A00001-75H70124R00039.pdf

PDF 421 KB Posted

Attached to
Pine Ridge, Kyle, Wanblee Multiple Duplex Sitework & Foundations Federal contract opportunity
Solicitation number
75H701-24-R-00039
Issued by
Department of Health and Human Services Indian Health Service

About this file

This document is Amendment A00001 to Solicitation 75H701-24-R-00039 issued by the Indian Health Service (IHS) Division of Engineering Services for the "Multiple Duplex Sitework & Foundations" project in Pine Ridge, Kyle, and Wanblee, South Dakota.

The amendment provides responses to 14 pre-proposal inquiries related to the solicitation, including clarification on top of footing elevations, finish levels for garage drywall, garage window and door requirements, compliance with the geotechnical report recommendations, subsurface drainage, backflow preventer installation, and requirements for using experience from firms other than the prime contractor. The amendment also makes administrative changes to update FAR and HHSAR clause references in the solicitation. The proposal due date of July 16, 2024 at 2:00 PM MDT remains unchanged.

View the file

Other files for this federal contract opportunity

Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

A00001

Jennifer J. Scroggins

See the following SF30 continuation page.

Indian Health Service Division of Engineering Services (DES) - Seattle 701 5th Ave, Suite 1600 Seattle, WA 98104

Indian Health Service Division of Engineering Services (DES) - Seattle 701 5th Ave, Suite 1600 Seattle, WA 98104

75H701-24-R-00039

1 2

07/09/2024

06/13/2024

SF30 CONTINUATION OF BOX 14.

Solicitation 75H701-24-R-00039 Amendment A00001 Project Pine Ridge, Kyle, Wanblee Multiple Duplex Sitework & Foundations

SUMMARY OF CHANGES:

Amendment A00001 to solicitation 75H701-24-R-00039 hereby addresses the following:

1. Provides Pre-Proposal Inquiries 1 through 14, dated July 09, 2024, 4 pages.

2. Revises solicitation Sections L.11.(1)(i)(D), Factor 1 (iii) through (vi), Factor 3; and, Sections M.2.(d), M.2.(h) and M.2.1. Factor 1. The attached revised sections are to be replaced in their entirety. Changes are generally identified, for convenience, either by strikeout for deletions, and underlining of text for additions or a single dark line in the margin. All portions of the revised sections shall apply whether or not changes have been indicated.

a. The entire revised solicitation is being provided as a separate attachment to this amendment (60 pages).

3. Makes administrative corrections to the following tables in the solicitation that populated blank rows as follows:

a. At Section I.2 Table HEALTH AND HUMAN SERVICES ACQUISITION REGULATION (HHSAR) CLAUSES INCORPORATED BY REFERENCE adds HHSAR clauses:

352.203-70 Anti-Lobbying Dec 2015 352-208-70 Printing and Duplication Dec 2015 352.222-70 Contractor Cooperation in Equal Employment Opp. Investigations Dec 2015 352.223-70 Safety and Health Dec 2015 352.224-71 Confidential Information Dec 2015 352.226-1 Indian Preference Dec 2015 352.226-2 Indian Preference Program Dec 2015 352.226-3 Native American Graves Protection and Repatriation Act Dec 2015 352.227-70 Publications And Publicity Dec 2015 352.237-75 Key Personnel Dec 2015 352.239-74 Electronic and Information Technology Accessibility Dec 2015

b. At Section L.1 Table FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) adds FAR clause:

52.204-7 System for Award Management Oct 2018

4. The proposal due date/time remains unchanged. Proposals are due by July 16, 2024, at 2:00 PM

MDT.

NOTICE TO OFFERORS: Offerors must acknowledge receipt of any and all amendments by number and date on their cover letter in their offer or by submitting a signed copy of the SF30. All other terms and conditions remain unchanged.

END SUMMARY OF CHANGES

Amendment A00001 under Solicitation 75H701-24-R-00039 Multiple Duplex Sitework & Foundations Pine Ridge, Kyle, and Wanblee, SD

INDIAN HEALTH SERVICE

DIVISION OF ENGINEERING

SERVICE

PRE-PROPOSAL INQUIRIES

Solicitation 75H701-24-R-00039

PROJECT:

Multiple Duplex Sitework & Foundations

LOCATION:

Pineridge, SD 57770 Kyle, SD 57752 Wanblee, SD 57577

PROJECT NO:

DOCUMENT

OWNER: Joshua VanSkike PHONE: 206-615-2480 DOCUMENTS:

DATE: 07/09/2024 DEPARTMENT: IHS/DES

Item No.

