A. 75H70527R00001 amendment 00002 questions.docx
DOCX document 20 KB Posted
- Attached to
- Bemidji Area Wide Teleradiology Services for Diagnostic Interpretation of Radiologic Studies
- Solicitation number
- 75H70527R00001
About this file
This file contains vendor questions and government responses for Amendment 00002 of Solicitation 75H70527R00001, a Firm Fixed Price IDIQ contract for teleradiology services at two Indian Health Service facilities. The contract is set aside for 100% Small Business and has been extended to November 30, 2026 at 1:00 pm CT. The Indian Health Service (IHS), under the Department of Health and Human Services, seeks a prime contractor to provide diagnostic interpretation of radiologic studies at the Red Lake Service Unit and Cass Lake Service Unit in Minnesota.
Key clarifications from the amendment include: STAT studies must be finalized and available within 60 minutes (preferred) or 30 minutes (required), with 95% compliance; Option Year Two quantities should match Base Year and other Option Years at 10,500 General Radiology, 2,500 Ultrasound, 2,400 CT, and 1,100 Mammography studies; echocardiograms will not be required at either facility; mammography monitor physicist testing refers to annual medical physicist evaluation of diagnostic workstations; Minnesota-specific licensure is mandatory for credentialing purposes and waivers will not be approved; credentialing by proxy is accepted for teleradiologists with documentation shared between facilities; prime contractors may divide reading work between multiple subcontractors without conditions or limitations; and digital breast tomosynthesis is performed for both screening and diagnostic mammograms, with approximately 20% of the 1,100 estimated mammograms being diagnostic. Additional details address PACS/RIS platforms (Fuji PACS 7.4 at Red Lake; GE at Cass Lake), historical six-month study volumes by modality and site, and the upcoming potential transition to Oracle Health for which interface requirements remain unconfirmed.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
75H70527R00001
AMENDMENT 00002
QUESTIONS
1. STAT turnaround time (PWS 4 and 7.h). PWS requires STAT studies to be finalized, signed, and available in the IHS EHR within 30 minutes, with 95% compliance. We respectfully ask the Government to consider a 60-minute STAT standard, for the following reasons:
· Volume growth and the time needed to add radiologists. VetMed currently has 23 Minnesota-licensed radiologists credentialed at IHS Bemidji. As imaging volume and STAT demand grow, VetMed will continue adding radiologists. Each new radiologist must obtain a Minnesota license and then complete IHS credentialing and privileging (at least 90 days per PWS 9.d) before reading. A 60-minute standard protects 95% compliance during volume surges and overnight while that added capacity is brought on.
· Consistency with other IHS and VA contracts. Phoenix Area IHS RFP 75H71226R00001 uses 60 minutes for STAT, and VA RFQ 36C25726Q0522 was amended to 1 hour.
· Patient safety is protected. All reports are final reads. Critical findings would still be called to the site clinician immediately, and stroke-protocol studies would still be prioritized for interpretation within 15 minutes.
The Government has updated the STAT read to be 30 minutes preferred, 60 minutes required.
2. Option Year Two quantities. The amended B.5 Bid Schedule lists Option Year Two (CLINs 0013–0018) as 8,550 General Radiology, 1,920 Ultrasound, 4,450 CT, and 1,155 Mammography. All other periods use the PWS figures (10,500 / 2,500 / 2,400 / 1,100). Please confirm whether Option Year Two should match the other periods. Yes, Option Year Two should be the same estimated quantities as the Base and other Option Years listed.
3. Echocardiogram interpreters. Echocardiograms are typically read by cardiologists rather than radiologists. Under PWS 5.c, may echocardiogram studies be interpreted by a board-certified cardiologist (as a VetMed employee or subcontractor), and must that physician also hold a Minnesota license? Echocardiograms will not be required to be read at either facility.
4. Mammography monitor physicist testing (PWS 8.e). Please confirm whether “physicist quality control testing” refers to the annual medical physicist evaluation of the contractor’s mammography diagnostic workstations, to be provided to each facility quarterly. If something additional is expected, please describe it. Yes, this is correct. Nothing additional is expected.
5. Section 508 Product Assessment Template. For this services contract, is the HHS Section 508 Product Assessment Template required with the proposal, or is a narrative description of Section 508 conformance enough? An HHS Checklist can be used to attest to Section 508 conformance.
6. SF 1449 Blocks 23 and 24. Is it acceptable to enter “See Section B.5 Bid Schedule” in Blocks 23 and 24, with all pricing provided in B.5? Yes, this is acceptable.
7. Submission format. Is there a preferred file format (Word or PDF) or a maximum email attachment size? If the files are large, may the proposal be sent across more than one email? There is no preferred format, the proposal may be sent across more than one email.
8. Is there an incumbent contractor currently performing these services? If so, please provide the contract number. Yes, 75H70522D00001.
9. Please confirm whether an MRI scanner is available at either IHS Hospital covered by this solicitation. No, there will not be MRI reading required at either location.
10. Should option year pricing be based on the 1% annual volume growth stated in the PWS, or on the flat quantities shown in the B.5 Bid Schedule. It would be the estimated quantiles in the B5. Bid Schedule and include a 1% annual growth for the Option Years.
