CONTRACTOR'S ESTIMATEBID SCHEDULE
VIRGENE BLAIR RESIDENTIAL TWO-PARTY WELL CONNECTIONBLAIR SITE WATER PRESSURE SYSTEM REPAIRS
COWLITZ TRIBECOWLITZ TRIBE
PO-15-B94LPO-15-B94L

1. Mobilization and Demobilization MacFarlane, Britany (IHS/POR): MacFarlane, Britany (IHS/POR):

Columbia County Well Pump Electrical Inspection Permit Fee = $112 + 12% tax 1 LS $ - 0 1. Mobilization and Demobilization 1 LS 0.00 0.00

2. Replacement 2HP Submersible Pump (Goulds 10GS20 or equal) 1 LS $ - 0 2. Replacement 2HP Submersible Pump (Goulds 10GS20 or equal) 1 LS 0.00 0.00

3. Replacement 1-1/4" Sch 120 PVC Drop Pipe and Submersible Cable 500 LF $ - 0 3. Replacement 1-1/4" Sch 120 PVC Drop Pipe and Submersible Cable 500 LF 0.00 0.00

4. Replacement 6" Well Cap 1 LS $ - 0 4. Replacement 6" Well Cap 1 LS 0.00 0.00

5.Replacement Pressure System1LS$ - 05.Replacement Pressure System1LS0.000.00
Amtrol WX255 or equal 80 gal tankAmtrol WX255 or equal 80 gal tank

6. 1-1/2" HDPE SDR 7 Water Service Line 550 LF $ - 0 6. 1-1/2" HDPE SDR 7 Water Service Line 550 LF 0.00 0.00

7. 4" Sch 80 PVC Encasement Pipe for Water Service Line 40 LF $ - 0 7. 4" Sch 80 PVC Encasement Pipe for Water Service Line 40 LF 0.00 0.00

8. Gravel Resurfacing 5 CY $ - 0 8. Gravel Resurfacing 5 CY 0.00 0.00

9. Freezeless Yard Hydrant 2 EA $ - 0 9. Freezeless Yard Hydrant 2 EA 0.00 0.00

10. 1" Individual PRV (Watts LF25AUB 10-35 psi or equal) with Box 1 LS $ - 0 10. 1" Individual PRV (Watts LF25AUB 10-35 psi or equal) with Box 1 LS 0.00 0.00

Estimated quantities Subtotal $ - 0 Subtotal 0.00

Taxes $ - 0 Taxes $ - 0 $ - 0

BlairTotal $ - 0 Total $ - 0 Total Modifications $ - 0

Britany MacFarlane, PE
Project Engineer
Signature of OfferorDate
Date
Position and Company

NOTE TO OFFEROR:

NO TERO FEES APPLY

THE OFFEROR MUST SUBMIT A PROPOSAL ON ALL ITEMS OF THE SCHEDULES AS AWARD WILL BE MADE IN AGGREGATE. THE ESTIMATED QUANTITIES OF INDIVIDUAL ITEMS MAY BE INCREASED OR DECREASED AS REQUIRED TO ACCOMMODATE ACTUAL CONDITIONS AT THE SITE AT THE UNIT BID PRICE. HOWEVER, IN NO EVENT SHALL THE TOTAL VALUE OF THE WORK PERFORMED EXCEED THE TOTAL CONTRACT AMOUNT WITHOUT PRIOR WRITTEN APPROVAL OF THE CONTRACTING OFFICER. THE CONTRACTOR SHALL BE PAID FOR ACTUAL QUANTITIES INSTALLED.