threats and hazards to the confidentiality, integrity, and availability of federal data or to the protection of information systems operated on behalf of HHS, including but are not limited to:
1. At any tier handling or accessing information, consent to and allow the Government, or an independent third party working at the Government's direction, without notice at any time during a weekday during regular business hours contractor local time, to access contractor and subcontractor installations, facilities, infrastructure, data centers, equipment (including but not limited to all servers, computing devices, and portable media), operations, documentation (whether in electronic, paper, or other forms), databases, and personnel which are used in performance of the contract.
The Government includes but is not limited to the U.S. Department of Justice, U.S. Government Accountability Office, and the HHS Office of the Inspector General (OIG). The purpose of the access is to facilitate performance inspections and reviews, security and compliance audits, and law enforcement investigations. For security audits, the audit may include but not be limited to such items as buffer overflows, open ports, unnecessary
- 14 -services, lack of user input filtering, cross site scripting vulnerabilities, SQL injection vulnerabilities, and any other known vulnerabilities.
2. At any tier handling or accessing protected information, fully cooperate with all audits, inspections, investigations, forensic analysis, or other reviews or requirements needed to carry out requirements presented in applicable law or policy. Beyond providing access, full cooperation also includes, but is not limited to, disclosure to investigators of information sufficient to identify the nature and extent of any criminal or fraudulent activity and the individuals responsible for that activity. It includes timely and complete production of requested data, metadata, information, and records relevant to any inspection, audit, investigation, or review, and making employees of the contractor available for interview by inspectors, auditors, and investigators upon request.
Full cooperation also includes allowing the Government to make reproductions or copies of information and equipment, including, if necessary, collecting a machine or system image capture.
3. Segregate Government protected information and metadata on the handling of Government protected information from other information. Commingling of information is prohibited. Inspectors, auditors, and investigators will not be precluded from having access to the sought information if sought information is commingled with other information.
4. Cooperate with inspections, audits, investigations, and reviews.
3. Section 508 Annual Report
The contractor shall submit an annual Section 508 report in accordance with the schedule set forth by the Contracting Officer (CO)/Contracting Officer's Representative (COR). The Section 508 Report Template and Instructions for completing the report are available at: http://www.hhs.gov/web/508/ contracting/technology/vendors.html under "Vendor Information and Documents."
REPORTING REQUIREMENTS FOR USE WITH THE ELECTRONIC REPORT DELIVERABLE
SUBMISSION (eRDS) SITE
All reports required herein shall be submitted in electronic format. All electronic contract deliverables shall be submitted via the NIAID electronic Report Deliverable Submission (eRDS) Site, available at the following website:
https://erds.niaid.nih.gov/. All electronic reports submitted shall be compliant with Section 508 of the Rehabilitation Act of 1973. Additional information about testing documents for Section 508 compliance, including guidance and specific checklists, by application, can be found at http://www.hhs.gov/web/508/index.html under "Making Files Accessible."
ARTICLE C.3. INVENTION REPORTING REQUIREMENT
All reports and documentation required by FAR Clause 52.227-11, Patent Rights-Ownership by the Contractor including, but not limited to, the invention disclosure report, the confirmatory license, and the Government support certification, shall be directed to the Division of Extramural Inventions and Technology Resources (DEITR), OPERA, OER, NIH, 6705 Rockledge Drive, Suite 310, MSC 7980, Bethesda, Maryland 20892-7980 (Telephone: 301-435-1986). In addition, one copy of an annual utilization report, and a copy of the final invention statement, shall be submitted to the Contracting Officer. The final invention statement (see FAR 27.303(b)(2)(ii)) shall be submitted to the Contracting Officer on the expiration date of the contract.
The annual utilization report shall be submitted in accordance with the DELIVERIES Article in SECTION F of this contract. The final invention statement (see FAR 27.303(b)(2)(ii)) shall be submitted on the expiration date of the contract. All reports shall be sent to the following address:
Aileene N. Lewis Contracting Officer National Institutes of Health National Institute of Allergy and Infectious Diseases Office of Acquisition 5601 Fishers Lane, Room 3B50 Bethesda, Maryland 20852-http://www.hhs.gov/web/508/contracting/technology/vendors.html http://www.hhs.gov/web/508/contracting/technology/vendors.html
- 15 -
If no invention is disclosed or no activity has occurred on a previously disclosed invention during the applicable reporting period, a negative report shall be submitted to the Contracting Officer at the address listed above.