11. Please confirm that echocardiogram interpretation is within the scope of this contract. Echocardiograms are typically interpreted by cardiologists rather than radiologists. No Echocardiogram interpretation will be required at either Service Unit.
12. Providers at IHS federal facilities are generally not required to hold a license in the specific state where the facility is located. We respectfully request that the Government waive the Minnesota specific licensure requirement and accept an active, unrestricted license form any U.S. State. The Government is retaining the Minnesota-specific requirement because it is necessary to complete credentialing for services under this contract. This requirement was previously reviewed with Bemidji Area Leadership and legal counsel. An active, unrestricted license from another U.S. state alone does not satisfy the facility’s current credentialing requirements. Accordingly, the requested waiver is not approved.
13. When are the facilities scheduled to transition to Oracle Health? Will this transition require the contractor to establish a new HL7 or FHIR interface connection? A confirmed Oracle Health transition schedule for the facilities and the associated contractor interface requirements are not available currently. The Government cannot currently confirm whether a new HL7 or FHIR interface connection will be required.
14. Will IHS accept credentialing by proxy based on the contractor’s accredited credentialing program, or will full IHS credentialing be required for each radiologist? Specifically, if a radiologist is already credentialed and privileged at another IHS facility, will IHS accept existing credentialing and grant privileges through credentialing by proxy, rather than requiring a completely new credentialing process? Yes. IHS accepts credentialing by proxy for teleradiologists, subject to review of the required documentation and approval by the receiving facility’s Medical Executive Committee and governing body. For radiologists already credentialed and privileged at another IHS facility, existing credentialing documentation may be shared and used to support this process. Credentialing packets may be shared between Red Lake and Cass Lake; separate packets are not required for each facility. However, existing privileges do not automatically transfer.
15. Is it acceptable for the prime contractor to divide the reading work between two subcontractors? For example-with one subcontractor performing General Radiology, Ultrasound, and CT, and a second subcontractor performing Echocardiograms, DEXA scans, and Mammography? If so, are there any conditions or limitations on splitting the work this way? Yes, this is acceptable. No conditions or limitations.
16. How is the FAR 52.219-14 limitation on subcontracting measured for this requirement, and does a first-tier small business subcontractor under NAICS 621512 count as a similarly situated entity? This will be a commercial award where the Prime Contractor is held responsible. In the event a sub-contractor does not perform in accordance with terms and conditions the Prime will be held accountable.
17. What is the credentialing timeline, and may credentialing begin before award? Credentialing by proxy is accepted for teleradiologists, and credentialing packets may be shared between Red Lake and Cass Lake. Processing depends on receipt of complete documentation, verification, and Medical Executive Committee and governing-body review. A specific turnaround time has not been confirmed.
Personnel security processing is separate. Applicants generally have 14 days to submit required materials, with possible seven-day extensions. These are submission periods, not guaranteed credentialing or clearance timelines. Whether credentialing may begin before award requires confirmation from the credentialing office and contracting officer.
18. Could you provide the annual sturdy volume by modality and site, broken out by routine, STAT, and after-hours, weekend, and holiday coverage? The available historical data cover April through September 2026. Six-month volumes are:
| • | Red Lake: 2,679 X-ray, 1,410 CT, 494 ultrasound, and 473 mammography studies. |
| • | Cass Lake: 2,128 X-ray, 455 CT, 451 ultrasound, and 267 mammography studies. |
The historical summaries also identify studies recorded as STAT. A complete annual breakdown by modality, site, priority, and after-hours, weekend, and holiday periods is not available in the current summary. DEXA volumes are not included in these data.
Separately, the PWS identifies approximately eight echocardiograms per month at Red Lake. Cass Lake does not currently provide echocardiograms but may add them in the future. Historical volumes are provided for planning purposes and do not guarantee future workload. * Echocardiograms are not required to be read at either site.
19. Which PACS and RIS platforms are in use at Red Lake and Cass Lake, and what are the connectivity and workstation requirements? Red Lake uses Fuji PACS version 7.4. Cass Lake’s PACS has been identified as GE; the specific product and version have not been confirmed. Both facilities use IHS RPMS/EHR. Separate RIS platform information has not been confirmed.
Images will route through each facility’s PACS, with technical setup coordinated with the selected contractor. Prior studies are available at both facilities.
Detailed connectivity and workstation specifications, including interface requirements, network access, security configuration, diagnostic displays, and responsibility for equipment and connection costs, require confirmation from facility IT.
20. Mammography (CLIN 6) CLIN 6 estimates 1,100 mammography studies. Because screening and diagnostic mammograms are valued differently, please clarify the following:
a) Of the estimated 1,100 mammograms, how many (or what percentage) are screening, and how many are diagnostic? An estimated 20% are diagnostic exams.
b) Is digital breast tomosynthesis (3D) performed for both screening and diagnostic mammograms? (Yes/No) If it is performed for only one type, please specify which. Yes, it is performed for both screening and diagnostic mammograms.
The current submission deadline for this opportunity is November 13, 2026. Is there a possibility of an extension to the deadline. Yes, this Solicitation will be extended to 11/30/2026 at 1 pm CT.
File details come from the government source that posted it. Updated .