This document is a Questions and Answers file for federal contract opportunity 75D30127Q79329 Amendment 01, issued by NIOSH (National Institute for Occupational Safety and Health), a CDC division.

The solicitation concerns hazardous waste pickup and disposal services at four NIOSH campus locations: Cincinnati (Hamilton Building at 5555 Ridge Ave. and Taft Building), Morgantown, Pittsburgh (626 Cochran Mill Rd.), and Spokane. Services required include quarterly pickups (four per year) at each location, with gas cylinder removal priced within each location's line item (CLINs 0001-0004 covering only their named campus, not all sites). Offerors may price identification and disposal of unknown-contents cylinders at Pittsburgh as a separate per-cylinder rate. The contractor determines packaging method (labpacks, drums, or combination), container sizes, and pickup quantities with no weight or quantity limits set by NIOSH. NIOSH provided a Morgantown quarterly pickup inventory spreadsheet and photographs of Pittsburgh cylinders but does not have capacity to create a complete cylinder inventory. Limited historical data is available; NIOSH stated no prior contract existed and this is a new requirement. Cincinnati's Taft and Hamilton buildings require two separate stops and manifests under the same EPA ID. Cincinnati, Morgantown, and Pittsburgh hold EPA Small Quantity Generator IDs; Spokane operates under a state ID. Pricing must comply with the solicitation format. The RFQ due date was November 17. Separate line-item awards will not be considered.

View the file

Other files

File Type Posted
143 bottles.jpg JPG image
143 flam storage.jpg JPG image
Manifest List.xlsx XLSX spreadsheet
143 gas bottles.jpg JPG image
143 gas.jpg JPG image
RFQ 75D301-27-Q-79329 AMEND 1.pdf PDF
RFQ 75D301-27-Q-79329.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions and Anwsers

75D30127Q79329 Amendment 01

1. Should cylinder removal be priced as an additional line item per location, at a per-cylinder unit price times the estimated count? Or should it be included in each location's line 0001-0004? Please include the removal price in the each location’s line 0001-0004.

2. For the Pittsburgh cylinders with unidentified contents, may we price identification and disposal of an unknown-contents cylinder as its own per-cylinder rate? Yes you may.

3. Should each of items 0001–0004 cover four quarterly pickups at the location named on that line, given that the descriptions refer to all NIOSH campuses? Yes, 4 quarterly pickups at each location.

4. The SOW requires separate pricing for gas cylinder removal, but the amended schedule does not include a cylinder line. Should we submit a separate price breakdown by location alongside the completed schedule?

Please include the removal price in the each location’s line 0001-0004.

5. SOW Task 1.3 requires gas cylinder removal as a separate line item, but the price schedule lists only CLINs 0001 through 0004. Where should offerors price cylinder removal, and should it be priced per cylinder or per removal event? Please include the removal price in the each location’s line 0001-0004.

6. CLINs 0001 through 0004 are each titled for a single campus, but each description still reads “for all NIOSH campuses.” Please confirm that each CLIN covers only its named campus. Yes it covers only the named campus.

7. Amendment 0001 removed the 13,200-pound limit per job. Is there a maximum quantity or weight per quarterly pickup that offerors should assume? There will be no set limit by NIOSH. The contractor is to determine.

8. For the Pittsburgh cylinders with unidentified contents, can NIOSH share any available inventory, tags, markings, or photographs to support characterization and pricing? Some pictures attached.

9. The Hamilton Building is listed as 555 Ridge Ave., Cincinnati. CDC lists the Alice Hamilton Laboratory at 5555 Ridge Avenue. Which address should we price? 5555 Ridge Ave.

10. Pittsburgh is listed as 628 Cochran Mill Rd. Other official NIOSH records list the campus at 626 Cochran Mill Road. Is 628 a separate pickup point, or should this be 626? 626 Cochran Mill Rd. is the correct address.

11. Will the NIOSH locations provide a detailed inventory to the awarded contractor ahead of time to ensure that the contractor will arrive with the proper supplies? The sites can provide a list with a much detail as time allows. Some waste can always be held for one quarter if the contractor would like to evaluate supply needs after the first pick-up.

12. Will any of the locations have elemental mercury or mercury containing devices which will need to be disposed of under this solicitation? Past 2 year I am unaware of any mercury waste but there is always a chance.

13. What is the volume of mercury compounds expected from each site per shipment? Past 2 year I am unaware of any mercury waste but there is always a chance.