To assist contractors in complying with invention reporting requirements of the clause, the NIH has developed "Interagency Edison," an electronic invention reporting system. Use of Interagency Edison is required as it streamlines the reporting process and greatly reduces paperwork. Access to the system is through a secure interactive Web site to ensure that all information submitted is protected. Interagency Edison and information relating to the capabilities of the system can be obtained from the Web ( http://www.iedison.gov), or by contacting the Extramural Inventions and Technology Resources Branch, OPERA, NIH.
http://www.iedison.gov
- 16 -
SECTION D - PACKAGING, MARKING AND SHIPPING
All deliverables required under this contract shall be packaged, marked and shipped in accordance with Government specifications. At a minimum, all deliverables shall be marked with the contract number and Contractor name. The Contractor shall guarantee that all required materials shall be delivered in immediate usable and acceptable condition.
- 17 -
SECTION E - INSPECTION AND ACCEPTANCE
1. The Contracting Officer or the duly authorized representative will perform inspection and acceptance of materials and services to be provided.
2. For the purpose of this SECTION, TBD is the authorized representative of the Contracting Officer.
3. Inspection and acceptance will be performed at:
National Institute of Allergy and Infectious Diseases National Institutes of Health 5601 Fishers Lane Rockville, MD 20852
Acceptance may be presumed unless otherwise indicated in writing by the Contracting Officer or the duly authorized representative within 30 days of receipt.
4. This contract incorporates the following clause by reference, with the same force and effect as if it were given in full text. Upon request, the Contracting Officer will make its full text available.
FAR Clause 52.246-8, Inspection of Research and Development - Cost-Reimbursement (May 2001).
Alternate I (April 1984) is not applicable to this contract.
- 18 -
SECTION F - DELIVERIES OR PERFORMANCE
ARTICLE F.1. PERIOD OF PERFORMANCE
1. The period of performance of this contract shall be from December 31, 2020 through December 30, 2021.
2. If the Government exercises its option(s) pursuant to the OPTION PROVISION Article in Section H of this contract, the period of performance will be increased as listed below:
Option Option Period Option 1 - Year 2 December 31, 2021 - December 30, 2022 Option 2 - Year 3 December 31, 2022 - December 30, 2023 Option 3 - Year 4 December 31, 2023 - December 30, 2024 Option 4 - Year 5 December 31, 2024 - December 30, 2025 Option 5 - Year 6 December 31, 2025 - December 30, 2026 Option 6 - Year 7 December 31, 2026 - December 30, 2027 Option 10 - Final Transition TBD Option 11 - Extension of Services
TBD
ARTICLE F.2. DELIVERIES
Satisfactory performance of the final contract shall be deemed to occur upon performance of the work described in the Statement of Work Article in SECTION C of this contract and upon delivery and acceptance by the Contracting Officer, or the duly authorized representative, of the items listed in Attachment 5, "Reporting Requirements and Deliverables" and in accordance with the stated delivery schedule:
The items specified in the REPORTING REQUIREMENTS Article in SECTION C of this contract will be required to be delivered F.o.b. Destination as set forth in FAR 52.247-35, F.o.b. DESTINATION, WITHIN CONSIGNEES PREMISES (APRIL 1984), and in accordance with and by the date(s) specified in Attachment 5, "Reporting Requirements and Deliverables".
ARTICLE F.3. LEVEL OF EFFORT
a. During the period of performance of this contract, the Contractor shall provide 10.4 Full-Time-Equivalents (FTEs) per contract year . The labor hours should include vacation, holiday, and sick leave. The labor hours include subcontractor and consultant labor hours.
b. The Contractor shall have satisfied the requirement herein if not less than 90% nor more than 110% of the total FTEs specified herein are furnished. These terms and conditions do not supersede the requirements of either the "Limitation of Cost" or "Limitation of Funds" clause.
c. In the event fewer FTEs than the minimum specified FTEs in the total categories are used by the Contractor in accomplishing the prescribed work and the Government has not invoked its rights under FAR Clause 52.249-6, TERMINATION (Cost-Reimbursement) incorporated in this contract, these parties agree that the fee will be adjusted based solely upon the quantity of FTEs by which the number of FTEs furnished is less than the number of FTEs specified in this ARTICLE. The resulting adjustment shall be evidenced by a contract modification.