Reference Drawing, Spec, Page COMMENTS POC IHS Approved Response

Amendment A00001 dated 07/09/2024

1. Sheet A311, detail 1, indicates 94’ for the top of the flooring. Sheet S101 indicates the top of the footing at 95’6”. Please advise which top of footing elevation is correct.

If 94’ is the top of the footing, can the contractor, at their discretion, over-excavate approximately 4 ½” for a 6’ foundation wall?

If 95’6” is the top of the footing, can the contractor, at their discretion, over-excavate 10 ½” for a 5’ foundation wall?

94ft is the TO Footing to ensure 4 ft clearance in crawlspace.

No concerns with over-excavation to provide a standard form.

2. Section: Gypsum Board, 092900 G. Gypsum Board Finish Levels.

What level of finish is required in the garages?

Drywall and first tape/mud is all that is anticipated.

3. Garage Windows - No window specification is provided for the windows required in the garage. Please provide

Windows will be the same windows provided in the house.

Please see schedules and elevations. Specification applies to garage windows as well.

4. Overhead Doors - No Overhead Door is provided for the overhead doors required in the garage. Please provide

Garage door information is included in schedule. Hardware is per manufacturer. Provide insulated doors, continuous angles on tracks, and install per manufacturer’s recommended installation guidelines.

5. Geotechnical Report - The geotechnical report indicates numerous “recommendations / recommends” in the report. Are the contractors required to follow each recommendation as indicated in the report or follow the details on the drawings? Please clarify what recommendations should be followed. Some examples include: Corrosivity We recommend a certified corrosion engineer be employed to determine the need for corrosion protection and to design appropriate protective measures. Is this required?

Yes, corrosion engineer is required to determine the need for corrosion protection to design appropriate protective measures. Concrete selection aligns with recommendations from Geotech report.

6. Subsurface Drainage - To prevent hydrostatic loading on the walls, a perforated rigid plastic drain line installed behind the base of the walls and extended below the adjacent grade is recommended.

If required, please indicate the requirements for subsurface drainage on the drawings.

Yes, install perimeter drain per Geotech report information and detail. All pertinent information is included in Geotech report.

INDIAN HEALTH SERVICE

DIVISION OF ENGINEERING

SERVICE

PRE-PROPOSAL INQUIRIES

Solicitation 75H701-24-R-00039

PROJECT:

Multiple Duplex Sitework & Foundations

LOCATION:

Pineridge, SD 57770 Kyle, SD 57752 Wanblee, SD 57577

PROJECT NO:

DOCUMENT

OWNER: Joshua VanSkike PHONE: 206-615-2480 DOCUMENTS:

DATE: 07/09/2024 DEPARTMENT: IHS/DES

Item No.

Reference

7. Sheet P111 - Please clarify if furnishing and installing the backflow preventer is part of this bid package.

Confirmed. Furnishing and installation a backflow preventer is part of this bid package.

8. Roof Plan - Sheet A103 – Can details be provided on the requirements to tie the garage roofs into the modular roofs?

Will this work have to be coordinated with modular delivery and installation, or will this place be done later?

Will the modular company allow the necessary tie-ins, flashing, etc., for the garage trusses and standing seam metal roof?

Tie-in is the responsibility of the installation general contractor. Details and installation requirements for the roof connections will be coordinated with the modular fabricator based on their delegated design.

INDIAN HEALTH SERVICE

DIVISION OF ENGINEERING

SERVICE

PRE-PROPOSAL INQUIRIES

Solicitation 75H701-24-R-00039

PROJECT:

Multiple Duplex Sitework & Foundations

LOCATION:

Pineridge, SD 57770 Kyle, SD 57752 Wanblee, SD 57577

PROJECT NO:

DOCUMENT

OWNER: Joshua VanSkike PHONE: 206-615-2480 DOCUMENTS:

DATE: 07/09/2024 DEPARTMENT: IHS/DES

Item No.

Reference

9. Specification M.2.H – Indicates Any experience provided for a firm other than the offeror(s) (prime contractor(s)) that is not listed under their name/SAM Unique Entity Identifier (UEI) number submitted under this solicitation will not be considered.