14. Will cylinders be a part of this work? There are conflicting statements on the RFQ document. Top of page 4 says that gas cylinders are not associated with all four sites and then cylinders are mentioned in item numbers 1 and 4. Task 1, item 3 states that “contractor shall provide a separate line item for gas-cylinder removal.” Will an inventory of cylinders for disposal be provided when the need arises so an adequate quote can be provided? An estimate of cylinders was provided in the SOW.

15. Can you provide us an inventory of waste to be picked up or historical data of what was picked up previously? Morgantown quarterly pickup inventory supplied on attached spreadsheet. Morgantown is largest producer of hazardous waste.

16. Can we submit pricing in our own format, or it must be in the format provided in solicitation? Most comply with the solicitation.

17. Can you provide shipment data for last 2 years from each site ? No. Spreadsheet provided for Morgantown for one quarterly pick-up.

18. Can we get an extension to submit the bid which will allow us more time to prepare a concise and competitive proposal? RFQ due date is Nov. 17;

19. Who was the previous contractor? Can we get a contract copy? This is a new requirement. With all the sites together

20. Are the wastes labpacks, drums or a combination of the 2? If so, is it 50/50? Contractors decision.

Whatever works best for the contractor.

21. 1. The SOW states that gas-cylinder removal shall be a separate line item, but the schedule lists only CLINs 0001 through 0004. Will a cylinder CLIN be added? Should it be priced per cylinder, per site, or as a lump sum? Please include the removal price in each location’s line 0001-0004.

22. Will the Government consider separate awards by line item? Specifically, will quotes for the gas-cylinder line item only be accepted? No

23. Can NIOSH provide a cylinder inventory for the estimated 100 cylinders (gas or contents, size, valve type, and condition)? How many of the 75 Pittsburgh cylinders have unidentified contents? NIOSH does not have the time or the man power to create an inventory list, Photos were provided for the Pittsburgh site.

24. Are the cylinders staged in the designated collection areas, or will removal require access to other areas of each site? Stored in a designated collection area.

25. Can NIOSH provide a waste inventory or container list for each site (waste type, container size and count) from recent pickups? One quarter was provided for the Morgantown site in an attachment. The contractor will determine the container size.

26. Is there an incumbent contractor, and can the prior contract number or award amount be shared? This is a new requirement.

27. Gas cylinders: for the 75 cylinders in Pittsburgh, approximately how many have unidentified contents, and are the cylinder types, valves and condition known? Is an inventory with photos available? NIOSH does not have the time or the man power to create an inventory list, Photos were provided for the Pittsburgh site.

28. Should gas cylinder removal be priced as one line item per site, or as a per-cylinder unit price? Price should be included in the line item.

29. For the small quantities of explosives (1 to 1,000 grams), can NIOSH share the material types and typical annual quantity? I am aware of only once in the past 5 year in Morgantown and it was Picric Acid that had crystalized creating a volatile hazard. Unaware of any waste from the other sites.

30. Do any sites hold an EPA ID number as a Small Quantity Generator, and will NIOSH sign manifests as the generator at each site? Cincinnati, Morgantown, Pittsburgh do. I believe Spokane has a state ID not through EPA.

31. Should gas-cylinder removal be priced as a new line item (for example 0005) with a per-cylinder unit price by site, and may cylinders with unidentified contents carry their own unit price? Please include the removal price in each location’s line 0001-0004.

32. Could you share the cylinder inventory (gas types and sizes), and how many of the 75 Pittsburgh cylinders have unidentified contents? NIOSH does not have the time or the man power to create an inventory list, Photos were provided for the Pittsburgh site.

33. Who is the incumbent contractor, and what was the prior-year contract value? New requirement

34. In Cincinnati, will the Taft and Hamilton buildings be handled as one pickup under a single EPA ID, or as two separate stops and manifests? Two separate stops but I believe they fall under the same EPA ID.

35. Waste profiles and quantities: Can CDC share the manifests or waste profiles from the last two pickups at each location, including waste types, quantities by waste stream, and container counts and sizes? No.

Spreadsheet provided for Morgantown for one quarterly pick-up

36. Gas cylinders: Can CDC provide the contents and sizes of the cylinders at Morgantown, Pittsburgh, and Spokane, including how many Pittsburgh cylinders have unidentified contents? NIOSH does not have the time or the man power to create an inventory list, Photos were provided for the Pittsburgh site

37. Prior contract: Can CDC share the prior contract number, incumbent contractor, and any publicly available award pricing? New requirement