- 19 -
ARTICLE F.4. CLAUSES INCORPORATED BY REFERENCE, FAR 52.252-2 (FEBRUARY
1998)
This contract incorporates the following clause(s) by reference, with the same force and effect as if it were given in full text. Upon request, the Contracting Officer will make its full text available. Also, the full text of a clause may be accessed electronically at this address: https://www.acquisition.gov/?q=browsefar.
FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSE:
52.242-15, Stop Work Order (August 1989)
Alternate I (April 1984) is applicable to this contract.
https://www.acquisition.gov/?q=browsefar
- 20 -
SECTION G - CONTRACT ADMINISTRATION DATA
ARTICLE G.1. CONTRACTING OFFICER'S REPRESENTATIVE (COR)
The following Contracting Officer's Representative (COR) will represent the Government for the purpose of this contract:
To be specified prior to award.
The COR is responsible for: (1) monitoring the Contractor's technical progress, including the surveillance and assessment of performance and recommending to the Contracting Officer changes in requirements; (2) interpreting the statement of work and any other technical performance requirements; (3) performing technical evaluation as required; (4) performing technical inspections and acceptances required by this contract; and (5) assisting in the resolution of technical problems encountered during performance.
The Contracting Officer is the only person with authority to act as agent of the Government under this contract. Only the Contracting Officer has authority to: (1) direct or negotiate any changes in the statement of work; (2) modify or extend the period of performance; (3) change the delivery schedule; (4) authorize reimbursement to the Contractor for any costs incurred during the performance of this contract; (5) otherwise change any terms and conditions of this contract; or (6) sign written licensing agreements. Any signed agreement shall be incorporated by reference in Section K of the contract
The Government may unilaterally change its COR designation.
ARTICLE G.2. KEY PERSONNEL, HHSAR 352.237-75 (December 2015)
The key personnel specified in this contract are considered to be essential to work performance. At least 30 days prior to the contractor voluntarily diverting any of the specified individuals to other programs or contracts the Contractor shall notify the Contracting Officer and shall submit a justification for the diversion or replacement and a request to replace the individual. The request must identify the proposed replacement and provide an explanation of how the replacement's skills, experience, and credentials meet or exceed the requirements of the contract (including, when applicable, Human Subjects Testing requirements). If the employee of the contractor is terminated for cause or separates from the contractor voluntarily with less than thirty days notice, the Contractor shall provide the maximum notice practicable under the circumstances. The Contractor shall not divert, replace, or announce any such change to key personnel without the written consent of the Contracting Officer. The contract will be modified to add or delete key personnel as necessary to reflect the agreement of the parties.
(End of Clause)
The following individual(s) is/are considered to be essential to the work being performed hereunder:
Name Title
TBD Principal Investigator
TBD Center Coordinator
ARTICLE G.3. INVOICE SUBMISSION/CONTRACT FINANCING REQUEST AND CONTRACT
FINANCIAL REPORT
a. Invoice Submission/Contract Financing Request and Contract Financial Reporting, NIH(RC)-4 for NIH Cost- Reimbursement Type Contracts are attached and made part of this contract. The Contractor shall follow the attached instructions and submission procedures specified below to meet the requirements of a "proper invoice" pursuant to FAR Subpart 32.9, Prompt Payment.
- 21 -
1. Payment requests shall be submitted to the offices identified below. Do not submit supporting documentation (e.g., receipts, time sheets, vendor invoices, etc.) with your payment request unless specified elsewhere in the contract or requested by the Contracting Officer.
a. The original invoice shall be submitted to the following designated billing office:
National Institutes of Health Office of Financial Management Commercial Accounts 2115 East Jefferson Street, Room 4B-432, MSC 8500 Bethesda, MD 20892-8500
b. One copy of the invoice shall be submitted to the following approving official:
Contracting Specialist National Institute of Allergy and Infectious Diseases Office of Acquisitions 5601 Fishers Lane Room Rockville, MD 20852 MSC
E-mail: NIAIDOAInvoices@niaid.nih.gov
The Contractor shall submit an electronic copy of the payment request to the approving official instead of a paper copy. The payment request shall be transmitted as an attachment via e-mail to the address listed above in one of the following formats: MSWord, MS Excel, or Adobe Portable Document Format (PDF). Only one payment request shall be submitted per e-mail and the subject line of the e-mail shall include the Contractor's name, contract number, and unique invoice number.
