This is an Amendment of Solicitation (Standard Form 30) for a Total Small Business set-aside opportunity issued by the Kayenta Health Center Acquisition Department in Kayenta, Arizona.
The solicitation 75H71026Q00127 has been amended to extend the response deadline from July 7, 2026 to July 9, 2026 at 10:00 AM MDT, and to attach Post Site Visit questions with photographs of the modular homes under renovation. The Period of Performance runs from August 1, 2026 to July 31, 2027. The amendment includes 29 questions and answers addressing clarifications on permits, taxes, HVAC specifications, plumbing work, flooring, fixtures, painting requirements, surface preparation standards, and project scope details across four modular housing units (3013, 3015, 3016, and 3025). Key clarifications include: Kayenta Township requires a construction permit with fees; local tax is 7% with 1% material tax minus labor; HVAC units are 3 tons; furnaces are to be disposed of by the contractor; only supply plumbing lines (not drain/vent lines) require replacement; existing water heaters are to remain; rooftop swamp coolers are not to be removed; ceramic tiles in kitchens and bathrooms of unit 3025 remain in place; door replacements are required for units 3013 and 3016; the government will install concrete pads for AC condensing units; painting is required only for bathroom fixtures and perimeter wood skirting with prime and two finish coats in Sherwin Williams Dover White 6385 Semi-Gloss; surface preparation follows HUD standards; no canopy work is required; and all eight tubs/walkins across four units are to be replaced, with unit 3025's master tub replaced by an open standing shower without glass doors. The document includes photographs documenting current conditions of kitchens, bathrooms, furnace locations, and skirting work for reference.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
75H71026Q00127 x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
Kayenta AZ 86033
Highway 160, Mile Post 394.3 PO Box 368 Acquisition Department Kayenta Health Center
07/06/20260006
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
04/20/2026
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
This is a Total Small Business (SB) set-aside.
This solicitation 75H71026Q00127 is hereby amended to reflect the following changes:
-- Attach Post Site Visit questions and photos of modular homes
-- Extend response date FROM 07/07/2026 TO 07/09/2026 at 10:00 AM MDT
Period of Performance: 08/01/2026 to 07/31/2027
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
JERLYN R. BEGAY
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
Post Site Visit – Questions:
1. In the previously answered questions, on Question #28, the answer is: "Government housing does require any permits/inspections from tribal or local permits. KSU housing oƯice to inspect installation of new equipment.” We believe the answer should be “doesn’t require any permits/inspections…..” Are we correct?
Yes & No, local government inspection of work is not required but, Kayenta Township required construction permit with fees.
2. In the previous Question #29, Navajo Nation Tax, does the 7% “local Kayenta Township tax regulation” include the 6% Navajo Nation Tax and 1% construction material tax (Less labor)? Or is the 7% additional to the 6% Navajo Nation Tax?
Local tax regulation only requires Kayenta Township Tax of 7% and construction permit cost of 1% material tax minus labor cost. $100 construction permit fees.
3. What are the HVAC unit specifications (BTUs, tonnage)?
3 tons
4. Are the furnaces being removed, returned to IHS or disposed of by the contractor?
Some are removed and contractor to dispose of all removed furnaces.
5. All supply plumbing lines are being replaced, what about drain and vent lines? If these Drain/Vent lines are ABS or PVC material I don’t think it’s necessary to replace.
Replace all supply plumbing and not the drain and vent lines.
6. If we are replacing the drain/vent lines it will add a substantial amount of work.
Project does not require replacement of drain/vent lines.
7. Are all water heaters needing to be replaced?
Keep existing water heaters.
8. Rooftop swamp coolers are present, with the new AC units these are no longer needed. Is the intention to leave these on the roof or Demo?
If we are demoing that will Also mean patching the roof. Project does not require removal and patching of rooftop swamp cooler.
9. All flooring is being demo’d and replaced. Does that include the tile that is found in kitchens and bathrooms? If yes, are we needing to re-install tile or just the spec’d out flooring throughout.
Quarters 3025 floor ceramic tiles in kitchen and bathroom will stay in place and replace flooring in all other areas.
10. Please confirm all Drywall and paint repairs will be done by KHC.
Project does not require drywall and paint repairs. Repairs done before renovation starts. Drywall and painting is required for the new bathroom tube/showers.
11. We are replacing baseboards, what about door casing? At the site visit I noticed many pieces of door casing missing.
Project requires door replacement and replace door casing as needed.
12. Are we needing to install concrete pads for the new AC condensing units?
Government to install concrete pads for the new AC condensing units.
