This statement of work outlines requirements for environmental site assessments and hazardous materials surveys at the Winnebago, Nebraska Indian Health Service campus. The contractor will conduct Phase 1 environmental site assessments and test for asbestos, lead-based paint, and other hazardous materials at multiple buildings and land parcels. The contractor must submit reports within 30 days for each location including methods, findings, and cost estimates for remediation. The performance period is 120 calendar days from notice to proceed. The solicitation specifies the Department of Health and Human Services Indian Health Service as the agency and includes details on coordination, safety protocols, deliverables, and compliance with tribal employment requirements.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| IHS IEE Representation Form_75H70624Q00005.pdf | ||
| 75H70624Q00005 Winnebago Phase 1 ESA.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
PHASE 1 ENVIRONMENTAL SITE
ASSESSMENT AND HAZARDOUS
MATERIAL AND ASBESTOS SURVEY
REPORTS
GP23AW802Z06
WINNEBAGO, NE
NOVEMBER 2023
Table of Contents
1. COORDINATION, LOCATION, AND TIMELINE
2. INTRODUCTION & PURPOSE
3. SCOPE
4. REQUIREMENTS
5. CONSTRUCTION ITEMS
6. RESPONSIBILITIES
7. COORDINATION
8. SUPERINTENDENT
9. PERFORMANCE PERIOD
10. INFECTION CONTROL & INTERIM LIFE SAFETY MEASURES
11. SAFETY AND SECURITY
12. RESTORATION
13. WARRANTY
14. DELIVERABLES
15. TRIBAL EMPLOYMENT RIGHTS OFFICE (TERO) REQUIREMENTS
BID SCHEDULE
APPENDIX A – WINNEBAGO, NE
STATMENT OF WORK
PHASE 1 ESA & HMAS
WINNEBAGO, NE
1. COORDINATION, LOCATION, AND TIMELINE
Contract Officer Representative (COR):
Stottin Newbrough
Project Engineer
Stottin.Newbrough@ihs.gov
Telephone: 605-719-4054
Location:
Winnebago, NE
Timeline:
60 Calendar Days
2. INTRODUCTION & PURPOSE
This project shall produce Phase 1 Environmental Site Assessment (ESA) and Hazardous
Materials and Asbestos Survey (HMAS) reports for the Winnebago Campus. Hazardous materials shall include asbestos, lead based paint (LBP), mold, mercury-containing materials, polychlorinated biphenyls (PCBs), chlorofluorocarbons (CFCs), hydrochlorofluorocarbons
(HCFCs), oil and oil products (including treated timbers), household hazardous-waste
(paints, varnishes, solvents, and cleaning chemicals), fuel oil tanks, miscellaneous hazardous materials, solid waste, and radon. Locations are shown in Appendix A.
The purpose of these assessments and surveys are to gather sufficient information to develop an independent professional opinion about the environmental condition of the property and to identify actual or potential environmental contamination.
3. SCOPE
The project defined within this Statement of Work is the Phase 1 Environmental Site
Assessment and Hazardous Material and Asbestos Survey Report for various Winnebago
IHS buildings and campus. A cost estimate for remediation shall be provided for each finding during the survey. The project includes all labor, transportation, and supplies to complete the survey and report.
The contractor shall provide certified inspector/s to perform the Phase 1 ESA per ASTM
E1527-21. A hazardous material and asbestos building and site survey shall also be provided for the buildings.
The contractor shall review the building and conduct a site investigation to determine the site mailto:Stottin.Newbrough@ihs.gov conditions. The building and site may be disturbed only as necessary to inspect and understand the environmental hazards that may be present.
Bulk samples from suspected hazardous materials shall be collected to be further tested at a certified laboratory using appropriate standard testing methods as necessary.
The contractor shall ensure all personnel is using appropriate personal protective equipment while on site.
1. Winnebago
1) Hospital. Installation 11506, Building 00304
a) Approximate age: 2004
b) Size: 8,808 square meters
c) Located: Winnebago, NE
d) Local contact: Paul McCarty 402-922-0076 or 402-872-2231 x2004
2) Heating Plant. Installation 11506, Building 00306
a) Approximate age: 2004
b) Size: 443 square meters
3) Ambulance. Installation 11506, Building 00307
a) Approximate age: 2009
b) Size: 235 square meters
4) Storage. Installation 11506, Building 00N15
a) Approximate age: 1968
b) Size: 297 square meters
5) Garage. Installation 11506, Building 00N16
a) Approximate age: 1968
b) Size: 111 square meters
6) Land. Installations 11506 & 03321
a) Approximate age: N/A
b) Size: 14.74 Acres (4.54 acres Federally owned, 10.2 acres leased)
7) Tunnel.
a) Approximate age: 1955
b) Size: Unknown
c) Located: Winnebago, NE
4. REQUIREMENTS
The contractor shall perform the following.