[Note: The original payment request must still be submitted in hard copy and mailed to the designated billing office to meet the requirements of a "proper invoice."]
Central Point of Distribution: NIAID_MIDBRCB
2. In addition to the requirements specified in FAR 32.905 for a proper invoice, the Contractor shall include the following information on the face page of all payment requests:
a. Name of the Office of Acquisitions. The Office of Acquisitions for this contract is NIAID .
b. Federal Taxpayer Identification Number (TIN). If the Contractor does not have a valid TIN, it shall identify the Vendor Identification Number (VIN) on the payment request. The VIN is the number that appears after the Contractor's name on the face page of the contract. [Note: A VIN is assigned to new contracts awarded on or after June 4, 2007, and any existing contract modified to include the VIN number.] If the Contractor has neither a TIN, DUNS, or VIN, contact the Contracting Officer.
c. DUNS or DUNS+4 Number. The DUNS number must identify the Contractor's name and address exactly as stated in the contract and as registered in the Central Contractor Registration (CCR) database. If the Contractor does not have a valid DUNS number, it shall identify the Vendor Identification Number (VIN) on the payment request. The VIN is the number that appears after the Contractor's name on the face page of the contract. [Note: A VIN is assigned to new contracts awarded on or after June 4, 2007, and any existing contract modified to include the VIN number.] If the Contractor has neither a TIN, DUNS, or VIN, contact the Contracting Officer.
d. Invoice Matching Option. This contract requires a two-way match.
- 22 -
e. Unique Invoice Number. Each payment request must be identified by a unique invoice number, which can only be used one time regardless of the number of contracts or orders held by an organization.
f. The Contract Title is:
CEIRR Influenza Data Processing and Communication Center
g. Contract Line Items as follows:
Line Item # Line Item Description
TBD To be specified at the time of award
b. The Contractor shall include the following certification on every invoice for reimbursable costs incurred with Fiscal Year funds subject to HHSAR Clause 352.231-70, Salary Rate Limitation in SECTION I of this contract.
For billing purposes, certified invoices are required for the billing period during which the applicable Fiscal Year funds were initially charged through the final billing period utilizing the applicable Fiscal Year funds:
"I hereby certify that the salaries charged in this invoice are in compliance with HHSAR Clause 352.231-70, Salary Rate Limitation in SECTION I of the above referenced contract."
ARTICLE G.4. PROVIDING ACCELERATED PAYMENT TO SMALL BUSINESS
SUBCONTRACTORS, FAR 52.232-40 (December 2013)
a. Upon receipt of accelerated payments from the Government, the Contractor shall make accelerated payments to its small business subcontractors under this contract, to the maximum extent practicable and prior to when such payment is otherwise required under the applicable contract or subcontract, after receipt of a proper invoice and all other required documentation from the small business subcontractor.
b. The acceleration of payments under this clause does not provide any new rights under the prompt Payment Act.
c. Include the substance of this clause, include this paragraph c, in all subcontracts with small business concerns, including subcontracts with small business concerns for the acquisition of commercial items.
(End of Clause)
ARTICLE G.5. INDIRECT COST RATES
In accordance with Federal Acquisition Regulation (FAR) (48 CFR Chapter 1) Clause 52.216-7 (d)(2), Allowable Cost and Payment incorporated by reference in this contract in PART II, SECTION I, the cognizant Contracting Officer representative responsible for negotiating provisional and/or final indirect cost rates is identified as follows:
Director, Division of Financial Advisory Services Office of Acquisition Management and Policy National Institutes of Health
6011 EXECUTIVE BLVD, ROOM 549C, MSC-7663
BETHESDA MD 20892-7663
These rates are hereby incorporated without further action of the Contracting Officer.
ARTICLE G.6. GOVERNMENT PROPERTY
If this RFP will result in the acquisition or use of Government Property provided by the contracting agency or if the Contracting Officer authorizes in the preaward negotiation process, the acquisition of property (other than real property), this ARTICLE will include applicable provisions and incorporate the HHS Publication, entitled, "HHS
- 23 -
Contracting Guide for Contract of Government Property," which can be found at: http://oamp.od.nih.gov/sites/default/ files/appendix_q_hhs_contracting_guide.pdf.
ARTICLE G.7. POST AWARD EVALUATION OF CONTRACTOR PERFORMANCE
a. Contractor Performance Evaluations
Interim and Final…