13. Do we replace the large tub in only one restroom at unit 3025 or do all the tubs get replaced in all 4 units for a total of 8 tubs/walkins
Remove large tub in quarters 3025. Four quarters to get 8 tubs/walkins replaced.
14. [HIGH PRIORITY] The work removes existing paint and rust from steel by wire-brushing and powered grinding (SOW Division 09). Has GSA tested the existing coatings for lead or other regulated substances, and is a lead/hazardous-coating survey available to oƯerors? If regulated coatings are present, please confirm the required containment, worker protection, and waste characterization/disposal requirements.
Buildings 3010 to 3041 are three (3) and four (4)-bedroom single-family housing units that are classified as “new”. These units were not included in the testing performed by iiná, bá that conducted inspection Marth 2012.
15. Is GSA aware of any areas of significant corrosion, section loss, or failed coatings beyond normal weathering that would require repair under the SOW prior to coating?
No significant corrosion or failed coating was identified in the project.
16. [HIGH PRIORITY] The SOW lists a “Canopy Surface” square footage for each area (e.g., AZ0356JJ North 16,250 ft², South 6,700 ft²). Please confirm whether each figure represents the actual steel surface area to be coated, or the projected/plan footprint of the canopy. If the latter, please advise the basis oƯerors should use to compute paintable steel surface.
Project does not require any canopy work.
17. The SOW tags both “Main Building” and “NII Building and Canopy” as AZ0336JJ, while the SF1449 lists CLIN 0005 (Main Building + Canopy walkway) as AZ0336JJ and CLIN 0004 (NII and 2 Canopies) as AZ0362JJ. Please confirm the correct facility/area code for each CLIN and which physical structures are included in each line item.
Project does not require any canopy work.
18. The SOW references “Project Footprint Drawing / Photos” as an attachment. Please confirm these are available to oƯerors and where they can be obtained, as they are needed to verify quantities and access.
Contractor was given opportunity to confirm footprint drawing/photos during on-site contractor inspection on July 1, 2026.
19. SOW Division 09 specifies a zero-VOC, low-odor, rust-inhibitive enamel with “TBD finish.” Please confirm (a) the required sheen, (b) the number of finish coats, and (c) any required dry-film thickness or specific product/performance standard.
Painting required only at bathroom tub/standing tub and perimeter wood skirting.
Prime paint and two finish coats is required.
20. Does a specific SSPC/NACE surface-preparation standard govern (e.g., SSPC-SP 2 / SP 3), or are the hand and power-tool methods described in Division 09 the full requirement?
Follow HUD standards for surface preparation which the modular home was built under.
21. The SOW requires colors to match existing. Please provide the existing paint manufacturer, color name/number, and sheen where known, or confirm oƯerors should field-match and submit samples for approval.
Manufacture: Sherwin Williams, Color: Dover White/ 6385, Interior PROMAR 200 Zero Voc Semi-Gloss
22. Gantry Building- Project has either been stated by what’s in the documents or verbally that all white surfaces to be repainted white but this building is not white but needs to be painted what color are we painting this building?
Dover White
23. Given continuous port operations, please confirm whether night or oƯ-peak work is permitted, how lane/booth and canopy-area closures will be coordinated, and any restrictions on aerial-lift staging or overhead work above active inspection lanes.
Four modular building renovations are vacant and work to be done anytime of the week. Any closure request of nearby tenants must be coordinated with government housing manager.
24. In unit 3025- The scope of work says to replace tub with walk-in shower. But the master in unit 3025 already has a walk-in shower. Do you want just another master tub install. Plus this master restroom has glass block right next to the master tub. If a master walk-in shower is installed this master bathroom will have two showers.
The master shower will be covering up the glass lock which appears to be allowing natural light into the restroom.
In quarters 3025, remove existing large tub and replace standing shower. Open standing shower to have no glass door where tenants install own standing shower curtains.
25. Unit 3025 - It looks like The Demo has started in this unit on the floor. Will the demo be completed by your staƯ or is that part of our SOW?
Floor demo to completed by KARH housing staƯ before contractor arrives.
26. Second question about the floor in unit 3025. Will the porcelain tile remain or does that also get demoed?
Porcelain tiles will remain in quarter 3025.
27. Again, who performs the demolition the Contractor or your staƯ? I need to know if the tile is gonna stay so I can adjust the LVT flooring.
KARH housing oƯice to remove carpet to wood base flooring and existing vinyl can be covered with new LVT tiles.
28. Unit 3013 there is no utility door in this home. Do you want a door installed that enters into the utility or not?
Replace both exterior doors.
29. Again in unit 3016 there is no utility door. Do you want a utility door installed at this location?
Replace both exterior doors.
Quarters: 3013 & 3015
Quarters: 3016
Quarters: 3025