Factor 1 (iii) Specialized Experience indicates iii) If any experience will be used for evaluation of other than the prime firm (e.g. affiliates, subsidiaries, parent companies, sister companies, etc.), a teaming arrangement shall be provided. If this is the case, clearly describe any teaming arrangements, which firms, firms’ resources, the relative firms’ roles and responsibilities, and any contractual arrangements established to constitute the offeror’s team.

Section M.2.H indicates experience not listed under the offeror’s name will not be considered, but the Factor indicates experience can be used for evaluation other than the prime firm. Please advise.

Please see Amendment A00001, revised solicitation, Sections L.11.(1)(i) Factor 1, (iii) through (vi); Factor 3; and Sections M.2.(h) and M.2.1. Factor 1. These revisions clarify and provide instructions on the evaluation of other than the prime firm under Factors 1 and 3.

The attached revised sections are to be replaced in their entirety. Changes are generally identified, for convenience, either by strikeout for deletions, and underlining of text for additions or a single dark line in the margin. All portions of the revised sections shall apply whether or not changes have been indicated.

10. Factor 1 (iii) Specialized Experience - If any experience will be used to evaluate firms other than the prime firm (e.g., affiliates, subsidiaries, parent companies, sister companies, etc.).

This requirement leaves it to interpretation when the “etc.” is referred

to. If a team member was a consultant for a general contractor. Can the team member (consultant) use the experience as a consultant?

i.e., Company A (General Contractor) is teaming with Company B (Team Member). Company B has experience as a consultant working for another general contractor on previous contracts that provided services like this solicitation. Can experience be utilized by Company B, the team member for this solicitation?

Yes, see Amendment A00001 revised solicitation section (specifically, Section L, Factor 1, para’s (ii) through (v)) as revisions have been made to help clarify submission of experience for a firm other than the prime contractor. Also, see answer to Question 9, above for revisions made to both Factor 1 and Factor 3.

11. Phasing - Is any phasing required for this project for the foundation work or the garages?

Yes, phasing may be required. The concrete foundations can be put in at any time, however, it does not make sense to build the garages until the modular is set.

INDIAN HEALTH SERVICE

DIVISION OF ENGINEERING

SERVICE

PRE-PROPOSAL INQUIRIES

Solicitation 75H701-24-R-00039

PROJECT:

Multiple Duplex Sitework & Foundations

LOCATION:

Pineridge, SD 57770 Kyle, SD 57752 Wanblee, SD 57577

PROJECT NO:

DOCUMENT

OWNER: Joshua VanSkike PHONE: 206-615-2480 DOCUMENTS:

DATE: 07/09/2024 DEPARTMENT: IHS/DES

Item No.

Reference

12. Modulars - When is it anticipated the modular homes will be procured? This process is currently underway. We do not have a date of when they will be procured as the contract is not complete yet.

13. Is there a design basis for the standing seam roofing panels, or is there information from the modular company for the roofing material so we can match the brand and color?

Specification for standing seam roof is provided in project manual. See spec 074113

14. It appears that FAR Clause 15.305 is identified in the solicitation. Is only section (a)(2)(iv)) of FAR Clause 15.305 a requirement, or is the entire clause applicable to this solicitation?

Specifically, Section 2, Past Performance Evaluation, subfactor (iii):

“The evaluation should take into account past performance information regarding predecessor companies, key personnel who have relevant experience, or subcontractors that will perform major or critical aspects of the requirement when such information is relevant to the instant acquisition.”

From the Solicitation - In the case of an offeror without a record of relevant past performance or for whom information on past performance is not available or so sparse that no meaningful past performance rating can be reasonably assigned, the offeror may not be evaluated favorably or unfavorably on past performance (see FAR 15.305(a)(2)(iv)). Therefore, the offeror shall be determined to have unknown past performance. In the context of acceptability/unacceptability “unknown” shall be considered “ACCEPTABLE.”

Section 15.305 of the FAR speaks to the proposal evaluation with paragraph (a)(2), subparagraphs (i) through (vi) discussing how past performance is evaluated. FAR 15.305(a)(2)(iv) is mentioned in this specific part of the solicitation as it discusses how no past performance is evaluated. In summary, FAR Part 15 and all other FAR parts as stated/referenced in the solicitation apply.

END OF DOCUMENT