1. The contractor shall obtain all required permits, insurance, and fees, federal and tribal, required of a general contractor working in Nebraska.
2. The contractor shall provide a complete report within thirty (30) days after competition of assessment and survey for each building. Each report shall include, but is not limited to, the following:
a. Phase 1 ESA and Hazardous Material, LBP, and Asbestos Report
b. Methods of testing
c. Findings, opinions, and recommendations
d. Site overview
e. Historical and environmental information
f. Records review
g. The site and adjoining property reconnaissance
h. Interviews
i. References
j. Test results and locations of hazards
k. Rough cost estimates for required remediation or potential demolition and disposal activities
l. Site diagram, site photographs, figures, property information, qualifications of environmental professionals, certificate of insurance, etc.
5. CONSTRUCTION ITEMS
N/A
6. RESPONSIBILITIES
The Contractor shall be responsible for the professional quality, technical accuracy, and coordination of all surveys, reports, and other services furnished under this contract. The
Contractor shall, without additional compensation, correct or revise any errors or deficiencies in its reports.
7. COORDINATION
Upon receiving an executed contract, the Contractor will schedule a scoping visit with the
COR to coordinate the project. Meetings at the locations will be with an IHS project team consisting of the COR, Service Unit facility manager, and other Service Unit IHS staff.
Site visits shall be coordinated with the COR and/or Facility Manager. Preliminary site visits during the proposal stage shall be allowed.
8. SUPERINTENDENT
The contractor shall at all times during the project have a designated and qualified
Superintendent on the project. The Superintendent shall be disclosed in writing with the name, office location, office number, and cell phone number. The Superintendent shall be the designated person by the contractor who will represent the contractor on-site during all times when work on-site is taking place.
9. PERFORMANCE PERIOD
The period of performance of this contract shall be 120 calendar days from the Notice to
Proceed (NTP).
10. INFECTION CONTROL & INTERIM LIFE SAFETY MEASURES
The contractor shall be required to follow the requirements of the Interim Life Safety
Measures, Infection Control Risk Assessment, and Pre-Construction Risk Assessment, if applicable. The permits and life safety measures assessment will be provided to the
Contractor following the award of the task order.
All work shall be performed in a manner to limit the disruption to the clinical activities.
11. SAFETY AND SECURITY
The contractor shall be responsible for the safe progress of the work to assure that patients, hospital staff, visitors, children, and tenants are not allowed access to unsafe areas or conditions during the progress of the work. The contractor and staff shall afford all staff, patients, and visitors’ professional courtesy during the project. Interim life safety measures will be strictly enforced during the project. For details, contact the Safety Officer.
The health center and the Indian Health Service staff shall not be responsible for the security of the contractor’s tools, equipment, or material during the project.
12. RESTORATION
The contractor shall restore all areas disturbed by the project to a condition at least equal to that existing before the project, and shall minimize interference to the function of the Service
Unit during the project.
13. WARRANTY
N/A
14. DELIVERABLES
Following contract award, the contractor shall provide the Indian Health Service submittals of proposed methods, materials, and new equipment to be utilized during the project. At a minimum, submittals are required for the following items:
1. Phase 1 Environmental Site Assessment Report – Each building per location
2. Hazardous Material, Lead-Based Paint, and Asbestos Survey Report – Each building per location
3. Cost Estimates
4. Project schedule
5. Resumes of qualified individuals performing the services
15. TRIBAL EMPLOYMENT RIGHTS OFFICE (TERO)
REQUIREMENTS
Contractors engaging in work on any Indian Reservation will be required to comply with the
Indian preference and Indian preference program requirements administered by the Tribal
Employment Rights Office (TERO).
Typical requirements of TERO include a percentage fee on the total contract price.
Contractors are strongly encouraged to contact the TERO office for an explanation of tribal requirements, required fees, and permits.
BID SCHEDULE
PHASE 1 ESA AND HMAS
GP23AW802Z06
Est. Unit Total
Item Description Qty. Unit Cost Cost
Phase 1 ESA and HMAS – Winnebago, NE
Multiple Building and Land Campus 1 Job $ $
Total $